PERSONAL STATEMENT
To pursue a career as an Electrical Engineer that utilizes my extensive experience
with strong technical and management skills in an environment that offers opportunity
for growth.
CAREER HIGHLIGHTS
• Organized and goal- oriented with 10+ years of experience in varying
technical and engineering industries including EPC of Substations.
• Three years’ experience in Testing & Commissioning field of
115/69/34.5kV/26kV Substations for various locations of Saudi ARAMCO and
SEC Shuqaiq Steam Power plant 2800MW Alstom Generator.
• Self-starter, highly motivated, strong leadership skills and an ability to
manage the time sensitive tasks in an efficient manner.
• Analytical problem solver with proven track record of successfully managing
and completing multiple projects in various environments.
EMPLOYMENT HISTORY
Testing & Commissioning Engineer
Hyundai Heavy Industries Co Limited
Al Shuqaiq, KSA.
Aug, 2015 - Present
Responsibilities:
• Testing and commissioning of various 6.14/13.8/26kV Switch Gear equipment
such as Circuit breakers (SF6/Vacuum/BOCB), Bus-bar, motorized/manual
disconnect switches, surge arrestors, HV/MV Power cables
• Hands on experience of performing Hi-Pot, Tan-Delta, Stability Test, DC/AC
Dielectric Test, Insulation & Contact Resistance.
• Testing of CTs, BCTs and VTs with Polarity test, Ratio test, Knee point
voltage test, insulation resistance test, winding Resistance test of Main
Generator.
• Inspection, Pre-commissioning and commissioning with NG-CSD of MCCBs,
Multi Functions Meters, Energy Meters, station batteries, battery chargers and
UPS.
• Testing of Panel components such as LOR, Trip Circuit Supervision, Fuse
Failure RXBA4 and all types of Auxiliary Relays.
• Testing of Power Transformer 960MVA(HITACHI) & Station Service
Transformers140 MVA (Hyundai)
• Primary injection & Secondary injection and Bus bar & T/F stability.
• Working on 10MW Emergency Generator with Vendor Wartsila to check CTs,
PTs and Winding Resistance of Generator, AVR, Generator protection relay.
• Present as FAT (Factory Acceptance Test) team member during internal
testing and physical inspection of 380kV Power Transformer in
commissioning phases by Manufacturer at Hitachi.
• Testing of GFR relay EOCR relay ACB OCR relays.
• Testing of ALSTOM Generator protection relay Power monitoring relay
Differential relay.
• Testing of synchronizing relay (ABB).
.
Testing & Commissioning Engineer
Energy & Power Contracting Company Limited
Al Khobar, KSA.
Jan, 2014 – Aug, 2015
Responsibilities:
• Testing and commissioning of various 69/34.5/13.8/ kV Substation equipment
such as live and dead tank Circuit breakers (SF6/Vacuum/BOCB), Bus-bar,
motorized/manual disconnect switches, MOV surge arrestors, HV/MV Power
cables
• Hands on experience of performing Hi-Pot, Tan-Delta, Stability Test, DC/AC
Dielectric Test, Insulation & Contact Resistance, SF6 Gas purity & Dew- point
Test.
• Testing of CTs, BCTs and VTs with Polarity test, Ratio test, Knee point
voltage test, insulation resistance test, winding Resistance test.
• Inspection, Pre-commissioning and commissioning with NG-CSD of MCCBs,
Multi Functions Meters, Energy Meters, station batteries, battery chargers
• Testing of Panel components such as LOR, Trip Circuit Supervision, Fuse
Failure RXBA4 and all types of Auxiliary Relays.
• Testing of Power Transformer & Station Service Transformers
• Primary injection & Secondary injection and Bus bar & T/F stability.
• Functional/Scheme Checking of all 13.8/69/115kV Switchgears and AC & DC
Panels along with ATS Scheme and SCADA, DFR, SOE and ANN Panels
installation & commissioning.
• Present as FAT (Factory Acceptance Test) team member during internal
testing and physical inspection of 69kV Protection Panels in commissioning
phases by Manufacturer at WESCOSA.
Projects Completed
• 69/13.8kV S/S Abqaiq Area GOSP-2
(Saudi Aramco Contract NO. 6600027451 & BI NO. 10-00633)
• 69/4.16kV S/S Abqaiq Area GOSP-3
(Saudi Aramco Contract NO. 6600027421 & BI NO. 10-00633)
• 69/13.8kV S/S Abqaiq Area NWIP
(Saudi Aramco Contract NO. 6600027421 & BI NO. 10-00633)
• 26/380KV SHUQAIQ STEEM POWER PLANT
(Saudi Electric Company Contract NO.30221097/00)
Site Electrical Engineer
Energy & Power Contracting Company Limited
Al Khobar, KSA.
March, 2013 –Jan, 2014
Responsibilities:
• Coordinate with Designer and Clients (ARAMCO) to resolve various technical
queries and other project related issues.
• Construction activities related to personnel management such as Jr.
Engineers, Sub-Contractors and Suppliers etc.
• Fulfillment of Approved Project Master Schedule and Requisition of
Construction materials, Tools & Equipment and submission of Daily & weekly
work progress reports to management.
• Receive/action Request for Inspection (RFI) that apply to electrical, civil &
mechanical works. Review Sub-contractors' claims related to construction
works. Assist in negotiations with Sub-contractors regarding the value of
claims or changes in schedules.
Supervisor (Electrical)
Ahmed Fine Textile Mills Ltd, Multan, Pakistan
MAY, 2005 - March, 2013
Responsibilities:
• Maintaining & troubleshooting of all Electrical Equipments including Power
Generators and other Electrical Switchgear.
• Procurement and replacement of obsolete electrical equipment
• Performed HMI Configuration & provide hardware support for CNC
(Computerized Numerical Cutter) and other electrical machinery
• Prepared Safety Management Programs for Mill Workers.
• Provide operational training of CNC to all concerned personnel.
• Erection of all Electrical system in Ahmad Fine{ Installation of Power plant,
Installation of two, oil immersed, 3 winding power Transformers rating
11kv/480v, L.T & H.T,O.C.B Rooms, Installation of MCB and MCCB,
Capacitors, Bus bar schemes, Power looms,3 phase Induction Motors and
other electrical Equipment.
• Installation of wiring, conduit and switchgear.
• Installation of Electrical Panels, Protection Systems.
• Solid knowledge in Generators/motors/Magnet contactors and other electrical
equipment operation and maintenance.
• Proficiently experience to install the Circuit Breakers, Protection Relays, and
Timers.
• Proficiently skilled in DC & AC
• Synchronization with WAPDA at 11kv when needed.
• Planned equipment and fixtures wiring and installation.
• Inspected wiring and fixtures for conformance to company specifications and
local electrical codes.
• Analyzed and resolved work problems.
• Estimated and supervised materials.
• Supervised machines and equipment set-up.
• Resolved work problems through proper analysis and assisted workers in
resolving work related issues.
• Maintained operating equipment to support time-based, predictive, and
emergency actions.
• Analyzed work orders, drawings to determine process, materials, machines,
tooling and sequence of operation
Electrical Technician
Descon Engineering LTD, Site Area Lahore, Pakistan
Jan, 2004 - April, 2005
Responsibilities
• Maintaining & troubleshooting of all Electrical Equipments including Power
Generators and other Electrical Switchgear.
• Performed HMI Configuration & provide hardware support for CNC
(Computerized Numerical Cutter) and other electrical machinery
CERTIFICATIONS & PROFESSIONAL ACCREDIATION
• ISO-9001 Awareness Training
• Aramco Safety Training
SKILLS
Equipment Used: Freja 300, Sverker 760, Breaker Analyzer EGIL, DC Supply
unit B10E, Tan-Delta Tester (Delta 2000), AC Hi-Pot Kit (up to
160kV) Omicron CT Analyzer, Micro-Ohm Meter, CT analyzer
(Programma, MOM600), DC Dielectric Kit, CPC 100 CMC 356
(Omicron) Primary injection kit, Oden/Foster, CNC & Dilo etc.
Software: Microstation, AutoCAD, EnerVista, Omicron CT-Analyzer
Tools: MS Office (Word/Excel/PowerPoint/Visio),
EDUCATION
D.A.E (Electronics Engineering)
Punjab Board of Technical Education, Lahore, Pakistan
B.Tech (Electronics Engineering)
Punjab Board of Technical Education, Lahore, Pakistan
PERSONAL INFORMATION
Name : Muhammad Kashif Rafiq
Father Name : Muhammad rafiq Anwar
Date of Birth : 13th
June, 1983
Marital Status : Single
Languages Known : English, Arabic & Urdu
Iqama Status : Valid / -Transferrable
Address : Chak No 261/E.B Tehsil Burewala Distract Vehari
(Pakistan)
(Programma, MOM600), DC Dielectric Kit, CPC 100 CMC 356
(Omicron) Primary injection kit, Oden/Foster, CNC & Dilo etc.
Software: Microstation, AutoCAD, EnerVista, Omicron CT-Analyzer
Tools: MS Office (Word/Excel/PowerPoint/Visio),
EDUCATION
D.A.E (Electronics Engineering)
Punjab Board of Technical Education, Lahore, Pakistan
B.Tech (Electronics Engineering)
Punjab Board of Technical Education, Lahore, Pakistan
PERSONAL INFORMATION
Name : Muhammad Kashif Rafiq
Father Name : Muhammad rafiq Anwar
Date of Birth : 13th
June, 1983
Marital Status : Single
Languages Known : English, Arabic & Urdu
Iqama Status : Valid / -Transferrable
Address : Chak No 261/E.B Tehsil Burewala Distract Vehari
(Pakistan)

Engr kashif cv

  • 1.
    Muhammad Kashif Rafiq Email:kashif.rafiq53@yahoo.com kashif.rafiq953@gmail.com Skype: Kashif.rafiq53 Mobile# 00960594994202 PERSONAL STATEMENT To pursue a career as an Electrical Engineer that utilizes my extensive experience with strong technical and management skills in an environment that offers opportunity for growth. CAREER HIGHLIGHTS • Organized and goal- oriented with 10+ years of experience in varying technical and engineering industries including EPC of Substations. • Three years’ experience in Testing & Commissioning field of 115/69/34.5kV/26kV Substations for various locations of Saudi ARAMCO and SEC Shuqaiq Steam Power plant 2800MW Alstom Generator. • Self-starter, highly motivated, strong leadership skills and an ability to manage the time sensitive tasks in an efficient manner. • Analytical problem solver with proven track record of successfully managing and completing multiple projects in various environments. EMPLOYMENT HISTORY Testing & Commissioning Engineer Hyundai Heavy Industries Co Limited Al Shuqaiq, KSA. Aug, 2015 - Present Responsibilities: • Testing and commissioning of various 6.14/13.8/26kV Switch Gear equipment such as Circuit breakers (SF6/Vacuum/BOCB), Bus-bar, motorized/manual disconnect switches, surge arrestors, HV/MV Power cables • Hands on experience of performing Hi-Pot, Tan-Delta, Stability Test, DC/AC Dielectric Test, Insulation & Contact Resistance. • Testing of CTs, BCTs and VTs with Polarity test, Ratio test, Knee point voltage test, insulation resistance test, winding Resistance test of Main Generator.
  • 2.
    • Inspection, Pre-commissioningand commissioning with NG-CSD of MCCBs, Multi Functions Meters, Energy Meters, station batteries, battery chargers and UPS. • Testing of Panel components such as LOR, Trip Circuit Supervision, Fuse Failure RXBA4 and all types of Auxiliary Relays. • Testing of Power Transformer 960MVA(HITACHI) & Station Service Transformers140 MVA (Hyundai) • Primary injection & Secondary injection and Bus bar & T/F stability. • Working on 10MW Emergency Generator with Vendor Wartsila to check CTs, PTs and Winding Resistance of Generator, AVR, Generator protection relay. • Present as FAT (Factory Acceptance Test) team member during internal testing and physical inspection of 380kV Power Transformer in commissioning phases by Manufacturer at Hitachi. • Testing of GFR relay EOCR relay ACB OCR relays. • Testing of ALSTOM Generator protection relay Power monitoring relay Differential relay. • Testing of synchronizing relay (ABB). . Testing & Commissioning Engineer Energy & Power Contracting Company Limited Al Khobar, KSA. Jan, 2014 – Aug, 2015 Responsibilities: • Testing and commissioning of various 69/34.5/13.8/ kV Substation equipment such as live and dead tank Circuit breakers (SF6/Vacuum/BOCB), Bus-bar, motorized/manual disconnect switches, MOV surge arrestors, HV/MV Power cables • Hands on experience of performing Hi-Pot, Tan-Delta, Stability Test, DC/AC Dielectric Test, Insulation & Contact Resistance, SF6 Gas purity & Dew- point Test. • Testing of CTs, BCTs and VTs with Polarity test, Ratio test, Knee point voltage test, insulation resistance test, winding Resistance test. • Inspection, Pre-commissioning and commissioning with NG-CSD of MCCBs, Multi Functions Meters, Energy Meters, station batteries, battery chargers • Testing of Panel components such as LOR, Trip Circuit Supervision, Fuse Failure RXBA4 and all types of Auxiliary Relays. • Testing of Power Transformer & Station Service Transformers • Primary injection & Secondary injection and Bus bar & T/F stability. • Functional/Scheme Checking of all 13.8/69/115kV Switchgears and AC & DC Panels along with ATS Scheme and SCADA, DFR, SOE and ANN Panels installation & commissioning. • Present as FAT (Factory Acceptance Test) team member during internal testing and physical inspection of 69kV Protection Panels in commissioning phases by Manufacturer at WESCOSA. Projects Completed • 69/13.8kV S/S Abqaiq Area GOSP-2 (Saudi Aramco Contract NO. 6600027451 & BI NO. 10-00633)
  • 3.
    • 69/4.16kV S/SAbqaiq Area GOSP-3 (Saudi Aramco Contract NO. 6600027421 & BI NO. 10-00633) • 69/13.8kV S/S Abqaiq Area NWIP (Saudi Aramco Contract NO. 6600027421 & BI NO. 10-00633) • 26/380KV SHUQAIQ STEEM POWER PLANT (Saudi Electric Company Contract NO.30221097/00) Site Electrical Engineer Energy & Power Contracting Company Limited Al Khobar, KSA. March, 2013 –Jan, 2014 Responsibilities: • Coordinate with Designer and Clients (ARAMCO) to resolve various technical queries and other project related issues. • Construction activities related to personnel management such as Jr. Engineers, Sub-Contractors and Suppliers etc. • Fulfillment of Approved Project Master Schedule and Requisition of Construction materials, Tools & Equipment and submission of Daily & weekly work progress reports to management. • Receive/action Request for Inspection (RFI) that apply to electrical, civil & mechanical works. Review Sub-contractors' claims related to construction works. Assist in negotiations with Sub-contractors regarding the value of claims or changes in schedules. Supervisor (Electrical) Ahmed Fine Textile Mills Ltd, Multan, Pakistan MAY, 2005 - March, 2013 Responsibilities: • Maintaining & troubleshooting of all Electrical Equipments including Power Generators and other Electrical Switchgear. • Procurement and replacement of obsolete electrical equipment • Performed HMI Configuration & provide hardware support for CNC (Computerized Numerical Cutter) and other electrical machinery • Prepared Safety Management Programs for Mill Workers. • Provide operational training of CNC to all concerned personnel. • Erection of all Electrical system in Ahmad Fine{ Installation of Power plant, Installation of two, oil immersed, 3 winding power Transformers rating 11kv/480v, L.T & H.T,O.C.B Rooms, Installation of MCB and MCCB, Capacitors, Bus bar schemes, Power looms,3 phase Induction Motors and other electrical Equipment. • Installation of wiring, conduit and switchgear.
  • 4.
    • Installation ofElectrical Panels, Protection Systems. • Solid knowledge in Generators/motors/Magnet contactors and other electrical equipment operation and maintenance. • Proficiently experience to install the Circuit Breakers, Protection Relays, and Timers. • Proficiently skilled in DC & AC • Synchronization with WAPDA at 11kv when needed. • Planned equipment and fixtures wiring and installation. • Inspected wiring and fixtures for conformance to company specifications and local electrical codes. • Analyzed and resolved work problems. • Estimated and supervised materials. • Supervised machines and equipment set-up. • Resolved work problems through proper analysis and assisted workers in resolving work related issues. • Maintained operating equipment to support time-based, predictive, and emergency actions. • Analyzed work orders, drawings to determine process, materials, machines, tooling and sequence of operation Electrical Technician Descon Engineering LTD, Site Area Lahore, Pakistan Jan, 2004 - April, 2005 Responsibilities • Maintaining & troubleshooting of all Electrical Equipments including Power Generators and other Electrical Switchgear. • Performed HMI Configuration & provide hardware support for CNC (Computerized Numerical Cutter) and other electrical machinery CERTIFICATIONS & PROFESSIONAL ACCREDIATION • ISO-9001 Awareness Training • Aramco Safety Training SKILLS Equipment Used: Freja 300, Sverker 760, Breaker Analyzer EGIL, DC Supply unit B10E, Tan-Delta Tester (Delta 2000), AC Hi-Pot Kit (up to 160kV) Omicron CT Analyzer, Micro-Ohm Meter, CT analyzer
  • 5.
    (Programma, MOM600), DCDielectric Kit, CPC 100 CMC 356 (Omicron) Primary injection kit, Oden/Foster, CNC & Dilo etc. Software: Microstation, AutoCAD, EnerVista, Omicron CT-Analyzer Tools: MS Office (Word/Excel/PowerPoint/Visio), EDUCATION D.A.E (Electronics Engineering) Punjab Board of Technical Education, Lahore, Pakistan B.Tech (Electronics Engineering) Punjab Board of Technical Education, Lahore, Pakistan PERSONAL INFORMATION Name : Muhammad Kashif Rafiq Father Name : Muhammad rafiq Anwar Date of Birth : 13th June, 1983 Marital Status : Single Languages Known : English, Arabic & Urdu Iqama Status : Valid / -Transferrable Address : Chak No 261/E.B Tehsil Burewala Distract Vehari (Pakistan)
  • 6.
    (Programma, MOM600), DCDielectric Kit, CPC 100 CMC 356 (Omicron) Primary injection kit, Oden/Foster, CNC & Dilo etc. Software: Microstation, AutoCAD, EnerVista, Omicron CT-Analyzer Tools: MS Office (Word/Excel/PowerPoint/Visio), EDUCATION D.A.E (Electronics Engineering) Punjab Board of Technical Education, Lahore, Pakistan B.Tech (Electronics Engineering) Punjab Board of Technical Education, Lahore, Pakistan PERSONAL INFORMATION Name : Muhammad Kashif Rafiq Father Name : Muhammad rafiq Anwar Date of Birth : 13th June, 1983 Marital Status : Single Languages Known : English, Arabic & Urdu Iqama Status : Valid / -Transferrable Address : Chak No 261/E.B Tehsil Burewala Distract Vehari (Pakistan)