SlideShare a Scribd company logo
1 of 4
Download to read offline
Tanveer Ahmed Niazi
The Manager HR,
Dear Sir / Madam,
I'm submitting resume to express my strong desire to be considered for the position
of senior planning engineer. I fully believe I'm qualified to fill the position and make
great contributions to encourage the growth of organization.
A brief review of my career & work experience will reveal what I can contribute to
any organization with a total working experience of 35 years, summarized as: senior
planning engineer for 3 years (UAE & Qatar), Planning engineer for 20 months (UAE),
Sr. planning / electrical Engineer for 4.5 years, electrical engineer 18 months (UAE &
KSA), manager installation & services for 1 year Pakistan), senior instrument
technician for 1 year (Oman) and senior sub-engineer for 21 years (Pakistan).
I have 35 years old, engineering diploma, 8 years old Primavera P6 refresher course,
3 years old PMI membership and examination preparation.
I'm convinced that I can provide you with the detailed information needed for you to see
what positive contributions I could make if given the chance to come in for an interview.
Sincerely,
Tanveer Ahmed Niazi
+971-50-120-4997, +974-6654-7875, +92 33-222-90-797
tanveeraniazi@yahoo.com, Skype ID: jubailrc
Profile Link http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9
Page 2 of 4Last Update August 7, 2016
Tanveer Ahmed Niazi,
Member PMI and PMI-KPC since August 2013
+971-50-120-4997, +974-6654-7875, +92 33-222-90-797
tanveeraniazi@yahoo.com, Skype ID jubailrc
http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9
Experience Summary
More then 30 years: KSA 5 years – UAE 5 years – Oman 1 year – 2 year Qatar and 21 years in home land.
High Reise Building Planning and large residential projects 8 years, Industrial & Road 7 years, Oil & Gas 1 year &
general (Construction, Maintenance & Operations) 18 years
Key Skills
 Perfect command over (oracle) primavera P6 V 8.3.
 Develop project execution master plan.
 Preparation of mitigation plans, recovery plan and baseline revision.
 Knowledge of FIDIC and other forms of contracts.
 Identifying the best series of events in the correct order for the project to finish in time and budget.
 Delay analysis using time impact & other methods. Delays assessment by as planned v/s. As built method &
"impacted as-planned" method.
 Prepare extension of time claim (EOT) as per FIDIC & Local Authorities’ Protocol
 Delivery of accurate and timely information to all stakeholders to the sanctioned cost, schedule and
performance criteria.
 Motivate, teach & train others to make them aware of an overall aim.
 The ability to remain flexible and calm under pressure and in the face of a tight deadline.
 Creative, good numeracy skills, good literacy skills and technical mind.
 Target-oriented, quality conscious and highly dependable team leader and mentor.
 Proven record of utilizing technical and interpersonal skills to boost organizational efficiency, productivity
and profits.
 Providing advice to people involved in the project.
 Participate actively in career development of direct reports, and succession planning initiatives
to build future expertise.
General Responsibilities
 Understanding the scope of the project in order to prepare Construction Program for the project with
proper logic and flow of the work in order to meet significant / contractual milestones, (detailed, baseline,
recovery, time impacted).
 Update the project manager/stack holders through earned value analysis to improve project progress,
performance, & visibility of cash flow.
 Management of the Project Controls function including participating in hiring (within guidelines),
Orchestration of the PC staff to meet the needs of the Project Manager with a customer service oriented
approach.
 Project forecasting, reporting SPI & CPI,
 Presenting the schedule performance and needs to concerns within the organization, client and the
influential stake holders of the project (as and when required).
 Delivery of accurate and timely information to all stakeholders to the sanctioned cost, schedule and key
performance indicators.
 Lead and/or participate in the identification of risks and eliminate or implement mitigation measures.
 Producing visual aids to help explain the schedule of work, including bar charts and network diagrams.
 Ensure project lessons learned are feed‐back to project stakeholders.
 Keeping in contact & updating the project manager, higher management & client by presenting them the
daily/weekly and Monthly Progress Reports.
 Updating the project manager with the current status of the project to take necessary action to
speed up the work if delay occurs.
Current Employer : Working for Actco General Contracting Dubai under 2P2C Project Management
Consultant P. O. Box 236438 Dubai payroll.
Period : Since Aug, 2016
Position : Sr. Planning Engineer.
Page 3 of 4Last Update August 7, 2016
Previous Employments:
1- Project : Nuafar Hospital for Treatment of Behavioral Disorder, Doha Qatar under 2P2C
Project Management Consultant P. O. Box 236438 Dubai payroll
Company Name : J&P (Joannou & Paraskevaides (Overseas) Ltd. Qatar
Period : Since Aug 2015 to May 2016
Position : Sr. Planning Engineer
2- Project : Improvement of Mafraq to Ghuweifat Border check post (Road) Highway
Company Name : Bin Hafeez Gen. Cont. Est Abu Dhabi UAE P.O. Box 47180
Period : Since July 2014 to Jul 2015
Position : Sr. Planning Engineer
3- Project : 2B+G+24 Residential Floors Viva Behriyah Tower VB20 & VB21 in the Pearl Qatar.
Company Name : Powerline Engineering WLL, P.O. Box 47270 Doha – Qatar.
Period : August 2012 FEB 2014
Position : Sr. Planning Engineer.
4- Project : Medina Centrale Pearl Qatar, 12 residential building with shopping mall, commercial
centers and swimming pools under 2P2C Project Management Consultant P. O. Box 236438 Dubai payroll.
Company Name : Grid Engineering WLL (subcontractor of Powerline Engineering WLL, P.O. Box 47270
Doha – Qatar).
Period : Sep. 2011 FEB 2012
Position : Sr. Planning Engineer.
5- Company Name : Tiger Contracting Co. LLC. – P. O. Box 25411, Sharjah; UAE
From : Nov. 2009 to Jul. 2011.
Projects : 3B+G+M+21 Office Floors Silver Tower Businesses Bay Dubai, 2B+G+M+14
Office Floors Businesses Bay Dubai Office Floors Opel Tower
Position : Planning Engineer
6- Company Name : GECO Mechanical & Electrical– P.O. Box 1150, Sharjah; UAE.
From : June 2008 to Nov. 2009.
Position : Planning Engineer
Project : Sharjah University Teaching Hospital.
7- Company Name : Techdynamic Contracting. Jubail; Kingdom of Saudi Arabia.
From : Nov. 2004 to Jan 2008
Position : Sr. Project / Planning Engineer.
Projects : Numerous residential, commercial and industrial buildings and other and
electrical, civil and mechanical projects.
Responsibilities : Understanding the scope of the project in order to prepare Construction Program
for the project with proper logic and flow of the work in order to meet significant / contractual
milestones, (detailed, baseline, recovery, time impacted), Casting & Estimation, Procurement,
dealing with the subcontractors and coordination with the client & third parties. Lead and/or
participate in the identification of risks and eliminate or implement mitigation measures and
Capitalize on potential opportunities. Produce visual aids to help explain the schedule of work,
including bar charts and network diagrams. Keeping in contact & updating the project manager,
higher management & client by presenting them the daily/weekly and Monthly Progress Reports.
8- Company Name : Mohammad Obaid Al-Marri Est. Jubail, kingdom of Saudi Arabia
From : May 2003 to Nov. 2004
Position : Field Engineer (Electrical)
Responsibilities : Preparation of submittals, shop drawings coordination with the client (Royal
Commission) and the third parties (SEC, Saudi Telecom, Road Department, Marafiq etc.), site
management and supervision.
9- Company Name : Pakistan Steel Mills Corp. Karachi Pakistan.
From : Aug. 1981 to May 1985 and from Oct 1986 to Oct 2001.
Position : Sr. Sub Engineer) AXEN (Assistant Executive Engineer)
Responsibilities : Supervision of the operational (shift) staff at Thermal Power Plant (TPP),
Sintering Plant, Iron Making Plant Complex (Blast Furnace) and Billet Mills.
Achievements : Revamping & Modernizing of Sintering Plant.
10- Company Name : The Oman Construction (TOCO-5); Muscat Oman.
Page 4 of 4Last Update August 7, 2016
Period : May 1985 to Feb 1986
Position : Instrument Site engineer
Responsibilities : Supervision and execution of the Instrumentation scope.
11- Company Name : Tyco Pakistan Limited
From : Jan. 2002 to Mar. 2003
Position : Manager Installation & Services.
Responsibilities : Estimation, Execution, and Commissioning
Personal Information:
 F/Name : Mr. Minhaj Uddin (Late)
 Contacts :+974-6654-7875, +92 33-222-90-797,+971-50-120-4997
 : tanveeraniazi@yaahoo.com
 Skype ID : jubailrcs
 Nationality : Pakistani
 Driving License : UAE – Pakistan
 Availability : One Month
 http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9

More Related Content

What's hot

Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Mehtab Zaidi
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zakZishan khan
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab Zaidi
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed Shahzad
 
Civil engineer Resume 24.2.16
Civil engineer Resume  24.2.16Civil engineer Resume  24.2.16
Civil engineer Resume 24.2.16Udhaya Kumar
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007REHAN MUMTAZ
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceSameh Sameh
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsNoor Wali Khan
 

What's hot (20)

Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
QS - CV
QS - CVQS - CV
QS - CV
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zak
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cv
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
 
Civil engineer Resume 24.2.16
Civil engineer Resume  24.2.16Civil engineer Resume  24.2.16
Civil engineer Resume 24.2.16
 
Eng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract EngineerEng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract Engineer
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 

Similar to Tanveer Sr Planning Engineer (20)

Planner's Resume
Planner's ResumePlanner's Resume
Planner's Resume
 
C.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._DattaC.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._Datta
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
 
Planning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu PPlanning_Engineer_Ramesh Babu P
Planning_Engineer_Ramesh Babu P
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
JOHN RESUME_PROJECT PLANNER
JOHN RESUME_PROJECT PLANNERJOHN RESUME_PROJECT PLANNER
JOHN RESUME_PROJECT PLANNER
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
Resume_Shakti
Resume_ShaktiResume_Shakti
Resume_Shakti
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Cv - Anil
Cv - AnilCv - Anil
Cv - Anil
 
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
 
Planning Engr Samar Abbas
Planning Engr Samar AbbasPlanning Engr Samar Abbas
Planning Engr Samar Abbas
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
avinash chandrashekar-CV
avinash chandrashekar-CVavinash chandrashekar-CV
avinash chandrashekar-CV
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
 
Cv6
Cv6Cv6
Cv6
 
Cv6
Cv6Cv6
Cv6
 
update cv
update cvupdate cv
update cv
 

Tanveer Sr Planning Engineer

  • 1. Tanveer Ahmed Niazi The Manager HR, Dear Sir / Madam, I'm submitting resume to express my strong desire to be considered for the position of senior planning engineer. I fully believe I'm qualified to fill the position and make great contributions to encourage the growth of organization. A brief review of my career & work experience will reveal what I can contribute to any organization with a total working experience of 35 years, summarized as: senior planning engineer for 3 years (UAE & Qatar), Planning engineer for 20 months (UAE), Sr. planning / electrical Engineer for 4.5 years, electrical engineer 18 months (UAE & KSA), manager installation & services for 1 year Pakistan), senior instrument technician for 1 year (Oman) and senior sub-engineer for 21 years (Pakistan). I have 35 years old, engineering diploma, 8 years old Primavera P6 refresher course, 3 years old PMI membership and examination preparation. I'm convinced that I can provide you with the detailed information needed for you to see what positive contributions I could make if given the chance to come in for an interview. Sincerely, Tanveer Ahmed Niazi +971-50-120-4997, +974-6654-7875, +92 33-222-90-797 tanveeraniazi@yahoo.com, Skype ID: jubailrc Profile Link http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9
  • 2. Page 2 of 4Last Update August 7, 2016 Tanveer Ahmed Niazi, Member PMI and PMI-KPC since August 2013 +971-50-120-4997, +974-6654-7875, +92 33-222-90-797 tanveeraniazi@yahoo.com, Skype ID jubailrc http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9 Experience Summary More then 30 years: KSA 5 years – UAE 5 years – Oman 1 year – 2 year Qatar and 21 years in home land. High Reise Building Planning and large residential projects 8 years, Industrial & Road 7 years, Oil & Gas 1 year & general (Construction, Maintenance & Operations) 18 years Key Skills  Perfect command over (oracle) primavera P6 V 8.3.  Develop project execution master plan.  Preparation of mitigation plans, recovery plan and baseline revision.  Knowledge of FIDIC and other forms of contracts.  Identifying the best series of events in the correct order for the project to finish in time and budget.  Delay analysis using time impact & other methods. Delays assessment by as planned v/s. As built method & "impacted as-planned" method.  Prepare extension of time claim (EOT) as per FIDIC & Local Authorities’ Protocol  Delivery of accurate and timely information to all stakeholders to the sanctioned cost, schedule and performance criteria.  Motivate, teach & train others to make them aware of an overall aim.  The ability to remain flexible and calm under pressure and in the face of a tight deadline.  Creative, good numeracy skills, good literacy skills and technical mind.  Target-oriented, quality conscious and highly dependable team leader and mentor.  Proven record of utilizing technical and interpersonal skills to boost organizational efficiency, productivity and profits.  Providing advice to people involved in the project.  Participate actively in career development of direct reports, and succession planning initiatives to build future expertise. General Responsibilities  Understanding the scope of the project in order to prepare Construction Program for the project with proper logic and flow of the work in order to meet significant / contractual milestones, (detailed, baseline, recovery, time impacted).  Update the project manager/stack holders through earned value analysis to improve project progress, performance, & visibility of cash flow.  Management of the Project Controls function including participating in hiring (within guidelines), Orchestration of the PC staff to meet the needs of the Project Manager with a customer service oriented approach.  Project forecasting, reporting SPI & CPI,  Presenting the schedule performance and needs to concerns within the organization, client and the influential stake holders of the project (as and when required).  Delivery of accurate and timely information to all stakeholders to the sanctioned cost, schedule and key performance indicators.  Lead and/or participate in the identification of risks and eliminate or implement mitigation measures.  Producing visual aids to help explain the schedule of work, including bar charts and network diagrams.  Ensure project lessons learned are feed‐back to project stakeholders.  Keeping in contact & updating the project manager, higher management & client by presenting them the daily/weekly and Monthly Progress Reports.  Updating the project manager with the current status of the project to take necessary action to speed up the work if delay occurs. Current Employer : Working for Actco General Contracting Dubai under 2P2C Project Management Consultant P. O. Box 236438 Dubai payroll. Period : Since Aug, 2016 Position : Sr. Planning Engineer.
  • 3. Page 3 of 4Last Update August 7, 2016 Previous Employments: 1- Project : Nuafar Hospital for Treatment of Behavioral Disorder, Doha Qatar under 2P2C Project Management Consultant P. O. Box 236438 Dubai payroll Company Name : J&P (Joannou & Paraskevaides (Overseas) Ltd. Qatar Period : Since Aug 2015 to May 2016 Position : Sr. Planning Engineer 2- Project : Improvement of Mafraq to Ghuweifat Border check post (Road) Highway Company Name : Bin Hafeez Gen. Cont. Est Abu Dhabi UAE P.O. Box 47180 Period : Since July 2014 to Jul 2015 Position : Sr. Planning Engineer 3- Project : 2B+G+24 Residential Floors Viva Behriyah Tower VB20 & VB21 in the Pearl Qatar. Company Name : Powerline Engineering WLL, P.O. Box 47270 Doha – Qatar. Period : August 2012 FEB 2014 Position : Sr. Planning Engineer. 4- Project : Medina Centrale Pearl Qatar, 12 residential building with shopping mall, commercial centers and swimming pools under 2P2C Project Management Consultant P. O. Box 236438 Dubai payroll. Company Name : Grid Engineering WLL (subcontractor of Powerline Engineering WLL, P.O. Box 47270 Doha – Qatar). Period : Sep. 2011 FEB 2012 Position : Sr. Planning Engineer. 5- Company Name : Tiger Contracting Co. LLC. – P. O. Box 25411, Sharjah; UAE From : Nov. 2009 to Jul. 2011. Projects : 3B+G+M+21 Office Floors Silver Tower Businesses Bay Dubai, 2B+G+M+14 Office Floors Businesses Bay Dubai Office Floors Opel Tower Position : Planning Engineer 6- Company Name : GECO Mechanical & Electrical– P.O. Box 1150, Sharjah; UAE. From : June 2008 to Nov. 2009. Position : Planning Engineer Project : Sharjah University Teaching Hospital. 7- Company Name : Techdynamic Contracting. Jubail; Kingdom of Saudi Arabia. From : Nov. 2004 to Jan 2008 Position : Sr. Project / Planning Engineer. Projects : Numerous residential, commercial and industrial buildings and other and electrical, civil and mechanical projects. Responsibilities : Understanding the scope of the project in order to prepare Construction Program for the project with proper logic and flow of the work in order to meet significant / contractual milestones, (detailed, baseline, recovery, time impacted), Casting & Estimation, Procurement, dealing with the subcontractors and coordination with the client & third parties. Lead and/or participate in the identification of risks and eliminate or implement mitigation measures and Capitalize on potential opportunities. Produce visual aids to help explain the schedule of work, including bar charts and network diagrams. Keeping in contact & updating the project manager, higher management & client by presenting them the daily/weekly and Monthly Progress Reports. 8- Company Name : Mohammad Obaid Al-Marri Est. Jubail, kingdom of Saudi Arabia From : May 2003 to Nov. 2004 Position : Field Engineer (Electrical) Responsibilities : Preparation of submittals, shop drawings coordination with the client (Royal Commission) and the third parties (SEC, Saudi Telecom, Road Department, Marafiq etc.), site management and supervision. 9- Company Name : Pakistan Steel Mills Corp. Karachi Pakistan. From : Aug. 1981 to May 1985 and from Oct 1986 to Oct 2001. Position : Sr. Sub Engineer) AXEN (Assistant Executive Engineer) Responsibilities : Supervision of the operational (shift) staff at Thermal Power Plant (TPP), Sintering Plant, Iron Making Plant Complex (Blast Furnace) and Billet Mills. Achievements : Revamping & Modernizing of Sintering Plant. 10- Company Name : The Oman Construction (TOCO-5); Muscat Oman.
  • 4. Page 4 of 4Last Update August 7, 2016 Period : May 1985 to Feb 1986 Position : Instrument Site engineer Responsibilities : Supervision and execution of the Instrumentation scope. 11- Company Name : Tyco Pakistan Limited From : Jan. 2002 to Mar. 2003 Position : Manager Installation & Services. Responsibilities : Estimation, Execution, and Commissioning Personal Information:  F/Name : Mr. Minhaj Uddin (Late)  Contacts :+974-6654-7875, +92 33-222-90-797,+971-50-120-4997  : tanveeraniazi@yaahoo.com  Skype ID : jubailrcs  Nationality : Pakistani  Driving License : UAE – Pakistan  Availability : One Month  http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9