SlideShare a Scribd company logo
1 of 5
John Keenan
SUMMARY:
Dedicated worker with over 10 years of experience within Industrial Construction settings. Well
regarded skills in providing optimum management, organization, collaborating with supervisors and
multidisciplinary team members. Committed to continued professional training. Effective in
management and communication skills. Efficient planner and excellent relations with subordinates;
as well as experienced in supervising assigned teammembers.
PROFESSIONAL EXPERIENCE
UP Professional Solutions (March 2015-Present)
Coordinator
CF Industries, Donaldsonville, LA
 Responsible for managing and overseeing the Contractors Construction activities and Quality
Control of project construction
 Responsible to coordinate, manage, and approve procurement of materials, equipment and
subcontracts, schedule development and daily update and reviews, coordinate and manage
onsite personnel and sub-contractors and daily coordination and productivity reporting and
meeting with CF Management for updates and issues resolution
UP Professional Solutions (Nov 2014-March 2015)
Mechanical Coordinator
Highlights of Contributions:
 Mechanical coordinator in the FCC unit
 Work scope involves replacing the Air Ring inside the Regenerator
 Also, overseeing multiple piping jobs, Valve replacements, and Office plate
replacements.
 Duties include making sure the contractor stays on schedule with the work scope,
make sure they complete the work they say they completed, help them oversee
obstacles, and make sure they are working safe and efficient.
H&H Technical Welding (2014-1014)
Supervisor of Pipe and Welding
Project: VALERO, Meraux, Louisiana
Highlights of Contributions:
 Foreman over welders for heavy wall and Alloy piping such as 1.25 Chrome, 2.25 Chrome,
321 Stainless Steel, 347 Stainless Steel
 Responsible for ordering and issuing all consumables such as; Welding wire and rods,
Grinding disk, Tungsten, Ear Plugs, Face shields, and all other PPE required
 Overseen track of hours per weld, keeping record of all delays such as; permits, weather,
and evacuations
 Planned all scaffold erections in advance for all welds
 In charge of keeping schedule updated with percentages of welds done per day
TWS (2013-2014)
General Foreman
Project: MARATHON REFINERY, Garyville, Louisiana
Highlights of Contributions:
 Coordinator over the Reactor tower with four chambers for 100% revamp
 Planned and laid out all blind points, and where internal parts per chamber went
 Made sure scaffold erections for demo of chambers and installation of new internal parts
per chambers
 Ensured all work was code work with several Alloys that required different welding wire
material such as; 2.25 Chrome, 309 Stainless Steel, and Inconel 82
 Responsible for making sure all material and equipment was available and ready for the job
such as; Fresh air equipment, Argon for welding, and Welding machines
H&H Technical Welding (2012-2013)
Quality Control
Project: VALERO, St. Rose, Louisiana
Highlights of Contributions:
 Overseen welding rod and wire material from multiple Alloy pipes such as 1.25 Chrome, 2.25
Chrome, Responsible for walking out all packages to insure work was completed according
to the details and specifications
 Overseen and visually inspected all welds made by H&H welders and brought about
corrections
 In charge of selling off and witnessing all hydro’s, blow-downs, and restorations as far as
piping systems performed
 Chrome, 309 Stainless Steel, 316 Stainless Steel, 321 Stainless Steel, 347 Stainless Steel,
Inconel, Duplex
Ohmstede Industrial
General Foreman
Project: BP, Decatur Alabama
Project: EXON MOBILE, Chalmette, Louisiana
Highlights of Contributions:
 In Charge of Ordering and receiving all material for piping projects
 Organized all piping for the day to day operations
 Well experienced and helped in the installation of Small bore piping such as, standard wall,
to Large bore piping up to schedule 160 wall
 Responsible for Making all the blind list for all blind points
 Coordinated all piping installation and had all the scaffolds built for demo piping, installing
piping, blinding piping, and welding pipe
Turner Industries (2011-2012)
General Foreman
Project: SHELL NORCO, Norco, Louisiana
 Coordinated all material for multiple turn-arounds within this project and responsible for
scheduling the manpower
 Multiple responsibilities such as Building and setting up packages, turning packages into
clients, and as well as laying out tie points
 Overseen all Planning, Scheduling, and Installation of piping
 Participated in helping the plant with Start-up Operations
SWS & TWS (2011-2012)
General Foreman
Project: MARATHON REFINERY, Garyville, Louisiana
Project: CONOCO PHILLIPS, Belle Chasse, Louisiana
Project: CF, Donaldsonville, Louisiana
Project: CITGO, Lemont, Illinois
Project: MARATHON REFINERY, Detroit, Michigan
Highlights of Contributions:
 Re-tubed a multitude of different heaters, from can heaters to conventional heaters
 Re-tubed 100% of heaters from convection boxes to radiant sections within these projects
 Familiar and experienced handling different size tubes in multiple heaters from 4 inch tubes
to 14 inch tubes
 Experienced and familiar with different types of Alloys such as; 9 chrome tubes, Inconel
tubes, 1.25 and 2.25 chrome tubes
Performance Contractors, Port Arthur, Texas (2010-2011)
Piping Scheduling and Planner
Project: MOTIVA EXPANSION
Highlights of Contributions:
 Managed all phases of production. Held additional responsibility as charge for overseeing
care, staff assignments, and setting a high standard for quality of work performed
 Ensured and promoted a safe working environment to prevent injuries
 Consistently exceeded call of duty by working through additional shifts
 Collaborated with multidisciplinary team members, working closely with supervisors and
peers to formulate, implement, and modify individual plans for daily production
Performance Contractors (2008-2010)
General Foreman
Project: MOTIVA EXPANSION PROJECT, Port Arthur, Texas
Project: MARATHON REFINERY, Garyville, Louisiana
Highlights of Contributions:
 Responsible for all Scheduling and planning of pipe installations
 In Charge of all cranes and planning of needs for day to day expansion
 In Charge of all packages and responsible for turning them into the clients
 Responsible for Coordinating all material for a productive work day
Turner Industries, Plaquemine, Louisiana (2007-2008)
General Foreman
Project: SHELL NORCO AND SHINTECH
Highlights of Contributions:
 Pipe Fabricator for maintenance
 General Foreman for exchanger crew
 Operator of trach-hoe at Shintech
 Responsible for Setup and Scheduling of Manpower needed over all equipment for the
exchanger crew
Cajun Constructors, Baton Rouge, Louisiana &
Valentine & LeBlanc Inc., Baton Rouge, Louisiana (2004-20007)
General Foreman
Project: DOW CAPSTONE
Highlights of Contributions:
 Installation of fire water lines
 Underground piping and utilities
 Lead man Under all Operations
 HDPE pipe fusing and installing
 Operating heavy duty equipment (Backhoe, Trach-hoe, Dozer, Directional Boring Rig)
Education and Certifications
 High School Diploma
 NCCER Industrial Pipefitter
 NCCER Basic Rigging
 Skill force Training

More Related Content

What's hot

Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updatedariel awayan
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3Kevin Hill
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdfCary Dela Cruz
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015JOHANNES JACOBUS PEENS
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd ResumeNathan Mudd
 
Planning Engineer CV Faizan
Planning Engineer CV FaizanPlanning Engineer CV Faizan
Planning Engineer CV FaizanFaizan Ahmed
 
Mark Graham CV Nov 2015
Mark Graham CV Nov 2015Mark Graham CV Nov 2015
Mark Graham CV Nov 2015Mark Graham
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny Daigrepont
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Marcel Boutin
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris Perry
 

What's hot (20)

QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
Ariel Awayan CV updated
Ariel Awayan CV updatedAriel Awayan CV updated
Ariel Awayan CV updated
 
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Kevin J Hill S3
Kevin J Hill S3Kevin J Hill S3
Kevin J Hill S3
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
Resume 12.5.16
Resume 12.5.16Resume 12.5.16
Resume 12.5.16
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
 
Joe Harris' Resume 2016
Joe Harris' Resume 2016Joe Harris' Resume 2016
Joe Harris' Resume 2016
 
Planning Engineer CV Faizan
Planning Engineer CV FaizanPlanning Engineer CV Faizan
Planning Engineer CV Faizan
 
Mark Graham CV Nov 2015
Mark Graham CV Nov 2015Mark Graham CV Nov 2015
Mark Graham CV Nov 2015
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)
 

Viewers also liked

Viewers also liked (20)

MANSOUR ALKAZAZ CV WITH PIC-new (3) (1)
MANSOUR ALKAZAZ CV WITH PIC-new (3) (1)MANSOUR ALKAZAZ CV WITH PIC-new (3) (1)
MANSOUR ALKAZAZ CV WITH PIC-new (3) (1)
 
Anticoagulación en el anciano
Anticoagulación en el ancianoAnticoagulación en el anciano
Anticoagulación en el anciano
 
CSUCI Powerpoint Feb 2016
CSUCI Powerpoint Feb 2016CSUCI Powerpoint Feb 2016
CSUCI Powerpoint Feb 2016
 
De Anza Feb 2016 PPT
De Anza Feb 2016 PPTDe Anza Feb 2016 PPT
De Anza Feb 2016 PPT
 
Imágenes directas123
Imágenes directas123Imágenes directas123
Imágenes directas123
 
Wheaton Powerpoint March 2016
Wheaton Powerpoint March 2016Wheaton Powerpoint March 2016
Wheaton Powerpoint March 2016
 
Interfaz de sonido- TRABAJO AUTÓNOMO.
Interfaz de sonido- TRABAJO AUTÓNOMO.Interfaz de sonido- TRABAJO AUTÓNOMO.
Interfaz de sonido- TRABAJO AUTÓNOMO.
 
Onicomicosis
OnicomicosisOnicomicosis
Onicomicosis
 
Gramalote (1)
Gramalote (1)Gramalote (1)
Gramalote (1)
 
Interfaz de sonido trabajo
Interfaz de sonido trabajoInterfaz de sonido trabajo
Interfaz de sonido trabajo
 
Interfaz de sonido trabajo
Interfaz de sonido trabajoInterfaz de sonido trabajo
Interfaz de sonido trabajo
 
Tenis de mesa dapatado bueno
Tenis de mesa dapatado buenoTenis de mesa dapatado bueno
Tenis de mesa dapatado bueno
 
Burnout
BurnoutBurnout
Burnout
 
Aporte individual Ana Tarapues
Aporte individual Ana TarapuesAporte individual Ana Tarapues
Aporte individual Ana Tarapues
 
Metcalf Resume
Metcalf ResumeMetcalf Resume
Metcalf Resume
 
#Yoga
#Yoga#Yoga
#Yoga
 
DABAR b
DABAR bDABAR b
DABAR b
 
Inceneritore rifiuti Calusco: P. Crosignani
Inceneritore rifiuti Calusco: P. CrosignaniInceneritore rifiuti Calusco: P. Crosignani
Inceneritore rifiuti Calusco: P. Crosignani
 
Lean Certification Parris Aaron
Lean Certification Parris AaronLean Certification Parris Aaron
Lean Certification Parris Aaron
 
Presentacion reconocimiento r diaz
Presentacion reconocimiento r diazPresentacion reconocimiento r diaz
Presentacion reconocimiento r diaz
 

Similar to John Keenan - Resume

Similar to John Keenan - Resume (20)

Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno Nobel
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong Resume-2
Gary Armstrong Resume-2
 
Resume
Resume Resume
Resume
 
Joubert_Dianna_Resume
Joubert_Dianna_ResumeJoubert_Dianna_Resume
Joubert_Dianna_Resume
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016
 
CV 3
CV 3CV 3
CV 3
 
Res414
Res414Res414
Res414
 
Tony Fox CV latest 06 May 2016
Tony Fox CV latest 06 May 2016Tony Fox CV latest 06 May 2016
Tony Fox CV latest 06 May 2016
 
Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
JVB_Resume_2016-7-6
JVB_Resume_2016-7-6JVB_Resume_2016-7-6
JVB_Resume_2016-7-6
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIR
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 

John Keenan - Resume

  • 1. John Keenan SUMMARY: Dedicated worker with over 10 years of experience within Industrial Construction settings. Well regarded skills in providing optimum management, organization, collaborating with supervisors and multidisciplinary team members. Committed to continued professional training. Effective in management and communication skills. Efficient planner and excellent relations with subordinates; as well as experienced in supervising assigned teammembers. PROFESSIONAL EXPERIENCE UP Professional Solutions (March 2015-Present) Coordinator CF Industries, Donaldsonville, LA  Responsible for managing and overseeing the Contractors Construction activities and Quality Control of project construction  Responsible to coordinate, manage, and approve procurement of materials, equipment and subcontracts, schedule development and daily update and reviews, coordinate and manage onsite personnel and sub-contractors and daily coordination and productivity reporting and meeting with CF Management for updates and issues resolution UP Professional Solutions (Nov 2014-March 2015) Mechanical Coordinator Highlights of Contributions:  Mechanical coordinator in the FCC unit  Work scope involves replacing the Air Ring inside the Regenerator  Also, overseeing multiple piping jobs, Valve replacements, and Office plate replacements.  Duties include making sure the contractor stays on schedule with the work scope, make sure they complete the work they say they completed, help them oversee obstacles, and make sure they are working safe and efficient. H&H Technical Welding (2014-1014) Supervisor of Pipe and Welding Project: VALERO, Meraux, Louisiana Highlights of Contributions:
  • 2.  Foreman over welders for heavy wall and Alloy piping such as 1.25 Chrome, 2.25 Chrome, 321 Stainless Steel, 347 Stainless Steel  Responsible for ordering and issuing all consumables such as; Welding wire and rods, Grinding disk, Tungsten, Ear Plugs, Face shields, and all other PPE required  Overseen track of hours per weld, keeping record of all delays such as; permits, weather, and evacuations  Planned all scaffold erections in advance for all welds  In charge of keeping schedule updated with percentages of welds done per day TWS (2013-2014) General Foreman Project: MARATHON REFINERY, Garyville, Louisiana Highlights of Contributions:  Coordinator over the Reactor tower with four chambers for 100% revamp  Planned and laid out all blind points, and where internal parts per chamber went  Made sure scaffold erections for demo of chambers and installation of new internal parts per chambers  Ensured all work was code work with several Alloys that required different welding wire material such as; 2.25 Chrome, 309 Stainless Steel, and Inconel 82  Responsible for making sure all material and equipment was available and ready for the job such as; Fresh air equipment, Argon for welding, and Welding machines H&H Technical Welding (2012-2013) Quality Control Project: VALERO, St. Rose, Louisiana Highlights of Contributions:  Overseen welding rod and wire material from multiple Alloy pipes such as 1.25 Chrome, 2.25 Chrome, Responsible for walking out all packages to insure work was completed according to the details and specifications  Overseen and visually inspected all welds made by H&H welders and brought about corrections  In charge of selling off and witnessing all hydro’s, blow-downs, and restorations as far as piping systems performed  Chrome, 309 Stainless Steel, 316 Stainless Steel, 321 Stainless Steel, 347 Stainless Steel, Inconel, Duplex
  • 3. Ohmstede Industrial General Foreman Project: BP, Decatur Alabama Project: EXON MOBILE, Chalmette, Louisiana Highlights of Contributions:  In Charge of Ordering and receiving all material for piping projects  Organized all piping for the day to day operations  Well experienced and helped in the installation of Small bore piping such as, standard wall, to Large bore piping up to schedule 160 wall  Responsible for Making all the blind list for all blind points  Coordinated all piping installation and had all the scaffolds built for demo piping, installing piping, blinding piping, and welding pipe Turner Industries (2011-2012) General Foreman Project: SHELL NORCO, Norco, Louisiana  Coordinated all material for multiple turn-arounds within this project and responsible for scheduling the manpower  Multiple responsibilities such as Building and setting up packages, turning packages into clients, and as well as laying out tie points  Overseen all Planning, Scheduling, and Installation of piping  Participated in helping the plant with Start-up Operations SWS & TWS (2011-2012) General Foreman Project: MARATHON REFINERY, Garyville, Louisiana Project: CONOCO PHILLIPS, Belle Chasse, Louisiana Project: CF, Donaldsonville, Louisiana Project: CITGO, Lemont, Illinois Project: MARATHON REFINERY, Detroit, Michigan Highlights of Contributions:  Re-tubed a multitude of different heaters, from can heaters to conventional heaters  Re-tubed 100% of heaters from convection boxes to radiant sections within these projects  Familiar and experienced handling different size tubes in multiple heaters from 4 inch tubes to 14 inch tubes
  • 4.  Experienced and familiar with different types of Alloys such as; 9 chrome tubes, Inconel tubes, 1.25 and 2.25 chrome tubes Performance Contractors, Port Arthur, Texas (2010-2011) Piping Scheduling and Planner Project: MOTIVA EXPANSION Highlights of Contributions:  Managed all phases of production. Held additional responsibility as charge for overseeing care, staff assignments, and setting a high standard for quality of work performed  Ensured and promoted a safe working environment to prevent injuries  Consistently exceeded call of duty by working through additional shifts  Collaborated with multidisciplinary team members, working closely with supervisors and peers to formulate, implement, and modify individual plans for daily production Performance Contractors (2008-2010) General Foreman Project: MOTIVA EXPANSION PROJECT, Port Arthur, Texas Project: MARATHON REFINERY, Garyville, Louisiana Highlights of Contributions:  Responsible for all Scheduling and planning of pipe installations  In Charge of all cranes and planning of needs for day to day expansion  In Charge of all packages and responsible for turning them into the clients  Responsible for Coordinating all material for a productive work day Turner Industries, Plaquemine, Louisiana (2007-2008) General Foreman Project: SHELL NORCO AND SHINTECH Highlights of Contributions:  Pipe Fabricator for maintenance  General Foreman for exchanger crew  Operator of trach-hoe at Shintech  Responsible for Setup and Scheduling of Manpower needed over all equipment for the exchanger crew
  • 5. Cajun Constructors, Baton Rouge, Louisiana & Valentine & LeBlanc Inc., Baton Rouge, Louisiana (2004-20007) General Foreman Project: DOW CAPSTONE Highlights of Contributions:  Installation of fire water lines  Underground piping and utilities  Lead man Under all Operations  HDPE pipe fusing and installing  Operating heavy duty equipment (Backhoe, Trach-hoe, Dozer, Directional Boring Rig) Education and Certifications  High School Diploma  NCCER Industrial Pipefitter  NCCER Basic Rigging  Skill force Training