OBJECTIVE
Highly accomplished Commissioning and Maintenance Engineer in the MEP projects (EPC) and
Petrochemical industries with over 11 years of experience implementing successful programs
projects and solutions incorporating a wide variety of technologies and applications. Proven
leadership successfully driving cost savings quality improvement and positively impacting
corporate culture. A natural mentor and motivator solving complex problems and achieving
business and project goals while being able to multi-task, known for strong client facing
relationships and a high level of enthusiasm for business success consistently demonstrating
integrity while simultaneously projecting a positive professional image.
Personal profile
Father’s Name : A.Dhandabani
Date of Birth & age : 10.03.1986, 30 years old
Nationality : Indian
Religion : Hindu
Marital Status : Married
Qualification : Diploma in EEE
Year of Completion : April 2005
Pass port number : H9990367
Percentage of Marks : 90.16% (final year)
Languages Known : Tamil, English
Total experience : 11 years
Gulf experience : 4+ years
Certificates : KAHRAMAA Electrical supervisor license
(Qatar General Electricity and Water Corporation)
KAHRAMAA Electrical Fitter License (HV) (Qatar General
Electricity and Water Corporation)
EMPLOYMENT EXPERIENCE:
ELECTRICAL COMMISSIONING ENGINEER
AL JABER ENGINEERING W.L.L, QATAR -Doha -May 2012 to Present
Job roles and responsibilities:-
 Organizing, assigning and supervising pre-commissioning and commissioning activities.
 Safety and quality policy implementation on day to day activities.
 Review and update pre-commissioning plan accordingly with QA&QC system and client
standards.
 Developing and preparation of detailed Method statement and commissioning procedures for
Transformer, Breaker, LV and HV Switch gear, MCC panel, UPS, HT & LT Motors, VFD, Battery
& Battery charger, Generator, CT, PT, Cables etc. accordingly with client standards and
comments; submitted to review, comments and approval to Comm. Manager and client
organization; Reinstatement procedure for systems.
 Develop and prepare inspection and test reports for pre-commissioning activities and
forwarding to Comm. Manager and QA&QC Manager for review, comments, approvaland
integration in QA&QC plan for pre-commissioning and commissioning.
 Planning and scheduling of activities in collaboration with construction contractor designated
personnel, estimation of manpower, equipment’s and materials necessary for each activity.
Forwarding to management for approval and to construction contractor.
 As built drawings submission and all site activity to satisfy the customer.
 Maintain and update department related records.
 Testing and Commissioning of Power Transformer from 2.5MVA up to 100MVA.
 Testing and commissioning of LT & HT (3.3KV, 6.6KV, 11KV) Motors up to 1716KW.
 Handling Control and Protection Schemes up to 230KV Grid Sub Station.
 Trouble shooting of various electrical systems at different type of switch yard, switch gears
and power plants.
 Testing and commissioning of control & relay panel for Transformer, Bus Coupler.
 Preparation of cable schedule and termination schedules.
 Load Test of Battery charger and Battery Bank.
 Knowledge about SCADA and PLC system.
 Installation, Commissioning and startup 6.6KV Siemens make vacuum circuit breakers.
 Installation, Commissioning and startup LT motors up to 160KW with ACB breakers.
 Commissioning and startup ABB and Siemens make AC variable speed drives up to 90 KW.
 Erection and commissioning of ABB make DC Variable speed drives up to 250KW.
 Wiring and commissioning of Power and Motor Control Centre up to 415V.
TEAM MEMBER [Electrical Maintenance]
M/S Saint Gobain Glass India Ltd -Chennai, Tamil Nadu -June 2010 to March 2012
Job roles and responsibilities:-
 Reporting to Team Leader – Breakdown and Production details.
 Ensuring Zero safety related discrepancies by adhering EHS compliances.
 Maintenance and maintaining the plant with proper spares management.
 Process modification and Reliability improvement.
 Preventive and Breakdown maintenance for Substation and plants.
 Planning the PM and Following schedule.
 Maintenance Blowers & conveyors motors, Heaters.
 Programming &trouble shooting in variable frequency drives.
 Handling the 20MVA Power plant and Process Plant as a Team Member.
 Hands on experience in operation of HT/LT SF6 Circuit breaker, Air Circuit Breakers, Vacuum
Circuit Breakers, Vacuum Contactors (SIEMENS, MERLIN GERIN etc.).
 Preventive maintenance of LT motors both AC up to 510KW(ABB).
 Maintenance of Electro Static Precipitator (ESP) 90KV ESP (BHEL).
 Maintenance in UPS up to 250 KVA (Merlin Gerin) and Batteries (HBL nife).
 EOT Cranes with VSD and Remote control operation.
 Belt , Roller and chain Conveyors, Motors (Induction, servo, Slip ring and DC), Bucket
Elevators, Dust Collectors, Screw Feeders, Electromagnetic Vibrators, Unbalanced Motors,
Crushers, compressors, Boilers, and Laser Detection systems.
JUNIOR ENGINEER (ELECTRICAL)
M/S Southern Petro Chemical Industries Corporation Ltd -Cuddalore, Tamil Nadu -May
2008 to June 2010
Job roles and responsibilities
Maintenance:-
 110KV switch yard maintenance
 110 KV SF6 ABB & SIEMENS make circuit breaker maintenance
 110 KV/6.6 KV, 21.6 MVA NGEF make power transformer LT substations
 6.6 KV /415V, 2MVA transformers
 Air circuit breakers of L&T make up to 415V, 3200 A
 415V/415V,250KVA Transformer for Lighting equipment’s
 415V, Power and motor control Centre
 LT motors up to 160KW with ACB breakers
 ABB make DC variable speed drives up to 250 KW
 ABB make AC variable speed drives up to 90 KW
 2x 25 KVA Liebert make UPS System
 1KVA to 7.5 KVA UPS for critical equipment’s
 Lead acid battery Banks and Battery Chargers for 360V, 110V and 220V DC Distribution
system Captive power plant maintenance:-
 6.6 KV, 2x 6 MW Wartsila makes power generating set.
 440 V, 500 KVA DG and 440 V, 50 KVA DG Set
 440 V, 75 KVA DG Set and all its accessories like on line heaters, Heat tracers, viscosity Control
panels and oil centrifuges.
 Synchronization of 6.0 MW 6.6 KV Generators with grid
UTILITY EQUIPMENTS:-
 6.6KV, 1716 KW HT induction motors for process Air Compressors.
 4x600 KW, 6.6 KV HT induction motors for water chillers.
 2x75 TR Brine solution compressors for negative temperature requirement.
 2x40 TR centralized AC plant for comfort air conditioning.
 50TR AC plant for comfort air conditioning.
 Adiabatic and conventional cooling towers
 Water treatment plants/cooling towers
 Plant lighting equipment’s and lighting Transformers.
 Maintenance of cranes/Hoists/lifts [up to 25 tons]
ELECTRICAL SUPERVISOR
AKSHYA A1 ELECTRICAL CONTACTORS -Chennai, Tamil Nadu -March 2007 to April 2008
Work place: Southern petro chemical Industries Corporation
Ltd; Sipcot complex, cuddalore)
Job responsibilities:-
 Shift electrical maintenance.
APPRENTICE TRAINEE
230KV AUTO SUB STATOION in TAMIL NADU ELECTRICITY BOARD -
Cuddalore, Tamil Nadu -March 2006 to February 2007
ELECTRICAL SUPERVISOR
SRI VASAN ELECTRICAL CONTACTORS -Cuddalore, Tamil Nadu -May 2005 to March 2006
Work place: SPIC Ltd and EID Parry Ltd (Duration- From May 2005 to March 2006)
Job responsibilities:-
 Construction work
DECLARATION
I do hereby declare that all the above statements made by me are true to my knowledge and
belief.
Place: Doha, Qatar Signature
Date: (ARULMANI DHANDABANI)

More Related Content

What's hot (20)

bala.1
bala.1bala.1
bala.1
 
UBAIDSHUJA_SON_OF_SHUJA_UL_MULK
UBAIDSHUJA_SON_OF_SHUJA_UL_MULKUBAIDSHUJA_SON_OF_SHUJA_UL_MULK
UBAIDSHUJA_SON_OF_SHUJA_UL_MULK
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
Sadanand dubey
Sadanand dubeySadanand dubey
Sadanand dubey
 
Curriculam vitae
Curriculam vitaeCurriculam vitae
Curriculam vitae
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 
ELEC.ENG CV
ELEC.ENG CVELEC.ENG CV
ELEC.ENG CV
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
NEW CV
NEW CVNEW CV
NEW CV
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015
 
Nstark 2015
Nstark 2015Nstark 2015
Nstark 2015
 
Clement Mensah 13
Clement Mensah 13Clement Mensah 13
Clement Mensah 13
 
Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances Solar Power Engineering & Operation Maintenances
Solar Power Engineering & Operation Maintenances
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Wilmer Filion CV 2016 e
Wilmer Filion CV 2016 eWilmer Filion CV 2016 e
Wilmer Filion CV 2016 e
 
SURESHPALANI CV
SURESHPALANI CVSURESHPALANI CV
SURESHPALANI CV
 

Viewers also liked

MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANSUDARSANAN NANU
 
YkApply for the Post Electrical & MEP supervisor
YkApply for the Post  Electrical & MEP supervisorYkApply for the Post  Electrical & MEP supervisor
YkApply for the Post Electrical & MEP supervisorYounas khan
 
Marcin Poprawski - Harmonia czy kakofonia polskie instytucje muzyczne w obraz...
Marcin Poprawski - Harmonia czy kakofonia polskie instytucje muzyczne w obraz...Marcin Poprawski - Harmonia czy kakofonia polskie instytucje muzyczne w obraz...
Marcin Poprawski - Harmonia czy kakofonia polskie instytucje muzyczne w obraz...Małopolski Instytut Kultury
 
Criteria and procedures for selection of civil society organizations in cross...
Criteria and procedures for selection of civil society organizations in cross...Criteria and procedures for selection of civil society organizations in cross...
Criteria and procedures for selection of civil society organizations in cross...МЦМС | MCIC
 
Pensamiento crco en ensea universitaria 1
Pensamiento crco en ensea universitaria 1Pensamiento crco en ensea universitaria 1
Pensamiento crco en ensea universitaria 1rpardo
 
Degree certificate SunderLand.PDF
Degree certificate SunderLand.PDFDegree certificate SunderLand.PDF
Degree certificate SunderLand.PDFihthisham iqbal
 
Get Cybersmart with Blogs
Get Cybersmart with BlogsGet Cybersmart with Blogs
Get Cybersmart with BlogsHelen Dixon
 
Bryan rojas 9 1
Bryan rojas 9 1Bryan rojas 9 1
Bryan rojas 9 1bryrojo02
 
Revista de Investigación N°8 de la U del Istmo Panamá: INCIDENCIA DE LAS EMIS...
Revista de Investigación N°8 de la U del Istmo Panamá: INCIDENCIA DE LAS EMIS...Revista de Investigación N°8 de la U del Istmo Panamá: INCIDENCIA DE LAS EMIS...
Revista de Investigación N°8 de la U del Istmo Panamá: INCIDENCIA DE LAS EMIS...Panamá
 
OMAR FAKHOURY AUTO RESUME 2016
OMAR FAKHOURY AUTO RESUME 2016 OMAR FAKHOURY AUTO RESUME 2016
OMAR FAKHOURY AUTO RESUME 2016 Omar Fakhoury
 
Weight Control And Healthy Eating for Women in Singapore
Weight Control And Healthy Eating for Women in SingaporeWeight Control And Healthy Eating for Women in Singapore
Weight Control And Healthy Eating for Women in SingaporeAzmiSuhaimi
 

Viewers also liked (20)

CURRICULUM VITAE new
CURRICULUM VITAE newCURRICULUM VITAE new
CURRICULUM VITAE new
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
YkApply for the Post Electrical & MEP supervisor
YkApply for the Post  Electrical & MEP supervisorYkApply for the Post  Electrical & MEP supervisor
YkApply for the Post Electrical & MEP supervisor
 
Simab CV sup.
Simab CV sup.Simab CV sup.
Simab CV sup.
 
Marcin Poprawski - Harmonia czy kakofonia polskie instytucje muzyczne w obraz...
Marcin Poprawski - Harmonia czy kakofonia polskie instytucje muzyczne w obraz...Marcin Poprawski - Harmonia czy kakofonia polskie instytucje muzyczne w obraz...
Marcin Poprawski - Harmonia czy kakofonia polskie instytucje muzyczne w obraz...
 
Criteria and procedures for selection of civil society organizations in cross...
Criteria and procedures for selection of civil society organizations in cross...Criteria and procedures for selection of civil society organizations in cross...
Criteria and procedures for selection of civil society organizations in cross...
 
Pensamiento crco en ensea universitaria 1
Pensamiento crco en ensea universitaria 1Pensamiento crco en ensea universitaria 1
Pensamiento crco en ensea universitaria 1
 
Ijmet 07 01_001
Ijmet 07 01_001Ijmet 07 01_001
Ijmet 07 01_001
 
Degree certificate SunderLand.PDF
Degree certificate SunderLand.PDFDegree certificate SunderLand.PDF
Degree certificate SunderLand.PDF
 
Get Cybersmart with Blogs
Get Cybersmart with BlogsGet Cybersmart with Blogs
Get Cybersmart with Blogs
 
Bryan rojas 9 1
Bryan rojas 9 1Bryan rojas 9 1
Bryan rojas 9 1
 
Sivanna Health
Sivanna HealthSivanna Health
Sivanna Health
 
Revista de Investigación N°8 de la U del Istmo Panamá: INCIDENCIA DE LAS EMIS...
Revista de Investigación N°8 de la U del Istmo Panamá: INCIDENCIA DE LAS EMIS...Revista de Investigación N°8 de la U del Istmo Panamá: INCIDENCIA DE LAS EMIS...
Revista de Investigación N°8 de la U del Istmo Panamá: INCIDENCIA DE LAS EMIS...
 
Nthy pitucita tics
Nthy pitucita ticsNthy pitucita tics
Nthy pitucita tics
 
Tudo tem seu tempo
Tudo tem seu tempoTudo tem seu tempo
Tudo tem seu tempo
 
OMAR FAKHOURY AUTO RESUME 2016
OMAR FAKHOURY AUTO RESUME 2016 OMAR FAKHOURY AUTO RESUME 2016
OMAR FAKHOURY AUTO RESUME 2016
 
AGRI-PPP IN VIET NAM
AGRI-PPP IN VIET NAMAGRI-PPP IN VIET NAM
AGRI-PPP IN VIET NAM
 
Sergey Neckludov
Sergey NeckludovSergey Neckludov
Sergey Neckludov
 
Weight Control And Healthy Eating for Women in Singapore
Weight Control And Healthy Eating for Women in SingaporeWeight Control And Healthy Eating for Women in Singapore
Weight Control And Healthy Eating for Women in Singapore
 

Similar to RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)

Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood ButtTahir Butt
 
yogesh Barvadiya (3)
yogesh Barvadiya (3)yogesh Barvadiya (3)
yogesh Barvadiya (3)YOGESH PATEL
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)Irfan Vali
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622MOHAMMAD KHALID MUSTAFA
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsIrfan Vali
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MIrfan Vali
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATELRakesh patel
 

Similar to RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1) (20)

Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood Butt
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
yogesh Barvadiya (3)
yogesh Barvadiya (3)yogesh Barvadiya (3)
yogesh Barvadiya (3)
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
Resume Francis
Resume FrancisResume Francis
Resume Francis
 
Resume E&I Engineer
Resume E&I EngineerResume E&I Engineer
Resume E&I Engineer
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
update 1
update 1update 1
update 1
 
RamCV1
RamCV1RamCV1
RamCV1
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Raju cv
Raju cv Raju cv
Raju cv
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume Projects
 
Curriculam vitae
Curriculam vitaeCurriculam vitae
Curriculam vitae
 
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
 
MOST_UPDATED_CV
MOST_UPDATED_CVMOST_UPDATED_CV
MOST_UPDATED_CV
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&M
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 

RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)

  • 1. ARULMANI DHANDABANI Phone: + 974 70552707 Email: arulmanidhandabani@gmail.com OBJECTIVE Highly accomplished Commissioning and Maintenance Engineer in the MEP projects (EPC) and Petrochemical industries with over 11 years of experience implementing successful programs projects and solutions incorporating a wide variety of technologies and applications. Proven leadership successfully driving cost savings quality improvement and positively impacting corporate culture. A natural mentor and motivator solving complex problems and achieving business and project goals while being able to multi-task, known for strong client facing relationships and a high level of enthusiasm for business success consistently demonstrating integrity while simultaneously projecting a positive professional image. Personal profile Father’s Name : A.Dhandabani Date of Birth & age : 10.03.1986, 30 years old Nationality : Indian Religion : Hindu Marital Status : Married Qualification : Diploma in EEE Year of Completion : April 2005 Pass port number : H9990367 Percentage of Marks : 90.16% (final year) Languages Known : Tamil, English Total experience : 11 years Gulf experience : 4+ years Certificates : KAHRAMAA Electrical supervisor license (Qatar General Electricity and Water Corporation) KAHRAMAA Electrical Fitter License (HV) (Qatar General Electricity and Water Corporation)
  • 2. EMPLOYMENT EXPERIENCE: ELECTRICAL COMMISSIONING ENGINEER AL JABER ENGINEERING W.L.L, QATAR -Doha -May 2012 to Present Job roles and responsibilities:-  Organizing, assigning and supervising pre-commissioning and commissioning activities.  Safety and quality policy implementation on day to day activities.  Review and update pre-commissioning plan accordingly with QA&QC system and client standards.  Developing and preparation of detailed Method statement and commissioning procedures for Transformer, Breaker, LV and HV Switch gear, MCC panel, UPS, HT & LT Motors, VFD, Battery & Battery charger, Generator, CT, PT, Cables etc. accordingly with client standards and comments; submitted to review, comments and approval to Comm. Manager and client organization; Reinstatement procedure for systems.  Develop and prepare inspection and test reports for pre-commissioning activities and forwarding to Comm. Manager and QA&QC Manager for review, comments, approvaland integration in QA&QC plan for pre-commissioning and commissioning.  Planning and scheduling of activities in collaboration with construction contractor designated personnel, estimation of manpower, equipment’s and materials necessary for each activity. Forwarding to management for approval and to construction contractor.  As built drawings submission and all site activity to satisfy the customer.  Maintain and update department related records.  Testing and Commissioning of Power Transformer from 2.5MVA up to 100MVA.  Testing and commissioning of LT & HT (3.3KV, 6.6KV, 11KV) Motors up to 1716KW.  Handling Control and Protection Schemes up to 230KV Grid Sub Station.  Trouble shooting of various electrical systems at different type of switch yard, switch gears and power plants.  Testing and commissioning of control & relay panel for Transformer, Bus Coupler.  Preparation of cable schedule and termination schedules.  Load Test of Battery charger and Battery Bank.  Knowledge about SCADA and PLC system.  Installation, Commissioning and startup 6.6KV Siemens make vacuum circuit breakers.  Installation, Commissioning and startup LT motors up to 160KW with ACB breakers.  Commissioning and startup ABB and Siemens make AC variable speed drives up to 90 KW.  Erection and commissioning of ABB make DC Variable speed drives up to 250KW.  Wiring and commissioning of Power and Motor Control Centre up to 415V.
  • 3. TEAM MEMBER [Electrical Maintenance] M/S Saint Gobain Glass India Ltd -Chennai, Tamil Nadu -June 2010 to March 2012 Job roles and responsibilities:-  Reporting to Team Leader – Breakdown and Production details.  Ensuring Zero safety related discrepancies by adhering EHS compliances.  Maintenance and maintaining the plant with proper spares management.  Process modification and Reliability improvement.  Preventive and Breakdown maintenance for Substation and plants.  Planning the PM and Following schedule.  Maintenance Blowers & conveyors motors, Heaters.  Programming &trouble shooting in variable frequency drives.  Handling the 20MVA Power plant and Process Plant as a Team Member.  Hands on experience in operation of HT/LT SF6 Circuit breaker, Air Circuit Breakers, Vacuum Circuit Breakers, Vacuum Contactors (SIEMENS, MERLIN GERIN etc.).  Preventive maintenance of LT motors both AC up to 510KW(ABB).  Maintenance of Electro Static Precipitator (ESP) 90KV ESP (BHEL).  Maintenance in UPS up to 250 KVA (Merlin Gerin) and Batteries (HBL nife).  EOT Cranes with VSD and Remote control operation.  Belt , Roller and chain Conveyors, Motors (Induction, servo, Slip ring and DC), Bucket Elevators, Dust Collectors, Screw Feeders, Electromagnetic Vibrators, Unbalanced Motors, Crushers, compressors, Boilers, and Laser Detection systems. JUNIOR ENGINEER (ELECTRICAL) M/S Southern Petro Chemical Industries Corporation Ltd -Cuddalore, Tamil Nadu -May 2008 to June 2010 Job roles and responsibilities Maintenance:-  110KV switch yard maintenance  110 KV SF6 ABB & SIEMENS make circuit breaker maintenance  110 KV/6.6 KV, 21.6 MVA NGEF make power transformer LT substations  6.6 KV /415V, 2MVA transformers  Air circuit breakers of L&T make up to 415V, 3200 A  415V/415V,250KVA Transformer for Lighting equipment’s  415V, Power and motor control Centre  LT motors up to 160KW with ACB breakers  ABB make DC variable speed drives up to 250 KW  ABB make AC variable speed drives up to 90 KW  2x 25 KVA Liebert make UPS System  1KVA to 7.5 KVA UPS for critical equipment’s  Lead acid battery Banks and Battery Chargers for 360V, 110V and 220V DC Distribution system Captive power plant maintenance:-
  • 4.  6.6 KV, 2x 6 MW Wartsila makes power generating set.  440 V, 500 KVA DG and 440 V, 50 KVA DG Set  440 V, 75 KVA DG Set and all its accessories like on line heaters, Heat tracers, viscosity Control panels and oil centrifuges.  Synchronization of 6.0 MW 6.6 KV Generators with grid UTILITY EQUIPMENTS:-  6.6KV, 1716 KW HT induction motors for process Air Compressors.  4x600 KW, 6.6 KV HT induction motors for water chillers.  2x75 TR Brine solution compressors for negative temperature requirement.  2x40 TR centralized AC plant for comfort air conditioning.  50TR AC plant for comfort air conditioning.  Adiabatic and conventional cooling towers  Water treatment plants/cooling towers  Plant lighting equipment’s and lighting Transformers.  Maintenance of cranes/Hoists/lifts [up to 25 tons] ELECTRICAL SUPERVISOR AKSHYA A1 ELECTRICAL CONTACTORS -Chennai, Tamil Nadu -March 2007 to April 2008 Work place: Southern petro chemical Industries Corporation Ltd; Sipcot complex, cuddalore) Job responsibilities:-  Shift electrical maintenance. APPRENTICE TRAINEE 230KV AUTO SUB STATOION in TAMIL NADU ELECTRICITY BOARD - Cuddalore, Tamil Nadu -March 2006 to February 2007 ELECTRICAL SUPERVISOR SRI VASAN ELECTRICAL CONTACTORS -Cuddalore, Tamil Nadu -May 2005 to March 2006 Work place: SPIC Ltd and EID Parry Ltd (Duration- From May 2005 to March 2006) Job responsibilities:-  Construction work DECLARATION I do hereby declare that all the above statements made by me are true to my knowledge and belief. Place: Doha, Qatar Signature Date: (ARULMANI DHANDABANI)