SlideShare a Scribd company logo
1 of 10
CURRICULUM VITAE
FAISAL AMIN
Chak No. 168/9L, District Sahiwal, Pakistan
CAREER OBJECTIVE:
Seeking a prosperous Career in order to boost my knowledge, experience
and interpersonal skills in a challenging environment
PERSONAL DATE:
• Father’s Name : Muhammad Amin
• Date of Birth : 10-10-1983
• Domicile : Sahiwal
• N.I.C No : 36501-1772935-9
• Passport No : AN1209353 (Valid up to August 2020)
• Nationality : Pakistani
• Marital Status : Married
• Languages : Urdu, Punjabi, English, Arabic
• Skype ID : faisalamin168
• Contact +92-3317969268,+92405450039
• Email : faisalamin168@yahoo.com
ACADEMIC QUALIFICATION:
Qualification Division Institute/Board
Matriculation (year 2002) 1st
B.I.S.P Multan
DAE (Mechanical) (Year 2005) 1st
P.B.T.E Lahore
6 Month Computer coarse 1st
Paradise computer college
Burewala
TRAINING & CERTIFICATION:
• Work at height from Qatlum.
• Rigging certificate from Fivesolios.
• Confined space from Descon.
• Incident Injury free from JGC & Technimount.
• First Aid training from ARABIAN SAFETY TRAINING CENTER
PROFESSIONAL QUALIFICATION:
3 Years DAE (Diploma of Associate Engineer in Mechanical Technology)
from GOVT College of technology Railway Road Lahore.
EXPERIENCE:
Company: Techno Engineering Company Pvt (Ltd) Badra Iraq.
Project: EPC GAS EXPORT PIPELINE BADRA- ZUBAIDAH REPUBLIC OF
IRAQ
Client: Gasprom Neft.
Position: Piping and Pipeline Supervisor
Duration: Nov 2015 to till now
• Hydrostatic testing of piping and reinstatement.
• To carry on Field Pipe Bending
• To supervise open cut road crossing and thrust boring activities of
pipe line.
• To raise Internal Inspection Request(IIR) in order to conduct
Inspection
• Was responsible for material planning, Job scheduling, planning
monitoring and control etc.
• Application of heat shrinkable sleeves, tie ins.
• To supervise pipeline and piping activities of the project which was
more than One lakh Dia Inch square, Fabrication and Erection.
• To supervise all activities of painting, sand blasting.
• Was responsible for relocation, modification, fabrication and
erection of piping supports.
EXPERIENCE:
Company: Gulf Consolidated Contractors Company (GCC), Saudi Arabia
Project: Install Pipeline Instrument Scraping Facilities (EPC PROJECT)
Client: SAUDI ARAMCO
Position: Supervisor Piping
Duration: Oct 2014 to Jun 2015
BI : 10-00006
Contractno: 66000301
Responsibilities:
• Hydrostatic testing of piping and reinstatement.
• To carry on Field Pipe Bending
• To supervise open cut road crossing and thrust boring activities of
pipe line.
• To raise Internal Inspection Request(IIR) in order to conduct
Inspection
• Was responsible for material planning, Job scheduling, planning
monitoring and control etc.
• Application of heat shrinkable sleeves, tie ins.
• To supervise pipeline and piping activities of the project which was
more than two lakh Dia Inch square, Fabrication and Erection.
• To supervise all activities of painting, sand blasting.
• Was responsible for relocation, modification, fabrication and
erection of piping supports.
Company: Gulf Consolidated Contractors Company (GCC), Saudi Arabia
Project: Wasit Gas Downstream Pipelines (EPC Project)
Client: SAUDI ARAMCO
Position: Superintendent Piping
Duration: Oct 2012 to Oct 2014
Bi : 10-00918
Contract No: 6600025971
Responsibilities:
• Pipe stringing as per Alignment Sheets
• Bending as Required
• To supervise the fit-up and welding of 56", 26", 24", 12", 10"
Pipelines.
• To Control Modification and Repair Work
• To supervise open cut road crossing and thrust boring activities of
pipeline.
• To Supervise the Cleaning, Flushing and Gauging.
• Hydrostatic testing of piping and reinstatement.
• To Supervise on plot piping activities.
• To Supervise Piping fabrication activities at fabrication shop.
• Was responsible for relocation, modification, fabrication and
erection of piping supports.
• To supervise all fabrication activities such as jacketed sulfur piping,
stainless steel piping cs, piping, pipe supports
Company: Descon Engineering, United Arab Emirates
Project: IGD HABSHAN 5 (Integrated Gas Development)
Client: JOINT VENTURE OF JGC & TECHNIMOUNT
Position: Supervisor Piping
Duration: Sep 2011 to Oct 2012
Responsibilities:
• To Supervise CS, SS Piping fabrication activities at fabrication shop
• To Supervise CS, SS Piping erection activities at site
• To Control Modification and Repair work of piping.
• To Control and monitoring the Piping progress
• Erection of pipe supports & modification.
• Responsible for Piping maintenance and working at plant shut down.
Company: Suraj Fertilizer
Project: Single Super Phosphate Fertilizer Factory, Harrapa, Pakistan
Client: Suraj Fertilizer
Position: Mechanical Maintenance Supervisor
Duration: May 2010 to Jul 2011
Responsibilities
• Maintenance of piping in the running plant
• Preventive maintenance of machinery.
• Responsible for Plant maintenance and working for shut downs.
• To prepare material requirement and planning for Shut downs and
Pre Shut downs.
Company: Descon Engineering Qatar LLC
Project: RAS LAFFAN C IWPP PROJECFT 8009
Position: Supervisor Piping
Duration: Sep 2009 to Dec 2009
Responsibilities
• To supervise CS, SS piping fabrication activities at fabrication shop.
• To supervise CS, SS piping erection activities at site.
• To control modification & repair work.
• To supervise fabrication and erection of pipe supports.
Company: Descon Engineering Qatar LLC
Project: Qatlam Aluminum Smelter Project
Client: Five Solios (France)
Position: Supervisor Piping
Duration: Mar 2009 to Sep 2009
Responsibilities:
• To supervise CS, SS piping fabrication activities at fabrication shop.
• To supervise CS, SS piping erection activities at site.
• To control duct, modification & repair work.
• Erection and fabrication of hoppers.
• Erection of lining plates in the hoppers and ducts.
• Fabrication & erection of ducts.
Company: Descon Engineering Qatar LLC
Project: Ras Laffan Olefin Project
Client: Technip (France)
Position: Supervisor Piping
Duration: Dec 2007 to Mar 2009
Responsibilities:
• To supervise CS, SS piping fabrication activities at fabrication shop.
• To supervise CS, SS piping erection activities at site.
• To control modification & repair work.
• Meeting with client and management.
• To Supervise fabrication and erection of pipe supports.
• To Supervise Hydro testing and air blowing activities.
• To Supervise Installation of control valves and instrument piping.
Company: JGC Middle East FZE (Qatar)
Project: Dolphin Onshore Facilities Project
Position: Supervisor Piping
Duration: Jul 2007 to Nov 2007
• To supervise CS, SS piping fabrication activities at fabrication shop
• To supervise CS, SS piping erection activities at site.
• To control modification & repair work.
• To control and monitoring the piping progress.
Company: DESCON ENGINEERING Qatar L.L.C
Project: Dolphin Onshore Facilities Project
Client: Japan Gas Corporation (JGC)
Position: Assistant Supervisor Piping
Duration: Mar 2007 to Jun 2007
Responsibilities:
• To supervise CS, SS piping fabrication activities at fabrication shop.
• To supervise CS, SS piping erection activities at site.
• To control modification & repair work.
• Meeting with client and management.
• To control and monitoring the piping progress.
Company: MASTER ENGINEERING COMPANY LTD LAHORE (PAKISTAN)
Position: Fabrication Lead Man
Duration: Mar 2006 to Dec 2006
• Fabrication activities of piping at fabrication shop.
• Fabrication activities of pipe supports.
• Working for Piping /Plant maintenance.

More Related Content

What's hot

What's hot (20)

joy S resume
joy S resumejoy S resume
joy S resume
 
Brian Charles Hoskins
Brian Charles HoskinsBrian Charles Hoskins
Brian Charles Hoskins
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
 
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
 
Andy B Espada Resume (7)
Andy B  Espada Resume (7)Andy B  Espada Resume (7)
Andy B Espada Resume (7)
 
Mario N. Sanchez - CV (Civil)-2 (1)Updated
Mario N. Sanchez - CV (Civil)-2 (1)UpdatedMario N. Sanchez - CV (Civil)-2 (1)Updated
Mario N. Sanchez - CV (Civil)-2 (1)Updated
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
resume'
resume'resume'
resume'
 
Azhar iqbal qc_inspector
Azhar iqbal qc_inspectorAzhar iqbal qc_inspector
Azhar iqbal qc_inspector
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12
 
Sandip new c v 12
Sandip new c v 12Sandip new c v 12
Sandip new c v 12
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
NABEEL_SME_23012015
NABEEL_SME_23012015NABEEL_SME_23012015
NABEEL_SME_23012015
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 

Similar to CV FAISAL

Similar to CV FAISAL (20)

Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
navjay
navjaynavjay
navjay
 
Resume
ResumeResume
Resume
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 
Zeshan Iltaf C.V
Zeshan Iltaf C.VZeshan Iltaf C.V
Zeshan Iltaf C.V
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
MY CV (1)
MY CV (1)MY CV (1)
MY CV (1)
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV
 
GABRIEL ANTHONY EDEM cv
GABRIEL ANTHONY EDEM cvGABRIEL ANTHONY EDEM cv
GABRIEL ANTHONY EDEM cv
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
Resume - Umamaheswaran
Resume - UmamaheswaranResume - Umamaheswaran
Resume - Umamaheswaran
 

CV FAISAL

  • 1. CURRICULUM VITAE FAISAL AMIN Chak No. 168/9L, District Sahiwal, Pakistan CAREER OBJECTIVE: Seeking a prosperous Career in order to boost my knowledge, experience and interpersonal skills in a challenging environment PERSONAL DATE: • Father’s Name : Muhammad Amin • Date of Birth : 10-10-1983 • Domicile : Sahiwal • N.I.C No : 36501-1772935-9 • Passport No : AN1209353 (Valid up to August 2020) • Nationality : Pakistani • Marital Status : Married • Languages : Urdu, Punjabi, English, Arabic • Skype ID : faisalamin168 • Contact +92-3317969268,+92405450039 • Email : faisalamin168@yahoo.com
  • 2. ACADEMIC QUALIFICATION: Qualification Division Institute/Board Matriculation (year 2002) 1st B.I.S.P Multan DAE (Mechanical) (Year 2005) 1st P.B.T.E Lahore 6 Month Computer coarse 1st Paradise computer college Burewala TRAINING & CERTIFICATION: • Work at height from Qatlum. • Rigging certificate from Fivesolios. • Confined space from Descon. • Incident Injury free from JGC & Technimount. • First Aid training from ARABIAN SAFETY TRAINING CENTER PROFESSIONAL QUALIFICATION: 3 Years DAE (Diploma of Associate Engineer in Mechanical Technology) from GOVT College of technology Railway Road Lahore. EXPERIENCE: Company: Techno Engineering Company Pvt (Ltd) Badra Iraq. Project: EPC GAS EXPORT PIPELINE BADRA- ZUBAIDAH REPUBLIC OF IRAQ Client: Gasprom Neft. Position: Piping and Pipeline Supervisor Duration: Nov 2015 to till now
  • 3. • Hydrostatic testing of piping and reinstatement. • To carry on Field Pipe Bending • To supervise open cut road crossing and thrust boring activities of pipe line. • To raise Internal Inspection Request(IIR) in order to conduct Inspection • Was responsible for material planning, Job scheduling, planning monitoring and control etc. • Application of heat shrinkable sleeves, tie ins. • To supervise pipeline and piping activities of the project which was more than One lakh Dia Inch square, Fabrication and Erection. • To supervise all activities of painting, sand blasting. • Was responsible for relocation, modification, fabrication and erection of piping supports.
  • 4. EXPERIENCE: Company: Gulf Consolidated Contractors Company (GCC), Saudi Arabia Project: Install Pipeline Instrument Scraping Facilities (EPC PROJECT) Client: SAUDI ARAMCO Position: Supervisor Piping Duration: Oct 2014 to Jun 2015 BI : 10-00006 Contractno: 66000301 Responsibilities: • Hydrostatic testing of piping and reinstatement. • To carry on Field Pipe Bending • To supervise open cut road crossing and thrust boring activities of pipe line. • To raise Internal Inspection Request(IIR) in order to conduct Inspection • Was responsible for material planning, Job scheduling, planning monitoring and control etc. • Application of heat shrinkable sleeves, tie ins. • To supervise pipeline and piping activities of the project which was more than two lakh Dia Inch square, Fabrication and Erection. • To supervise all activities of painting, sand blasting. • Was responsible for relocation, modification, fabrication and
  • 5. erection of piping supports. Company: Gulf Consolidated Contractors Company (GCC), Saudi Arabia Project: Wasit Gas Downstream Pipelines (EPC Project) Client: SAUDI ARAMCO Position: Superintendent Piping Duration: Oct 2012 to Oct 2014 Bi : 10-00918 Contract No: 6600025971 Responsibilities: • Pipe stringing as per Alignment Sheets • Bending as Required • To supervise the fit-up and welding of 56", 26", 24", 12", 10" Pipelines. • To Control Modification and Repair Work • To supervise open cut road crossing and thrust boring activities of pipeline. • To Supervise the Cleaning, Flushing and Gauging. • Hydrostatic testing of piping and reinstatement. • To Supervise on plot piping activities. • To Supervise Piping fabrication activities at fabrication shop.
  • 6. • Was responsible for relocation, modification, fabrication and erection of piping supports. • To supervise all fabrication activities such as jacketed sulfur piping, stainless steel piping cs, piping, pipe supports Company: Descon Engineering, United Arab Emirates Project: IGD HABSHAN 5 (Integrated Gas Development) Client: JOINT VENTURE OF JGC & TECHNIMOUNT Position: Supervisor Piping Duration: Sep 2011 to Oct 2012 Responsibilities: • To Supervise CS, SS Piping fabrication activities at fabrication shop • To Supervise CS, SS Piping erection activities at site • To Control Modification and Repair work of piping. • To Control and monitoring the Piping progress • Erection of pipe supports & modification. • Responsible for Piping maintenance and working at plant shut down. Company: Suraj Fertilizer Project: Single Super Phosphate Fertilizer Factory, Harrapa, Pakistan Client: Suraj Fertilizer Position: Mechanical Maintenance Supervisor Duration: May 2010 to Jul 2011 Responsibilities
  • 7. • Maintenance of piping in the running plant • Preventive maintenance of machinery. • Responsible for Plant maintenance and working for shut downs. • To prepare material requirement and planning for Shut downs and Pre Shut downs. Company: Descon Engineering Qatar LLC Project: RAS LAFFAN C IWPP PROJECFT 8009 Position: Supervisor Piping Duration: Sep 2009 to Dec 2009 Responsibilities • To supervise CS, SS piping fabrication activities at fabrication shop. • To supervise CS, SS piping erection activities at site. • To control modification & repair work. • To supervise fabrication and erection of pipe supports. Company: Descon Engineering Qatar LLC Project: Qatlam Aluminum Smelter Project Client: Five Solios (France) Position: Supervisor Piping Duration: Mar 2009 to Sep 2009 Responsibilities: • To supervise CS, SS piping fabrication activities at fabrication shop. • To supervise CS, SS piping erection activities at site.
  • 8. • To control duct, modification & repair work. • Erection and fabrication of hoppers. • Erection of lining plates in the hoppers and ducts. • Fabrication & erection of ducts. Company: Descon Engineering Qatar LLC Project: Ras Laffan Olefin Project Client: Technip (France) Position: Supervisor Piping Duration: Dec 2007 to Mar 2009 Responsibilities: • To supervise CS, SS piping fabrication activities at fabrication shop. • To supervise CS, SS piping erection activities at site. • To control modification & repair work. • Meeting with client and management. • To Supervise fabrication and erection of pipe supports. • To Supervise Hydro testing and air blowing activities. • To Supervise Installation of control valves and instrument piping. Company: JGC Middle East FZE (Qatar) Project: Dolphin Onshore Facilities Project Position: Supervisor Piping
  • 9. Duration: Jul 2007 to Nov 2007 • To supervise CS, SS piping fabrication activities at fabrication shop • To supervise CS, SS piping erection activities at site. • To control modification & repair work. • To control and monitoring the piping progress. Company: DESCON ENGINEERING Qatar L.L.C Project: Dolphin Onshore Facilities Project Client: Japan Gas Corporation (JGC) Position: Assistant Supervisor Piping Duration: Mar 2007 to Jun 2007 Responsibilities: • To supervise CS, SS piping fabrication activities at fabrication shop. • To supervise CS, SS piping erection activities at site. • To control modification & repair work. • Meeting with client and management. • To control and monitoring the piping progress. Company: MASTER ENGINEERING COMPANY LTD LAHORE (PAKISTAN) Position: Fabrication Lead Man Duration: Mar 2006 to Dec 2006 • Fabrication activities of piping at fabrication shop.
  • 10. • Fabrication activities of pipe supports. • Working for Piping /Plant maintenance.