Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Latest cv engr. zubair
1. CURRICULAM - VITAE
CORRESPONDENCE ADDRESS:
Al-Noor Medical store Quaid-e-Azam road Khororpakka
District Lodhran
E-mail-zubfff@hotmail.com/zubfff0321@gmail.com
Mobile No: 0321-4226942
Mobile No: +966-59-4300833
PERSONAL DETAIL
Name : Muhammad Zubair Noor
Date of Birth : 07-May, 1990
Father's Name :Ch Noor Muhammad Meo
Permanent Address :Al-Noor Medical store Quaid-e-Azam road KhrorPakka
Gender : Male
Marital status : Married
Contact No. : 0321-4226942 -+966-59-4300833
E-mail :zubfff@hotmail.com
C.N.I.C No :36202-2578858-7
Nationality : Pakistani
Passport # :GY9998581
CAREER OBJECTIVE:
Looking For a challenging and dynamic atmosphere where I may show my hidden
Capabilities under the supervision of co-operative and sympathetic persons.
Professional skills associated with Transportation Engg, Management, Buildings
Construction, Bridges etc.
My goal & aim is to make sure work should be completed as per the Codes &
Standards and respective Project requirements and on schedule to achieve Company
goal.
POSITION As a Project Engr.
CONTRACTOR Canadian Engineering Projects, KSA
CONSULTAN AL-Othaim
CLIENT Al-Othaim
PROJECT Construction of Bisha-Oth project at Jazan-Bisha
DURATION 29, April 2015 to still working
Project Scope
The above mentioned Project is a market of Al-Othaim at Jazan-Bisha, KSA.
It is Building Structures include Steel structure. It is a commercial building project that
includes Building structure, tanks, hanger, Asphalt, Cladding and finishing work of
Building.
Responsibilities
Prepare and plan the jobs, related to constructions.
2. Supervise all Works independently.
Compilation of approved quantities for preparation of running bills.
Co-ordinate with consultant Engineer.
Ensure that during execution of job all necessary safety measures are
taken.
Verifying that the quality policy of the company is being fully implemented
and maintained.
Checking and verifying that construction work is being carried out as per
the latest approved drawings.
Ensuring that the work is performed in accordance with the specifications.
Ensuring that the work is being carried out as per the quality Inspection
plan.
Ensuring that the work should be done according to international
standards.
Report to the Project manager regarding technical problems or
modifications.
Prepare and update plan equipment and Material requirement for
constructions.
Prepare the Daily Progress reports.
EXPERINCE
POSITION As a QA/QC Engr.
CONTRACTOR Engineering Kinetics pvt.ltd
CONSULTAN WASO
CLIENT Pakistan Atomic Energy Commission
PROJECT Construction of SR, RS & EM Building C-3/4 Chashma
Construction of Internal Roads, Foot Paths, Fencing and Covereda
Walk Ways At C-3/4 Chashma
DURATION 16, March2014 to 15, April 2015
Project Scope
The above mentioned Projects are Category-II Building Structures. SR, RS are Storage
building of Waste material for C-3 Plant.
Embedded parts, Equipment Foundation and Steel Structure are major parts of these
buildings.
8 km Carpeted Roads, Foot paths and Fencing around the Existing Building
Responsibilities
Prepare and plan the jobs, related to constructions.
Prepare the Project Quality Inspection plan PQAP.
Prepare the Inspection Test Plan ITP’s.
Supervise Works in accordance of International Standards.
Prepare the Audit reports and follow-up.
Meeting with Quality assurance department QAD C-3/C-4 Pakistan
atomic energy Commission.
Check all the materials that are used at site according to ITP’s.
Conducting training of Site manpower regarding Company Policy
and follow the parameters to maintain the quality of work according
to standards.
Prepare all Mix designs.
Make sure the Testing and calibration of all equipment.
3. Compilation of approved quantities for preparation of running bills.
Co-ordinate with Discipline Incharge.
Ensure that during execution of job all necessary safety measures are
taken.
Verifying that the quality policy of the company is being fully implemented
and maintained.
Checking and verifying that construction work is being carried out as per
the latest approved drawings.
Ensuring that the work is performed in accordance with the specifications.
Ensuring that the work is being carried out as per the quality Inspection
plan.
Ensure that during execution of job all necessary safety measures are
taken.
Report to the Project manager regarding technical problems or
modifications.
Prepare and update plan equipment requirement and testing for
constructions.
Assist the Planning Department to Compile Daily Progress reports.
EXPERINCE
POSITION As a QA/QC Engr.
CONTRACTOR Engineering Kinetics pvt.ltd
CONSULTAN WASO
CLIENT Pakistan Atomic Energy Commission
PROJECT Construction of outfall channel & allied structures C-3/4Chashma
Construction of Fire Pump Station C-3/4 Chashma
DURATION 1,Nov-2013to 10 April 2014
ProjectScope
Construction of Fire Pump Station for C-3/4 is Category-II Building Structure.
Equipment Foundation for Pneumatic Tanks, Water Storage Tanks of Capacity
3,00000 gallon.
Crane Beams, End brackets and Sleeves are major parts of these building.
Construction of Outfall Channel & Allied Structure for C-3/4 is Category-III Structures.
Its include 6.646 Km of Lined Channel.
Two 30m vehicle bridges at RD 1+700 & 5+560
One Pedestrian Bridge & Aqua duct at RD 3+200
Two 30m Pre-stressed Bridges across the running canal C-1/2 40 ton Capacity.
Two Railway bridges at outfall Channel.
One Hydal Base structure of 5.6 MW capacity.
(Dewatering, Sheet Piling, heavy rafts and Tail race are the major parts of this structure)
Responsibilities
4. Preparation of PQAP for Projects.
Organize, implement, conduct and manage the QA/QC Programs as per the Company's
Quality Policy.
Coordinate the document controls of technical submittals, drawings with the Project
Team and to ensure that the QA/QC validation has been done, to ensure their issue,
amendments and recall of controlled documents.
Coordinate all inspections; monitor the required tests and record inspections and tests
made pas the Contract Plan and Contract Specifications.
Ensure that Non-Conformance Report (NCR’s) areraise once the activities deviated
from the Contract Specifications or normal construction industry practices.
Supervision of all labs testing according to standards.
Coordination with client representative.
Discuss issues in weekly & monthly meetings.
Review the customer’s specifications and undertake relevant training to the site QC
inspectors.
Coordinate all of the on and off site quality inspections and quality audits with the site
Contractors, Sub-contractors and Suppliers.
Prepare ITP’s to be used for conduct of inspection and testing.
Assigned task and inspection works to site QC inspectors on daily basis and review
outcome of inspection and documents.
Conduct inspection for trial mixes of concrete in batching plant prior to submittal and
acceptance by the Consultant.
Coordinate all material receipt inspections and review all material certification and
testing.
Ensure all quality control documentation is complied with for the works from
construction through hand over.
Ensure that safety is adhered at all times.
EXPERINCE
Position As a QA Inspector
CONTRACTOR EKL
CONSULTAN Engineering Kinetics Pvt. Ltd
CLIENT WASO
PROJECT Construction of Out Fall Channel & Allied Structure C-3/4
Chashma
DURATION 8, June 2013 to 10, Nov 2013
Site inspections related to concrete, steel, formwork etc.
Implementation of PQAP at site.
Follow ITP’s for inspection points.
Project Drawings, PQAP & specification study for the implementation at site.
Study of applicable codes & standard.
Material testing of coarse & fine aggregate, FDT’s at site.
Testing of fresh Concrete.
Inspection of control points of Client.
Discussion with client of any site related issue according to PQAP.
5. Position As an Internee
CONTRACTOR RMC pvt.ltd
CONSULTAN Engineering associates consultant (EA consultant)
CLIENT NHA
PROJECT Construction of flyover at Rasheeda Bad, Multan
DURATION 10th June 2012 to 10th July 2012
PROFESSIONAL QUALIFICATION:
Pursuing 4 year bachelor degree in civil engineering from University of Engineering &
TechnologyTaxila.
CGPA is 3.05
Session 2009
PEC Registration No. CIVIL/34926
PROJECT & RESEARCH WORK:
Report of Design of structure (medical city in CMH Rawalpindi )
Estimation report of houses and flats
Report on sewerage system, estimation of sewage flow and water supply system in
colonies
Final year project“Effect of additives(fly ash, steel billet) on the performance of
HMA ”
Research paper on final year project
TOOLS:
Microsoft office (word, power point , excel)
AUTO CAD
Eagle Point
MS Project
EPANET
E -TABS
RISA (2D & 3D)
ACADEMICQUALIFICATION:
Year Qualification School / college Board /
University
Percentage
2007 MATRIC Govt
H/SGahimammar
Multan board 89.90
2009 FSC Punjab college of
science Multan.
Multan board 81.55
2013 BSC UET TAXILA UET TAXILA 75.8
Catalog of 50x90 houses in Auto CAD
Project report of FFCL building Rawalpindi
6. LANGUAGE KNOWN:
Urdu : Can Speak, Read &Write
English : Can Speak, Read &Write
Punjabi :Can Speak, Read & Write
Arabic : Can Speak
Interests &Hobbies :
Reading Holy Quran
Computer Using
Internet Surfing
Reading Islamic & Historical Books
Sports
Management programs
Traveling