SlideShare a Scribd company logo
1 of 3
Download to read offline
Wathiq Alanbaki
430 Madison Ave,
Elizabeth, New Jersey 07201
http://wathiqalanbaki.wix.com/wathiq1
Projectengineer40@yahoo.com
8504056618
US CITIZEN
OBJECTIVE
To obtain a position in Power and Energy Systems Field .
EDUCATION
Master’s Degree inElectrical Engineering
Concentration is Power and Energy Systems
New Jersey Institute of Technology May 2016, GPA 3.5
B.S. in Electrical Engineering 2003
Honors: 1st place, Innovation Award – Power Systems Design
RELEVANT COURSEWORK
Renewable Energy Systems Power Systems Steady State Analysis Power Electronics
Transients in Power Systems Protection of Power Systems Power Distribution
MEMBERSHIPS
Institute of Electrical and Electronics Engineers (IEEE)
COMPUTER SKILLS
CAD 2015/2014, E-TAP, MS Office
PROJECTS AND ACTIVITIES
• Submitted a project regarding the Nuclear Power Plants in addition to design the PWR single line diagram of
Generator 1370 MVA -25 KV, GSU 345-25 KV,Unit Transformer 6.6-25 KV,Aux Transformer 345-6.6 KV
• Submitted a presentation regarding the solar PV System andThe Concentrated Solar Power Plants CSP.
• Researched new methodologies and developed new procedures to apply principles of electrical theories to the
projects such as using solar cells as a secondary source in generating power within the batteries panel.
• Performed testing of the automation and control systems based on the PLC(Allen-Bradley and IDEC) technology
• Designed robotic algorithms and software of an automotive industry and petroleum drilling systems
EXPERIENCE
POWER GUIDANCE – USA
2009-present
Project Engineer- Online Consultant
• Perform Engineering Consultations to ITECHO and Design the Operational Single Line Diagram and drawings of
(500 KV,138 KV, 132 KV, 33 KV, 11KV)
• Export Switchgear and Transformer spare parts (current transformers ,ammeters, contactors ,control relays AC &
DC, Timers)
• Prepare and provide guidance in preparing and developing the engineering deliverables for electric substation
projects- including the development of one & three line diagrams; schematics and wiring diagrams; relay settings and
calculations; control and relaying panel layouts and specifications; control and relaying panel and equipment wiring
diagrams.
• Develop wiring diagrams and cable / conduit tables depending on schematics from GE & SEMIENS of the
(incoming cct, outgoing cct, battery panel, Alarm cct, Trip cct, DC cct and etc...)
• Complete complex drawing packages with minimal/no supervision from sketches provided by others
ITECHO - JORDAN
2007-2009
Project Engineer
 Developed standard commissioning and testing practices for high voltage equipment and associated protective relays
and controls equipment.
 Developed and issued a Design Build contract for furnishing, installing and testing a two (2) unequal segment, fixed
series capacitor bank, Segment 1- rated 2000A/ 98.16 MVAR/8.18 ohm and Segment 2 -
2000A/196.32 MVAR/16.36 ohm. SF6 gas circuit breakers were used for switching.
 Supervised on Hydroelectric Power Plant 230 kV - 13.8 kV Switchyard. Directed and performed the layout, design,
material specification, and preparation of equipment physical package, interconnection schematics
and wiring diagrams for the installation of four SF6 gas circuit breakers configured in a four-breaker ring bus
arrangement. Two new 50 MVA GSU transformers were installed. SEL microprocessor relays were utilized for
transformer, line, and switchyard bus protection.
• Performed conceptual layout, detailed design, major equipment procurement, bidding and construction engineering
for this 230/115kV substation constructed on a fast track schedule to meet oil pipeline pumping station loads.
• Supervised on installing 161 kV Substation , New Breaker and a Half and adding 160 MVAR Capacitor Bank .The
initial development of this yard consisted of re-terminating the 161 kV line in a three breaker ring-bus fashion, which
included a connection to the existing 161/69 kV transformer and the addition of two 161 kV, 30 MVAR
fuselessshunt capacitor banks. The project consisted of the addition of a new 161 kV, 60 MVAR fuseless shunt
capacitor bank and SF6 gas circuit breaker. Both substations required detailed material selection, ordering, tracking
and expediting.
• Replaced 138kV, 50MVA Transformer and 138kV , 132C Breakers in addition to develop Elementary Diagrams for
the 220/66kV Transformer Bank Protections, LBFB Protection for new and existing 220kV and 66kV Circuit
Breakers, 220kV Line Protection upgrades, 220kV and 66kV new Bus Differential Protection and new Under-
Frequency Load Shedding Scheme using GE and SEL relays.
• Managed a project to connect 1500kVA, 34.5kV-500V Dry-type traction power rectifier transformer, 600V DC
switchgear, and 600V AC/DC, 2000W, 72 diode rectifier.
• Performed commissioning and start-up engineering for inside plant construction projects in the Delivery Project and
Construction Management Organization (P&CM)
BAGHDAD COMPANY FOR GAS TURBINES LTD.- JORDAN
2005- 2007
Project Engineer
 Responsible for project management, scheduling, inspection and design of construction projects consisting of
underground feed, area layout, equipment used, labor and material estimates. Conducted designing of utility
substations and large factory distribution installations load capacities from 5-55 MVA.
• Responsible for creating design prints for construction of 2.4kV, 12kV, and 13.8kV, high voltage overhead feeder
for, cost-effectiveness, reliability, and extensions of circuits using AutoCAD, load flow and available fault analysis
studies prepared in EasyPower and ETAP software's.
• Supervised all construction and design of overhead, underground, and manhole routes of electrical services to client's
substation or utility substation on assigned project.
• Comprised sub-contractors list and supervise their projects and completion dates.
• Alternative energy source team advisor on using alternative energy sources included but not limited to wind power
technology, methane fuel source from garbage technology, solar power technology, clean coal technology, and other
fuel burning technologies to reduce or eliminate hazardous emissions.
• Completed tear out and redesign of 11,500V - 2400V utility substation
• All one-line schematic and equipment layout design drawings were completed in AutoCAD
• Supervised and troubleshoot electrical substations consisting of triple, dual, or single transformation, with 2000W
rectification that converts 491VAC to 625VDC. Programmed protection relay settings for cathode and feeder
breakers
• Responsible for planning, and designing, of 11.5kV - 2400V substation with redundancy feed from 2 adjacent utility
substations and assembling specs for 15kV metal clad secondary switchgear, including Cooper PST auto throw over
switch (A.T.O) 600A.
Specified project materials cost estimation, including overrun contingencies, and Specified primary cable size 750
MCM kcmilxlp 15kV w/concentric neutral
wathiq alanbaki

More Related Content

What's hot

Sam res (houston) O &G
Sam res (houston) O &GSam res (houston) O &G
Sam res (houston) O &GSam Mehta
 
Resume Rezaul Haque
Resume Rezaul HaqueResume Rezaul Haque
Resume Rezaul HaqueRezaul Haque
 
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSPower System Operation
 
Wind Loads on PV roof top solar installations.
Wind Loads on PV roof top solar installations.Wind Loads on PV roof top solar installations.
Wind Loads on PV roof top solar installations.David Cohen
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaBishal Rimal
 
Aldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgearAldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgearHariSantoso20
 
Seimic Qualification of Transformers - Pradeep ProSIM
Seimic Qualification of Transformers - Pradeep ProSIMSeimic Qualification of Transformers - Pradeep ProSIM
Seimic Qualification of Transformers - Pradeep ProSIMProSIM R & D Pvt. Ltd.
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsIrfan Vali
 
Sliding-mode controller for a photovoltaic system based on a ´ Cuk converter
Sliding-mode controller for a photovoltaic system based on a ´ Cuk converterSliding-mode controller for a photovoltaic system based on a ´ Cuk converter
Sliding-mode controller for a photovoltaic system based on a ´ Cuk converterIJECEIAES
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substationsharique_64
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan Dey
 
Gases insulation powerstation
Gases  insulation powerstationGases  insulation powerstation
Gases insulation powerstationraja sukumar
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MIrfan Vali
 

What's hot (20)

Rex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resumeRex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resume
 
Sam res (houston) O &G
Sam res (houston) O &GSam res (houston) O &G
Sam res (houston) O &G
 
Resume Rezaul Haque
Resume Rezaul HaqueResume Rezaul Haque
Resume Rezaul Haque
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
TESTING AND COMMISSIONING OF VSC HVDC SYSTEMS
 
Wind Loads on PV roof top solar installations.
Wind Loads on PV roof top solar installations.Wind Loads on PV roof top solar installations.
Wind Loads on PV roof top solar installations.
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokhara
 
Aldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgearAldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgear
 
Understanding power concepts rev 0
Understanding power concepts rev 0Understanding power concepts rev 0
Understanding power concepts rev 0
 
Power system 50 titles
Power system 50 titlesPower system 50 titles
Power system 50 titles
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
latest project list
 latest project list latest project list
latest project list
 
RVNL_Report_ppt
RVNL_Report_pptRVNL_Report_ppt
RVNL_Report_ppt
 
Seimic Qualification of Transformers - Pradeep ProSIM
Seimic Qualification of Transformers - Pradeep ProSIMSeimic Qualification of Transformers - Pradeep ProSIM
Seimic Qualification of Transformers - Pradeep ProSIM
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume Projects
 
Sliding-mode controller for a photovoltaic system based on a ´ Cuk converter
Sliding-mode controller for a photovoltaic system based on a ´ Cuk converterSliding-mode controller for a photovoltaic system based on a ´ Cuk converter
Sliding-mode controller for a photovoltaic system based on a ´ Cuk converter
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
 
Gases insulation powerstation
Gases  insulation powerstationGases  insulation powerstation
Gases insulation powerstation
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&M
 

Viewers also liked

Viewers also liked (12)

220kv grid wapda town lahore
220kv grid wapda town lahore220kv grid wapda town lahore
220kv grid wapda town lahore
 
Hipotiroidismo congénito
Hipotiroidismo congénitoHipotiroidismo congénito
Hipotiroidismo congénito
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 
Loxoscelismo y ofidismo en pediatria
Loxoscelismo y ofidismo en pediatriaLoxoscelismo y ofidismo en pediatria
Loxoscelismo y ofidismo en pediatria
 
A 220kV Substation
A 220kV SubstationA 220kV Substation
A 220kV Substation
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Social Media Facebook
Social Media FacebookSocial Media Facebook
Social Media Facebook
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
frogcelsat
frogcelsatfrogcelsat
frogcelsat
 

Similar to wathiq alanbaki

Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...Naveed Shahzad
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert ResumeLarry Hebert
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap
 
ASSET Project Engineer
ASSET Project EngineerASSET Project Engineer
ASSET Project EngineerMike Yost
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Avirup Ghosh
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACAravind Panasa
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Abdul Alim Dewan
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41Habib Ali Khan
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 

Similar to wathiq alanbaki (20)

Hesham Saafan C.V.1
Hesham Saafan C.V.1Hesham Saafan C.V.1
Hesham Saafan C.V.1
 
Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert Resume
 
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
venkatCV
venkatCVvenkatCV
venkatCV
 
ELEC.ENG CV
ELEC.ENG CVELEC.ENG CV
ELEC.ENG CV
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
ASSET Project Engineer
ASSET Project EngineerASSET Project Engineer
ASSET Project Engineer
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
 
DESIGN
DESIGNDESIGN
DESIGN
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 

wathiq alanbaki

  • 1. Wathiq Alanbaki 430 Madison Ave, Elizabeth, New Jersey 07201 http://wathiqalanbaki.wix.com/wathiq1 Projectengineer40@yahoo.com 8504056618 US CITIZEN OBJECTIVE To obtain a position in Power and Energy Systems Field . EDUCATION Master’s Degree inElectrical Engineering Concentration is Power and Energy Systems New Jersey Institute of Technology May 2016, GPA 3.5 B.S. in Electrical Engineering 2003 Honors: 1st place, Innovation Award – Power Systems Design RELEVANT COURSEWORK Renewable Energy Systems Power Systems Steady State Analysis Power Electronics Transients in Power Systems Protection of Power Systems Power Distribution MEMBERSHIPS Institute of Electrical and Electronics Engineers (IEEE) COMPUTER SKILLS CAD 2015/2014, E-TAP, MS Office PROJECTS AND ACTIVITIES • Submitted a project regarding the Nuclear Power Plants in addition to design the PWR single line diagram of Generator 1370 MVA -25 KV, GSU 345-25 KV,Unit Transformer 6.6-25 KV,Aux Transformer 345-6.6 KV • Submitted a presentation regarding the solar PV System andThe Concentrated Solar Power Plants CSP. • Researched new methodologies and developed new procedures to apply principles of electrical theories to the projects such as using solar cells as a secondary source in generating power within the batteries panel. • Performed testing of the automation and control systems based on the PLC(Allen-Bradley and IDEC) technology • Designed robotic algorithms and software of an automotive industry and petroleum drilling systems EXPERIENCE POWER GUIDANCE – USA 2009-present Project Engineer- Online Consultant • Perform Engineering Consultations to ITECHO and Design the Operational Single Line Diagram and drawings of (500 KV,138 KV, 132 KV, 33 KV, 11KV) • Export Switchgear and Transformer spare parts (current transformers ,ammeters, contactors ,control relays AC & DC, Timers) • Prepare and provide guidance in preparing and developing the engineering deliverables for electric substation projects- including the development of one & three line diagrams; schematics and wiring diagrams; relay settings and calculations; control and relaying panel layouts and specifications; control and relaying panel and equipment wiring diagrams. • Develop wiring diagrams and cable / conduit tables depending on schematics from GE & SEMIENS of the (incoming cct, outgoing cct, battery panel, Alarm cct, Trip cct, DC cct and etc...) • Complete complex drawing packages with minimal/no supervision from sketches provided by others
  • 2. ITECHO - JORDAN 2007-2009 Project Engineer  Developed standard commissioning and testing practices for high voltage equipment and associated protective relays and controls equipment.  Developed and issued a Design Build contract for furnishing, installing and testing a two (2) unequal segment, fixed series capacitor bank, Segment 1- rated 2000A/ 98.16 MVAR/8.18 ohm and Segment 2 - 2000A/196.32 MVAR/16.36 ohm. SF6 gas circuit breakers were used for switching.  Supervised on Hydroelectric Power Plant 230 kV - 13.8 kV Switchyard. Directed and performed the layout, design, material specification, and preparation of equipment physical package, interconnection schematics and wiring diagrams for the installation of four SF6 gas circuit breakers configured in a four-breaker ring bus arrangement. Two new 50 MVA GSU transformers were installed. SEL microprocessor relays were utilized for transformer, line, and switchyard bus protection. • Performed conceptual layout, detailed design, major equipment procurement, bidding and construction engineering for this 230/115kV substation constructed on a fast track schedule to meet oil pipeline pumping station loads. • Supervised on installing 161 kV Substation , New Breaker and a Half and adding 160 MVAR Capacitor Bank .The initial development of this yard consisted of re-terminating the 161 kV line in a three breaker ring-bus fashion, which included a connection to the existing 161/69 kV transformer and the addition of two 161 kV, 30 MVAR fuselessshunt capacitor banks. The project consisted of the addition of a new 161 kV, 60 MVAR fuseless shunt capacitor bank and SF6 gas circuit breaker. Both substations required detailed material selection, ordering, tracking and expediting. • Replaced 138kV, 50MVA Transformer and 138kV , 132C Breakers in addition to develop Elementary Diagrams for the 220/66kV Transformer Bank Protections, LBFB Protection for new and existing 220kV and 66kV Circuit Breakers, 220kV Line Protection upgrades, 220kV and 66kV new Bus Differential Protection and new Under- Frequency Load Shedding Scheme using GE and SEL relays. • Managed a project to connect 1500kVA, 34.5kV-500V Dry-type traction power rectifier transformer, 600V DC switchgear, and 600V AC/DC, 2000W, 72 diode rectifier. • Performed commissioning and start-up engineering for inside plant construction projects in the Delivery Project and Construction Management Organization (P&CM) BAGHDAD COMPANY FOR GAS TURBINES LTD.- JORDAN 2005- 2007 Project Engineer  Responsible for project management, scheduling, inspection and design of construction projects consisting of underground feed, area layout, equipment used, labor and material estimates. Conducted designing of utility substations and large factory distribution installations load capacities from 5-55 MVA. • Responsible for creating design prints for construction of 2.4kV, 12kV, and 13.8kV, high voltage overhead feeder for, cost-effectiveness, reliability, and extensions of circuits using AutoCAD, load flow and available fault analysis studies prepared in EasyPower and ETAP software's. • Supervised all construction and design of overhead, underground, and manhole routes of electrical services to client's substation or utility substation on assigned project. • Comprised sub-contractors list and supervise their projects and completion dates. • Alternative energy source team advisor on using alternative energy sources included but not limited to wind power technology, methane fuel source from garbage technology, solar power technology, clean coal technology, and other fuel burning technologies to reduce or eliminate hazardous emissions. • Completed tear out and redesign of 11,500V - 2400V utility substation • All one-line schematic and equipment layout design drawings were completed in AutoCAD • Supervised and troubleshoot electrical substations consisting of triple, dual, or single transformation, with 2000W rectification that converts 491VAC to 625VDC. Programmed protection relay settings for cathode and feeder breakers • Responsible for planning, and designing, of 11.5kV - 2400V substation with redundancy feed from 2 adjacent utility substations and assembling specs for 15kV metal clad secondary switchgear, including Cooper PST auto throw over switch (A.T.O) 600A. Specified project materials cost estimation, including overrun contingencies, and Specified primary cable size 750 MCM kcmilxlp 15kV w/concentric neutral