Krishnaprasad Keekan Kamalaksha is an electrical engineer from India seeking a senior position. He has 9 years experience in electrical design, engineering, procurement, construction and commissioning of power systems for oil, gas and petrochemical plants. His experience includes projects in Saudi Arabia and India. He is proficient in engineering software like ETAP, AutoCAD and has a Bachelor's degree in Electrical Engineering.
1. KRISHNAPRASAD KEEKAN KAMALAKSHA
Email: krishna_70709@yahoo.in
Mobile: +971 526518053
PO BOX No. 18220, Dubai, UAE.
UAE Driving License No. 2136044
ELECTRICAL ENGINEER.
Objective
Looking for a challenging position as senior electrical engineer career in an innovative organization where my skills and
abilities will be tapped to its best and which will help me to explore myself fully and realize my potential. A role that would
mutually benefit me and the organization I work for.
Work Experience
A competent Electrical Engineer with nine years of Experience in EPC at Oil & Gas and Petrochemical Industries and
Desalination Plant with comprehensive knowledge in engineering, design, procurement, Construction, commissioning,
developing and maintaining electrical and instrumentation systems and components to required global standards and
specifications with focusing on schedule, quality and economy.
Profile
. Superior breadth of design, engineering, procurement, commissioning & facility maintenance of MEP .
. Skilled in PLC, automation, SCADA, remote control system, communication protocol.
. Knowledgeable in electrical standard codes such as IEC, IEEE, ANSI,NEMA, NEC , GLOBAL.
. Skilled in ETAP, Eco-dial, AutoCAD and ELCAD and MS-Office, BMS & MAXIMO.
. Skilled in design, installation, modification and maintenance of Motor, MCC, VFD, UPS.
. Maintain, trouble-shooting 220kv/110kv/33kv substation protection & control system, alarm system
. Procurement of major electrical equipment, man-hour estimates, cost estimates, and bid proposal preparation.
. Strong background in leading and managing projects in a changing environment.
. Bachelor of Engineering and Technology (Electrical and Electronics Engineering)
Key Skills
• ETAP, Auto CAD, MICRO- STATION, LUXICON.
• BMS, MAXIMO, MS Office, MS Projects, BD/PM/CM.
Achievements
• Prepared an as built drawing and implemented shortest route to the load side and saved 45 KM of cable and 25 Drums
of power and control cables.
• Built Collaborative planning schedule with multidiscipline engineers and interface contractors.
• Got promoted from electrical engineer to project engineer.
2. IMDAAD LLC - Dubai.
Project : Dubai International Airports – Concourse A
(From 23rd
April, 2014 to the date).
Project Engineer – Electrical.
Roles & Responsibilities
• Prepare method of statements. Check material take-off and requisitions based on approved drawings.
• Prepare orders for electrical tools and test equipment’s for site works and testing.
• Safe work permit issuer for electrical works. Upheld health, safety and government regulations in all work
operations.
• Supervise the execution of the electrical works by subcontractors, engineers and supervisors are done in accordance
to the program schedule, approved plan or drawings and the required standards.
• Conduct inspection and relevant electrical tests on grounding system, cables, panel boards, generators, transformers
and other related electrical equipment’s.
• Having extensive experience in the MEP systems including HVAC Air handling unit, Pre-conditioned air system,
Extract fans, Smoke extract fans, FCU’s, Fresh Air plants, , Secondary chilled water network systems.
• MV and LV Power distributions, VFD, UPS and Battery systems, Lighting control systems, Emergency centralized
battery system, Electrical Substation, and plant rooms.
• Air Craft potable water systems, PRV’s Electrical storage Water Heater systems, Water Fountains, Water fountains
and Jacuzzi system, Plant Drainage system, plant sewage system, PKS, Grease Trappe.
LARSEN AND TOUBRO LIMITED.(EPC) – Saudi Arabia
Project : Ras Tanura Integrated Project (RTIP)- Saudi Aramco and Dow and
Refinery Associates –SADARA, Jubail.
Polyethylene Unit (From 3rd
April, 2013 to 30th
March, 2014).
Electrical Engineer.
Roles & Responsibilities
• Preparing detail electrical design and material take off of the power systems, cable and raceway routing, lighting and
grounding.
• Preparation and developing of detailed main single line Diagram schematic in AutoCAD.
• Maximum demand estimation including future load and deciding voltage level.
• Design, power quality meters, C.T and V.T Connections for substations.
• Responsible for short circuit calculations, voltage drop calculations, Power and cable size calculations.
• Develop power plan distribution, substation and equipment layout and sections.
• Prepare motor control diagrams and control elementary diagrams.
• Sizing of generators, load flow studies and lighting calculations.
• Main cable size calculations for motors and loads.
• ETAP Relay coordination studies and prepare relay setting for MV and LV loads.
• Design of grounding system & Lightning protection systems, Ground grid and grounding layout.
• Preparation of Cable Schedule in MS Excel and estimation of cable lengths
3. • Review of power electronics UPS, Variable frequency.
• Review of DC power system Battery racks and Battery chargers.
• Estimation for material and electrical equipment products & BOQ.
• Preparing the RFQ and reviewing the quotation for materials and electrical equipments.
• Prepare PLC/DCS wiring and interconnection diagrams.
• Review of all instrumentation drawings, Hook- up Block diagram, P&ID, ILD, cause and effect diagram, instrument
location plan. Conduit riser diagram.
• Used 2D Micro station, 3D modeling and Auto Cad 14.
• Fully conversant with global standards like IEC, NEC, NFPA, IEEE standards.
• Review of all instrumentation drawings, Block diagram, P&ID, ILD, cause and effect diagram, instrument location
plan. Conduit riser diagram.
MR Al- Kathlan Co. (EPCC) – Saudi Arabia.
November 2009- February 2013.
Project : Jubail Export Refinery Project (JERP)- Saudi Aramco and Total Refining And
Petrochemical –SATORP, Jubail.
Package 5C: Auxiliary Utilities
(From 21st
April,2012 to 17th
Feb,2013)
Project : King Abdullah Petroleum Studies and Research Centre (KAPSARC) - Riyadh
Utility and solar plant Packages. (From 17th
July, 2010 to 18th
April, 2012)
Project : Upgrade Community Sanitary Wastewater Treatment Facility project
(UCSWTP) – PETRO RABIGH. (From 20th
Nov, 2009 to 15th
July, 2010)
Sr. Electrical Engineer
Roles & Responsibilities
• Reviewing Electrical design includes single line diagrams, plan power distribution, substation, lighting calculations
circuiting, motor control diagrams, control elementary diagrams, PLC/DCS wiring and interconnection diagrams.
• Selection of Transformer/DG capacity and number with necessary metering & protection.
• Selecting the location of load center & captive power generation station.
• Segregation of estimated maximum demand into individual load centers.
• Short circuit & voltage drop calculation at each level of distribution.
• Selection of HV & LV switchgear based on breaking, making & short time capacity.
• Selection of HV & LV cables based on thermal, short circuit & voltage drop based ampacity.
• Preparation of sectional drawing of HV & LV switches board and bus bar sizing.
• Design of earthing and lightning protection system. Earthing ground grid and layout.
• Design of fire and safety in substation, trenches and other parts of electrical systems.
• Preparation of power and control cable schedule.
• Preparation of building plan & equipment layout such as point of supply and cable trench layout.
• Design protection & control scheme and physical design of 345kv/115/kv/34kv substations, Saudi Arabia.
• Installation and commissioning of substations physical system and protection scheme.
• Emergency DG and Motor control center, MV & LV electrical room layout.
• Lighting, Power and UPS layout with distribution scheme.
4. • Coordinated cable tray and raceway layout with detailed sections.
• Developing interconnection drawing of control signals from electrical systems to DCS via interposing relay panel.
• Handled electrical package equipment like Heat tracing & cathodic protection system.
• Review of termination drawings and instrument Loop Diagrams for all systems.
• Ensuring compliance to all applicable codes and standards
• Installation and Commissioning assistance of new control systems DCS, ESD (Invensys).
Telecommunication:
Voice connection: With UTP CAT-6 cable conduits, cable supports for others communication system such
as paging.
Paging/Party system: With U jelly filled cable GTC# 7139-001/ stub-cable protection kit B-97029 T/D
cabinet GTC # C-85096
Outside plant cabling: Approximately 4 KM Concrete Encased duct Bank to install UEF 200Pair/22AWG
cable and 1 KM Concrete Encased duct Bank to install UEF 25Pair/22AWG cable
Inside plant Building: (Sub-Station) With EMT conduit, cable 4 Pair/24AWG CAT-6 UTP cables homerun
from telecom cabinet to individual outlet and CAT-6 Belden/CDT structured cabling system
Instrumentation:
PLC (Honeywell) based chiller control system in the local instrument room.
Refrigerant Leak Detection System (RLDS) Beacon and Horn in local instrument room and equipment area.
Digital and analog marshalling and system cabinet in the local control room and required field Junction
boxes.
Field instruments as per instrument specification sheet, drawings and instrument installation schedule.
Terminate all the cables associated with PLC based control system.
Interface the required start, stop, status and any other signal to MCC and LCP.
Familiar with process flow diagram (PFD), piping layout and isometric piping details.
Installation of pump and motors with the limiting torque system.
HVAC layout, HVAC Air flow - AHU, HVAC schematic and control diagram.
Familiar with plumbing layout, water piping layout and drainage/waste/vent layout.
Installation of concrete encased 6” and 4” diameter PVC ducts.
Foundation Details of electrical equipments which includes outdoor switch gears, Power Transformers, Package
substation, area lighting and Street lighting.
Sterling Electro Enterprise Pvt. Limited.
June 2007 - October 2009.
Project : 220KV KERELA STATE ELECTRICITY BOARD - India.
(25th
Nov 2008 to 17th
October 2009)
Project : Mangalore Refinery and Petrochemical Limited (MRPL) –Mangalore, India
(From 7th
July, 2007 to 17th
Nov, 2008)
Assistant Electrical Engineer.
Roles & Responsibilities
• Distributed power according to prepared list of MV/LV substations and electrical equipment’s.
• Adhere to the provisions contained in the Electricity Act 2003 and the supply code.
• Verified project designs to ensure operational accountability.
• Reviewed system design in coordination with external vendors ,project design to ensure operational accountable.
• Monitored power distribution system features such as single-line diagrams and electrical equipment layouts.
5. • Attend and depute personnel for training in consultation with the training centers of KSEB.
• Responsible for operation & maintenance , troubleshooting of mechanical and electrical equipments.
• 33KV, 11KV, 415V Power control centers and Motor Control Centers along With its connected switch gears.
• Electrical driven and diesel driven fire water pump and controller.
• LV power and lighting distribution panels, Junction boxes , Disconnecting and manual transfer switches.
• Outdoor area lighting, Street lighting, and building lighting and toggle switches, relays (static & magnetic)
• Implementing routine, preventive, corrective, predictive, breakdown maintenance functions with safety & PTW.
• Establishing operating procedures and preparing technical reports and documents.
Organization and Affiliations.
• Saudi Council of Engineers Member 2011
Riyadh, Kingdom of Saudi Arabia
Communication Skills.
Language Known : English, Hindi, Kannada, Malayalam, Tamil, Arabic
Soft Skills: Team work and collaboration, adaptability, Problem solving, Critical Observation, Conflict Resolution.
Academic Qualifications.
• Bachelor of Technology in Electrical & Electronics Engineering (B-TECH)
University of Kannur, Kerala, - India
Graduated: July 2007
• Electrical Design Engineering Course at Smart Brains Engineers & Technologists Private Limited on March 2013.
• Pursuing MBA at Sikkim Manipal University-Distance Education Program.
Project Handled.
1. Ras Tanura Integrated Project (RTIP)- Saudi Aramco Dow and Refining at
Ras Tanura –SADARA, Jubail.
2. Jubail Export Refinery Project (JERP)- Saudi Aramco and Total Refining and
Petrochemical –SATORP, Jubail.
3. King Abdullah Petroleum Studies and Research Centre (KAPSARC) - Riyadh
Utility and solar plant Packages, Riyadh.
4. Upgrade Community Sanitary Wastewater Treatment Facility project
(UCSWTP) – PETRO RABIGH.
5. Hindustan Petroleum Corporation Limited (HPCL) –Mangalore, India
6. Mangalore Refinery and Petrochemical Limited (MRPL) –Mangalore, India
7. 220KV KERELA STATE ELECTRICITY BOARD - India.
Personal Details.
Date of Birth : January 26, 1985
Gender : Male
Nationality : Indian
Marital Status : Single
Religion : Hindu
Home Address : Kamalaksha Kripa, Hosdurg,
Kanhangad, Kerala , India.
Tel No: 0091- 9447438318.
Passport Details.
6. Passport Number : G6137737
Date of Issue : 15/01/2008
Date of Expiry ` : 14/01/2018
KRISHNAPRSAD.K.K
Date: 08-05-2016
7. Passport Number : G6137737
Date of Issue : 15/01/2008
Date of Expiry ` : 14/01/2018
KRISHNAPRSAD.K.K
Date: 08-05-2016