OBJECTIVE
Looking forward to work in a prestigious organization, which can provide a
constructive and an innovative ambience, where I can solely implement the acquired
educational, technical skills, knowledge and can establish myself as an asset to the
organization in the field of Oil & Gas and Power Plant.
:
Bachelor of Engineering in Electronics And Instrumentation with 67 % in the year
2006 in M.A.M. College of engineering, Trichy, Affiliated to ANNA UNIVERSITY,
Chennai.
Technical Qualification:
Overall Eight years of experience in Maintenance, Construction, Inspection,
Precommissiong & Testing, Punch listing and implementation in the field of
Electrical and instrumentation works ensuring good quality of workmanship has been
conceded in accordance with Client requirements, Project Specification, International
Codes and Standard. Possessed adequate experience in implementing and executing
task required in promoting services that will associate in obtaining common company
objective of providing quality output in all aspects of works. Proficient in project
planning, manpower /workforce management, achievement of inspection and quality
control systems & maintaining perfect coordination with all involved groups to
catalyze project implementation. Demonstrated skill in site activities of
instrumentation, System installation, loop, logic, functional test and pre-
commissioning of various projects as Oil & Gas and High Rise Building, Power
plants.
Abstract of Background:
DURATION: From
PROFESSIONAL EXPERIENCE:
COMPANY: Samsung Engineering Saudi Arabia.
2014 TO STILL.
CLIENT: Saudi Arabian Oil Company (Saudi Aramco),
PROJECT: Shaybah NGL recovery & Utilities facilities project package#2
(BI-10-00167-002).
POSITION: INSTRUMENTATION & QC INSPECTOR
Execute QC Inspection activities of the project through the implementation of Project
Quality Plan, QCP’s, and ITP’s, SAES, standard ARAMCO drawings, applicable
standards and specifications. The inspection coverage mainly includes
instrumentation works such as installation of Field instruments, Instruments air
tubing&leaktest, cabling/wiring of instrumentation and fiber optic cables of fire
detection and Gas detection system, associated DCS/ESD/MMS cabinets &
accessories loop checking and pre commissioning of the instrumentation. Also
Job Description:
involved in preparation of inspection and testing reports, loop packages, calibration
certificate and other attachment required for inspection reports.
DURATION: From 2012 TO 2013.
COMPANY: Bonatti S.p.a. Branch Saudi Arabia.
CLIENT: Saudi Arabian Oil Company (Saudi Aramco),
PROJECT: KRT-2 Pipeline Rehabilitation - Phase VI and Day lighting
SJ-1, QJ-1, QJ-2 & QJ_3 Lateral lines(BI-10-00094/00226).
POSITION: E&I QC INSPECTOR.
PROJECT OBJECTIVES
Project scope is Replacement of KRT-2 Crude Oil Pipeline between Km 105
(kursaniyah Trap Area) to Km 210 (RasTanura Refinery).Work include, Construct
new temporary cathodic protection for Road & Pipe crossings. Construct some new
MOV's.& Replace & Relocate the Existing MOV also. Construct low voltage buried
cable from switch rack to MOV's. Construct new task light for Pump stations.
Construct new lighting pole for SSD fence .Installation of pressure
indicator .Responsible for all electrical and Instrument pre commissioning &
commissioning activities.
:
DURATION: From
COMPANY: M.R Al Khathlan Est. Saudi Arabia.
2008 TO 2011
CLIENT: Saudi Arabian Oil Company (Saudi Aramco)
PROJECTS: King Abdullah Petroleum Studies and Research Centre
(KAPSARC).And Replacement of Electrical Equipments @Five
GOSP.
KAPSARC:
PROJECT OBJECTIVES:
Construction of operation and maintenance buildings, substations, storage facilities,
Fire Water pump station, Raw Water pump stations, Irrigation Water pump station,
Potable Water pump station, RO Plant(119*3GPM), etc.
Integrated Building Management System, Fire Alarm Control Systems, Power
Monitoring Systems, Energy Monitoring Systems, PLC systems for chiller plant, RO
plant, irrigation systems & Potable Water, Fire Water, Raw Water, Irrigation Water
and Thermal Energy storage tanks.13.8kV power distribution network including SF6
outdoor switchgears, power transformers, MCCs, UPS, DC power systems, package
substations, grounding, interior and exterior lighting systems, etc
GOSP:
The objective of the project is to replace the ageing obsolete 4.16 KV switchgear’s
and MCC’s ,480 V MCC’s in switchgear van’s and the 115kv systems in the
transformer yard equipped with obsolete switchers and power transformers at 5
southern area GOSP crude handling facilities . This facility has YOKOGAWA CS
3000 DCS and TRICONEX based PLC system and INVENSYS SCADA and RTU in
control building. This power automation system replaced with advanced RTU and
OSAS (Open substation automation system). The power system (RTU -SCADA and
OSAS) can control from anywhere in PDD, Saudi Arabian Oil Company. Crude
handling facilities can control by ESD and DCS systems. The substation power and
automation signals from RTU and OSAS to PDD routed by microwave link.
 Prior to construction Responsible for preparing Quality construction procedure
& testing packages, for that particular jobs.
JOB RESPONSIBILITIES:
 Preparation of Request for Inspection and Testing through QMIS, including
day to day direct coordination with Client’s Representative for the smooth
execution and implementation of inspection activities.
 Conduct witness and inspection of Instrument Calibration, Installation, Testing,
Instrument Loop Checking and Sequence Test.
 Witness and monitor instrument calibration, installation, testing, loop checking,
sequence testing, impulse tubing and air line leak testing.
 Attending project meeting especially Quality control related.
 Working under compliance to existing Construction, Quality and Safety
Policies.
 Issue Nonconformance, Surveillance and Quality Control Inspection Reports if
appropriate and needed as per deviations versus approved Construction
Documents and References.
 Generates punch list for the work deviation against specified drawing
requirements of electrical and instrument system such as cable tray and conduit,
grounding, lighting, all instrument installation and communication system.
 Review project requirements, ILD, specifications, Scope of work, NMR and
related IFC packages.
 Familiarity to read and review all kinds of Electrical & instrument drawings
such as Cable Routing and Location Layout, ,logic diagram, single line
diagram, Instrument Loop Diagram, Instrument Connection Diagram, Piping &
Instrument diagram, Input/output List, Instrument Hook Up’s, and Instrument
MTO’s.
 Participated in a team for Quality Audits & ensured that adequate QA/QC
system is in place, confirmed effectiveness.
 Communicate and coordinate to resolve the project interface issues with other
disciplines and respective Interface package.
 Managing overall activities pertaining to installation and commissioning of
electrical, instrumentation of a wide range of machinery, systems and
equipments.
 Worked on the following Industrial Standards:
 National Electric Code (NEC)
 International Electro technical Commission
 Underwriters Laboratories Standards
 National Electrical Manufacturers Association Standard
 National Fire Protection Association standards
 Instrument Society of America Recommended Practices and Standard
 To ensure Installation of FIRE ALARM CONTROL PANEL & FAS devices
like smoke/heat detectors, manual pull station, beacon lights & beam detectors
& Fusible plug fire detection loop system.
 To ensure Installation of HVAC DDC, PLC MARSHALLING cabinet, IRP
panel &AHU instruments, review the interconnection diagram.
 To ensure Installation of FIRE WATER PUMP CONTROLLER (FIRE TROL).
 To ensure Installation of DCS I/O modules, AMN 51 type nest, ACM 71 type
communication module.
 Implement all ESD and DCS systems to, Pumps (Up to 4000HP) and MOV’s
as per crude handling process logics.
 Installation, pre-commissioning and commissioning of new Fire Alarm Control
System Smoke detectors .Duct smoke detectors, beam detectors, manual pull
station.
 Review of approved loop packages and co-ordinate with SAPMT and DCS
Vendor to ensure integrity of the loops and tracking of the loop test progress.
 Follow up with SAPMT & SAPID to close the MCC Exception items in order
to achieve the target dates.
 Coordinating with vendor work activities for F & G (General Monitors,
Triconex), ESD (Invensys, Triconex), and DCS (Yokogawa).
 Planned and Executed Electrical work activities such as Installation of MCC,
SG, LV Cable Laying, Lighting Fixture Installation, Lighting Distribution
Board, Earthling and Grounding System.
 Also familiar with 115/13.8 KV,13.8/4.16,4.16/480V transformers,115 KV,
1200 A SF6 circuit breakers,1200A disconnect switches(double break center
rotation),115KV CVT, Surge Arresters.13.8 KV,4.16,480, switchgear’s and
MCC’s
DURATION:
Previous Professional Experience
POSITION: MAINTENANCE ENGINEER- INSTRUMENT
FROM 2006 TO 2008.
COMPANY: HOFINCNS INFOTECH & INDUSTRIAL SERVICES LTD.
CLIENT: BHARAT ALUMINIUM COMPANY
CHATTISGARH.
• Calibration & maintenance of Pressure & Temperature gauges, Indicators,
Recorders.
FUNCTIONAL AREA:
• Calibration & maintenance of Pressure, Level, Flow & Temperature
transmitter.
• Installation & setting of Vibration, Speed, Axial shift of Rotor, Differential
expansion etc.
• Setting rising & falling point of pressure switch.
• Calibration & maintenance of Analytical instruments such as Conductivity
meter, PH Meter, O2 analyzer, Opacity monitor.
• Calibration and tuning of Controllers & Loop Processors for automatic control
of Drum level, Furnace draught, Combustion control, MS temperature control,
Dearator Pressure & temperature control.
• Servicing, Installation & Calibration of Electrical actuators make Auma,
Rotorque Bernard & Pneumatic actuators make ARCA, Forbes marshal and
MIL Control.
Name : Nithyanantham Packiriswami.
PASSPORT DEATAILS:
Passport Number : G3268435
Date of Issue : 23/07/2007
Date of Expiry : 22/07/2017
Place of Issue : Trichy
DATE OF BIRTH: 13-01-1985
PERSONAL DETAILS:
SEX: Male
PERMANENT ADDRESS: 3-504, Kammangudi, Adichapuram Post,
Mannargudi T.K – 614 717,
Thiruvarur District,
Tamilnadu, India.
NATIONALITY: Indian
DECLARATION:
I hereby declare that the above-mentioned data are true to the best of my
knowledge and belief.
Yours truly
(P.NITHYANANTHAM)
Date:
Location:

More Related Content

What's hot

Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nicolae Vasiliu
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerjohn britto
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 

What's hot (20)

Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 
Thousif_CV
Thousif_CVThousif_CV
Thousif_CV
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Cover letter
Cover letterCover letter
Cover letter
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
 
Mohamed hamdy cv
Mohamed hamdy cvMohamed hamdy cv
Mohamed hamdy cv
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Energy brochure
Energy brochureEnergy brochure
Energy brochure
 

Viewers also liked

Saudi Aramco Heatmap
Saudi Aramco HeatmapSaudi Aramco Heatmap
Saudi Aramco HeatmapAaron Marion
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)Aravinth Jai
 
A. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cvA. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cvAbderrazak Zouaghi
 
New base 815 special 24 march 2016
New base 815 special 24 march 2016New base 815 special 24 march 2016
New base 815 special 24 march 2016Khaled Al Awadi
 
Complet cv of engineer habibi revet1 -
Complet  cv of engineer habibi revet1 -Complet  cv of engineer habibi revet1 -
Complet cv of engineer habibi revet1 -khanwali habibi
 
Aramco Certificate Experience
Aramco Certificate ExperienceAramco Certificate Experience
Aramco Certificate ExperienceElias Omer Adam
 
Louis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical EngineerLouis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical EngineerLouis du Plessis
 
Vigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance DocumentVigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance DocumentNabeel Khan
 
CV of Engineer Habibi pictur
CV of Engineer Habibi picturCV of Engineer Habibi pictur
CV of Engineer Habibi picturkhanwali habibi
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Gary Dickson
 
Karl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - CopyKarl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - CopyKarl Jones
 
Sound engineer cv pfd 3
Sound engineer cv pfd 3Sound engineer cv pfd 3
Sound engineer cv pfd 3Paul Chivers
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerMujeebuddin Mohammad
 
Naser odwan CV-Mechanical Engineer
Naser odwan CV-Mechanical EngineerNaser odwan CV-Mechanical Engineer
Naser odwan CV-Mechanical EngineerNaser Odwan
 

Viewers also liked (19)

Aramco Question
Aramco Question Aramco Question
Aramco Question
 
Saudi Aramco Heatmap
Saudi Aramco HeatmapSaudi Aramco Heatmap
Saudi Aramco Heatmap
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)
 
A. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cvA. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cv
 
New base 815 special 24 march 2016
New base 815 special 24 march 2016New base 815 special 24 march 2016
New base 815 special 24 march 2016
 
Complet cv of engineer habibi revet1 -
Complet  cv of engineer habibi revet1 -Complet  cv of engineer habibi revet1 -
Complet cv of engineer habibi revet1 -
 
Aramco Exp.
Aramco Exp.Aramco Exp.
Aramco Exp.
 
Aramco Certificate Experience
Aramco Certificate ExperienceAramco Certificate Experience
Aramco Certificate Experience
 
saudi aramco (1)
saudi aramco (1)saudi aramco (1)
saudi aramco (1)
 
Louis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical EngineerLouis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical Engineer
 
Vigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance DocumentVigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance Document
 
CV of Engineer Habibi pictur
CV of Engineer Habibi picturCV of Engineer Habibi pictur
CV of Engineer Habibi pictur
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)
 
Karl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - CopyKarl jones Aramco CV -Use this one - Copy
Karl jones Aramco CV -Use this one - Copy
 
Sound engineer cv pfd 3
Sound engineer cv pfd 3Sound engineer cv pfd 3
Sound engineer cv pfd 3
 
Shafiq CV
Shafiq CVShafiq CV
Shafiq CV
 
cover letter
cover lettercover letter
cover letter
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
Naser odwan CV-Mechanical Engineer
Naser odwan CV-Mechanical EngineerNaser odwan CV-Mechanical Engineer
Naser odwan CV-Mechanical Engineer
 

Similar to INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071

PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVMAHMOOD AHMED
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMansoor Ali
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Electrical technician
Electrical technicianElectrical technician
Electrical techniciantanweer alam
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances krishna mohan
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANtanweer alam
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)rana maqsood
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and constructionrana maqsood
 

Similar to INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071 (20)

roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QC
 
Cv
CvCv
Cv
 
update 1
update 1update 1
update 1
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
CV
CVCV
CV
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Rajesh CV -
Rajesh CV - Rajesh CV -
Rajesh CV -
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Resume_Gopala
Resume_GopalaResume_Gopala
Resume_Gopala
 
M Imran
M ImranM Imran
M Imran
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 

INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071

  • 1. CURRICULAM VITAE NITHYANANTHAM.P Email: nithy25@gmail.com nithy_mannai@yahoo.co.in, Mob No: SAP NO. 70013071 OBJECTIVE Looking forward to work in a prestigious organization, which can provide a constructive and an innovative ambience, where I can solely implement the acquired educational, technical skills, knowledge and can establish myself as an asset to the organization in the field of Oil & Gas and Power Plant. : Bachelor of Engineering in Electronics And Instrumentation with 67 % in the year 2006 in M.A.M. College of engineering, Trichy, Affiliated to ANNA UNIVERSITY, Chennai. Technical Qualification: Overall Eight years of experience in Maintenance, Construction, Inspection, Precommissiong & Testing, Punch listing and implementation in the field of Electrical and instrumentation works ensuring good quality of workmanship has been conceded in accordance with Client requirements, Project Specification, International Codes and Standard. Possessed adequate experience in implementing and executing task required in promoting services that will associate in obtaining common company objective of providing quality output in all aspects of works. Proficient in project planning, manpower /workforce management, achievement of inspection and quality control systems & maintaining perfect coordination with all involved groups to catalyze project implementation. Demonstrated skill in site activities of instrumentation, System installation, loop, logic, functional test and pre- commissioning of various projects as Oil & Gas and High Rise Building, Power plants. Abstract of Background: DURATION: From PROFESSIONAL EXPERIENCE: COMPANY: Samsung Engineering Saudi Arabia. 2014 TO STILL. CLIENT: Saudi Arabian Oil Company (Saudi Aramco), PROJECT: Shaybah NGL recovery & Utilities facilities project package#2 (BI-10-00167-002). POSITION: INSTRUMENTATION & QC INSPECTOR Execute QC Inspection activities of the project through the implementation of Project Quality Plan, QCP’s, and ITP’s, SAES, standard ARAMCO drawings, applicable standards and specifications. The inspection coverage mainly includes instrumentation works such as installation of Field instruments, Instruments air tubing&leaktest, cabling/wiring of instrumentation and fiber optic cables of fire detection and Gas detection system, associated DCS/ESD/MMS cabinets & accessories loop checking and pre commissioning of the instrumentation. Also Job Description:
  • 2. involved in preparation of inspection and testing reports, loop packages, calibration certificate and other attachment required for inspection reports. DURATION: From 2012 TO 2013. COMPANY: Bonatti S.p.a. Branch Saudi Arabia. CLIENT: Saudi Arabian Oil Company (Saudi Aramco), PROJECT: KRT-2 Pipeline Rehabilitation - Phase VI and Day lighting SJ-1, QJ-1, QJ-2 & QJ_3 Lateral lines(BI-10-00094/00226). POSITION: E&I QC INSPECTOR. PROJECT OBJECTIVES Project scope is Replacement of KRT-2 Crude Oil Pipeline between Km 105 (kursaniyah Trap Area) to Km 210 (RasTanura Refinery).Work include, Construct new temporary cathodic protection for Road & Pipe crossings. Construct some new MOV's.& Replace & Relocate the Existing MOV also. Construct low voltage buried cable from switch rack to MOV's. Construct new task light for Pump stations. Construct new lighting pole for SSD fence .Installation of pressure indicator .Responsible for all electrical and Instrument pre commissioning & commissioning activities. : DURATION: From COMPANY: M.R Al Khathlan Est. Saudi Arabia. 2008 TO 2011 CLIENT: Saudi Arabian Oil Company (Saudi Aramco) PROJECTS: King Abdullah Petroleum Studies and Research Centre (KAPSARC).And Replacement of Electrical Equipments @Five GOSP. KAPSARC: PROJECT OBJECTIVES: Construction of operation and maintenance buildings, substations, storage facilities, Fire Water pump station, Raw Water pump stations, Irrigation Water pump station, Potable Water pump station, RO Plant(119*3GPM), etc. Integrated Building Management System, Fire Alarm Control Systems, Power Monitoring Systems, Energy Monitoring Systems, PLC systems for chiller plant, RO plant, irrigation systems & Potable Water, Fire Water, Raw Water, Irrigation Water and Thermal Energy storage tanks.13.8kV power distribution network including SF6 outdoor switchgears, power transformers, MCCs, UPS, DC power systems, package substations, grounding, interior and exterior lighting systems, etc GOSP:
  • 3. The objective of the project is to replace the ageing obsolete 4.16 KV switchgear’s and MCC’s ,480 V MCC’s in switchgear van’s and the 115kv systems in the transformer yard equipped with obsolete switchers and power transformers at 5 southern area GOSP crude handling facilities . This facility has YOKOGAWA CS 3000 DCS and TRICONEX based PLC system and INVENSYS SCADA and RTU in control building. This power automation system replaced with advanced RTU and OSAS (Open substation automation system). The power system (RTU -SCADA and OSAS) can control from anywhere in PDD, Saudi Arabian Oil Company. Crude handling facilities can control by ESD and DCS systems. The substation power and automation signals from RTU and OSAS to PDD routed by microwave link.  Prior to construction Responsible for preparing Quality construction procedure & testing packages, for that particular jobs. JOB RESPONSIBILITIES:  Preparation of Request for Inspection and Testing through QMIS, including day to day direct coordination with Client’s Representative for the smooth execution and implementation of inspection activities.  Conduct witness and inspection of Instrument Calibration, Installation, Testing, Instrument Loop Checking and Sequence Test.  Witness and monitor instrument calibration, installation, testing, loop checking, sequence testing, impulse tubing and air line leak testing.  Attending project meeting especially Quality control related.  Working under compliance to existing Construction, Quality and Safety Policies.  Issue Nonconformance, Surveillance and Quality Control Inspection Reports if appropriate and needed as per deviations versus approved Construction Documents and References.  Generates punch list for the work deviation against specified drawing requirements of electrical and instrument system such as cable tray and conduit, grounding, lighting, all instrument installation and communication system.  Review project requirements, ILD, specifications, Scope of work, NMR and related IFC packages.  Familiarity to read and review all kinds of Electrical & instrument drawings such as Cable Routing and Location Layout, ,logic diagram, single line diagram, Instrument Loop Diagram, Instrument Connection Diagram, Piping &
  • 4. Instrument diagram, Input/output List, Instrument Hook Up’s, and Instrument MTO’s.  Participated in a team for Quality Audits & ensured that adequate QA/QC system is in place, confirmed effectiveness.  Communicate and coordinate to resolve the project interface issues with other disciplines and respective Interface package.  Managing overall activities pertaining to installation and commissioning of electrical, instrumentation of a wide range of machinery, systems and equipments.  Worked on the following Industrial Standards:  National Electric Code (NEC)  International Electro technical Commission  Underwriters Laboratories Standards  National Electrical Manufacturers Association Standard  National Fire Protection Association standards  Instrument Society of America Recommended Practices and Standard  To ensure Installation of FIRE ALARM CONTROL PANEL & FAS devices like smoke/heat detectors, manual pull station, beacon lights & beam detectors & Fusible plug fire detection loop system.  To ensure Installation of HVAC DDC, PLC MARSHALLING cabinet, IRP panel &AHU instruments, review the interconnection diagram.  To ensure Installation of FIRE WATER PUMP CONTROLLER (FIRE TROL).  To ensure Installation of DCS I/O modules, AMN 51 type nest, ACM 71 type communication module.  Implement all ESD and DCS systems to, Pumps (Up to 4000HP) and MOV’s as per crude handling process logics.  Installation, pre-commissioning and commissioning of new Fire Alarm Control System Smoke detectors .Duct smoke detectors, beam detectors, manual pull station.  Review of approved loop packages and co-ordinate with SAPMT and DCS Vendor to ensure integrity of the loops and tracking of the loop test progress.  Follow up with SAPMT & SAPID to close the MCC Exception items in order to achieve the target dates.  Coordinating with vendor work activities for F & G (General Monitors, Triconex), ESD (Invensys, Triconex), and DCS (Yokogawa).
  • 5.  Planned and Executed Electrical work activities such as Installation of MCC, SG, LV Cable Laying, Lighting Fixture Installation, Lighting Distribution Board, Earthling and Grounding System.  Also familiar with 115/13.8 KV,13.8/4.16,4.16/480V transformers,115 KV, 1200 A SF6 circuit breakers,1200A disconnect switches(double break center rotation),115KV CVT, Surge Arresters.13.8 KV,4.16,480, switchgear’s and MCC’s DURATION: Previous Professional Experience POSITION: MAINTENANCE ENGINEER- INSTRUMENT FROM 2006 TO 2008. COMPANY: HOFINCNS INFOTECH & INDUSTRIAL SERVICES LTD. CLIENT: BHARAT ALUMINIUM COMPANY CHATTISGARH. • Calibration & maintenance of Pressure & Temperature gauges, Indicators, Recorders. FUNCTIONAL AREA: • Calibration & maintenance of Pressure, Level, Flow & Temperature transmitter. • Installation & setting of Vibration, Speed, Axial shift of Rotor, Differential expansion etc. • Setting rising & falling point of pressure switch. • Calibration & maintenance of Analytical instruments such as Conductivity meter, PH Meter, O2 analyzer, Opacity monitor. • Calibration and tuning of Controllers & Loop Processors for automatic control of Drum level, Furnace draught, Combustion control, MS temperature control, Dearator Pressure & temperature control. • Servicing, Installation & Calibration of Electrical actuators make Auma, Rotorque Bernard & Pneumatic actuators make ARCA, Forbes marshal and MIL Control.
  • 6. Name : Nithyanantham Packiriswami. PASSPORT DEATAILS: Passport Number : G3268435 Date of Issue : 23/07/2007 Date of Expiry : 22/07/2017 Place of Issue : Trichy DATE OF BIRTH: 13-01-1985 PERSONAL DETAILS: SEX: Male PERMANENT ADDRESS: 3-504, Kammangudi, Adichapuram Post, Mannargudi T.K – 614 717, Thiruvarur District, Tamilnadu, India. NATIONALITY: Indian DECLARATION: I hereby declare that the above-mentioned data are true to the best of my knowledge and belief. Yours truly (P.NITHYANANTHAM) Date: Location: