SlideShare a Scribd company logo
1 of 6
Download to read offline
Curriculum Vitae – Mechanical Superintendent, Oil and
Gas, Power, Petrochemical – Refinery
ABINASH SUNDAR ROUTRAY
routray_abinash@rediffmail.com, routrayabinash@yahoo.com
Mobile: +91 8895802143®, +91 9777442158
Date of Birth: 24th
June, 1966, Place of Birth: Balarampur, Keonjhar, Orissa (India)
Objective:
Continuous Improvement - look forward to work with MNCs where there is always a team-work
environment and possibility to grow by putting hard work with honesty and with always learning and
positive attitude.
PASSPORT DETAIL-G3007457 (valid up to 16th
October 2017)
Permanent Address:
S/O : Sri Anadi Charan Routray
At/p.o : Balarampur
P.S : Ghashipura
Dist : Keonjhar,
Pin code: 758025.
State : Orissa.
Educational Background:
 Diploma in Mechanical -1987 U.C.P Berhampur, Orissa, India.
Professional Trainings received:
 Level II in Non Destructive Testing for different methods (RT, UT, MPT, and DPT).
Computer Exposure:
M.S-Office, Excel & Out look
Languages Known:
. English, Hindi, & Oriya
Summary Of Experience:
A certified mechanical engineer with more than 20 years experience in the field of engineering,
management, supervision, coordination and inspection of process piping for petrochemical,
Refinery,LNG, Chemical, Steel plant, Compressor Station, for clients such as IOCL,Y-LNG,RIL, Deepak
Steel & Power. Ensuring all phases of project are completed on agreed schedule with safety and
quality requirements.
Work Experience Track Record:
Current Employment: Jindal Steel And Power Limited (Angul, Odisha, India.)
7th
October 2014 and Continuing.
Mechanical In charge for Shop Fabrication.
Experience : Essar Construction Oversease Limited .Borouge CGC -1 Project Ruwiese Abu Dhabi.
Mechanical Lead- Excuting Piping, Equipments Like Silos Erection and Installation.
Coordinating with Client for Tie-In Jobs Etc.
22nd
jan to 10th
June 2014.
Current Employment:
Petron Engineering and Construction limited
R.C.M for GAIL PETROCHEMICAL COMPLEX (GPU UNIT)
PATA, U.P, INDIA.
25th
June 2012 to 8th
oct 2013
Resposible- Site Incharge for GPU phase –II expansion.
Experience: Uhde India Pvt. Ltd.(Thyssen Krupp Group) for IOCL VGO/HDT and DHDT Project
(PARADEEP ORISSA, INDIA)
16th
November to 20th
June
Construction Manager
 Fire Heater for VGO/HDT and DHDT unit.
 Regularly report to the Client IOCL on all activities status.
 Monitored the performance of contractor (Heurtey Petrochem and Petron), reviewed the
method statement and job safety analysis and implement safely.
 Implemented and planned the execution strategies, resource planning, contractors
monitoring and oversight programs.
 Attend and anticipate in site meetings as Owner’s representative.
 Review and comment on EPC Monthly Progress Report and provide input directly to the
Client for further consolidation and feedback to EPC progress.
 Managed to check all the incoming materials for the units.
 Managed and supervised all piping fabrication, erection, fit-up, welding inspection, hydro
testing, pneumatic testing, bolt tensioning and torque as required, cleanliness check, air
blowing and tightness test.
 Supervised and inspected the erection/installation and pre-commissioning of Process piping
for VGO/HDT project.
 Committed for the implementation of a safe working environment for the contractor team
without any incident and injury free culture.
 Acting as a key interface with the contractor to coordinate progress, priorities and change
management and assure quality in design work.
 Working closely with the contractor teams to assure quality and compliance with
specifications for the Overall designs and the construction execution plan.
 Verify achievement of project milestones and progress versus plan
Experience: Uhde India Pvt. Ltd. (Thyssen Krupp Group) for IOCL VGO/HDT Project.
(Vadodara, Gujrat)
25th
Jan 2010 to 13th
November 2010
Construction Manager
 Supervised and overviewed the contractor (GDCL) to implement the requirements of the
contract including the drawings and specifications.
 Reviewed the construction procedure and job safety analysis.
 Planned the overall activities and coordinated with other discipline in the same area.
 Maintained the quality control records and work safely.
 Closely monitoring the Erection of Equipments, installation of package units with related to
unit piping for VGO unit.
 Monitored the flow of all work with the objective of improving the contractor’s productivity,
schedule performance, and safety.
 Ensured all Piping quality control records required are completed prior to final Inspection.
 Supervised the implementation of approved commissioning procedure as applicable for the
Piping. Generated & managed the mechanical completion punch list for the Piping prior to
final acceptance.
 Attended the weekly progress and coordination meeting as required. Achieved the
milestone of piping progress.
 Managed and supervised all piping fabrication, erection, fit-up, welding inspection, hydro
testing, pneumatic testing, bolt tensioning and torque as required, cleanliness check, air
blowing and tightness test.
 Supervised and inspected the erection/installation and pre-commissioning of Process piping
 To assist pre commissioning and commissioning activities of systems completed include
flange joint leak test, air flushing, water flushing, nitrogen purging etc.
To execute overall on plot piping fabrication and erection works include identification of
materials, coordination for the qualification of welders, inspection of site as per isometric,
GAD and P&ID, fabrication of pipe spool, organize inspection of welding, coordination for
the NDT, installation of piping, preparation of as built drawing and test pack, preparation of
mechanical punch list, hydro testing, Flange Management and box up activities as per
applicable codes, procedure and standards
Experience: Punj Lloyd Ltd. For Y-LNG, PMC-YEMGAS (YENEN) LNG-Project
7th
Jan 2009 to 10th
Sept 2009
Deputy Manager
 BOG compressor, Sea water intake system and ETP unit erection and commissioning
with piping.
 Supervision and monitoring the construction activities such as Fabrication of pipes and
supports and its erection.
 Ensure that Field Quality Control Plan (FQCP) is implemented and drawings are updated at
workshop to avoid rework on site.
 Managed and supervised all pipe rack and related steel structures erection, fit-up, welding
inspection, bolt tensioning and torque as required, cleanliness check, and tightness test.
 Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding,
Testing etc.
 Prepare internal construction punch list for clearing before final inspection of client.
Experience: Punj Lloyd Ltd.For RIL, EWPL Project (Compressor Station-7&8)
5th
January 2008 to 3rd
January 2009.
Deputy Manager Piping
 Ensure that construction activities are carried out to the highest HSE standards.
 Monitors and coordinates Equipments and Pipe erection, Installation of various valves at
position.
 Coordinate, plan and schedule day-to-day inspection related work activities and directions of
existing plant operation units.
 Monitors and coordinates fabrication of spools and welding as per drawings.
 Allocation of work to various groups as per priority.
 Conducting Hydro Test As Per Given RFI to QA/ QC.
 Conducting Cleaning and Gauging For Piping And Pipelines As Per Given Requirements.
 Monitors and coordinates all necessary testing procedures such as visual inspection,
radiography, magnetic particle examination, ultrasonic testing, and dye penetrate testing,
pressure testing and hydro testing.
 Generated & managed the mechanical completion punch list for the piping prior to final
acceptance.
Experience: L & T ECC Division for Reliance, Project- Reliance Export Refinery (SEZ)
Jamnagar, Gujarat.
24th
October 2006 to 22nd
December 2007
Sr. Engineer Piping
 Monitors and coordinates fabrication of spools and welding as per drawings.
 Ensure that construction activities are carried out to the highest HSE standards.
 Monitors and coordinates Pipe erection.
 Allocation of work to various groups as per priority.
 Conducting Hydro Test As Per Given RFI to QA/QC.
 Conducting Cleaning and Gauging For Piping And Pipelines As Per Given Requirements.
 Monitors and coordinates all necessary testing procedures such as visual inspection,
radiography, magnetic particle examination, ultrasonic testing, dye penetrate testing,
pressure testing and hydro testing.
 To supervise and monitor the piping fabrication and installation at different pipe racks in
OSBL units including welder qualification, identification of material, preparation of weld
production reports, coordination with NDT.
Experience: M/S Shree Baba Vishwanath Iron pvt.ltd. Varanasi.
10th
September 2004 to 20th
August 2006
Mechanical In-Charge (Projects & Maintenance)
 Monitoring of Fabrication of structures, and Equipments erection by contractors.
 Managed and supervised all pipe rack steel structures erection.
 Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding.
 To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements
are realistically quantified as per scope and budget and follow up the delivery of the
project/construction materials.
 To liaise with procurement and material management team to ensure the project materials
and equipments delivery are in time as per planned schedule to site.
 To study the vendor manuals for monitoring the materials delivery and ensuring all
inspection of equipments and material as per vendor specification
 Ensure that contractors will comply with HSE requirements at site.
Experience: M/S Deepak Steel & Power ltd. Barbil, Orissa
5th
July 2002 to 08th
August 2004.
Mechanical Engineer (Project)
 Looking after overall extension of raw material handling system.
 E.g. Fabrication & Erection of Mechanical Building structures, Equipments.
 Monitoring of Fabrication of structures, and Equipments erection by contractors.
 Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding.
 Visual Inspection of Fit-up & welding activity.
 Assist and support Line Management and Supervision in all.
 Involved in preparation of Material take off and manpower supervision.
Experience: M/S Grewal Associates.Barbil, Orissa.
1st
June 2000 to 3rd
July 2002. Company
Mechanical Engineer
 Looking after overall extension of raw material handling system.
 E.g. Fabrication & Erection of Mechanical Building structures, Equipments.
 Preparation of daily progress report.
 Preparation of estimation based on AFC drawing and prepare procurement schedule for
complete the project on schedule time.
 Guidance to junior related to construction, quality control and how to maintain the work
schedule.
 Responsible for ensuring the works are carried out with commitment to health and safety
legislation and company and site regulation.
Experience: M/S Indfab with NINL- Dubri, NTPC- Kaniha, NALCO- Anugul, Super Thermal
power plant Talcher under Bridge & Roof (I) ltd. L&T ltd.
1st
June 1990 to 25th
May 2000.
Engineer
 Involves in Project works of Mechanical Construction.
 Visual Inspection of Fit-up & Welding activity.
 Man power planning & Mobilization of different project sites. Assist and support
Management and Supervision in all.
 Involved in preparation of Material take off and manpower supervision.
 Looking after client Billing & Follow up.
 Arrangement of Resources.
routray_abinash@rediffmail.com, routrayabinash@gmail.com, AT/PO-BALARAMPUR,
VIA-KUSHALESWAR, DIST-KEONJHAR, ORISSA, PIN-758025

More Related Content

What's hot (20)

Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
C.V
C.VC.V
C.V
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
CV_Suhail
CV_SuhailCV_Suhail
CV_Suhail
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and Piping
 
Cv precast concrete
Cv   precast concreteCv   precast concrete
Cv precast concrete
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Resume - NATARAJAN SIVASUBRAMANI
Resume - NATARAJAN  SIVASUBRAMANIResume - NATARAJAN  SIVASUBRAMANI
Resume - NATARAJAN SIVASUBRAMANI
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisor
 
venkatesh QC resume.
venkatesh QC resume.venkatesh QC resume.
venkatesh QC resume.
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Mohammed Moosa CV
Mohammed Moosa CVMohammed Moosa CV
Mohammed Moosa CV
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 

Viewers also liked

La bruixa i el gat presentación
La bruixa i el gat presentaciónLa bruixa i el gat presentación
La bruixa i el gat presentaciónmarlope12
 
Paraula de gos presentació
Paraula de gos presentacióParaula de gos presentació
Paraula de gos presentaciómarlope12
 
Using Social Media to make club life easier 2016
Using Social Media to make club life easier 2016Using Social Media to make club life easier 2016
Using Social Media to make club life easier 2016Craig Burton
 
Conceptes matematics
Conceptes  matematicsConceptes  matematics
Conceptes matematicsmarlope12
 
El rossinyol
El rossinyolEl rossinyol
El rossinyolmarlope12
 
Conte triangle
Conte triangleConte triangle
Conte trianglemarlope12
 
Studying abroad in usa - Concordia in India
Studying abroad in usa - Concordia in IndiaStudying abroad in usa - Concordia in India
Studying abroad in usa - Concordia in Indiaaswinimurali
 
Shapes and colours
Shapes and coloursShapes and colours
Shapes and coloursmarlope12
 
El pallasso que no volia fer
El pallasso que no volia ferEl pallasso que no volia fer
El pallasso que no volia fermarlope12
 
TheOfficeofSustainabilityProposal
TheOfficeofSustainabilityProposalTheOfficeofSustainabilityProposal
TheOfficeofSustainabilityProposalKacy McGill
 
La bruixa altagràcia
La bruixa altagràciaLa bruixa altagràcia
La bruixa altagràciamarlope12
 
Worldwide Logistics Group[PDF].2014
Worldwide Logistics Group[PDF].2014Worldwide Logistics Group[PDF].2014
Worldwide Logistics Group[PDF].2014Shlykova Yana China
 

Viewers also liked (15)

La bruixa i el gat presentación
La bruixa i el gat presentaciónLa bruixa i el gat presentación
La bruixa i el gat presentación
 
Paraula de gos presentació
Paraula de gos presentacióParaula de gos presentació
Paraula de gos presentació
 
Rectangle 2
Rectangle 2Rectangle 2
Rectangle 2
 
Using Social Media to make club life easier 2016
Using Social Media to make club life easier 2016Using Social Media to make club life easier 2016
Using Social Media to make club life easier 2016
 
Conceptes matematics
Conceptes  matematicsConceptes  matematics
Conceptes matematics
 
Alphabet
AlphabetAlphabet
Alphabet
 
El rossinyol
El rossinyolEl rossinyol
El rossinyol
 
Conte triangle
Conte triangleConte triangle
Conte triangle
 
Studying abroad in usa - Concordia in India
Studying abroad in usa - Concordia in IndiaStudying abroad in usa - Concordia in India
Studying abroad in usa - Concordia in India
 
Shapes and colours
Shapes and coloursShapes and colours
Shapes and colours
 
SANJAY__B
SANJAY__BSANJAY__B
SANJAY__B
 
El pallasso que no volia fer
El pallasso que no volia ferEl pallasso que no volia fer
El pallasso que no volia fer
 
TheOfficeofSustainabilityProposal
TheOfficeofSustainabilityProposalTheOfficeofSustainabilityProposal
TheOfficeofSustainabilityProposal
 
La bruixa altagràcia
La bruixa altagràciaLa bruixa altagràcia
La bruixa altagràcia
 
Worldwide Logistics Group[PDF].2014
Worldwide Logistics Group[PDF].2014Worldwide Logistics Group[PDF].2014
Worldwide Logistics Group[PDF].2014
 

Similar to MS-Abinash

Similar to MS-Abinash (20)

Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017Slamet Nurhadi's CV - Jan 2017
Slamet Nurhadi's CV - Jan 2017
 
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docx
 
CV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOCCV _Shaju Palissery Bhaskaran.DOC
CV _Shaju Palissery Bhaskaran.DOC
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
Resume Abdulbari
Resume   AbdulbariResume   Abdulbari
Resume Abdulbari
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
Qc
QcQc
Qc
 
mechanical cv
mechanical cvmechanical cv
mechanical cv
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 

MS-Abinash

  • 1. Curriculum Vitae – Mechanical Superintendent, Oil and Gas, Power, Petrochemical – Refinery ABINASH SUNDAR ROUTRAY routray_abinash@rediffmail.com, routrayabinash@yahoo.com Mobile: +91 8895802143®, +91 9777442158 Date of Birth: 24th June, 1966, Place of Birth: Balarampur, Keonjhar, Orissa (India) Objective: Continuous Improvement - look forward to work with MNCs where there is always a team-work environment and possibility to grow by putting hard work with honesty and with always learning and positive attitude. PASSPORT DETAIL-G3007457 (valid up to 16th October 2017) Permanent Address: S/O : Sri Anadi Charan Routray At/p.o : Balarampur P.S : Ghashipura Dist : Keonjhar, Pin code: 758025. State : Orissa. Educational Background:  Diploma in Mechanical -1987 U.C.P Berhampur, Orissa, India. Professional Trainings received:  Level II in Non Destructive Testing for different methods (RT, UT, MPT, and DPT). Computer Exposure: M.S-Office, Excel & Out look Languages Known: . English, Hindi, & Oriya
  • 2. Summary Of Experience: A certified mechanical engineer with more than 20 years experience in the field of engineering, management, supervision, coordination and inspection of process piping for petrochemical, Refinery,LNG, Chemical, Steel plant, Compressor Station, for clients such as IOCL,Y-LNG,RIL, Deepak Steel & Power. Ensuring all phases of project are completed on agreed schedule with safety and quality requirements. Work Experience Track Record: Current Employment: Jindal Steel And Power Limited (Angul, Odisha, India.) 7th October 2014 and Continuing. Mechanical In charge for Shop Fabrication. Experience : Essar Construction Oversease Limited .Borouge CGC -1 Project Ruwiese Abu Dhabi. Mechanical Lead- Excuting Piping, Equipments Like Silos Erection and Installation. Coordinating with Client for Tie-In Jobs Etc. 22nd jan to 10th June 2014. Current Employment: Petron Engineering and Construction limited R.C.M for GAIL PETROCHEMICAL COMPLEX (GPU UNIT) PATA, U.P, INDIA. 25th June 2012 to 8th oct 2013 Resposible- Site Incharge for GPU phase –II expansion. Experience: Uhde India Pvt. Ltd.(Thyssen Krupp Group) for IOCL VGO/HDT and DHDT Project (PARADEEP ORISSA, INDIA) 16th November to 20th June Construction Manager  Fire Heater for VGO/HDT and DHDT unit.  Regularly report to the Client IOCL on all activities status.  Monitored the performance of contractor (Heurtey Petrochem and Petron), reviewed the method statement and job safety analysis and implement safely.  Implemented and planned the execution strategies, resource planning, contractors monitoring and oversight programs.  Attend and anticipate in site meetings as Owner’s representative.  Review and comment on EPC Monthly Progress Report and provide input directly to the Client for further consolidation and feedback to EPC progress.  Managed to check all the incoming materials for the units.
  • 3.  Managed and supervised all piping fabrication, erection, fit-up, welding inspection, hydro testing, pneumatic testing, bolt tensioning and torque as required, cleanliness check, air blowing and tightness test.  Supervised and inspected the erection/installation and pre-commissioning of Process piping for VGO/HDT project.  Committed for the implementation of a safe working environment for the contractor team without any incident and injury free culture.  Acting as a key interface with the contractor to coordinate progress, priorities and change management and assure quality in design work.  Working closely with the contractor teams to assure quality and compliance with specifications for the Overall designs and the construction execution plan.  Verify achievement of project milestones and progress versus plan Experience: Uhde India Pvt. Ltd. (Thyssen Krupp Group) for IOCL VGO/HDT Project. (Vadodara, Gujrat) 25th Jan 2010 to 13th November 2010 Construction Manager  Supervised and overviewed the contractor (GDCL) to implement the requirements of the contract including the drawings and specifications.  Reviewed the construction procedure and job safety analysis.  Planned the overall activities and coordinated with other discipline in the same area.  Maintained the quality control records and work safely.  Closely monitoring the Erection of Equipments, installation of package units with related to unit piping for VGO unit.  Monitored the flow of all work with the objective of improving the contractor’s productivity, schedule performance, and safety.  Ensured all Piping quality control records required are completed prior to final Inspection.  Supervised the implementation of approved commissioning procedure as applicable for the Piping. Generated & managed the mechanical completion punch list for the Piping prior to final acceptance.  Attended the weekly progress and coordination meeting as required. Achieved the milestone of piping progress.  Managed and supervised all piping fabrication, erection, fit-up, welding inspection, hydro testing, pneumatic testing, bolt tensioning and torque as required, cleanliness check, air blowing and tightness test.  Supervised and inspected the erection/installation and pre-commissioning of Process piping  To assist pre commissioning and commissioning activities of systems completed include flange joint leak test, air flushing, water flushing, nitrogen purging etc. To execute overall on plot piping fabrication and erection works include identification of materials, coordination for the qualification of welders, inspection of site as per isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding, coordination for the NDT, installation of piping, preparation of as built drawing and test pack, preparation of mechanical punch list, hydro testing, Flange Management and box up activities as per applicable codes, procedure and standards Experience: Punj Lloyd Ltd. For Y-LNG, PMC-YEMGAS (YENEN) LNG-Project 7th Jan 2009 to 10th Sept 2009
  • 4. Deputy Manager  BOG compressor, Sea water intake system and ETP unit erection and commissioning with piping.  Supervision and monitoring the construction activities such as Fabrication of pipes and supports and its erection.  Ensure that Field Quality Control Plan (FQCP) is implemented and drawings are updated at workshop to avoid rework on site.  Managed and supervised all pipe rack and related steel structures erection, fit-up, welding inspection, bolt tensioning and torque as required, cleanliness check, and tightness test.  Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding, Testing etc.  Prepare internal construction punch list for clearing before final inspection of client. Experience: Punj Lloyd Ltd.For RIL, EWPL Project (Compressor Station-7&8) 5th January 2008 to 3rd January 2009. Deputy Manager Piping  Ensure that construction activities are carried out to the highest HSE standards.  Monitors and coordinates Equipments and Pipe erection, Installation of various valves at position.  Coordinate, plan and schedule day-to-day inspection related work activities and directions of existing plant operation units.  Monitors and coordinates fabrication of spools and welding as per drawings.  Allocation of work to various groups as per priority.  Conducting Hydro Test As Per Given RFI to QA/ QC.  Conducting Cleaning and Gauging For Piping And Pipelines As Per Given Requirements.  Monitors and coordinates all necessary testing procedures such as visual inspection, radiography, magnetic particle examination, ultrasonic testing, and dye penetrate testing, pressure testing and hydro testing.  Generated & managed the mechanical completion punch list for the piping prior to final acceptance. Experience: L & T ECC Division for Reliance, Project- Reliance Export Refinery (SEZ) Jamnagar, Gujarat. 24th October 2006 to 22nd December 2007 Sr. Engineer Piping  Monitors and coordinates fabrication of spools and welding as per drawings.  Ensure that construction activities are carried out to the highest HSE standards.  Monitors and coordinates Pipe erection.  Allocation of work to various groups as per priority.  Conducting Hydro Test As Per Given RFI to QA/QC.  Conducting Cleaning and Gauging For Piping And Pipelines As Per Given Requirements.  Monitors and coordinates all necessary testing procedures such as visual inspection, radiography, magnetic particle examination, ultrasonic testing, dye penetrate testing, pressure testing and hydro testing.
  • 5.  To supervise and monitor the piping fabrication and installation at different pipe racks in OSBL units including welder qualification, identification of material, preparation of weld production reports, coordination with NDT. Experience: M/S Shree Baba Vishwanath Iron pvt.ltd. Varanasi. 10th September 2004 to 20th August 2006 Mechanical In-Charge (Projects & Maintenance)  Monitoring of Fabrication of structures, and Equipments erection by contractors.  Managed and supervised all pipe rack steel structures erection.  Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding.  To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements are realistically quantified as per scope and budget and follow up the delivery of the project/construction materials.  To liaise with procurement and material management team to ensure the project materials and equipments delivery are in time as per planned schedule to site.  To study the vendor manuals for monitoring the materials delivery and ensuring all inspection of equipments and material as per vendor specification  Ensure that contractors will comply with HSE requirements at site. Experience: M/S Deepak Steel & Power ltd. Barbil, Orissa 5th July 2002 to 08th August 2004. Mechanical Engineer (Project)  Looking after overall extension of raw material handling system.  E.g. Fabrication & Erection of Mechanical Building structures, Equipments.  Monitoring of Fabrication of structures, and Equipments erection by contractors.  Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding.  Visual Inspection of Fit-up & welding activity.  Assist and support Line Management and Supervision in all.  Involved in preparation of Material take off and manpower supervision. Experience: M/S Grewal Associates.Barbil, Orissa. 1st June 2000 to 3rd July 2002. Company Mechanical Engineer  Looking after overall extension of raw material handling system.  E.g. Fabrication & Erection of Mechanical Building structures, Equipments.  Preparation of daily progress report.  Preparation of estimation based on AFC drawing and prepare procurement schedule for complete the project on schedule time.
  • 6.  Guidance to junior related to construction, quality control and how to maintain the work schedule.  Responsible for ensuring the works are carried out with commitment to health and safety legislation and company and site regulation. Experience: M/S Indfab with NINL- Dubri, NTPC- Kaniha, NALCO- Anugul, Super Thermal power plant Talcher under Bridge & Roof (I) ltd. L&T ltd. 1st June 1990 to 25th May 2000. Engineer  Involves in Project works of Mechanical Construction.  Visual Inspection of Fit-up & Welding activity.  Man power planning & Mobilization of different project sites. Assist and support Management and Supervision in all.  Involved in preparation of Material take off and manpower supervision.  Looking after client Billing & Follow up.  Arrangement of Resources. routray_abinash@rediffmail.com, routrayabinash@gmail.com, AT/PO-BALARAMPUR, VIA-KUSHALESWAR, DIST-KEONJHAR, ORISSA, PIN-758025