SlideShare a Scribd company logo
1 of 11
Download to read offline
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 1
Personal date
Present address
Date of birth
Identification card #
Nationality/Race
Religion
107/223 M. 13, Bang Phil Yai, Bang Phil,
Samut Phakan 10540 Thailand.
July, 24, 1966
4 2102 00001 86 9
Thai
Buddhism
Education & Certifications
1987
2000
2009
2009
2015
Diploma in Civil Engineering / Chanthaburi Technical College., Thailand.
Business Safety Training/NPC., Thailand.
OSHA Safety Training/TTCL., Thailand.
Bolt Tensioning Operation & Maintenance / TET ALLIANCE ASIA PTE LTD., Singapore.
NDT Level ll Certificate Number: NDT-CNI-832 / CNI Pacific., Thailand.
Expertise
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2016 IS IS IS MG MG MG MG MG MG MG
2015 MG MG MG MG IS IS
2014 MG MG MG MG MG MG MG MG MG
2013 MG MG MG MG MG MG MG MG MG
2012 MG MG MG MG MG MG MG MG MG MG MG MG
2011 SP SP SP MG MG
2010 SP SP SP SP SP SP SP SP SP SP SP SP
2009 SP SP SP SP SP SP SP SP SP SP SP SP
2008 SP SP SP SP SP SP SP SP SP SP SP SP
2007 SP SP SP SP SP SP SP IS IS IS IS IS
2006 IS IS IS MG MG MG MG
2005 MG MG MG MG MG MG MG MG MG MG MG MG
2004 MG MG MG MG MG MG MG MG MG MG MG MG
2003 MG MG MG MG MG MG MG MG MG MG MG MG
2002 MG MG MG MG MG MG MG MG MG MG MG MG
2001 MG MG MG MG MG MG MG MG MG MG MG MG
2000 MG MG MG MG MG MG MG MG MG MG MG MG
1999 MG MG
1998
1997 SP SP SP SP SP SP SP
1996 SP SP SP SP SP SP SP SP SP SP SP
1995 SP SP SP SP SP SP SP SP SP SP SP SP
1994 DR DR DR DR DR DR DR SP SP SP
1993 FM FM FM FM FM FM FM FM FM
1992 IS IS FM FM FM FM FM FM FM FM FM FM
1991 DR DR DR DR DR DR DR DR DR DR IS
Experience Category Subcategory
9 Years (MG) Manager Construction & Project.
7 Years (SP) Supervisor Plant, QA/QC-Furnace, Civil, Steel Structure and Painting.
2 Years (IS) Inspector Civil, Steel Structure, Piping, Furnace and Painting.
2 Years (FM) Foreman Civil, Steel Structure and Piping.
2 Years (DR) Draftsman Civil & Steel Structure.
Special skills
Language knowledge/English Moderately.
Computer ability Microsoft office (WORD, EXCEL, POWER POINT, Auto CAD, Internet)
Summary work
Than twenty years of professional experience (1991 up to Present) for Engineering and Construction work of
Management, Inspector and Supervisor to Civil, Steel Structure, Furnace, Fire Heater, Vessel Tank, Piping and
Painting.
I flowing project Specification requirement for job reference codes; JSA, OSHA, HSSE, JSEA, EIA, AFC, ITP, ANSI/ASME,
Pressure piping, Power boilers and Pressure vessels, AWS, API, ASNT, ASTM, AISC & Various codes.
Present of work
Korat 2 and Korat 3 in Huay Bong Sub Distric, Dan Khun Tot Distric of Nakorn Ratchasima Province are Thailand’s first
major wind farm. The two wind farm projects have an installed combined capacity of 207 MW. (103 MW.each), In
total 90 wind turbines, each with 2.30 MW. capacity, are installed in the project.
The concrete foundations have shown some cracks and need to strengthening by the new part of the concrete
pedestal with install and stress the stressbars.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 2
Experience
Demco Public Company Limited
November, 2015 – Present.
QC Manager
Project
Main construction
Client/Location
Watabak Wind Project.
Demco Pcl.
Wind Engine Ltd. / Thep Sathit district of Chaiyaphum.
Responsibilities
WATABAK WIND FARM PROJECT; In Watabak sub-district, Thep Sathit district of Chaiyaphum Province is one of
Thailand’s major wind farms. The wind farm project has installed overall combined capacity of 60 MW in total 30
wind turbines.
Overall responsibility of the QA/QC process Issues all relevant inspection forms, standards, and review and sign all
final documents before Handover to the Owner Explain the QA/QC requirements to Project and Construction
Management Implementing and issuing the QA procedures as part of the QA system.
Working out the procedures under the scope Evaluating possible subcontractors and tenders regarding QA relevant
issues Definition of documentation and certification requirements for the subcontractors Document control, review
and reissuing of all QA specifications and procedures if modifications are necessary Processing and approving of
necessary deviations from the procedures and specifications.
Demco Public Company Limited
November, 2015 – March, 2016.
QA/QC Civil Engineer
Project
Main construction
Client/Location
First Korat Wind Project.
Demco Pcl.
Wind Engine Holding Ltd. / Dan Khun Tot district of Nakorn Ratchasima.
Responsibilities
- Monitors construction activities and quality control for strengthening work of 10 wind turbine’s foundations (WTG
No.13A, 14A, 27A, 29A, 31A, 32A, 33A, 34A, 43A & 44A) ensure compliance with plans, specifications, procedure,
standard code, quality control, Inspection test plan and schedule.
- Monitors construction activities for Quality control inspection of the reinforcement concrete works, post tension
stressbars, earth work and backfill.
- Review instruction manuals of construction materials and technical data to assist and advice onsite.
- Reviews and interprets working drawings to determine if information is adequate for successful completion of
construction.
SDB Construction Company Limited
December, 2014 – April, 2015
Project Consultant
Project
Main construction
Client/Location
CNS-E-85 Project.
SDB Construction Co., Ltd.
The Shell Company of Thailand Ltd. / Klongtoey district of Bangkok.
Responsibilities
- Helping clients in project planning, cost estimation, and solving structural issues.
- Helping clients in engineering design for civil and piping.
- Ensuring projects stay on budget and are completed within schedule.
- Studied building plans and made modifications in view of safety and comfort.
- Collaborated with contractors, project managers, and construction staff and maintained quality of projects.
- Improved building performance through continuous supervision and personal involvement.
- Researched and evaluated construction phases and ensured compliance with environment regulations.
- Reviewed design documents and submitted necessary documents to local authorities for construction clearance.
- Studied contract documents and guided clients in making necessary changes for maximizing accountability of
contractors.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 3
- Drafted technical documents and ensured work is carried on accordingly.
Aec Engineering & Construction Company Limited
September, 2013 – August, 2014
Project Manager
Project
Main construction
Client/Location
BCP Plant 3 Recondition Project.
Toyo-Thai Corporation Pcl.
Toyo-Thai Corporation Pcl. / Bangchak Petroleum Pcl., Bangchak district of Bangkok.
Responsibilities
- Supervision, production and safety of 300+ employees, ability to perform the job duties of each employee.
- Responsible for the project construction work as assigned.
- Establish and/or review construction execution plan.
- Involve in construction subcontracting strategy process.
- Participate in the subcontractor selection process.
- In-charge of the worksite and being the focal point for the Client and external parties.
- Manage and ensure all the construction team and subcontractors to perform the construction works meet the
target schedule, budget and quality with client’s and company’s HSE standard.
- Ensure the construction and quality procedures are implemented.
- Established and/or review organization chart of construction work and ensure that the site personnel are sufficiently
qualified and/or trained to perform their respective tasks.
- Resolve any construction issues which are related to quality, safety, cost and engineering.
- Promote and maintain a cheerful and friendly atmosphere among all parties at site.
- Review the work execution plan submitted by subcontractor. Ensure that it covers all relevant aspects i.e.
Construction task force, construction equipment, temporary facilities, construction method and safe working
conditions.
- Check and coordinate the 3 months look ahead schedule in each area in conjunction with IFC drawings and
material delivery schedule so that a proper mobilization plan of the construction force can be realized.
- Monitor the performance of discipline supervisors and Subcontractors.
- Foster and maintain relationship with Client and Subcontractors.
- Maintain good image with the various local authorities.
- Provide accurate information to the project manager and construction department manager with regards to site
conditions and progress.
- Primary responsible for weekly construction progress report to Client and Project Manager.
- Certified construction progress of the project.
- Ensure that QA/QC records are systematically filed and safety kept for handover operation, towards the end of the
construction work.
- Be actively involved/support during pre-commissioning and commissioning activities of the plant if required.
- Ensure the construction site closing either subcontracting contract close out cover all aspects.
Aec Engineering & Construction Company Limited
March, 2014 – May, 2014
Project Manager
Project
Main construction
Client/Location
BCP Plant 3 Turnaround Project.
Toyo-Thai Corporation Pcl.
Toyo-Thai Corporation Pcl. / Bangchak Petroleum Pcl., Bangchak district of Bangkok.
Responsibilities
- Supervision, production and safety of 300+ employees, ability to perform the job duties of each employee.
- Enable to take the requirements of the client to be implemented as on the designed drawings and finally to be
actually.
- Constructed with the agreed time frame, budget and quality as expected by the client and designers.
- Overall planning and control of project activities to ensure project completion is in accordance with the project
schedule.
- Coordinate with other departments associated with the project works to ensure project completion is in
accordance with the project schedule.
- Monitor project costs closely and minimize cost overrun (variation orders).
- Ensure contractual issues are resolved in a timely and satisfactory manner.
- Update monthly progress report and chair and coordinate planning meetings with relevant contractors and
departments.
- Chair site and coordination meetings with the contractor and client.
- Ensure that ISO, QA, QC procedures are followed.
- Ensure safety requirements are followed to reduce accidents and incidents on site.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 4
- Ensure successful completion of the project and customer satisfaction.
- Coordinate with finance for conclusion or final account etc.
Thai-Unitech Limited
September, 2012 – March, 2013
Project Manager
Project
Main construction
Client/Location
LNG Power Plant Project.
Thai-Unitech Ltd.
Bangkok Industrial Gas Co., Ltd. / Kasemskdi Trading Co., Ltd. Phetchaburi.
Responsibilities
- Supervision, production and safety of 60+ employees, ability to perform the job duties of each employee.
- Monitor all Project Management Procedures.
- Liaise with Clients to ensure their satisfaction with our performance.
- Issue progress claims to clients.
- Review and control of project drawings.
- Manage cost/estimation and contract specification.
- Prepare and issue the weekly/monthly progress reports.
- Prepare necessary document of shop drawing, material submittals required for customer approval.
- Monitor and control subcontractor work to meet the company standard. Ensure the projects meet schedule and
approval plan.
- Supervise the installation and commissioning of Electrical, Mechanical, Safety and Security System.
- Prepare all necessary documentation for the acceptance, handover and invoicing.
Thai-Unitech Limited
June, 2012 – August, 2012
Project Manager
Project
Main construction
Client/Location
Oxygen Station.
Thai-Unitech Ltd.
Bangkok Industrial Gas Co., Ltd. / Bankhai, Hospital, Rayong.
Responsibilities
- Supervision, production and safety of 30+ employees, ability to perform the job duties of each employee.
- Coordination of planning permissions together with planning agency.
- Design/Layout of oxygen systems and compressed air stations.
- Design of power supply and distribution systems.
- Negotiation and preparation of contracts of the different works.
- Coordination and supervision of the installations on site.
- Acceptance of the installations and hand over to the plants/plant manager and the maintenance manager.
- Compilation of basic documentations.
Thai-Unitech Limited
November, 2011 – August, 2012
Project Manager
Project
Main construction
Client/Location
Repair & Protection concrete structure for IRPC Jetty.
Thai-Unitech Ltd.
Civil Master Construction Co., Ltd. / IRPC Pcl. Rayong
Responsibilities
- Supervision, production and safety of 90+ employees, ability to perform the job duties of each employee.
- Coordination of planning permissions together with planning agency.
- Design/Layout of scaffolding.
- Controlling the quality of the project.
- Controlling of materials, parts, and components.
- Monitoring project progress and ensuring completion on time according to the agreed schedule.
- Coordinating between internal divisions, government organizations and subcontractors.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 5
Toyo-Thai Corporation Public Company Limited
April, 2010 – March, 2011
Painting & Insulation Supervisor
Project
Main construction
Client/Location
D-145 HPP02-HP Project.
Toyo-Thai Corporation public company limited.
MTP H.P.J.V. (Thailand) Ltd. / Map Taphut, Rayong.
Responsibilities
- Supervise and oversea coating and Insulation functions by communicating, planning, scheduling and monitoring
the work flow of assigned staff and sub-contractors.
- Assigns, plans and schedules work fronts for shop and site painting and blasting personnel performing various
coating duties.
- Develops and plans work schedule including associated equipment usage, painting expenditures and equipment
maintenance.
- Control during construction activities; ensuring QHSE practices are acceptable and that proper measures and
procedures are being implemented; ensuring that proper coating and insulation procedures are applied and that
proper consumables are used.
- Earned strong P&ID, isometric piping drawings and mechanical drawings development skills as project construction
requirements.
- Review method statement, project specification and technical queries for painting and insulation.
- Assure safety and quality measures before and after the work commence.
Toyo-Thai Corporation Public Company Limited
October, 2008 – April, 2010
Steel Structure Supervisor
Project
Main construction
Location
D-137-PTTPE LDPE Project.
Toyo-Thai Corporation Pcl.
PTT Polyethylene Co., Ltd. / Map Taphut, Rayong.
Responsibilities
- Plans and coordinates work, trains and motivates, monitors and evaluates performance of production laborers
within a specific department to ensure their ability to safely operate production equipment, cranes, and material
handling devices; counsels, disciplines and documents as necessary.
- Oversee the production operation of precast concrete products. Read production orders to determine job
specifications and requirements.
- Set up molds for specific products. Lift mold parts to assemble.
- Handle and assemble rebar cages per production specifications.
- Measure work piece dimensions to determine accuracy of mold set up.
- Perform quality control checks at critical points throughout the production process; conducts daily pre-pour
inspections of products to be cast; conducts post-pour inspections of cast products.
- Finish fresh concrete after it has been poured into prepared molds.
- Strip finished products from molds.
- Remove excess concrete from structure and mold by scraping by hand and using steel wool to clean.
- Performs clean-up and housekeeping duties; sweep floor; shovel excess debris.
- Operates any equipment needed to perform the job, such as the mixer, tow motors, overhead cranes, vibrators,
power tools, hand tools, etc.
- Perform related duties as requested and/or needed by other supervision.
Toyo-Thai Corporation Public Company Limited
July, 2007 – September, 2008
Civil & Steel Structure Supervisor
Project
Main construction
Location
D-140 Inthanon Project
Toyo-Thai Corporation Pcl.
Viny-Thai Pcl. / Map Taphut, Rayong
Responsibilities
- Supervision, production and safety of 120+ employees, ability to perform the job duties of each employee.
- Review method statement and advance comments, communicate with engineering and construction, resolve
construction issue on site, attended construction meeting about schedule/HES/quality, sign PTW every day, push
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 6
construction schedule, assist quality control, review bill of quantity.
BJC Heavy Industries public company limited
March, 2006 – July, 2007
QA/QC Supervisor
Project
Main construction
Location
Aromatic Company ATC Reformer and Aromatics Complex Project
ITT SpA (Fired heaters)
Aromatics Complex / Map-Taphut, Rayong
Responsibilities
- Kickoff meeting of pre – inspection with contractor & supplier.
- Review contractor & supplier quality document submitted for approval.
- Review contractor & supplier’s test and inspection report, final MDR data book.
- Witness Welder Qualification Test.
- Witness & Supervision of Welding Work, Post Weld Heat Treatment (PWHT)
- Witness Non Destructive Testing & Destructive Examination
- Witness Pressure Test and Flushing & Safety Valve Testing
- Witness & Supervision of Painting work & Insulation Work.
- Witness & Supervision of Mechanical Work (Machine Installation work)
- Co-ordinate with Contractor QA/QC Manager & Inspector
- QC Document Control System and etc.
- Ensuring effective inspection performance by contractor, by: Conduct inspections of all incoming equipment and
selected bulk materials
- Conduct regular inspections on fabrication and construction activities/Conduct shop inspections at local
fabricators
- Provide expertise on inspection techniques and methods as needed Verify compliance with agreed corrective
actions to non-conformances
- Witness selected NDE activities, review radiographs etc.
- Ensure safety performance in quality control (ionizing radiation, confined spaces etc.)
- Witness inspections and conduct acceptance inspections on behalf of the Owners team, incl.
- Assistance to mechanical discipline in witness inspections such as flange faces or bolt torque and in acceptance
testing such as equipment internal inspections before final closure.
- Witnessing of hydrostatic an pneumatic pressure tests for acceptance. Witnessing of safety relieve valves
calibration testing. Acceptance inspections of safety relief valves final installation, including interlock systems
verification. Quality Assurance: Having Knowledge of ISO, API, ASTM standards. Review for acceptance sub
contractor quality systems documentation, in respect of ITPs, procedures for quality control etc.
- Be pro-active in ensuring effective use of ITP and related documents in all quality monitoring activities.
- Audit sub-contractors on QA/QC matters.
- Audit compilation of the project quality records dossier. Be pro-active in ensuring effective implementation of
nonconformance and deviation control systems.
- Conduct technical and quality assessments of local subcontractors.
- Participate in quality audits. Assist in reviews of subcontractor quality dossiers and final system compilation manuals.
- Ownership of QA/QC initiatives within the Construction teams.
Aec Engineering & Construction Company Limited
July, 2004 – September, 2006
Construction Manager
Project
Main construction
Location
Construction & Piping HMC Site Project.
Bangkok Industrial Gas Co., Ltd.
HMC Polymers Co., Ltd. / Map-Taphut, Rayong.
Responsibilities
- Manage the construction project from start to finish.
- Perform a key role in project planning, budgeting, and identification of resources needed.
- Ensure that construction activities move according to predetermined schedule.
- Devise the project work plans and make revisions as and when need arises.
- Communicate effectively with the contractors responsible for completing various phases of the project.
- Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants, contractors,
sub-contractors and laborers.
- Monitor the progress of the construction activities on a regular basis and hold regular status meetings with all the
sub-teams.
- Maintain strict adherence to the budgetary guidelines, quality and safety standards.
- Periodic inspection of construction sites.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 7
- Ensure project documents are complete.
- Identify the elements of project design and construction likely to give rise to disputes and claims.
Aec Engineering & Construction Company Limited
February, 2003 – April, 2004
Construction Manager
Project
Main construction
Location
Hiring for Piping Installation (Plant 1-4 area) Project.
PTT Chemical Pcl.
PTT Chemical Pcl. / Map-Taphut, Rayong.
Responsibilities
- Plan, Manage and monitor detailed design and construction of projects
- Manage costs on each project
- Procure and contract as required
- Provide input on procurement and Technical Services strategies
- Identify, Monitor and manage key project risks
- Identify and document key lessons learnt and areas of opportunity upon project completion.
Aec Engineering & Construction Company Limited
May, 2001 – December, 2002
Construction Manager
Project
Main construction
Location
TA Recovery Project.
TPT Petrochemicals (Thailand) Co., Ltd.
TPT Petrochemicals (Thailand) Co., Ltd. / Map-Taphut, Rayong.
Responsibilities
- Identify manpower requirement for the project.
- Co-ordinate and maintain clients and subcontractors relationships.
- Monitor and provide direction for the financial progress of the projects.
- Control construction work performed by sub-contractors or own staff and co-ordinates with the heads of
departments and the client's engineers.
- Follow up the work progress reports and evaluated the performance of sub-contractors and own staff.
- Ensure project execution is in accordance with the conditions of contract and is efficiently managed.
- Advise Engineer team for analyzing tender and construction document.
- Review drawing and prepare detailed plan to achieve the requirement project schedule.
- Able to sign on construction supervision document.
- Co -ordinate with consultant, owner representative and management.
- Focus on handing contractual aspects of construction.
- Perform other related duties as assigned.
Aec Engineering & Construction Company Limited
November, 1999 – December, 2000
Construction Manager
Project
Main construction
Location
Fabrication & Installation Stanchion Sunshade Project.
PTT Chemical Pcl.
PTT Chemical Pcl. / Map-Taphut, Rayong.
Responsibilities
- Manage the construction project from start to finish.
- Perform a key role in project planning, budgeting, and identification of resources needed.
- Ensure that construction activities move according to predetermined schedule.
- Devise the project work plans and make revisions as and when need arises.
- Communicate effectively with the contractors responsible for completing various phases of the project.
- Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants, contractors,
sub-contractors and laborers.
- Monitor the progress of the construction activities on a regular basis and hold regular status meetings with all the
sub-teams.
- Maintain strict adherence to the budgetary guidelines, quality and safety standards.
- Periodic inspection of construction sites.
- Ensure project documents are complete.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 8
- Identify the elements of project design and construction likely to give rise to disputes and claims.
Thai Maintenance Contracting Company Limited
February, 1997 – August, 1997
Project Supervisor
Project
Main construction
Location
PA Module Unit Project.
Foster Wheeler Ltd.
Siam Styrene Monomer Co., Ltd. / Map-Taphut, Rayong.
Responsibilities
- Regular reporting to Regional Project Manager. On all project related activities.
- Strictly check delivery of material construction specification & standards.
- Coordinates with involved departments/contractors/engineering when required.
- Had to maintain high standards in achieving plant safety, quality products, as well as cost efficient production.
- Kept production schedule and maintained all set standards including maintaining excellent housekeeping
standards.
- Dealt with outside personnel regarding shipping, receiving, & packaging products.
- Trained personnel in OSHA safety regulations and First Aid.
- Attended daily production meetings with plant manager & plant department Supervisors.
- Reported any incidents or developments as they occurred including logistics and possible solutions.
- Responsible for employee discipline, write up, early dismissal, & referral to management.
- Familiar with the grievance process.
Sen - Thai Engineering Company Limited
October, 1995 – November, 1996
Project Supervisor
Project
Main construction
Location
Fired Heater 3 Unit Project.
CTCI (Thailand) Ltd.
Siam Styrene Monomer Co., Ltd. / Map-Taphut, Rayong.
Responsibilities
- To control construction site.
- Manage schedule, quality control, keep safety at site.
- Review and comment on drawing specifications and any other documents that may require for the project.
- Review and inspect the contractor capability in term of personal, equipment and other conditions with regard to
the contract/bid conditions and legal requirements.
- Where applicable provide suggestions or observations in respect to the element of the works.
- Carry out inspections based upon site specific requirements as directed by the line manager or QA/QC process.
- Assist with the development of the inspection process for the C&S/Finishing works at site.
- Record accurate inspections carried out in line with the site documents.
- Advise line manager and record where applicable any works not carried out in accordance with the drawings
and specifications.
- Check the work done by the contractor.
- Assist with the H&S at site and advise line manager of any infringements.
- Assist where required in the development of the commissioning procedures that are required for the project.
- Review and comment in respect to As Built Drawings and operations manuals.
- Provide support for the functional area of the project within which they are allocated, or for the project team as a
whole, as required by the structure of the project team.
- Monitor and advise line manager of all of the works within their specific area of concern.
- Any other duties that may be assigned as part of the construction works.
Sen - Thai Engineering Company Limited
March, 1995 – October, 1995
Plant Supervisor
Project
Main construction
Pipe Support EA Unit Project.
CTCI (Thailand) Ltd.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 9
Location Work Shop Sen-Thai / Map-Taphut, Rayong.
Responsibilities
- Preparation before welding (like WPS etc.)
- Personally inspection after job finishing (like dry survey & etc.)
- Job offering activity for all type Inspections (NDT).
- Make all inspection reports & data sheets.
- Maintain all data, reports & documents.
- Maintain the relation with 3rd party Inspector.
- Completing the job timely.
- Provide Guidance to site foremans.
Sen - Thai Engineering Company Limited
October, 1994 – March, 1995
Plant Supervisor
Project
Main construction
Location
Work Whop New Buildings Project.
Sen-Thai Engineering Co., Ltd
Work Shop Sen-Thai / Map-Taphut, Rayong.
Responsibilities
- Had to maintain high standards in achieving plant safety, quality products, as well as cost efficient production.
- Kept production schedule and maintained all set standards including maintaining excellent housekeeping
standards.
- Dealt with outside personnel regarding shipping, receiving, & packaging products.
- Trained personnel in OSHA safety regulations and First Aid.
- Attended daily production meetings with plant manager & plant department Supervisors.
- Reported any incidents or developments as they occurred including logistics and possible solutions.
- Responsible for employee discipline, write up, early dismissal, & referral to management.
- Familiar with the grievance process.
Emco (Thailand) Limited
February, 1994 – August, 1994
Steel Structure Draftsman
Project
Main construction
Location
VCM Project.
Viny-Thai Pcl.
Viny-Thai Pcl. / Map-Taphut. Rayong.
Responsibilities
- Basic design for steel structural and pipe support.
- Shop drawing design.
- Recheck shop drawing, addition and modification design, drawings will be check for correct revision.
- Mark off and Drilling will be verified as being in accordance AFC drawing.
- Fit up and alignment of base plates, gussets and such will be verified as being in accordance with AFC drawing.
- Erected steel structural, Stairways, Ladders, Platforms, Walkways and Hand-rill will be verified as being of true
alignment, and clipped, and in accordance with AFC drawing.
Vow Engineering Company Limited
August, 1992 – September, 1993
Piping Foreman
Project
Main construction
Location
Block 4 Project.
Ital Thai Co., Ltd.
Rayong Power Plant / Map-Taphut. Rayong.
Responsibilities
- Prepares material take‑off', layout appropriate systems and makes isometric and schematic sketches from
blueprints, specifications, submittals and job orders.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 10
- Participates in job planning for work packages, site set-up and construction schedules, Estimates worker hour
requirements to meet the needs of the construction plan.
- Establishes and adjusts work sequences to meet construction schedules utilizing knowledge of equipment
capacities and assigned personnel.
- Schedules and coordinates activities of assigned craft workers while communicating and coordinating schedules
with other trades.
- Operates and supervises operation of equipment and machinery such as backhoes, forklifts, man lifts, power tools
and tampers. Inspects work in progress and completed work to insure conformance to specifications.
- Coordinates placement and storage of materials, tools and supplies to support the construction plan.
- Eliminates construction and job site hazards as they are recognized to reduce safety incidents and their severity.
- Estimates cost for change orders and/or contracts. As required, works with tools to meet construction schedules or
other demands.
- Responsibly and professionally represents the project team and the company at formal and informal meetings with
customer counterparts.
- Assists in the relationship building with preferred customers by utilizing the concepts and techniques learned in
company-sponsored training.
- Protects the company’s interest by managing aspects of assigned work packages.
- Manages the proper utilization, maintenance and condition of all company owned/furnished equipment, power
tools, jigs, fixtures and consumables under his/her cognizance.
Beta Engineering & Chemical Company Limited
August, 1992 – September, 1993
Civil Draftsman & Civil Foreman
Project
Main construction
Location
CCR-2 Project
Thai Oil Pcl.
Thai Oil Pcl. (Refinery)/ Sriracha, Chonburi.
Responsibilities
- Monitoring And quality control plan.
- Monitor and track the performance of Foreman and contractors to standard construction steps correctly.
- Monitor contractor performance successfully as planned and the quality engineering.
- Problem-solving site to work within the given period of construction.
- Monitor and report the progress of the construction plans assigned by superiors.
- Record and report on the construction job.
Meisei International Company Limited
November, 1991 – March, 1992
QC Inspector
Project
Main construction
Location
Thai-Carbon Black Project
Mitsubishi Kakoki Kaisha Ltd. (MKK)
Thai Carbon Black / Sriracha, Chonburi.
Responsibilities
- Ensuring effective inspection performance by contractor, by: Conduct inspections of all incoming equipment and
selected bulk materials.
- Conduct regular inspections on fabrication and construction activities.
- Conduct shop inspections at local fabrication.
- Witnessing Welding Procedure Qualification tests, Welder Qualification tests and its approval.
- Witnessing Hot tapping operations.
- Provide expertise on inspection techniques and methods as needed Verify compliance with agreed corrective
actions to non-conformances.
- Witness selected NDE activities, review radiographs etc.
- Ensure safety performance in quality control (ionizing radiation, confined spaces etc.)
- Witness inspections and conduct acceptance inspections on behalf of the Owners team, incl.
- Assistance to mechanical discipline in witness inspections such as flange faces or bolt torque and in acceptance
testing such as equipment internal inspections before final closure.
- Witnessing of hydrostatic an pneumatic pressure tests for acceptance. Witnessing of safety relieve valves
calibration testing. Acceptance inspections of safety relief valves final installation, including interlock systems
verification, Quality Assurance: Having Knowledge of ISO, API, ASTM standards. Review for acceptance
subcontractor quality systems documentation, in respect of ITPs, procedures for quality control etc.
- Be pro-active in ensuring effective use of ITP and related documents in all quality monitoring activities
- Audit sub-contractors on QA/QC matters.
Mr. Wattana Poomsawad
+668-9149-4448
wpecl@mail.com
https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 11
- Audit compilation of the project quality records dossier. Be pro-active in ensuring effective implementation of
nonconformance and deviation control systems.
- Conduct technical and quality assessments of local subcontractors.
- Participate in quality audits. Assist in reviews of subcontractor quality dossiers and final system compilation manuals.
- Ownership of QA/QC initiatives within the Construction teams
- Apply an audit and review follow-up system with the principle Contractor, and lead / participate in such.
- Approving the QA/QC procedures, Inspection Test Plans and Quality assurance procedures and NDT procedures of
Contractors.
Sino-Thai Engineering & Construction public company limited
February, 1991 – November, 1991
Steel Structure Draftsman
Project
Main construction
Location
PVC Plan Project
Foster Wheeler Ltd.
Viny-Thai Pcl. / Map-Taphut. Rayong.
Responsibilities
- Basic design for steel structural and pipe support.
- Shop drawing design.
- Recheck shop drawing, addition and modification design, drawings will be check for correct revision.
- Mark off and Drilling will be verified as being in accordance AFC drawing.
- Fit up and alignment of base plates, gussets and such will be verified as being in accordance with AFC drawing.
- Erected steel structural, Stairways, Ladders, Platforms, Walkways and Hand-rill will be verified as being of true
alignment, and clipped, and in accordance with AFC drawing.

More Related Content

What's hot

Company Profile Pt Minspec Indonesia
Company Profile Pt Minspec IndonesiaCompany Profile Pt Minspec Indonesia
Company Profile Pt Minspec IndonesiaHabibie Razak
 
edwin cv for QA-QC Manager
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC ManagerEdwin Aguinaldo
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu Kodaniyil
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)Midel Dalangin
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. ZubairZubair Noor
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007sajid hasan
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMANSaif kharal
 
Cirriculum vitae pelis2
Cirriculum vitae  pelis2Cirriculum vitae  pelis2
Cirriculum vitae pelis2Peter Pelis
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Khalid Tamur , PMP®
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Dateyusuf khan
 
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019Jefferson Tomas Tulabot
 

What's hot (19)

Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Company Profile Pt Minspec Indonesia
Company Profile Pt Minspec IndonesiaCompany Profile Pt Minspec Indonesia
Company Profile Pt Minspec Indonesia
 
edwin cv for QA-QC Manager
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC Manager
 
MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CV
 
CV QUANPH - FEB 2019
CV QUANPH - FEB 2019CV QUANPH - FEB 2019
CV QUANPH - FEB 2019
 
Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
Cirriculum vitae pelis2
Cirriculum vitae  pelis2Cirriculum vitae  pelis2
Cirriculum vitae pelis2
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)
 
CV
CVCV
CV
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
 

Viewers also liked

Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...
Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...
Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...Dmitry Kushnir
 
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...Trinity Kings World Leadership(Family Archives): King President Obama Honors,...
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...Terrell Patillo
 
Servicios de Publicidad Onllie y Posicionamiento Web de Murcia.Portaldetuciud...
Servicios de Publicidad Onllie y Posicionamiento Web de Murcia.Portaldetuciud...Servicios de Publicidad Onllie y Posicionamiento Web de Murcia.Portaldetuciud...
Servicios de Publicidad Onllie y Posicionamiento Web de Murcia.Portaldetuciud...BMN
 
Estrategias de aprendizaje
Estrategias de aprendizajeEstrategias de aprendizaje
Estrategias de aprendizajeAriani Medina
 
Investigacion bibliografica
Investigacion bibliograficaInvestigacion bibliografica
Investigacion bibliograficaRodrigo Bernal
 
Place-Based Learning Supported by Technology
Place-Based Learning Supported by TechnologyPlace-Based Learning Supported by Technology
Place-Based Learning Supported by TechnologyS. Otto Khera
 
Ukie_Portfolio_ready(2)-1
Ukie_Portfolio_ready(2)-1Ukie_Portfolio_ready(2)-1
Ukie_Portfolio_ready(2)-1Alex Art
 

Viewers also liked (13)

Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...
Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...
Прогностичні моделі гідрологічних процесів вод Північно-Західного регіону Чор...
 
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...Trinity Kings World Leadership(Family Archives): King President Obama Honors,...
Trinity Kings World Leadership(Family Archives): King President Obama Honors,...
 
Bab 1
Bab 1Bab 1
Bab 1
 
Taguada rosa
Taguada  rosaTaguada  rosa
Taguada rosa
 
Bab 6
Bab 6Bab 6
Bab 6
 
Crudo petroleo Círculo de Empresarios
Crudo petroleo Círculo de EmpresariosCrudo petroleo Círculo de Empresarios
Crudo petroleo Círculo de Empresarios
 
Servicios de Publicidad Onllie y Posicionamiento Web de Murcia.Portaldetuciud...
Servicios de Publicidad Onllie y Posicionamiento Web de Murcia.Portaldetuciud...Servicios de Publicidad Onllie y Posicionamiento Web de Murcia.Portaldetuciud...
Servicios de Publicidad Onllie y Posicionamiento Web de Murcia.Portaldetuciud...
 
Comenzar
ComenzarComenzar
Comenzar
 
Estrategias de aprendizaje
Estrategias de aprendizajeEstrategias de aprendizaje
Estrategias de aprendizaje
 
Investigacion bibliografica
Investigacion bibliograficaInvestigacion bibliografica
Investigacion bibliografica
 
Place-Based Learning Supported by Technology
Place-Based Learning Supported by TechnologyPlace-Based Learning Supported by Technology
Place-Based Learning Supported by Technology
 
Bab 5
Bab 5Bab 5
Bab 5
 
Ukie_Portfolio_ready(2)-1
Ukie_Portfolio_ready(2)-1Ukie_Portfolio_ready(2)-1
Ukie_Portfolio_ready(2)-1
 

Similar to Wp 241016

Similar to Wp 241016 (20)

Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
CV-CE-0516
CV-CE-0516CV-CE-0516
CV-CE-0516
 
CV ref
CV refCV ref
CV ref
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
Yuthasil cv-june-2016-pp-1
Yuthasil cv-june-2016-pp-1Yuthasil cv-june-2016-pp-1
Yuthasil cv-june-2016-pp-1
 
Yuthasil-CV-June-2016-pp-1
Yuthasil-CV-June-2016-pp-1Yuthasil-CV-June-2016-pp-1
Yuthasil-CV-June-2016-pp-1
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Tin's CV
Tin's CVTin's CV
Tin's CV
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUME
 
resume paramatt1
resume paramatt1resume paramatt1
resume paramatt1
 
1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam
 
RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015
 
amit
amitamit
amit
 
Mochamad Kholik - CV
Mochamad Kholik - CVMochamad Kholik - CV
Mochamad Kholik - CV
 
Resume latest
Resume latestResume latest
Resume latest
 
Radhuan CV 2015 latest
Radhuan CV 2015 latestRadhuan CV 2015 latest
Radhuan CV 2015 latest
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
resume paramatt
resume paramattresume paramatt
resume paramatt
 

Recently uploaded

定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一z xss
 
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量sehgh15heh
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改yuu sss
 
Issues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxIssues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxJenniferPeraro1
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipSoham Mondal
 
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCRdollysharma2066
 
Application deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfApplication deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfCyril CAUDROY
 
Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Riya Pathan
 
tools in IDTelated to first year vtu students is useful where they can refer ...
tools in IDTelated to first year vtu students is useful where they can refer ...tools in IDTelated to first year vtu students is useful where they can refer ...
tools in IDTelated to first year vtu students is useful where they can refer ...vinbld123
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书saphesg8
 
格里菲斯大学毕业证(Griffith毕业证)#文凭成绩单#真实留信学历认证永久存档
格里菲斯大学毕业证(Griffith毕业证)#文凭成绩单#真实留信学历认证永久存档格里菲斯大学毕业证(Griffith毕业证)#文凭成绩单#真实留信学历认证永久存档
格里菲斯大学毕业证(Griffith毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样umasea
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxGry Tina Tinde
 
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607dollysharma2066
 
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一F La
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfpadillaangelina0023
 
Digital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Discovery Institute
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of JobRemote DBA Services
 
办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书saphesg8
 

Recently uploaded (20)

定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
 
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
 
Issues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxIssues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptx
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management Internship
 
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
 
Application deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfApplication deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdf
 
Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713
 
tools in IDTelated to first year vtu students is useful where they can refer ...
tools in IDTelated to first year vtu students is useful where they can refer ...tools in IDTelated to first year vtu students is useful where they can refer ...
tools in IDTelated to first year vtu students is useful where they can refer ...
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
 
格里菲斯大学毕业证(Griffith毕业证)#文凭成绩单#真实留信学历认证永久存档
格里菲斯大学毕业证(Griffith毕业证)#文凭成绩单#真实留信学历认证永久存档格里菲斯大学毕业证(Griffith毕业证)#文凭成绩单#真实留信学历认证永久存档
格里菲斯大学毕业证(Griffith毕业证)#文凭成绩单#真实留信学历认证永久存档
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptx
 
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
 
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
办理(Hull毕业证书)英国赫尔大学毕业证成绩单原版一比一
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdf
 
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort ServiceYoung Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
 
Digital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, India
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Job
 
办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书
 

Wp 241016

  • 1. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 1 Personal date Present address Date of birth Identification card # Nationality/Race Religion 107/223 M. 13, Bang Phil Yai, Bang Phil, Samut Phakan 10540 Thailand. July, 24, 1966 4 2102 00001 86 9 Thai Buddhism Education & Certifications 1987 2000 2009 2009 2015 Diploma in Civil Engineering / Chanthaburi Technical College., Thailand. Business Safety Training/NPC., Thailand. OSHA Safety Training/TTCL., Thailand. Bolt Tensioning Operation & Maintenance / TET ALLIANCE ASIA PTE LTD., Singapore. NDT Level ll Certificate Number: NDT-CNI-832 / CNI Pacific., Thailand. Expertise Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2016 IS IS IS MG MG MG MG MG MG MG 2015 MG MG MG MG IS IS 2014 MG MG MG MG MG MG MG MG MG 2013 MG MG MG MG MG MG MG MG MG 2012 MG MG MG MG MG MG MG MG MG MG MG MG 2011 SP SP SP MG MG 2010 SP SP SP SP SP SP SP SP SP SP SP SP 2009 SP SP SP SP SP SP SP SP SP SP SP SP 2008 SP SP SP SP SP SP SP SP SP SP SP SP 2007 SP SP SP SP SP SP SP IS IS IS IS IS 2006 IS IS IS MG MG MG MG 2005 MG MG MG MG MG MG MG MG MG MG MG MG 2004 MG MG MG MG MG MG MG MG MG MG MG MG 2003 MG MG MG MG MG MG MG MG MG MG MG MG 2002 MG MG MG MG MG MG MG MG MG MG MG MG 2001 MG MG MG MG MG MG MG MG MG MG MG MG 2000 MG MG MG MG MG MG MG MG MG MG MG MG 1999 MG MG 1998 1997 SP SP SP SP SP SP SP 1996 SP SP SP SP SP SP SP SP SP SP SP 1995 SP SP SP SP SP SP SP SP SP SP SP SP 1994 DR DR DR DR DR DR DR SP SP SP 1993 FM FM FM FM FM FM FM FM FM 1992 IS IS FM FM FM FM FM FM FM FM FM FM 1991 DR DR DR DR DR DR DR DR DR DR IS Experience Category Subcategory 9 Years (MG) Manager Construction & Project. 7 Years (SP) Supervisor Plant, QA/QC-Furnace, Civil, Steel Structure and Painting. 2 Years (IS) Inspector Civil, Steel Structure, Piping, Furnace and Painting. 2 Years (FM) Foreman Civil, Steel Structure and Piping. 2 Years (DR) Draftsman Civil & Steel Structure. Special skills Language knowledge/English Moderately. Computer ability Microsoft office (WORD, EXCEL, POWER POINT, Auto CAD, Internet) Summary work Than twenty years of professional experience (1991 up to Present) for Engineering and Construction work of Management, Inspector and Supervisor to Civil, Steel Structure, Furnace, Fire Heater, Vessel Tank, Piping and Painting. I flowing project Specification requirement for job reference codes; JSA, OSHA, HSSE, JSEA, EIA, AFC, ITP, ANSI/ASME, Pressure piping, Power boilers and Pressure vessels, AWS, API, ASNT, ASTM, AISC & Various codes. Present of work Korat 2 and Korat 3 in Huay Bong Sub Distric, Dan Khun Tot Distric of Nakorn Ratchasima Province are Thailand’s first major wind farm. The two wind farm projects have an installed combined capacity of 207 MW. (103 MW.each), In total 90 wind turbines, each with 2.30 MW. capacity, are installed in the project. The concrete foundations have shown some cracks and need to strengthening by the new part of the concrete pedestal with install and stress the stressbars.
  • 2. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 2 Experience Demco Public Company Limited November, 2015 – Present. QC Manager Project Main construction Client/Location Watabak Wind Project. Demco Pcl. Wind Engine Ltd. / Thep Sathit district of Chaiyaphum. Responsibilities WATABAK WIND FARM PROJECT; In Watabak sub-district, Thep Sathit district of Chaiyaphum Province is one of Thailand’s major wind farms. The wind farm project has installed overall combined capacity of 60 MW in total 30 wind turbines. Overall responsibility of the QA/QC process Issues all relevant inspection forms, standards, and review and sign all final documents before Handover to the Owner Explain the QA/QC requirements to Project and Construction Management Implementing and issuing the QA procedures as part of the QA system. Working out the procedures under the scope Evaluating possible subcontractors and tenders regarding QA relevant issues Definition of documentation and certification requirements for the subcontractors Document control, review and reissuing of all QA specifications and procedures if modifications are necessary Processing and approving of necessary deviations from the procedures and specifications. Demco Public Company Limited November, 2015 – March, 2016. QA/QC Civil Engineer Project Main construction Client/Location First Korat Wind Project. Demco Pcl. Wind Engine Holding Ltd. / Dan Khun Tot district of Nakorn Ratchasima. Responsibilities - Monitors construction activities and quality control for strengthening work of 10 wind turbine’s foundations (WTG No.13A, 14A, 27A, 29A, 31A, 32A, 33A, 34A, 43A & 44A) ensure compliance with plans, specifications, procedure, standard code, quality control, Inspection test plan and schedule. - Monitors construction activities for Quality control inspection of the reinforcement concrete works, post tension stressbars, earth work and backfill. - Review instruction manuals of construction materials and technical data to assist and advice onsite. - Reviews and interprets working drawings to determine if information is adequate for successful completion of construction. SDB Construction Company Limited December, 2014 – April, 2015 Project Consultant Project Main construction Client/Location CNS-E-85 Project. SDB Construction Co., Ltd. The Shell Company of Thailand Ltd. / Klongtoey district of Bangkok. Responsibilities - Helping clients in project planning, cost estimation, and solving structural issues. - Helping clients in engineering design for civil and piping. - Ensuring projects stay on budget and are completed within schedule. - Studied building plans and made modifications in view of safety and comfort. - Collaborated with contractors, project managers, and construction staff and maintained quality of projects. - Improved building performance through continuous supervision and personal involvement. - Researched and evaluated construction phases and ensured compliance with environment regulations. - Reviewed design documents and submitted necessary documents to local authorities for construction clearance. - Studied contract documents and guided clients in making necessary changes for maximizing accountability of contractors.
  • 3. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 3 - Drafted technical documents and ensured work is carried on accordingly. Aec Engineering & Construction Company Limited September, 2013 – August, 2014 Project Manager Project Main construction Client/Location BCP Plant 3 Recondition Project. Toyo-Thai Corporation Pcl. Toyo-Thai Corporation Pcl. / Bangchak Petroleum Pcl., Bangchak district of Bangkok. Responsibilities - Supervision, production and safety of 300+ employees, ability to perform the job duties of each employee. - Responsible for the project construction work as assigned. - Establish and/or review construction execution plan. - Involve in construction subcontracting strategy process. - Participate in the subcontractor selection process. - In-charge of the worksite and being the focal point for the Client and external parties. - Manage and ensure all the construction team and subcontractors to perform the construction works meet the target schedule, budget and quality with client’s and company’s HSE standard. - Ensure the construction and quality procedures are implemented. - Established and/or review organization chart of construction work and ensure that the site personnel are sufficiently qualified and/or trained to perform their respective tasks. - Resolve any construction issues which are related to quality, safety, cost and engineering. - Promote and maintain a cheerful and friendly atmosphere among all parties at site. - Review the work execution plan submitted by subcontractor. Ensure that it covers all relevant aspects i.e. Construction task force, construction equipment, temporary facilities, construction method and safe working conditions. - Check and coordinate the 3 months look ahead schedule in each area in conjunction with IFC drawings and material delivery schedule so that a proper mobilization plan of the construction force can be realized. - Monitor the performance of discipline supervisors and Subcontractors. - Foster and maintain relationship with Client and Subcontractors. - Maintain good image with the various local authorities. - Provide accurate information to the project manager and construction department manager with regards to site conditions and progress. - Primary responsible for weekly construction progress report to Client and Project Manager. - Certified construction progress of the project. - Ensure that QA/QC records are systematically filed and safety kept for handover operation, towards the end of the construction work. - Be actively involved/support during pre-commissioning and commissioning activities of the plant if required. - Ensure the construction site closing either subcontracting contract close out cover all aspects. Aec Engineering & Construction Company Limited March, 2014 – May, 2014 Project Manager Project Main construction Client/Location BCP Plant 3 Turnaround Project. Toyo-Thai Corporation Pcl. Toyo-Thai Corporation Pcl. / Bangchak Petroleum Pcl., Bangchak district of Bangkok. Responsibilities - Supervision, production and safety of 300+ employees, ability to perform the job duties of each employee. - Enable to take the requirements of the client to be implemented as on the designed drawings and finally to be actually. - Constructed with the agreed time frame, budget and quality as expected by the client and designers. - Overall planning and control of project activities to ensure project completion is in accordance with the project schedule. - Coordinate with other departments associated with the project works to ensure project completion is in accordance with the project schedule. - Monitor project costs closely and minimize cost overrun (variation orders). - Ensure contractual issues are resolved in a timely and satisfactory manner. - Update monthly progress report and chair and coordinate planning meetings with relevant contractors and departments. - Chair site and coordination meetings with the contractor and client. - Ensure that ISO, QA, QC procedures are followed. - Ensure safety requirements are followed to reduce accidents and incidents on site.
  • 4. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 4 - Ensure successful completion of the project and customer satisfaction. - Coordinate with finance for conclusion or final account etc. Thai-Unitech Limited September, 2012 – March, 2013 Project Manager Project Main construction Client/Location LNG Power Plant Project. Thai-Unitech Ltd. Bangkok Industrial Gas Co., Ltd. / Kasemskdi Trading Co., Ltd. Phetchaburi. Responsibilities - Supervision, production and safety of 60+ employees, ability to perform the job duties of each employee. - Monitor all Project Management Procedures. - Liaise with Clients to ensure their satisfaction with our performance. - Issue progress claims to clients. - Review and control of project drawings. - Manage cost/estimation and contract specification. - Prepare and issue the weekly/monthly progress reports. - Prepare necessary document of shop drawing, material submittals required for customer approval. - Monitor and control subcontractor work to meet the company standard. Ensure the projects meet schedule and approval plan. - Supervise the installation and commissioning of Electrical, Mechanical, Safety and Security System. - Prepare all necessary documentation for the acceptance, handover and invoicing. Thai-Unitech Limited June, 2012 – August, 2012 Project Manager Project Main construction Client/Location Oxygen Station. Thai-Unitech Ltd. Bangkok Industrial Gas Co., Ltd. / Bankhai, Hospital, Rayong. Responsibilities - Supervision, production and safety of 30+ employees, ability to perform the job duties of each employee. - Coordination of planning permissions together with planning agency. - Design/Layout of oxygen systems and compressed air stations. - Design of power supply and distribution systems. - Negotiation and preparation of contracts of the different works. - Coordination and supervision of the installations on site. - Acceptance of the installations and hand over to the plants/plant manager and the maintenance manager. - Compilation of basic documentations. Thai-Unitech Limited November, 2011 – August, 2012 Project Manager Project Main construction Client/Location Repair & Protection concrete structure for IRPC Jetty. Thai-Unitech Ltd. Civil Master Construction Co., Ltd. / IRPC Pcl. Rayong Responsibilities - Supervision, production and safety of 90+ employees, ability to perform the job duties of each employee. - Coordination of planning permissions together with planning agency. - Design/Layout of scaffolding. - Controlling the quality of the project. - Controlling of materials, parts, and components. - Monitoring project progress and ensuring completion on time according to the agreed schedule. - Coordinating between internal divisions, government organizations and subcontractors.
  • 5. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 5 Toyo-Thai Corporation Public Company Limited April, 2010 – March, 2011 Painting & Insulation Supervisor Project Main construction Client/Location D-145 HPP02-HP Project. Toyo-Thai Corporation public company limited. MTP H.P.J.V. (Thailand) Ltd. / Map Taphut, Rayong. Responsibilities - Supervise and oversea coating and Insulation functions by communicating, planning, scheduling and monitoring the work flow of assigned staff and sub-contractors. - Assigns, plans and schedules work fronts for shop and site painting and blasting personnel performing various coating duties. - Develops and plans work schedule including associated equipment usage, painting expenditures and equipment maintenance. - Control during construction activities; ensuring QHSE practices are acceptable and that proper measures and procedures are being implemented; ensuring that proper coating and insulation procedures are applied and that proper consumables are used. - Earned strong P&ID, isometric piping drawings and mechanical drawings development skills as project construction requirements. - Review method statement, project specification and technical queries for painting and insulation. - Assure safety and quality measures before and after the work commence. Toyo-Thai Corporation Public Company Limited October, 2008 – April, 2010 Steel Structure Supervisor Project Main construction Location D-137-PTTPE LDPE Project. Toyo-Thai Corporation Pcl. PTT Polyethylene Co., Ltd. / Map Taphut, Rayong. Responsibilities - Plans and coordinates work, trains and motivates, monitors and evaluates performance of production laborers within a specific department to ensure their ability to safely operate production equipment, cranes, and material handling devices; counsels, disciplines and documents as necessary. - Oversee the production operation of precast concrete products. Read production orders to determine job specifications and requirements. - Set up molds for specific products. Lift mold parts to assemble. - Handle and assemble rebar cages per production specifications. - Measure work piece dimensions to determine accuracy of mold set up. - Perform quality control checks at critical points throughout the production process; conducts daily pre-pour inspections of products to be cast; conducts post-pour inspections of cast products. - Finish fresh concrete after it has been poured into prepared molds. - Strip finished products from molds. - Remove excess concrete from structure and mold by scraping by hand and using steel wool to clean. - Performs clean-up and housekeeping duties; sweep floor; shovel excess debris. - Operates any equipment needed to perform the job, such as the mixer, tow motors, overhead cranes, vibrators, power tools, hand tools, etc. - Perform related duties as requested and/or needed by other supervision. Toyo-Thai Corporation Public Company Limited July, 2007 – September, 2008 Civil & Steel Structure Supervisor Project Main construction Location D-140 Inthanon Project Toyo-Thai Corporation Pcl. Viny-Thai Pcl. / Map Taphut, Rayong Responsibilities - Supervision, production and safety of 120+ employees, ability to perform the job duties of each employee. - Review method statement and advance comments, communicate with engineering and construction, resolve construction issue on site, attended construction meeting about schedule/HES/quality, sign PTW every day, push
  • 6. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 6 construction schedule, assist quality control, review bill of quantity. BJC Heavy Industries public company limited March, 2006 – July, 2007 QA/QC Supervisor Project Main construction Location Aromatic Company ATC Reformer and Aromatics Complex Project ITT SpA (Fired heaters) Aromatics Complex / Map-Taphut, Rayong Responsibilities - Kickoff meeting of pre – inspection with contractor & supplier. - Review contractor & supplier quality document submitted for approval. - Review contractor & supplier’s test and inspection report, final MDR data book. - Witness Welder Qualification Test. - Witness & Supervision of Welding Work, Post Weld Heat Treatment (PWHT) - Witness Non Destructive Testing & Destructive Examination - Witness Pressure Test and Flushing & Safety Valve Testing - Witness & Supervision of Painting work & Insulation Work. - Witness & Supervision of Mechanical Work (Machine Installation work) - Co-ordinate with Contractor QA/QC Manager & Inspector - QC Document Control System and etc. - Ensuring effective inspection performance by contractor, by: Conduct inspections of all incoming equipment and selected bulk materials - Conduct regular inspections on fabrication and construction activities/Conduct shop inspections at local fabricators - Provide expertise on inspection techniques and methods as needed Verify compliance with agreed corrective actions to non-conformances - Witness selected NDE activities, review radiographs etc. - Ensure safety performance in quality control (ionizing radiation, confined spaces etc.) - Witness inspections and conduct acceptance inspections on behalf of the Owners team, incl. - Assistance to mechanical discipline in witness inspections such as flange faces or bolt torque and in acceptance testing such as equipment internal inspections before final closure. - Witnessing of hydrostatic an pneumatic pressure tests for acceptance. Witnessing of safety relieve valves calibration testing. Acceptance inspections of safety relief valves final installation, including interlock systems verification. Quality Assurance: Having Knowledge of ISO, API, ASTM standards. Review for acceptance sub contractor quality systems documentation, in respect of ITPs, procedures for quality control etc. - Be pro-active in ensuring effective use of ITP and related documents in all quality monitoring activities. - Audit sub-contractors on QA/QC matters. - Audit compilation of the project quality records dossier. Be pro-active in ensuring effective implementation of nonconformance and deviation control systems. - Conduct technical and quality assessments of local subcontractors. - Participate in quality audits. Assist in reviews of subcontractor quality dossiers and final system compilation manuals. - Ownership of QA/QC initiatives within the Construction teams. Aec Engineering & Construction Company Limited July, 2004 – September, 2006 Construction Manager Project Main construction Location Construction & Piping HMC Site Project. Bangkok Industrial Gas Co., Ltd. HMC Polymers Co., Ltd. / Map-Taphut, Rayong. Responsibilities - Manage the construction project from start to finish. - Perform a key role in project planning, budgeting, and identification of resources needed. - Ensure that construction activities move according to predetermined schedule. - Devise the project work plans and make revisions as and when need arises. - Communicate effectively with the contractors responsible for completing various phases of the project. - Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants, contractors, sub-contractors and laborers. - Monitor the progress of the construction activities on a regular basis and hold regular status meetings with all the sub-teams. - Maintain strict adherence to the budgetary guidelines, quality and safety standards. - Periodic inspection of construction sites.
  • 7. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 7 - Ensure project documents are complete. - Identify the elements of project design and construction likely to give rise to disputes and claims. Aec Engineering & Construction Company Limited February, 2003 – April, 2004 Construction Manager Project Main construction Location Hiring for Piping Installation (Plant 1-4 area) Project. PTT Chemical Pcl. PTT Chemical Pcl. / Map-Taphut, Rayong. Responsibilities - Plan, Manage and monitor detailed design and construction of projects - Manage costs on each project - Procure and contract as required - Provide input on procurement and Technical Services strategies - Identify, Monitor and manage key project risks - Identify and document key lessons learnt and areas of opportunity upon project completion. Aec Engineering & Construction Company Limited May, 2001 – December, 2002 Construction Manager Project Main construction Location TA Recovery Project. TPT Petrochemicals (Thailand) Co., Ltd. TPT Petrochemicals (Thailand) Co., Ltd. / Map-Taphut, Rayong. Responsibilities - Identify manpower requirement for the project. - Co-ordinate and maintain clients and subcontractors relationships. - Monitor and provide direction for the financial progress of the projects. - Control construction work performed by sub-contractors or own staff and co-ordinates with the heads of departments and the client's engineers. - Follow up the work progress reports and evaluated the performance of sub-contractors and own staff. - Ensure project execution is in accordance with the conditions of contract and is efficiently managed. - Advise Engineer team for analyzing tender and construction document. - Review drawing and prepare detailed plan to achieve the requirement project schedule. - Able to sign on construction supervision document. - Co -ordinate with consultant, owner representative and management. - Focus on handing contractual aspects of construction. - Perform other related duties as assigned. Aec Engineering & Construction Company Limited November, 1999 – December, 2000 Construction Manager Project Main construction Location Fabrication & Installation Stanchion Sunshade Project. PTT Chemical Pcl. PTT Chemical Pcl. / Map-Taphut, Rayong. Responsibilities - Manage the construction project from start to finish. - Perform a key role in project planning, budgeting, and identification of resources needed. - Ensure that construction activities move according to predetermined schedule. - Devise the project work plans and make revisions as and when need arises. - Communicate effectively with the contractors responsible for completing various phases of the project. - Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants, contractors, sub-contractors and laborers. - Monitor the progress of the construction activities on a regular basis and hold regular status meetings with all the sub-teams. - Maintain strict adherence to the budgetary guidelines, quality and safety standards. - Periodic inspection of construction sites. - Ensure project documents are complete.
  • 8. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 8 - Identify the elements of project design and construction likely to give rise to disputes and claims. Thai Maintenance Contracting Company Limited February, 1997 – August, 1997 Project Supervisor Project Main construction Location PA Module Unit Project. Foster Wheeler Ltd. Siam Styrene Monomer Co., Ltd. / Map-Taphut, Rayong. Responsibilities - Regular reporting to Regional Project Manager. On all project related activities. - Strictly check delivery of material construction specification & standards. - Coordinates with involved departments/contractors/engineering when required. - Had to maintain high standards in achieving plant safety, quality products, as well as cost efficient production. - Kept production schedule and maintained all set standards including maintaining excellent housekeeping standards. - Dealt with outside personnel regarding shipping, receiving, & packaging products. - Trained personnel in OSHA safety regulations and First Aid. - Attended daily production meetings with plant manager & plant department Supervisors. - Reported any incidents or developments as they occurred including logistics and possible solutions. - Responsible for employee discipline, write up, early dismissal, & referral to management. - Familiar with the grievance process. Sen - Thai Engineering Company Limited October, 1995 – November, 1996 Project Supervisor Project Main construction Location Fired Heater 3 Unit Project. CTCI (Thailand) Ltd. Siam Styrene Monomer Co., Ltd. / Map-Taphut, Rayong. Responsibilities - To control construction site. - Manage schedule, quality control, keep safety at site. - Review and comment on drawing specifications and any other documents that may require for the project. - Review and inspect the contractor capability in term of personal, equipment and other conditions with regard to the contract/bid conditions and legal requirements. - Where applicable provide suggestions or observations in respect to the element of the works. - Carry out inspections based upon site specific requirements as directed by the line manager or QA/QC process. - Assist with the development of the inspection process for the C&S/Finishing works at site. - Record accurate inspections carried out in line with the site documents. - Advise line manager and record where applicable any works not carried out in accordance with the drawings and specifications. - Check the work done by the contractor. - Assist with the H&S at site and advise line manager of any infringements. - Assist where required in the development of the commissioning procedures that are required for the project. - Review and comment in respect to As Built Drawings and operations manuals. - Provide support for the functional area of the project within which they are allocated, or for the project team as a whole, as required by the structure of the project team. - Monitor and advise line manager of all of the works within their specific area of concern. - Any other duties that may be assigned as part of the construction works. Sen - Thai Engineering Company Limited March, 1995 – October, 1995 Plant Supervisor Project Main construction Pipe Support EA Unit Project. CTCI (Thailand) Ltd.
  • 9. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 9 Location Work Shop Sen-Thai / Map-Taphut, Rayong. Responsibilities - Preparation before welding (like WPS etc.) - Personally inspection after job finishing (like dry survey & etc.) - Job offering activity for all type Inspections (NDT). - Make all inspection reports & data sheets. - Maintain all data, reports & documents. - Maintain the relation with 3rd party Inspector. - Completing the job timely. - Provide Guidance to site foremans. Sen - Thai Engineering Company Limited October, 1994 – March, 1995 Plant Supervisor Project Main construction Location Work Whop New Buildings Project. Sen-Thai Engineering Co., Ltd Work Shop Sen-Thai / Map-Taphut, Rayong. Responsibilities - Had to maintain high standards in achieving plant safety, quality products, as well as cost efficient production. - Kept production schedule and maintained all set standards including maintaining excellent housekeeping standards. - Dealt with outside personnel regarding shipping, receiving, & packaging products. - Trained personnel in OSHA safety regulations and First Aid. - Attended daily production meetings with plant manager & plant department Supervisors. - Reported any incidents or developments as they occurred including logistics and possible solutions. - Responsible for employee discipline, write up, early dismissal, & referral to management. - Familiar with the grievance process. Emco (Thailand) Limited February, 1994 – August, 1994 Steel Structure Draftsman Project Main construction Location VCM Project. Viny-Thai Pcl. Viny-Thai Pcl. / Map-Taphut. Rayong. Responsibilities - Basic design for steel structural and pipe support. - Shop drawing design. - Recheck shop drawing, addition and modification design, drawings will be check for correct revision. - Mark off and Drilling will be verified as being in accordance AFC drawing. - Fit up and alignment of base plates, gussets and such will be verified as being in accordance with AFC drawing. - Erected steel structural, Stairways, Ladders, Platforms, Walkways and Hand-rill will be verified as being of true alignment, and clipped, and in accordance with AFC drawing. Vow Engineering Company Limited August, 1992 – September, 1993 Piping Foreman Project Main construction Location Block 4 Project. Ital Thai Co., Ltd. Rayong Power Plant / Map-Taphut. Rayong. Responsibilities - Prepares material take‑off', layout appropriate systems and makes isometric and schematic sketches from blueprints, specifications, submittals and job orders.
  • 10. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 10 - Participates in job planning for work packages, site set-up and construction schedules, Estimates worker hour requirements to meet the needs of the construction plan. - Establishes and adjusts work sequences to meet construction schedules utilizing knowledge of equipment capacities and assigned personnel. - Schedules and coordinates activities of assigned craft workers while communicating and coordinating schedules with other trades. - Operates and supervises operation of equipment and machinery such as backhoes, forklifts, man lifts, power tools and tampers. Inspects work in progress and completed work to insure conformance to specifications. - Coordinates placement and storage of materials, tools and supplies to support the construction plan. - Eliminates construction and job site hazards as they are recognized to reduce safety incidents and their severity. - Estimates cost for change orders and/or contracts. As required, works with tools to meet construction schedules or other demands. - Responsibly and professionally represents the project team and the company at formal and informal meetings with customer counterparts. - Assists in the relationship building with preferred customers by utilizing the concepts and techniques learned in company-sponsored training. - Protects the company’s interest by managing aspects of assigned work packages. - Manages the proper utilization, maintenance and condition of all company owned/furnished equipment, power tools, jigs, fixtures and consumables under his/her cognizance. Beta Engineering & Chemical Company Limited August, 1992 – September, 1993 Civil Draftsman & Civil Foreman Project Main construction Location CCR-2 Project Thai Oil Pcl. Thai Oil Pcl. (Refinery)/ Sriracha, Chonburi. Responsibilities - Monitoring And quality control plan. - Monitor and track the performance of Foreman and contractors to standard construction steps correctly. - Monitor contractor performance successfully as planned and the quality engineering. - Problem-solving site to work within the given period of construction. - Monitor and report the progress of the construction plans assigned by superiors. - Record and report on the construction job. Meisei International Company Limited November, 1991 – March, 1992 QC Inspector Project Main construction Location Thai-Carbon Black Project Mitsubishi Kakoki Kaisha Ltd. (MKK) Thai Carbon Black / Sriracha, Chonburi. Responsibilities - Ensuring effective inspection performance by contractor, by: Conduct inspections of all incoming equipment and selected bulk materials. - Conduct regular inspections on fabrication and construction activities. - Conduct shop inspections at local fabrication. - Witnessing Welding Procedure Qualification tests, Welder Qualification tests and its approval. - Witnessing Hot tapping operations. - Provide expertise on inspection techniques and methods as needed Verify compliance with agreed corrective actions to non-conformances. - Witness selected NDE activities, review radiographs etc. - Ensure safety performance in quality control (ionizing radiation, confined spaces etc.) - Witness inspections and conduct acceptance inspections on behalf of the Owners team, incl. - Assistance to mechanical discipline in witness inspections such as flange faces or bolt torque and in acceptance testing such as equipment internal inspections before final closure. - Witnessing of hydrostatic an pneumatic pressure tests for acceptance. Witnessing of safety relieve valves calibration testing. Acceptance inspections of safety relief valves final installation, including interlock systems verification, Quality Assurance: Having Knowledge of ISO, API, ASTM standards. Review for acceptance subcontractor quality systems documentation, in respect of ITPs, procedures for quality control etc. - Be pro-active in ensuring effective use of ITP and related documents in all quality monitoring activities - Audit sub-contractors on QA/QC matters.
  • 11. Mr. Wattana Poomsawad +668-9149-4448 wpecl@mail.com https://th.linkedin.com/in/wattana-poomsawad-4231aa8b 11 - Audit compilation of the project quality records dossier. Be pro-active in ensuring effective implementation of nonconformance and deviation control systems. - Conduct technical and quality assessments of local subcontractors. - Participate in quality audits. Assist in reviews of subcontractor quality dossiers and final system compilation manuals. - Ownership of QA/QC initiatives within the Construction teams - Apply an audit and review follow-up system with the principle Contractor, and lead / participate in such. - Approving the QA/QC procedures, Inspection Test Plans and Quality assurance procedures and NDT procedures of Contractors. Sino-Thai Engineering & Construction public company limited February, 1991 – November, 1991 Steel Structure Draftsman Project Main construction Location PVC Plan Project Foster Wheeler Ltd. Viny-Thai Pcl. / Map-Taphut. Rayong. Responsibilities - Basic design for steel structural and pipe support. - Shop drawing design. - Recheck shop drawing, addition and modification design, drawings will be check for correct revision. - Mark off and Drilling will be verified as being in accordance AFC drawing. - Fit up and alignment of base plates, gussets and such will be verified as being in accordance with AFC drawing. - Erected steel structural, Stairways, Ladders, Platforms, Walkways and Hand-rill will be verified as being of true alignment, and clipped, and in accordance with AFC drawing.