SlideShare a Scribd company logo
1 of 6
CURRICULAM - VITAE
CORRESPONDENCE ADDRESS:
Al-Noor Medical store Quaid-e-Azam road Khororpakka
District Lodhran
E-mail-zubfff@hotmail.com/zubfff0321@gmail.com
Mobile No: 0321-4226942
Mobile No: +966-59-4300833
PERSONAL DETAIL
Name : Muhammad Zubair Noor
Date of Birth : 07-May, 1990
Father's Name :Ch Noor Muhammad Meo
Permanent Address :Al-Noor Medical store Quaid-e-Azam road KhrorPakka
Gender : Male
Marital status : Married
Contact No. : 0321-4226942 -+966-59-4300833
E-mail :zubfff@hotmail.com
C.N.I.C No :36202-2578858-7
Nationality : Pakistani
Passport # :GY9998581
CAREER OBJECTIVE:
 Looking For a challenging and dynamic atmosphere where I may show my hidden
Capabilities under the supervision of co-operative and sympathetic persons.
Professional skills associated with Transportation Engg, Management, Buildings
Construction, Bridges etc.
 My goal & aim is to make sure work should be completed as per the Codes &
Standards and respective Project requirements and on schedule to achieve Company
goal.
POSITION As a Project Engr.
CONTRACTOR Canadian Engineering Projects, KSA
CONSULTAN AL-Othaim
CLIENT Al-Othaim
PROJECT Construction of Bisha-Oth project at Jazan-Bisha
DURATION 29, April 2015 to still working
Project Scope
The above mentioned Project is a market of Al-Othaim at Jazan-Bisha, KSA.
It is Building Structures include Steel structure. It is a commercial building project that
includes Building structure, tanks, hanger, Asphalt, Cladding and finishing work of
Building.
Responsibilities
 Prepare and plan the jobs, related to constructions.
 Supervise all Works independently.
 Compilation of approved quantities for preparation of running bills.
 Co-ordinate with consultant Engineer.
 Ensure that during execution of job all necessary safety measures are
taken.
 Verifying that the quality policy of the company is being fully implemented
and maintained.
 Checking and verifying that construction work is being carried out as per
the latest approved drawings.
 Ensuring that the work is performed in accordance with the specifications.
 Ensuring that the work is being carried out as per the quality Inspection
plan.
 Ensuring that the work should be done according to international
standards.
 Report to the Project manager regarding technical problems or
modifications.
 Prepare and update plan equipment and Material requirement for
constructions.
 Prepare the Daily Progress reports.
EXPERINCE
POSITION As a QA/QC Engr.
CONTRACTOR Engineering Kinetics pvt.ltd
CONSULTAN WASO
CLIENT Pakistan Atomic Energy Commission
PROJECT Construction of SR, RS & EM Building C-3/4 Chashma
Construction of Internal Roads, Foot Paths, Fencing and Covereda
Walk Ways At C-3/4 Chashma
DURATION 16, March2014 to 15, April 2015
Project Scope
The above mentioned Projects are Category-II Building Structures. SR, RS are Storage
building of Waste material for C-3 Plant.
Embedded parts, Equipment Foundation and Steel Structure are major parts of these
buildings.
8 km Carpeted Roads, Foot paths and Fencing around the Existing Building
Responsibilities
 Prepare and plan the jobs, related to constructions.
 Prepare the Project Quality Inspection plan PQAP.
 Prepare the Inspection Test Plan ITP’s.
 Supervise Works in accordance of International Standards.
 Prepare the Audit reports and follow-up.
 Meeting with Quality assurance department QAD C-3/C-4 Pakistan
atomic energy Commission.
 Check all the materials that are used at site according to ITP’s.
 Conducting training of Site manpower regarding Company Policy
and follow the parameters to maintain the quality of work according
to standards.
 Prepare all Mix designs.
 Make sure the Testing and calibration of all equipment.
 Compilation of approved quantities for preparation of running bills.
 Co-ordinate with Discipline Incharge.
 Ensure that during execution of job all necessary safety measures are
taken.
 Verifying that the quality policy of the company is being fully implemented
and maintained.
 Checking and verifying that construction work is being carried out as per
the latest approved drawings.
 Ensuring that the work is performed in accordance with the specifications.
 Ensuring that the work is being carried out as per the quality Inspection
plan.
 Ensure that during execution of job all necessary safety measures are
taken.
 Report to the Project manager regarding technical problems or
modifications.
 Prepare and update plan equipment requirement and testing for
constructions.
 Assist the Planning Department to Compile Daily Progress reports.
EXPERINCE
POSITION As a QA/QC Engr.
CONTRACTOR Engineering Kinetics pvt.ltd
CONSULTAN WASO
CLIENT Pakistan Atomic Energy Commission
PROJECT Construction of outfall channel & allied structures C-3/4Chashma
Construction of Fire Pump Station C-3/4 Chashma
DURATION 1,Nov-2013to 10 April 2014
ProjectScope
Construction of Fire Pump Station for C-3/4 is Category-II Building Structure.
Equipment Foundation for Pneumatic Tanks, Water Storage Tanks of Capacity
3,00000 gallon.
Crane Beams, End brackets and Sleeves are major parts of these building.
Construction of Outfall Channel & Allied Structure for C-3/4 is Category-III Structures.
Its include 6.646 Km of Lined Channel.
Two 30m vehicle bridges at RD 1+700 & 5+560
One Pedestrian Bridge & Aqua duct at RD 3+200
Two 30m Pre-stressed Bridges across the running canal C-1/2 40 ton Capacity.
Two Railway bridges at outfall Channel.
One Hydal Base structure of 5.6 MW capacity.
(Dewatering, Sheet Piling, heavy rafts and Tail race are the major parts of this structure)
Responsibilities
 Preparation of PQAP for Projects.
 Organize, implement, conduct and manage the QA/QC Programs as per the Company's
Quality Policy.
 Coordinate the document controls of technical submittals, drawings with the Project
Team and to ensure that the QA/QC validation has been done, to ensure their issue,
amendments and recall of controlled documents.
 Coordinate all inspections; monitor the required tests and record inspections and tests
made pas the Contract Plan and Contract Specifications.
 Ensure that Non-Conformance Report (NCR’s) areraise once the activities deviated
from the Contract Specifications or normal construction industry practices.
 Supervision of all labs testing according to standards.
 Coordination with client representative.
 Discuss issues in weekly & monthly meetings.
 Review the customer’s specifications and undertake relevant training to the site QC
inspectors.
 Coordinate all of the on and off site quality inspections and quality audits with the site
Contractors, Sub-contractors and Suppliers.
 Prepare ITP’s to be used for conduct of inspection and testing.
 Assigned task and inspection works to site QC inspectors on daily basis and review
outcome of inspection and documents.
 Conduct inspection for trial mixes of concrete in batching plant prior to submittal and
acceptance by the Consultant.
 Coordinate all material receipt inspections and review all material certification and
testing.
 Ensure all quality control documentation is complied with for the works from
construction through hand over.
 Ensure that safety is adhered at all times.
EXPERINCE
Position As a QA Inspector
CONTRACTOR EKL
CONSULTAN Engineering Kinetics Pvt. Ltd
CLIENT WASO
PROJECT Construction of Out Fall Channel & Allied Structure C-3/4
Chashma
DURATION 8, June 2013 to 10, Nov 2013
 Site inspections related to concrete, steel, formwork etc.
 Implementation of PQAP at site.
 Follow ITP’s for inspection points.
 Project Drawings, PQAP & specification study for the implementation at site.
 Study of applicable codes & standard.
 Material testing of coarse & fine aggregate, FDT’s at site.
 Testing of fresh Concrete.
 Inspection of control points of Client.
 Discussion with client of any site related issue according to PQAP.
Position As an Internee
CONTRACTOR RMC pvt.ltd
CONSULTAN Engineering associates consultant (EA consultant)
CLIENT NHA
PROJECT Construction of flyover at Rasheeda Bad, Multan
DURATION 10th June 2012 to 10th July 2012
PROFESSIONAL QUALIFICATION:
 Pursuing 4 year bachelor degree in civil engineering from University of Engineering &
TechnologyTaxila.
 CGPA is 3.05
 Session 2009
 PEC Registration No. CIVIL/34926
PROJECT & RESEARCH WORK:
 Report of Design of structure (medical city in CMH Rawalpindi )
 Estimation report of houses and flats
 Report on sewerage system, estimation of sewage flow and water supply system in
colonies
 Final year project“Effect of additives(fly ash, steel billet) on the performance of
HMA ”
 Research paper on final year project
TOOLS:
 Microsoft office (word, power point , excel)
 AUTO CAD
 Eagle Point
 MS Project
 EPANET
 E -TABS
 RISA (2D & 3D)
ACADEMICQUALIFICATION:
Year Qualification School / college Board /
University
Percentage
2007 MATRIC Govt
H/SGahimammar
Multan board 89.90
2009 FSC Punjab college of
science Multan.
Multan board 81.55
2013 BSC UET TAXILA UET TAXILA 75.8
 Catalog of 50x90 houses in Auto CAD
 Project report of FFCL building Rawalpindi
LANGUAGE KNOWN:
 Urdu : Can Speak, Read &Write
 English : Can Speak, Read &Write
 Punjabi :Can Speak, Read & Write
 Arabic : Can Speak
Interests &Hobbies :
 Reading Holy Quran
 Computer Using
 Internet Surfing
 Reading Islamic & Historical Books
 Sports
 Management programs
 Traveling

More Related Content

What's hot (20)

Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQC
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
Suneesh-QAQC Inspector-CV
Suneesh-QAQC Inspector-CVSuneesh-QAQC Inspector-CV
Suneesh-QAQC Inspector-CV
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CV
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil Engineer
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Cv precast concrete
Cv   precast concreteCv   precast concrete
Cv precast concrete
 
Nidhin George_CV
Nidhin George_CVNidhin George_CV
Nidhin George_CV
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
Certified QA QC civil engineer
Certified QA QC civil engineer Certified QA QC civil engineer
Certified QA QC civil engineer
 
edwin cv for QA-QC Manager
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC Manager
 
Resume_Anjanna
Resume_AnjannaResume_Anjanna
Resume_Anjanna
 
QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 
Naveen Resume.doc
Naveen Resume.docNaveen Resume.doc
Naveen Resume.doc
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 

Viewers also liked (20)

Universal design for learning
Universal design for learningUniversal design for learning
Universal design for learning
 
Grupo empresarial nule
Grupo empresarial nuleGrupo empresarial nule
Grupo empresarial nule
 
Rmp
RmpRmp
Rmp
 
Psicología juridica
Psicología juridicaPsicología juridica
Psicología juridica
 
Modo de producción primitiva
Modo de producción primitivaModo de producción primitiva
Modo de producción primitiva
 
TTH QI Presentation
TTH QI Presentation TTH QI Presentation
TTH QI Presentation
 
HIPAA: How to avoid becoming a worst case scenario
HIPAA: How to avoid becoming a worst case scenario HIPAA: How to avoid becoming a worst case scenario
HIPAA: How to avoid becoming a worst case scenario
 
Mi presentación
Mi presentaciónMi presentación
Mi presentación
 
Modo de producción primitiva pdf
Modo de producción primitiva pdfModo de producción primitiva pdf
Modo de producción primitiva pdf
 
Atún
AtúnAtún
Atún
 
Rmc
RmcRmc
Rmc
 
Atún
AtúnAtún
Atún
 
ux_standards_slides
ux_standards_slidesux_standards_slides
ux_standards_slides
 
Magdalena Osorno
Magdalena Osorno Magdalena Osorno
Magdalena Osorno
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Furey-Chad-MSc-ENGM-December-2015
Furey-Chad-MSc-ENGM-December-2015Furey-Chad-MSc-ENGM-December-2015
Furey-Chad-MSc-ENGM-December-2015
 
7 waterlogging and salinity
7 waterlogging and salinity7 waterlogging and salinity
7 waterlogging and salinity
 
Teoría clásica del comercio internacional
Teoría clásica del comercio internacionalTeoría clásica del comercio internacional
Teoría clásica del comercio internacional
 
7-Waterlogging and salinity
7-Waterlogging and salinity7-Waterlogging and salinity
7-Waterlogging and salinity
 
Grupo empresarial nule
Grupo empresarial nuleGrupo empresarial nule
Grupo empresarial nule
 

Similar to Latest cv engr. zubair

Similar to Latest cv engr. zubair (20)

Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
NEW RESUME AUG-16
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
 
Anuj resume 21 - copy
Anuj resume 21 - copyAnuj resume 21 - copy
Anuj resume 21 - copy
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
cv of arshad
cv of arshadcv of arshad
cv of arshad
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
MONIKANDAN-RESUME - B
MONIKANDAN-RESUME - BMONIKANDAN-RESUME - B
MONIKANDAN-RESUME - B
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkat
 
Imran barkat.
Imran barkat.Imran barkat.
Imran barkat.
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
Azam Raza (QAQC)Mechanical engineer.
Azam Raza (QAQC)Mechanical engineer.Azam Raza (QAQC)Mechanical engineer.
Azam Raza (QAQC)Mechanical engineer.
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
BASEEM
BASEEMBASEEM
BASEEM
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Latest cv engr. zubair

  • 1. CURRICULAM - VITAE CORRESPONDENCE ADDRESS: Al-Noor Medical store Quaid-e-Azam road Khororpakka District Lodhran E-mail-zubfff@hotmail.com/zubfff0321@gmail.com Mobile No: 0321-4226942 Mobile No: +966-59-4300833 PERSONAL DETAIL Name : Muhammad Zubair Noor Date of Birth : 07-May, 1990 Father's Name :Ch Noor Muhammad Meo Permanent Address :Al-Noor Medical store Quaid-e-Azam road KhrorPakka Gender : Male Marital status : Married Contact No. : 0321-4226942 -+966-59-4300833 E-mail :zubfff@hotmail.com C.N.I.C No :36202-2578858-7 Nationality : Pakistani Passport # :GY9998581 CAREER OBJECTIVE:  Looking For a challenging and dynamic atmosphere where I may show my hidden Capabilities under the supervision of co-operative and sympathetic persons. Professional skills associated with Transportation Engg, Management, Buildings Construction, Bridges etc.  My goal & aim is to make sure work should be completed as per the Codes & Standards and respective Project requirements and on schedule to achieve Company goal. POSITION As a Project Engr. CONTRACTOR Canadian Engineering Projects, KSA CONSULTAN AL-Othaim CLIENT Al-Othaim PROJECT Construction of Bisha-Oth project at Jazan-Bisha DURATION 29, April 2015 to still working Project Scope The above mentioned Project is a market of Al-Othaim at Jazan-Bisha, KSA. It is Building Structures include Steel structure. It is a commercial building project that includes Building structure, tanks, hanger, Asphalt, Cladding and finishing work of Building. Responsibilities  Prepare and plan the jobs, related to constructions.
  • 2.  Supervise all Works independently.  Compilation of approved quantities for preparation of running bills.  Co-ordinate with consultant Engineer.  Ensure that during execution of job all necessary safety measures are taken.  Verifying that the quality policy of the company is being fully implemented and maintained.  Checking and verifying that construction work is being carried out as per the latest approved drawings.  Ensuring that the work is performed in accordance with the specifications.  Ensuring that the work is being carried out as per the quality Inspection plan.  Ensuring that the work should be done according to international standards.  Report to the Project manager regarding technical problems or modifications.  Prepare and update plan equipment and Material requirement for constructions.  Prepare the Daily Progress reports. EXPERINCE POSITION As a QA/QC Engr. CONTRACTOR Engineering Kinetics pvt.ltd CONSULTAN WASO CLIENT Pakistan Atomic Energy Commission PROJECT Construction of SR, RS & EM Building C-3/4 Chashma Construction of Internal Roads, Foot Paths, Fencing and Covereda Walk Ways At C-3/4 Chashma DURATION 16, March2014 to 15, April 2015 Project Scope The above mentioned Projects are Category-II Building Structures. SR, RS are Storage building of Waste material for C-3 Plant. Embedded parts, Equipment Foundation and Steel Structure are major parts of these buildings. 8 km Carpeted Roads, Foot paths and Fencing around the Existing Building Responsibilities  Prepare and plan the jobs, related to constructions.  Prepare the Project Quality Inspection plan PQAP.  Prepare the Inspection Test Plan ITP’s.  Supervise Works in accordance of International Standards.  Prepare the Audit reports and follow-up.  Meeting with Quality assurance department QAD C-3/C-4 Pakistan atomic energy Commission.  Check all the materials that are used at site according to ITP’s.  Conducting training of Site manpower regarding Company Policy and follow the parameters to maintain the quality of work according to standards.  Prepare all Mix designs.  Make sure the Testing and calibration of all equipment.
  • 3.  Compilation of approved quantities for preparation of running bills.  Co-ordinate with Discipline Incharge.  Ensure that during execution of job all necessary safety measures are taken.  Verifying that the quality policy of the company is being fully implemented and maintained.  Checking and verifying that construction work is being carried out as per the latest approved drawings.  Ensuring that the work is performed in accordance with the specifications.  Ensuring that the work is being carried out as per the quality Inspection plan.  Ensure that during execution of job all necessary safety measures are taken.  Report to the Project manager regarding technical problems or modifications.  Prepare and update plan equipment requirement and testing for constructions.  Assist the Planning Department to Compile Daily Progress reports. EXPERINCE POSITION As a QA/QC Engr. CONTRACTOR Engineering Kinetics pvt.ltd CONSULTAN WASO CLIENT Pakistan Atomic Energy Commission PROJECT Construction of outfall channel & allied structures C-3/4Chashma Construction of Fire Pump Station C-3/4 Chashma DURATION 1,Nov-2013to 10 April 2014 ProjectScope Construction of Fire Pump Station for C-3/4 is Category-II Building Structure. Equipment Foundation for Pneumatic Tanks, Water Storage Tanks of Capacity 3,00000 gallon. Crane Beams, End brackets and Sleeves are major parts of these building. Construction of Outfall Channel & Allied Structure for C-3/4 is Category-III Structures. Its include 6.646 Km of Lined Channel. Two 30m vehicle bridges at RD 1+700 & 5+560 One Pedestrian Bridge & Aqua duct at RD 3+200 Two 30m Pre-stressed Bridges across the running canal C-1/2 40 ton Capacity. Two Railway bridges at outfall Channel. One Hydal Base structure of 5.6 MW capacity. (Dewatering, Sheet Piling, heavy rafts and Tail race are the major parts of this structure) Responsibilities
  • 4.  Preparation of PQAP for Projects.  Organize, implement, conduct and manage the QA/QC Programs as per the Company's Quality Policy.  Coordinate the document controls of technical submittals, drawings with the Project Team and to ensure that the QA/QC validation has been done, to ensure their issue, amendments and recall of controlled documents.  Coordinate all inspections; monitor the required tests and record inspections and tests made pas the Contract Plan and Contract Specifications.  Ensure that Non-Conformance Report (NCR’s) areraise once the activities deviated from the Contract Specifications or normal construction industry practices.  Supervision of all labs testing according to standards.  Coordination with client representative.  Discuss issues in weekly & monthly meetings.  Review the customer’s specifications and undertake relevant training to the site QC inspectors.  Coordinate all of the on and off site quality inspections and quality audits with the site Contractors, Sub-contractors and Suppliers.  Prepare ITP’s to be used for conduct of inspection and testing.  Assigned task and inspection works to site QC inspectors on daily basis and review outcome of inspection and documents.  Conduct inspection for trial mixes of concrete in batching plant prior to submittal and acceptance by the Consultant.  Coordinate all material receipt inspections and review all material certification and testing.  Ensure all quality control documentation is complied with for the works from construction through hand over.  Ensure that safety is adhered at all times. EXPERINCE Position As a QA Inspector CONTRACTOR EKL CONSULTAN Engineering Kinetics Pvt. Ltd CLIENT WASO PROJECT Construction of Out Fall Channel & Allied Structure C-3/4 Chashma DURATION 8, June 2013 to 10, Nov 2013  Site inspections related to concrete, steel, formwork etc.  Implementation of PQAP at site.  Follow ITP’s for inspection points.  Project Drawings, PQAP & specification study for the implementation at site.  Study of applicable codes & standard.  Material testing of coarse & fine aggregate, FDT’s at site.  Testing of fresh Concrete.  Inspection of control points of Client.  Discussion with client of any site related issue according to PQAP.
  • 5. Position As an Internee CONTRACTOR RMC pvt.ltd CONSULTAN Engineering associates consultant (EA consultant) CLIENT NHA PROJECT Construction of flyover at Rasheeda Bad, Multan DURATION 10th June 2012 to 10th July 2012 PROFESSIONAL QUALIFICATION:  Pursuing 4 year bachelor degree in civil engineering from University of Engineering & TechnologyTaxila.  CGPA is 3.05  Session 2009  PEC Registration No. CIVIL/34926 PROJECT & RESEARCH WORK:  Report of Design of structure (medical city in CMH Rawalpindi )  Estimation report of houses and flats  Report on sewerage system, estimation of sewage flow and water supply system in colonies  Final year project“Effect of additives(fly ash, steel billet) on the performance of HMA ”  Research paper on final year project TOOLS:  Microsoft office (word, power point , excel)  AUTO CAD  Eagle Point  MS Project  EPANET  E -TABS  RISA (2D & 3D) ACADEMICQUALIFICATION: Year Qualification School / college Board / University Percentage 2007 MATRIC Govt H/SGahimammar Multan board 89.90 2009 FSC Punjab college of science Multan. Multan board 81.55 2013 BSC UET TAXILA UET TAXILA 75.8  Catalog of 50x90 houses in Auto CAD  Project report of FFCL building Rawalpindi
  • 6. LANGUAGE KNOWN:  Urdu : Can Speak, Read &Write  English : Can Speak, Read &Write  Punjabi :Can Speak, Read & Write  Arabic : Can Speak Interests &Hobbies :  Reading Holy Quran  Computer Using  Internet Surfing  Reading Islamic & Historical Books  Sports  Management programs  Traveling