CURRICULUM VITAE SAIFUL NIZAM BIN IDERIS CAREER PROFILE
A WIDELY EXPERIENCED FITTER / FITTER FOREMAN
GENERAL SUPERVISOR & CONSTRUCTION SUPERINTENDENT
REPRESENTATIVE FOR OIL & GAS PROJECT OFFSHORE AND ONSHORE.
PERSONNEL DETAILS
Name : Saiful Nizam Bin Ideris
Nric No. : 780818-11-5411
Date Of Birth : 18 August 1978
Nationality : Malaysian
Marital Status : Married
Religion : Islam
Race : Malay
Health : Medically Fit
Weight : 65 Kg.
Height : 169 Cm
Resident Adress : 5589 Taman Rakyat Bestari 2, Jalan Rumah Murah Bukit Kuang
24000 Chukai Kemaman,Terengganu
E-Mail Address : Saiful4393@Gmail.Com
Phone No. : 013-3944393 / 013-9324393
Epf No. : 159633646
Income Tax No. :
Socso No. :
Bank Acc No. :
Safety Passport No. : A25006078 Expired July 2017
Medical Examination : Expire Jun 2016
Training & Courses : Offshore Safety Course - Helicopter Under
Attended Water Escape Training (Huet),
Sea Survival, Safety Orientation For Offshore/
Onshore And Fire Fighting @ TSTC ( Valid Jun 2016 )
: Professional Accident Investigation, Loss
Prevention System Train-The-Trainer,
Radiation Safety, Scaffolding Safety,
Eectrical Safety And Combustible
Gas Safety Course.
: Emergency Response Team Training.
: Hand And Fingger Injury Prevention Training
: Scaffolding Apperciation Course @ BSTS ( Valid July 2016)
: Incident Investigation Course @ BSTS ( Valid July 2016 )
: Permit To Work Applicant Course @ BSTS ( Valid July 2016 )
: Rigging And Slingging Course @ BSTS ( Valid Jun 2016)
: Safety ( HSE )Supervisory Course @ BSTS ( Valid Jun 2016 )
: Designated First Aider Course @ SMTC ( Valid July 2016 )
Education Background : 1997-1998
Institut Latihan Perindustrian Petronas(ILLP)
: 1995-1996
:
Sijil Tinggi Pelajaran Malaysia (STPM)
1991-1995
Languages :
Sijil Pelajaran Malaysia (SPM)
Malaysia & English.
Computer Knowledge Microsoft Excel, Microsoft Word And Microsoft
: Project.
Expected Salary :
Notice Period Required :
WORKING EXPERIENCES
EMPLOYER : PETRA ENERGY SDN BHD
CLIENT : SABAH SHELL EXPLORATION & PRODUCTION
EMPLOYMENT PERIOD : APRIL 2013 – MAY 2016
POSITION : CONSTRUCTION SUPERINTENDENT
LOCATION : SABAH WATER
PROJECT TITLE : GUMUSUT KAKAP SEMI FPS PROJECT
SCOPE OF WORK
 Thorough understanding of work scope, work load and project specification.
 Allocate work and specify responsibilities for accountability of assigned task and evaluation of
performance.
 Follows plans and strategize for work plan based on the overall project execution plan and
strategy.
 Monitor overall work schedule and resource mobilization plan based on work front (drawing
and material release) plan in association with project control.
 Implement three week look ahead schedule with inputs from Project Control Department and
draw up final weekly execution plan
 Review work front, progress and resource deployment against plan on weekly basis with
Subcontractors for timely completion of work against schedule. Identify potential threats to
safety, quality and progress of work; recommend mitigating measures to site management
and follow up for action.
 Monitors progress of pre-fabrication and erection works and reports to Construction
Manager on a daily basis.
 Coordinate with Superintendents of other disciplines at the project site and Construction
Manager to review work interfaces at field to minimize hold on work
 Preparation/implementation of Method Statement, Job hazard analysis, risk assessment and
mitigation plan in consultation with HSSE team for key activities
 Frequently assess Subcontractors’ work performance and quality standards to meet the
project specification and arrange technical workshop for supervisors and Tool-Box talk for
workmen for competency development
 Supervise and guide Subcontractor’s Supervisors for timely and accurate work execution.
Ensure that all the work activities are completed as per the quality norms and as per project
specifications.
 Supervise preparation and pre-fabrication erection works on site.
 Checks that Subcontractors pre-fabrication and erection equipment are satisfactory operating
and adequate for the job to be carried out.
 Daily coordinates with QC Inspectors.
 Monitors the preparation of the pre-commissioning operation in close coordination with QC
Inspectors and Construction Superintenden.
 Ensures that materials are stored and maintained in adequate conditions. Monitors the
management of materials and spare parts.
 Supervises pre-commissioning activities.
 Ensures that all subsystem/system is thoroughly check before and signed off prior to
commencement and that safety perimeters are establish in the vicinity of testing.
 Ensures routine good housekeeping is performed on site by Contractor.
 Responsible for establishing, promoting and maintaining a safe and hazard free working
environment.
 Carry out any other duties as and when required by the Construction Manager.
 Monitor and appraise construction work in the specific discipline.
 Ensure necessary corrective action taken in areas such as planning and scheduling , cost
control, subcontract administration, safety and quality of work.
 Proactive with contractor as need in successful completion of construction scope of work.
 Report progress, performance, issue and challenges at site to Site lead.
 Interpret SSPC drawing and specifications and advise fabricators on compliance.
 Represent SSPC and follow SSPC procedures in accordance to SSPC OIM’s.
 Review the contractor works, procedure, and schedule and monitor work progress, quality
and safety.
 Schedule, plan and direct the work of others supervisors , inspector, technician, vendor
representative and other personnel. Be responsible for checking subordinates work methods,
out put punctuality and job progress.
 Implements safe working practice and procedures to ensure that safe working conditions are
always maintained through work crew practising safe work methods.
 Report of work progress, current and near term plans, accident, near miss, and any order
significant events and incidents to immediate superior.
 Develop list incomplete works and punch list items and monitor program until completion.
 The Personnel is responsible for ensuring that all static equipment technical integrity,
readiness of all resources such as materials, procedures. All materials and equipments
 Supplied by Vendors and Company alike shall meet current SMEP current technical HSE
requirement. The incumbent shall ensure to exercise prudent control in delivering
maintenance activities in a cost effective approach and ensure costs are monitored and
tracked on daily basis
 To deliver Technical Integrity health of offshore production facilities to a state of 100%
reliability of mechanical static facilities.
 To manage, minimize and clear all deviated conditions of offshore facilities under the To
ensure all SIMOPS/SSP (Simultaneous Operation / Site Specific Procedure) requirements are
fulfilled and comply with current standards and Sarawak Assets management approvals are
obtained.stipulated timeframe
 To ensure HAZID (Hazard Identification) and risk assessment workshops are conducted for all
parties involved.
 To ensure all onshore fabrications of pipe spools and structures are completed in time for
offshore installation in accordance to current SMEP Maintenance Inspection Standards
 To ensure all Specific Work Procedures such as heavy lifting, complex and high risk
maintenance activities are covered.
 To ensure compliance to current HSSE standards with focus on 12 Life Saving Rules, Shell
Golden Rule and Goal Zero.
 To ensure that Hazards & Effects Management Planning (HEMP) is in place, and HSSE risks
associated identified has mitigation measures in place.
 To prepare and submit static mechanical inspection report and drawings to contractors for
fieldwork scoping activities, isometric drawings preparation and material take off
compilation.
 Able to make decisions during field execution to ensure progress are adhered to as planned
and/or come-up with alternatives to accommodate possible constraints onsit
EMPLOYER : CARIMIN ENGINEERING SDN BHD
CLIENT : PETRONAS CARIGALI SDN BHD
EMPLOYMENT PERIOD : MARCH 2010- FEB 2013
POSITION : CONSTRUCTION SUPERVISOR
LOCATION : SARAWAK WATER
PROJECT TITLE : SKO REVEJUNATION OF PIPE LINE
SCOPE OF WORK
 Reviews & Monitoring for all reports and forecasts, including summary of construction
progress, job manpower forecasts and the activities of subcontractors to ensure compliance
with specifications and procedures.
 Reviews schedules, construction methods and procedures as assigned & oversees the
implementation of work packages, from approval to work thru package closeout and post
maintenance testing.
 Inticipates with Job Hazard Analysis (JHA) group for potential Hazards in work areas and
analyzes with recommendation solutions or corrective actions.
 Latest construction management principles are to be implemented that will ensure the
constructions works are completed on time, within Safety code and to the required quality
 Any delay of scheduled that can either be prevented or mitigated are to be quickly reported
and suggested acceptable solutions to be implemented.
 Responsible directly to the Offshore Team Leader ( OTL )liaise with PCSB personnel on site (
as necessary ) to ensure smooth systematic execution of the project in accordance with the
agreed
 Supervision for clarify and organize all programmed work involved especially in plant work.
 Daily meeting with platform and other party supervision for the next day work activity
program.
 Lead construction activity from mobilization of manpower, tools & equipment, arrangement
of materials, fabrication, installation, function test, commissioning and deliver to client
EMPLOYER : RAMUNIA FABRICATOR SDN. BHD.
CLIENT : TALISMAN ENERGY
EMPLOYMENT PERIOD : AUGUST 2006 - DECEMBER 2008
POSITION : GENERAL SUPERVISOR
LOCATION : BLOCK PM-3 CAA & Kemaman Supply Base
( TALISMAN MALAYSIA LIMITED )
SCOPE OF WORK
 Hook-up, commisioning work & completion of other flow line installation work & shutdown
 Supervision for clarify and organize all programmed work involved especially in plant work
 Supervise the fabrication & installation related activties.
 Daily meeting with platform and other party supervision for the next day work activity
program
 Job planning & manning.
 To monitor shop fabrication and site instuction.
 BRA water injection modification.
 BRA cha mau launcher & 18'' riser piping installation.
 BRE cold tapping / cutting services for condensate return line.
 BOD, BOC & BOB installation of 8”& 6'' gas , oil
 Production flowline & 2'' vent flowline.
 Installation of BOD & BOC sdv service platform.
 Responsible directly to the Offshore Team Leader ( OTL )liaise with TALISMAN personnel on
site ( as necessary ) to ensure smooth systematic execution of the project in accordance with
the agreed
EMPLOYER : DAYANG ENTERPRISE
CLIENT : PETRONAS CARIGALI
EMPLOYMENT PERIOD : MAY 2005 - JULY 2006
POSITION : FITTER FOREMAN
LOCATION : SOUTH ANGSI - A , TERENGGANU
PROJECT TITLE : FABRICATION AND INSTALLATION ALL MATERIALS
PIPING AND STRUCTURE FOR UPGRADING PIPE LINE ANDRA-TCOT
SCOPE OF WORK
 Implementation of Piping & Structure Fabrication work for Petronas Carigali PCSB
 Lead Hydro Test team, prepare result & report for project handover
 Perform Tie in Pipe Spool to existing, Hook up & Commissioning
 Conduct daily toolbox meeting, sharing all the issues with construction Crew
 Involve in manpower planning, interpret drawing, site verification and Project Quality Plan
EMPLOYER : NIPPON STEEL CONSTUCTION (M)SDN BHD. (DB KURUSIO 1 & 2).
CLIENT : SHELL, CARIGALI, ESSO & TALISMAN ENERGY
EMPLOYMENT PERIOD : FEB 2002 - DEC 2003
POSITION : FITTER AND CLAMP OPTR FIT UP SUBSEA PIPELINE EQUIPMENT)
PROJECT TITLE : E11K-A , E11R-C COMPLEX INSTALLATION AND COMMISIONING.
SCOPE OF WORK
 B11P-A jacket installation.
 JNDR-A riser installation, exp spool and mid pt tie- in.
 B11P-A top side installation.
 Install ANDP-E jacket and top side.
 KINDP-A jacket and top side installation.
 Ketam mini platform-A and ketam vent-A
 Decommisioning and removal.
 MIDR-A vessel installation.
 Install BR-B to RDP-A 24'' OD x 158km pipe line.
 Install 32'' OD x 68km pipe line FROM P-A to E11R-B
EMPLOYER : SARKU ENGINEERING SERVICES SDN BHD.
CLIENT : PETRONAS CARIGALI
EMPLOYMENT PERIOD : MAC 2001 - AUG 2001
POSITION : PIPE FITTER
PROJECT TITLE : FABRICATION PIPING AND INSTALLATION DUYONG
REVISIT 111 PROJECT PETRONAS CARIGALI.
SCOPE OF WORK
 Follow the Various Applicable Documents (Specifications, Standards, Codes, Guidelines, Scope
Of Work & Regulation) and Most Stringent of those Requirement.
 Representation of Piping Installation, Field Adjustment as per isometric (P&ID) Design. To
Extract the Necessary Engineering, Data Engineering, Drawing Isometric Drawings
 Prepare The Hydro Test /Pneumatic Test Packages And Gets Approval From Clients. Carrying
Out the Hydro/Pneumatic Testing Of the Piping Systems As Per The Approved Test Loop
Package
 Conduct line check for completeness.
 Fabrication various kind pipe support as per drawing .
 Call client for finally line check. & restatement
 Clear the final punch list
EMPLOYER : DAYANG ENTERPRISE SDN BHD
CLIENT : PETRONAS CARIGALI
EMPLOYMENT PERIOD : JULY 1999 - SEPT 2001
POSITION : FITTER .
PROJECT TITLE : INSTALLATION PIPE LINE , FABRICATE AND INSTALLATION
OF VALVESTATION FOR PETRONAS
SCOPE OF WORK
 Conduct line check for completeness.
 Fill up and sign off the following inspection Test records (ITRS) as the pre/post Pressure test
activities progress.
 Issue the request for inspection (RFI) complete with associated test packs dossiers to QA and
client within 24hrs before flushing , then within 24hrs
 Before pressure testing and also immediately after reinstatement .
 Obtain permit to work from HSE dept , for each test package prior to performing the pressure
test.
 Follow the Various Applicable Documents (Specifications, Standards, Codes, Guidelines, Scope
Of Work & Regulation) and Most Stringent of those Requirement.
 Representation of Piping Installation, Field Adjustment as per isometric (P&ID) Design. To
Extract the Necessary Engineering, Data Engineering, Drawing Isometric Drawings
 Prepare The Hydro Test /Pneumatic Test Packages And Gets Approval From Clients. Carrying
Out the Hydro/Pneumatic Testing Of the Piping Systems As Per The Approved Test Loop
Packages.

More Related Content

What's hot (20)

CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQC
 
Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.
 
Mani cv
Mani   cvMani   cv
Mani cv
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Prakesh Welding Foreman CV
Prakesh Welding Foreman CVPrakesh Welding Foreman CV
Prakesh Welding Foreman CV
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
Resume MAR
Resume MARResume MAR
Resume MAR
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
 
Mech
MechMech
Mech
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 

Similar to CV 2016 (20)

Touseef cv
Touseef cvTouseef cv
Touseef cv
 
Gobi resume
Gobi resumeGobi resume
Gobi resume
 
Prem_CV
Prem_CVPrem_CV
Prem_CV
 
RaissAbinCV2
RaissAbinCV2RaissAbinCV2
RaissAbinCV2
 
Mohan Giri CV
Mohan Giri CVMohan Giri CV
Mohan Giri CV
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
 
Kit Capangpangan
Kit CapangpanganKit Capangpangan
Kit Capangpangan
 
Waseem HSE Officer CV
Waseem HSE Officer CVWaseem HSE Officer CV
Waseem HSE Officer CV
 
Naushad_CV 2016
Naushad_CV 2016Naushad_CV 2016
Naushad_CV 2016
 
HSE Engineer - sutan d
HSE Engineer - sutan dHSE Engineer - sutan d
HSE Engineer - sutan d
 
syed athar (1)
syed athar (1)syed athar (1)
syed athar (1)
 
MARS NOLAN RESUME 2
MARS NOLAN RESUME 2MARS NOLAN RESUME 2
MARS NOLAN RESUME 2
 
Murugan_Resume
Murugan_ResumeMurugan_Resume
Murugan_Resume
 
My CV
My CVMy CV
My CV
 
Bg cv
Bg cvBg cv
Bg cv
 
Senior HSE Engineer with 17 years experiences
Senior HSE Engineer with 17 years experiencesSenior HSE Engineer with 17 years experiences
Senior HSE Engineer with 17 years experiences
 
Shivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety ProfessionalShivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety Professional
 
SYED CV Updated
SYED CV UpdatedSYED CV Updated
SYED CV Updated
 
JUSTICE HSE CV
JUSTICE HSE CVJUSTICE HSE CV
JUSTICE HSE CV
 
Ahmad HSE2 - updated 2016 - Copy
Ahmad  HSE2 - updated 2016 - CopyAhmad  HSE2 - updated 2016 - Copy
Ahmad HSE2 - updated 2016 - Copy
 

CV 2016

  • 1. CURRICULUM VITAE SAIFUL NIZAM BIN IDERIS CAREER PROFILE A WIDELY EXPERIENCED FITTER / FITTER FOREMAN GENERAL SUPERVISOR & CONSTRUCTION SUPERINTENDENT REPRESENTATIVE FOR OIL & GAS PROJECT OFFSHORE AND ONSHORE. PERSONNEL DETAILS Name : Saiful Nizam Bin Ideris Nric No. : 780818-11-5411 Date Of Birth : 18 August 1978 Nationality : Malaysian Marital Status : Married Religion : Islam Race : Malay Health : Medically Fit Weight : 65 Kg. Height : 169 Cm Resident Adress : 5589 Taman Rakyat Bestari 2, Jalan Rumah Murah Bukit Kuang 24000 Chukai Kemaman,Terengganu E-Mail Address : Saiful4393@Gmail.Com Phone No. : 013-3944393 / 013-9324393 Epf No. : 159633646 Income Tax No. : Socso No. : Bank Acc No. : Safety Passport No. : A25006078 Expired July 2017 Medical Examination : Expire Jun 2016 Training & Courses : Offshore Safety Course - Helicopter Under Attended Water Escape Training (Huet), Sea Survival, Safety Orientation For Offshore/ Onshore And Fire Fighting @ TSTC ( Valid Jun 2016 ) : Professional Accident Investigation, Loss Prevention System Train-The-Trainer, Radiation Safety, Scaffolding Safety,
  • 2. Eectrical Safety And Combustible Gas Safety Course. : Emergency Response Team Training. : Hand And Fingger Injury Prevention Training : Scaffolding Apperciation Course @ BSTS ( Valid July 2016) : Incident Investigation Course @ BSTS ( Valid July 2016 ) : Permit To Work Applicant Course @ BSTS ( Valid July 2016 ) : Rigging And Slingging Course @ BSTS ( Valid Jun 2016) : Safety ( HSE )Supervisory Course @ BSTS ( Valid Jun 2016 ) : Designated First Aider Course @ SMTC ( Valid July 2016 ) Education Background : 1997-1998 Institut Latihan Perindustrian Petronas(ILLP) : 1995-1996 : Sijil Tinggi Pelajaran Malaysia (STPM) 1991-1995 Languages : Sijil Pelajaran Malaysia (SPM) Malaysia & English. Computer Knowledge Microsoft Excel, Microsoft Word And Microsoft : Project. Expected Salary : Notice Period Required :
  • 3. WORKING EXPERIENCES EMPLOYER : PETRA ENERGY SDN BHD CLIENT : SABAH SHELL EXPLORATION & PRODUCTION EMPLOYMENT PERIOD : APRIL 2013 – MAY 2016 POSITION : CONSTRUCTION SUPERINTENDENT LOCATION : SABAH WATER PROJECT TITLE : GUMUSUT KAKAP SEMI FPS PROJECT SCOPE OF WORK  Thorough understanding of work scope, work load and project specification.  Allocate work and specify responsibilities for accountability of assigned task and evaluation of performance.  Follows plans and strategize for work plan based on the overall project execution plan and strategy.  Monitor overall work schedule and resource mobilization plan based on work front (drawing and material release) plan in association with project control.  Implement three week look ahead schedule with inputs from Project Control Department and draw up final weekly execution plan  Review work front, progress and resource deployment against plan on weekly basis with Subcontractors for timely completion of work against schedule. Identify potential threats to safety, quality and progress of work; recommend mitigating measures to site management and follow up for action.  Monitors progress of pre-fabrication and erection works and reports to Construction Manager on a daily basis.  Coordinate with Superintendents of other disciplines at the project site and Construction Manager to review work interfaces at field to minimize hold on work  Preparation/implementation of Method Statement, Job hazard analysis, risk assessment and mitigation plan in consultation with HSSE team for key activities  Frequently assess Subcontractors’ work performance and quality standards to meet the project specification and arrange technical workshop for supervisors and Tool-Box talk for workmen for competency development  Supervise and guide Subcontractor’s Supervisors for timely and accurate work execution. Ensure that all the work activities are completed as per the quality norms and as per project specifications.  Supervise preparation and pre-fabrication erection works on site.  Checks that Subcontractors pre-fabrication and erection equipment are satisfactory operating and adequate for the job to be carried out.  Daily coordinates with QC Inspectors.
  • 4.  Monitors the preparation of the pre-commissioning operation in close coordination with QC Inspectors and Construction Superintenden.  Ensures that materials are stored and maintained in adequate conditions. Monitors the management of materials and spare parts.  Supervises pre-commissioning activities.  Ensures that all subsystem/system is thoroughly check before and signed off prior to commencement and that safety perimeters are establish in the vicinity of testing.  Ensures routine good housekeeping is performed on site by Contractor.  Responsible for establishing, promoting and maintaining a safe and hazard free working environment.  Carry out any other duties as and when required by the Construction Manager.  Monitor and appraise construction work in the specific discipline.  Ensure necessary corrective action taken in areas such as planning and scheduling , cost control, subcontract administration, safety and quality of work.  Proactive with contractor as need in successful completion of construction scope of work.  Report progress, performance, issue and challenges at site to Site lead.  Interpret SSPC drawing and specifications and advise fabricators on compliance.  Represent SSPC and follow SSPC procedures in accordance to SSPC OIM’s.  Review the contractor works, procedure, and schedule and monitor work progress, quality and safety.  Schedule, plan and direct the work of others supervisors , inspector, technician, vendor representative and other personnel. Be responsible for checking subordinates work methods, out put punctuality and job progress.  Implements safe working practice and procedures to ensure that safe working conditions are always maintained through work crew practising safe work methods.  Report of work progress, current and near term plans, accident, near miss, and any order significant events and incidents to immediate superior.  Develop list incomplete works and punch list items and monitor program until completion.  The Personnel is responsible for ensuring that all static equipment technical integrity, readiness of all resources such as materials, procedures. All materials and equipments  Supplied by Vendors and Company alike shall meet current SMEP current technical HSE requirement. The incumbent shall ensure to exercise prudent control in delivering maintenance activities in a cost effective approach and ensure costs are monitored and tracked on daily basis  To deliver Technical Integrity health of offshore production facilities to a state of 100% reliability of mechanical static facilities.
  • 5.  To manage, minimize and clear all deviated conditions of offshore facilities under the To ensure all SIMOPS/SSP (Simultaneous Operation / Site Specific Procedure) requirements are fulfilled and comply with current standards and Sarawak Assets management approvals are obtained.stipulated timeframe  To ensure HAZID (Hazard Identification) and risk assessment workshops are conducted for all parties involved.  To ensure all onshore fabrications of pipe spools and structures are completed in time for offshore installation in accordance to current SMEP Maintenance Inspection Standards  To ensure all Specific Work Procedures such as heavy lifting, complex and high risk maintenance activities are covered.  To ensure compliance to current HSSE standards with focus on 12 Life Saving Rules, Shell Golden Rule and Goal Zero.  To ensure that Hazards & Effects Management Planning (HEMP) is in place, and HSSE risks associated identified has mitigation measures in place.  To prepare and submit static mechanical inspection report and drawings to contractors for fieldwork scoping activities, isometric drawings preparation and material take off compilation.  Able to make decisions during field execution to ensure progress are adhered to as planned and/or come-up with alternatives to accommodate possible constraints onsit
  • 6. EMPLOYER : CARIMIN ENGINEERING SDN BHD CLIENT : PETRONAS CARIGALI SDN BHD EMPLOYMENT PERIOD : MARCH 2010- FEB 2013 POSITION : CONSTRUCTION SUPERVISOR LOCATION : SARAWAK WATER PROJECT TITLE : SKO REVEJUNATION OF PIPE LINE SCOPE OF WORK  Reviews & Monitoring for all reports and forecasts, including summary of construction progress, job manpower forecasts and the activities of subcontractors to ensure compliance with specifications and procedures.  Reviews schedules, construction methods and procedures as assigned & oversees the implementation of work packages, from approval to work thru package closeout and post maintenance testing.  Inticipates with Job Hazard Analysis (JHA) group for potential Hazards in work areas and analyzes with recommendation solutions or corrective actions.  Latest construction management principles are to be implemented that will ensure the constructions works are completed on time, within Safety code and to the required quality  Any delay of scheduled that can either be prevented or mitigated are to be quickly reported and suggested acceptable solutions to be implemented.  Responsible directly to the Offshore Team Leader ( OTL )liaise with PCSB personnel on site ( as necessary ) to ensure smooth systematic execution of the project in accordance with the agreed  Supervision for clarify and organize all programmed work involved especially in plant work.  Daily meeting with platform and other party supervision for the next day work activity program.  Lead construction activity from mobilization of manpower, tools & equipment, arrangement of materials, fabrication, installation, function test, commissioning and deliver to client
  • 7. EMPLOYER : RAMUNIA FABRICATOR SDN. BHD. CLIENT : TALISMAN ENERGY EMPLOYMENT PERIOD : AUGUST 2006 - DECEMBER 2008 POSITION : GENERAL SUPERVISOR LOCATION : BLOCK PM-3 CAA & Kemaman Supply Base ( TALISMAN MALAYSIA LIMITED ) SCOPE OF WORK  Hook-up, commisioning work & completion of other flow line installation work & shutdown  Supervision for clarify and organize all programmed work involved especially in plant work  Supervise the fabrication & installation related activties.  Daily meeting with platform and other party supervision for the next day work activity program  Job planning & manning.  To monitor shop fabrication and site instuction.  BRA water injection modification.  BRA cha mau launcher & 18'' riser piping installation.  BRE cold tapping / cutting services for condensate return line.  BOD, BOC & BOB installation of 8”& 6'' gas , oil  Production flowline & 2'' vent flowline.  Installation of BOD & BOC sdv service platform.  Responsible directly to the Offshore Team Leader ( OTL )liaise with TALISMAN personnel on site ( as necessary ) to ensure smooth systematic execution of the project in accordance with the agreed
  • 8. EMPLOYER : DAYANG ENTERPRISE CLIENT : PETRONAS CARIGALI EMPLOYMENT PERIOD : MAY 2005 - JULY 2006 POSITION : FITTER FOREMAN LOCATION : SOUTH ANGSI - A , TERENGGANU PROJECT TITLE : FABRICATION AND INSTALLATION ALL MATERIALS PIPING AND STRUCTURE FOR UPGRADING PIPE LINE ANDRA-TCOT SCOPE OF WORK  Implementation of Piping & Structure Fabrication work for Petronas Carigali PCSB  Lead Hydro Test team, prepare result & report for project handover  Perform Tie in Pipe Spool to existing, Hook up & Commissioning  Conduct daily toolbox meeting, sharing all the issues with construction Crew  Involve in manpower planning, interpret drawing, site verification and Project Quality Plan
  • 9. EMPLOYER : NIPPON STEEL CONSTUCTION (M)SDN BHD. (DB KURUSIO 1 & 2). CLIENT : SHELL, CARIGALI, ESSO & TALISMAN ENERGY EMPLOYMENT PERIOD : FEB 2002 - DEC 2003 POSITION : FITTER AND CLAMP OPTR FIT UP SUBSEA PIPELINE EQUIPMENT) PROJECT TITLE : E11K-A , E11R-C COMPLEX INSTALLATION AND COMMISIONING. SCOPE OF WORK  B11P-A jacket installation.  JNDR-A riser installation, exp spool and mid pt tie- in.  B11P-A top side installation.  Install ANDP-E jacket and top side.  KINDP-A jacket and top side installation.  Ketam mini platform-A and ketam vent-A  Decommisioning and removal.  MIDR-A vessel installation.  Install BR-B to RDP-A 24'' OD x 158km pipe line.  Install 32'' OD x 68km pipe line FROM P-A to E11R-B
  • 10. EMPLOYER : SARKU ENGINEERING SERVICES SDN BHD. CLIENT : PETRONAS CARIGALI EMPLOYMENT PERIOD : MAC 2001 - AUG 2001 POSITION : PIPE FITTER PROJECT TITLE : FABRICATION PIPING AND INSTALLATION DUYONG REVISIT 111 PROJECT PETRONAS CARIGALI. SCOPE OF WORK  Follow the Various Applicable Documents (Specifications, Standards, Codes, Guidelines, Scope Of Work & Regulation) and Most Stringent of those Requirement.  Representation of Piping Installation, Field Adjustment as per isometric (P&ID) Design. To Extract the Necessary Engineering, Data Engineering, Drawing Isometric Drawings  Prepare The Hydro Test /Pneumatic Test Packages And Gets Approval From Clients. Carrying Out the Hydro/Pneumatic Testing Of the Piping Systems As Per The Approved Test Loop Package  Conduct line check for completeness.  Fabrication various kind pipe support as per drawing .  Call client for finally line check. & restatement  Clear the final punch list
  • 11. EMPLOYER : DAYANG ENTERPRISE SDN BHD CLIENT : PETRONAS CARIGALI EMPLOYMENT PERIOD : JULY 1999 - SEPT 2001 POSITION : FITTER . PROJECT TITLE : INSTALLATION PIPE LINE , FABRICATE AND INSTALLATION OF VALVESTATION FOR PETRONAS SCOPE OF WORK  Conduct line check for completeness.  Fill up and sign off the following inspection Test records (ITRS) as the pre/post Pressure test activities progress.  Issue the request for inspection (RFI) complete with associated test packs dossiers to QA and client within 24hrs before flushing , then within 24hrs  Before pressure testing and also immediately after reinstatement .  Obtain permit to work from HSE dept , for each test package prior to performing the pressure test.  Follow the Various Applicable Documents (Specifications, Standards, Codes, Guidelines, Scope Of Work & Regulation) and Most Stringent of those Requirement.  Representation of Piping Installation, Field Adjustment as per isometric (P&ID) Design. To Extract the Necessary Engineering, Data Engineering, Drawing Isometric Drawings  Prepare The Hydro Test /Pneumatic Test Packages And Gets Approval From Clients. Carrying Out the Hydro/Pneumatic Testing Of the Piping Systems As Per The Approved Test Loop Packages.