Double Revolving field theory-how the rotor develops torque
Resume of mr. villasis nelson p. 2016 r1
1. Page 1
C U R R I C U L U M V I T A E
N E L S O N P E R A N T E V I L L A S I S
096 Manigbas St. Bolo Bauan, Bantangas City
+63999-354-56-03 / +63-043-980-0031
E-mail Address: villasisnelson@yahoo.com
villasisnelson@gmail.com
OBJECTIVE:
To have a trustworthy position in a company through efficient and active involvement in its
operations. Share my skills, knowledge and abilities for the success of the company and for the growth of
my career
PERSONAL DATA
PermanentAddress : 096 Manigbas St. Bolo Bauan, Bantangas City
Date of Birth : November 16, 1975
Place of Birth : Ilo-Ilo City
Age : 40 years old
Height : 5’5”
Weight : 85 kgs.
Gender : Male
Civil Status : Married
SUPPLEMENTAL INFORMATION
SSS No. : 04 - 0905949 – 0
T.I.N : 304-562-250-00
PassportNo : EC2256189
EDUCATIONAL QUALIFICATION
College GOLDEN GATE COLLEGES
Piprieto St. Batangas City
BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING
April 02, 2005
Secondary BAUAN HIGH SCHOOL
Bauan,Batangas
Primary BOLO ELEMENTARY SCHOOL
Bolo, Bauan,Batangas
Vocational Course ADVANCED BUSINESS CONSULTANCY CENTRE PHILS. INC.
ABCC Bldg. 127 M.H. Del Pilar St., Batangas City
AUTOCAD I
July 15, 2006 – August 26, 2006
TRAININGS AND SEMINARS ATTENDED:
GAS TURBINE POWER PLANTS SEMINAR
Held at the Golden Gate College
February 05, 2005
OCCUPATIONAL SAFETY AND HEALTH
Held on March 15-19 2004
Alpa Hotel Batangas City
OJT – KEPPEL BATANGAS
April 20, 2005 – June 14, 2005 (300 hrs.)
2. Page 2
PROFESSIONAL WORK EXPERIENCES
MAY. 11, 2016. PIPING ENGINEER
TO PRESENT JEL - Jurong Engineering Limited
PCP PENGERANG COGENERATION PLANT
RAPID PROJECT MALAYSIA
Responsible for the planning and erection of4 Units of HRSG Piping.
Monitoring the availability and quantity of all piping material thatneed on site erection.Direct coordination to client
regarding any deviation and clarification atsite erection.
Supervise the efficiency of manpower for every system and monitoring ofdaily progress againstprojecttarget
schedule.
REFERENCES
N. SUBRAMANIAN
Project Manager
Jurong Engineering Limited
PCP PENGERANG COGENERATION PLANT
MALAYSIA
Jan. 22, 2015. PIPING ENGINEER
March. 2016 JEL - Jurong Engineering Limited
Az-Zour North Phase 1 IWPP Project
KUWAIT
JOB DESCRIPTION
Responsible for the planning and erection ofRemenelization and 10 Units of Desalination Plantboth metallic and
GRP Piping.Also in-charge in the fabrication of all big/small bore piping and pipe support atfabrication as well as
blasting and painting.
Monitoring the availability and quantity of all piping material thatneed on site erection.Direct coordination to client
regarding any deviation and clarification atsite erection.
Supervise the efficiency of manpower for every system and monitoring of daily progress againstprojecttarget
schedule.
REFERENCES
Norlyne L. Gagarin
Project Manager
Jurong Engineering Limited
3. Page 3
Az-Zour North Phase 1 IWPP Project
KUWAIT
June 16, 2014. QA/QC SUPERVISOR
Sept. 15, 2014 Mitsubishi Heavy Industries,Ltd.
O Mon Thermal Power Plant Project Phase II
Lilama 45.1 Fabrication, Dong Nai Province,
Vietnam
JOB DESCRIPTION
Responsible for the implementation of quality control at fabrication site, supervises quality control
documentation and inspection in the piping fabrication in accordance with the existing codes and standards,
approved MHPS inspection procedures, and project specifications. monitoring for the actual piping progress
against project plan. and conduct weekly meeting for resolving any site deviation as will as the project
weekly progress. reviewing final package for final documentation hand over.
REFERENCES
Ms. Harumi Yasuda
Project Manager
Mitsubishi Heavy Industries,Ltd.
O Mon Thermal Power PlantProject Phase II
Lilama 45.1 Fabrication, Dong Nai Province, Vietnam
Feb. 05, 2013. PIPING ENGINEER
Mar. 31, 2014 JEL - Jurong Engineering Limited
Chana II Combined Cycle Power Project
124/5 Moo 1, Highway 43 Tambon Paching,
Chana Songkhla 90130,THAILAND
JOB DESCRIPTION
Responsible for the planning ofpiping erection as per approved piping erection sequence also in -charge for
widrawall ofpiping spools and permanentsupports as per priorityto be supplyon each piping team for ERECTION.
Performing actual site supervision to raise-up (RFI) RequestFor Information to any significantpiping deviation and
changes atsite condition.Also in-charges for the actual piping progress reportagainstprojectplan.Also incharge in
projectschedule implementation and coordination with the clientand other contractor and give instructions and
information to projectstaff and worker. Also supervise and implementthe company’s safety, health and
environmental program ,monitor and coordinate overall activities between revenue line to ensure efficiencyof
operation especiallyduring breakdown and peak hours . Execution of ECC walkdown and Preparation of Erection
Clearance Certificate (ECC) documents prior to commissioning.As well as, clearing ofpunch listitems for ECCs.
Preparation of Turn Over Package (TOP) documents prior to final hand over project.
REFERENCES
Nicholas Chen Nyit Kong
Project Manager
4. Page 4
Jurong Engineering Limited
Chana II Combined Cycle Power Project
124/5 Moo 1, Highway 43 tambon paching,
Chana Songkhla 90130, THAILAND
Feb. 01, 2012. QA/QC SUPERVISOR
Nov. 30 2012. Mitsui-Kinzoku Engineering Kabushiki-Kaisha
MESCO INC. PHILIPPINE BRANCH
TAGANITO MINING PROJECT
Claver, Surigao Del Norte 8410
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the off-site battery limit piping accordance with the existing codes and
standards, approved site erection and inspection procedures, and project specifications. Scope of
inspection includes all activities in piping, equipments, and structural works such as piping fit up check,
weld visual check, line check, pressure test, column alignment check, bolt tightness check,pump location
and elevation check, pump alignment check, erection completion check and others as statedin the approved
site erection and inspection procedures.
REFERENCES
Mr. MasaakiUemura
Site Manager
Taganito Mining Project
Claver Surigao Del Norte
PHILIPPINES
May 27, 2011. QA/QC SUPERVISOR
to Nov. 30 2011. Mitsubishi Heavy Industries, Ltd. ( MITSUI & CO. LTD)
PAITON-3 EXPANSION PROJECT
INDONESIA
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the boiler in accordance with the existing codes and standards, approved
site erection and inspection procedures, and project specifications. Scope of inspection includes all
activities in piping, equipments, and structural works such as piping fit up check, weld visual check, line
check, pressure test, packer plate location and elevation check, column alignment check, bolt tightness
check, grouting, pump location and elevation check, pump alignment check, erection completion check and
others as statedin the approved site erection and inspection procedures.
REFERENCES
Mr. Ryoichi Jono
QA/QC Manager
Mitsubishi Heavy Industries,Ltd.
Paiton – 3 Expansion Project
Indonesia
5. Page 5
May 15, 2010. QA/QC SUPERVISOR
May 7, 2011 Mitsubishi Heavy Industries, Ltd. (SUMITOMO CORPORATION BOILER
DIVISION)
TANJUNG JATI B. PROJECT UNIT 3&4
INDONESIA
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the boiler in accordance with the existing codes and standards, approved
site erection and inspection procedures, and project specifications. Scope of inspection includes all
activities in piping, equipments, and structural works such as piping fit up check, weld visual check, line
check, pressure test, packer plate location and elevation check, column alignment check, grouting, bolt
tightness check,pump location and elevation check, pump alignment check,erection completion check and
others as statedin the approved site erection and inspection procedures.
REFERENCES
Mr. Jun Sakamoto
QA/QC Manager
Mitsubishi Heavy Industries,Ltd.
Tanjung Jati B. Projecet
Indonesia
March 27, 2009. QA/QC SUPERVISOR
April 15, 2010 Mitsubishi Heavy Industries, Ltd.
SHUQAIQ II
(IWPP) IndependentWater & Power Plant Project
Jizan Province Kingdom of Saudi Arabia
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the boiler, turbine, and balance of plant (outdoor) areas in accordance with
the existing codes and standards, approved site erection and inspection procedures, and project
specifications. Scope of inspection includes all activities in piping, equipments, and structural works such
as piping fit up check,weld visual check, line check,pressure test, column alignment check, bolt tightness
check, tank/vessel location and elevation check, pump location and elevation check, pump alignment check,
erection completion check and others as stated in the approved site erection and inspection procedures.
Balance of plant areas include Fuel Gas Reducing Station, Piperack,Fuel Oil Pumphouse, Fuel Oil Tank area,
Emergency Diesel Generator area, Water Tank area,Water Treatment area, Seawater Intake area,Chlorination
area,Auxiliary Boiler area and Desalination Plants.
REFERENCES
Mr. Takayuki Okamoto
QA/QC Manager
Mitsubishi Heavy Industries,Ltd.
SHUQAIQ II
(IWPP) IndependentWater & Power Plant Project
6. Page 6
Jizan Province Kingdom of Saudi Arabia
June 07, 2008. QA/QC SUPERVISOR
February 28, 2009. Mitsubishi Heavy Industries,Ltd.
O Mon Thermal Power PlantProject
Can Tho Province, Vietnam
JOB DESCRIPTION
Responsible for the implementation of quality control at construction site, supervises quality control
documentation and inspection in the boiler, turbine, and balance of plant (outdoor) areas in accordance with
the existing codes and standards, approved site erection and inspection procedures and project
specifications. Scope of inspection includes all activities in piping, tanks/vessels, auxiliary equipments,
condenser, and structural works such as piping fit up check, weld visual check, line check,pressure test,
column alignment check, bolt tightness check, tank/vessel location and elevation check, pump location and
elevation check, pump alignment check, erection completion check and others as stated in the approved site
erection and inspection procedures. Balance of Plant areas include Fuel Oil Metering Station, Fuel Gas
Reducing Station, Piperack, Fuel Oil Tank Area, Fuel Oil Pumphouse, Fuel Oil Valve Station, Steam
Transformer area,Seawater Chlorination Plant, Water Treatment Plant, Seawater Intake area
REFERENCES
Mr. Yasuhisa Morinaga
QA/QC Manager
Mitsubishi Heavy Industries,Ltd.
O Mon Thermal Power PlantProject
Can Tho Province, Vietnam
November 2, 2006 Process Engineer
June 06, 2008 EEI CORPORATION - INCO - GORO Nickel Modularization Project
Sta. Maria Bolo, Bauan,Batangas
In-Charged in Traveler preparation/monitoring & Control on Over all Fabrication Shop Operation involving
Structural Pipe Supportand other ancillaries’ items.
Performs actual field-work inspections on related on going activities as to the use and type of materials,
quality of workmanship and for compliance with codes,contractplans,specifications and providing other
assistance in projectdevelopmentand Monitoring actual work projects as againstprojectschedule
represented bychart, updating work schedule and evaluates significantdeviation of actual project
performance from the projected activities. ;
Prepare daily report summaryof observation base on actual work progress and other design changes.
Reviews/Checks ofPiping Isometric fabrication drawing made bythe draftsman from IFC Clients drawing.
Updates traveler blocks a change notice and latestdrawing revision number and change notice
block on affected approved for fabrication drawings.
Reviews/Checks technical sketches/cutting list prepared bydraftsman.
Coordinates with Shop section supervisors on fabrication process workability.
Standard Code and project specification studies.
REFERENCES
Raul G. J. Dela Cruz
7. Page 7
Project Manager
EEI Corporation
GORO-Nickle Project
March 2005 – KMP STEEL FABRICATION
October 2006 (QC/ Quality Control / Project Coordinator)
In House Subcontractor of Babcock Hitachi Phils.Inc. (BHPI)
JOB DESCRIPTION
As Quality Control Engineer
Documentation ofthe reports to be submitted to the Quality Control DepartmentofBHPI. (especiallydimensions,
weld size, defects,etc.
Visual inspection ofwelds using penetranttesting (PT)
Inspection ofdimension according to drawing plan.
Check of cosmetics.
As Project Coordinator / Engineer
Scheduled and allocate manpower
Representatives in meetings
Responsible for the material take-offand cutting plans
As follow – upper
Time keeper
March 05, 2000 – CDS GENERAL CONTRACTOR
September 30, 2003 (Mechanical Fitter)
JOB DESCRIPTION:
Check - up and Calibration Clearance and Repair ofOverhauling any types of Pump such as:
a. RECIPROCATING PUMP
b. CENTRIFUGAL PUMP
c. SCREW PUMP AND CONDUCTORS
Disassemble and Assemble Lube Compressor Lube Oil Purifiers Lube Oil Coolers and Hydraulic Motors.
Check – up Clearance and Calibrate Intermediate Shaft, Anchor winch, Capstan, Rudder Stock and
Rudder Blades,Dismantle and Installing Propeller Shaftand the Propeller with Regards for Blue Fittings.
RE-aligning Pump Rooms Motors Generators Units and Reduction Gear with Re-engine Installation.
I hereby certify the statementI made are true and correct to the bestof my knowledge and beliefany false
information,misrepresentation,falsification and materials omission offacts may used as a ground for cancellation.I
am further authorizing this companyto conductan investigation ofmy personal background and inquire,through my
referees.