SlideShare a Scribd company logo
1 of 11
Rosdi Bin Baharuddin
Residence Address:
No 2, Jalan Paya Lebar Empat 27/10D
Laman Seri, Seksyen 27,
40400 Shah Alam
Selangor Darul Ehsan.
Malaysia.
Tel : 603-51031727 H/p : 012-3935521
Email Address : didirasta63@gmail.com
: dd_rasta@yahoo.com
CAREER OBJEVTIVE
A high experienced and motivated person seeking for any challenging position within
private firm or corporation. Desire opportunity for advancement to pursue knowledge,
credibility and interest.
EDUCATION & QUALIFICATION
• Bachelor of Engineering Mechanical
Mara Institute of Technology (ITM), Shah Alam, Selangor.
• Diploma in Mechanical Engineering
Federal Institute of Technology
• Malaysian Certificate of Education
Technical Institute Kuantan, Pahang.
WORKING EXPERIENCE
• Company : PETROVIETNAM ENERGY TECHNOLOGICAL
CORPORATION (PV EIC)
Position : Client Site Representative (CSR)
Period : April 2015 – Current (Free Lance)
Project Name : Provision Of Design And Execution Of Disconnection, Towing
And Re-Installation Dai Hung FPU & CALM Buoy System At
Dai Hung Oil Field, Block 05.1A
• Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD)
Position : Offshore Construction Superintendent (OCS)
Period : November 2014 – March 2015
Project Name : Transportation & Installation of Offshore Facilities for Year
2014 – 2016 (Package A)
10’’ Pipeline SKO PL381 from TKP-A to WLDP-C.
• Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD)
Position : Offshore Construction Superintendent (OCS)
Period : October 2014
Project Name : Transportation & Installation of Offshore Facilities for Year
2014 – 2016 (Package A)
Cable and J-Tube Installations for Dulang-B to Dulang-C
• Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD)
Position : Offshore Construction Superintendent (OCS)
Period : August 2014 – October 2014
Project Name : Transportation & Installation of Offshore Facilities for Year
2014 – 2016 (Package A)
16’’ Pipeline Dalak Pipeline for PML-2 to SSGP Tee-Off
Sipitang, Sabah.
• Company : SHANGHAI EB PIPELINE ENGINEERING CO. LTD
Position : Offshore Construction Superintendent (OCS)
Period : March 2014 – Current (Free Lance)
Project Name : Large Scale Offshore Installation Test Qualification
Program For Flexible Pipe For Offshore Pipelines And Riser,
China.
1. 6” 4L RTP 460m c/w 10 m (D) x 2.4m(W) storage reel
2. 12” 4L RTP 300m c/w 10 m (D) x 2.4m(W) storage reel
3. 6” PE100TCP 422m c/w 7.1 m (D) x 3.95 m(W) storage reel
4. 6” PA12 TCP 422m c/w 7.1m (D) x 3.95 m(W) storage reel
• Company : OMBAK MARINE GROUP SDN BHD
Position : Senior Project Advisor
Period : August 2013 – December 2013 (Free Lance)
Project Name : Provision of Procurement, Construction and
Commissioning for PC Methanol Plant 1 Jetty
Refurbishment. W P Labuan.
• Company : PREMIER VIABLE SDN BHD (Shah Alam, Selangor)
Position : Senior Project Manager
Period : August 2009 – July 2013
Project Name :
1. Provision of Pig Trap Inspection, Maintenance &
Procurement Services for PCSB SKO (3+2 years Contract)
2. Provision of Site Installation and Maintenance Work of 5
nos New Channel Head for Gas Pre-Heater at LGAST.
3. Provision of fitness for services (FFS) assessment of pipeline
For Petronas Carigali Sdn Bhd - Sarawak Operations
Petronas Carigali Sdn Bhd - SKO) on once off basis.
4. Pre-Commisioning foor cleaning,gauging,filling Pipeline,
Hydortesting, System leak testing and Bulk Dewatering.
5. Pre-Commisioning for cleaning,gauging,filling Pipeline,
Hydrotesting, System leak testing and Bulk Dewatering for
28 & 36 Inches for SOGT, Kimanis Sabah.
6. Provision of Preservation pipeline for 28 & 36 Inches
Pipeline for SOGT, Kimanis, Sabah.
• Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD)
Position : Offshore Construction Superintendent (OCS)
Period : March 2009 – May 2009
Project Name : Pipeline Replacement 400m At Kepong A- Tiong A, PMO,
Kerteh, Kuala Trengganu.
• Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD)
Position : Project Manager
Period : June 2007 – October 2008
Project Name : Labuan Gas Terminal Upgrade. Wilayah Persekutuan
Labuan Malaysia.
PML Mega Methanol Plant (PML2) in Labuan. This new development will include a new gas
pipeline from Kikeh offchore field to Labuan Gas Terrminal (LGAST), upgrading of the LGAST
facilities and new gas pipeline from LGAST to PML 2 in Labuan.
This Procurement, Construction and Commissioning package 1 (PCC #2) work scope
comprises the following scope of work:
• 12-inch Export Gas Pipeline from LGAST to GRT-2.
• 8-inch Fuel Gas Pipeline From GRT-1 to GRT-2
• 6-inch Condensate Line from GRT-1 to GRT-2
1.1 Detail Scope of Work
The Procurement, Construction and Commissioning scope of work to be performed by
PBJV under the project is covering the following scope:
a) Project and General Site Management Services.
b) Review of all drawings and documents for completeness and constructability.
c) Site preparation, route survey, construction of Temporary Facilities and liaison
with the local authority.
d) Procurement of material, including logistic, handling, temporary storage and
controlling at site, which shall include transportation of Free Issue Material
from a location that will be detailed out during the contract execution.
e) Carry out site clearance for the pipeline route ROW and prepare linepipes
stockpile area.
f) Handling and stringing of linepipes at the fabrication area.
g) Carry out welding and stack on the rollers before pipepulling.
h) Perform Hydrotesting and Pre-Commissioning work for the whole length of
completed pipeline.
i) Perform follow-on construction engineering and updating them into the As
Built documentation.
j) Prepare Final Documentation compilation and provide the project Close Out
Report.
PBJV objective is to perform major part of Engineering, Planning and Procurement
activities in Shah Alam Office and installation, erection, tie-ins, hook-up Inspection,
Testing Commissioning and Documentation of this project fully at Labuan project site in
accordance with the execution methodology as described herein. The objective is to
achieve satisfactory project completion to the required schedule and specified milestone.
• Position : Offshore Construction Superintendent (OCS)
Period : November 2006 – April 2007
Project Name : West Lutong Pipeline Replacement Project, Petronas
Carigali Sdn Bhd . TL Offshore Sdn Bhd.
• Position : Offshore Construction Superintendent (OCS)
Period : November 2005 – January 2006
Project Name : Construction of 16” Diam. BAP-AA to MCOT Shore
Approach Pipeline And Offshore Pipelaying, Miri, Serawak,
Malaysia.
• Position : Project Manager
Period : May 2003 – December 2005
Project Name :
1. EPCC of NGDS to Kluang FL Stage 2/05, Kluang, Johor
2. EPCC of NGDS to Ayer Keroh FL Stage 1/05, Ayer Keroh
Industrial Area, Melaka.
3. EPCC of NGDS to Batu Berendam FL Stage 1/05, Batu
Berendam Industrial Area, Melaka.
4. EPCC of NGDS to Parit Buntar FL Stage 1/05, Parit Buntar
Industrial Area, Parit Buntar, Perak.
5. EPCC of NGDS to Puchong DL Stage 1/05, Puchong
Industrial Area, Puchong, Selangor
6. EPCC of NGDS to Kuantan Port FL Stage 3/04, Kuantan,
Pahang
7. EPCC of NGDS to Prai FL DL Stage 1/04, Prai Industrial
Area, Pulau Pinang.
8. EPCC of NGDS to Cheng FL1/DL1, Melaka.
9. EPCC of NGDS to Top Glove 2 (Reinforcement), Meru,
Selangor.
10. EPCC of NGDS to Segambut Looping, Segambut, Kuala
Lumpur.
Scope of Work and Responsibilities
o To lead project team on Engineering, Procurement, Construction and
Commissioning of pipeline.
o To establish overall project schedule and work planning based on contractual
dates with project engineer and team members.
o To liaise and keeping client informed on project progress based on daily reports,
action plan and other operational issues through monthly progress reports.
o To liaise with sub-contractor on technical problems if the subject arise.
o To ensure all procedures, manuals and specifications are followed and
implemented at the work place.
o To monitor and supervised as well as to maintain safety culture as required by the
client.
• Position : Project Manager
Period : January 2003 – May 2003
Project Name : Petronas Carigali/TLO MLNG 3, Bintulu, Sarawak, Trunkline
5, 32”x 120km Offshore Project
Scope of Work And Responsibilities
o To lead project team on the pre-commissioning activities at Trunkline 5, 32” x
120km Offshore Project which included the line check, cleaning, pressure testing,
vacuum drying, nitrogen packing and reinstatement of pipeline.
o To establish overall project schedule and work planning based on contractual
dates with project engineer and team members.
o To liaise and keeping main contractor/client informed on project progress based
on daily reports, action plan and other operational issues through monthly
progress reports.
o To liaise with main-contractor on technical problems if the subject arise.
o To ensure all procedures, manuals and specifications are followed and
implemented at the work place.
o To monitor and supervised as well as to maintain safety culture as required by the
client.
• Position : Project Manager
Period : August 2002 – December 2002
Project Name : Petronas MLNG 3’s, Bintulu, Sarawak
Contract with Ranhill Engineer and Contractors (REC)
Scope of Work And Responsibilities
o To lead project team on the pre-commissioning activities at MLNG 3-Slugcatcher
3 which included the line check, cleaning and pressure testing of pipeline.
o To establish overall project schedule and work planning based on contractual
dates with project engineer and team members.
o To liaise and keeping main contractor/client informed on project progress based
on daily reports, action plan and other operational issues through monthly
progress reports.
o To liaise with main contractor on technical problems if the subject arise.
o To ensure all procedures, manuals and specifications are followed and
implemented at the work place.
o To monitor and supervised as well as to maintain safety culture as required by the
client.
• Company : GAS MALAYSIA SDN BHD (Shah Alam, Selangor)
Position : Project Engineer
Period : January 2000 – April 2002
Project Name : 1. EPCC of NGDS to KL-Bangi Looping, Serdang,
Selangor.
2. EPCC of NGDS to PJ FL1/DL1, PJ Selangor.
3. EPCC of NGDS to Air Hitam-Kluang, Kluang, Johor.
4. EPCC of NGDS to Alor Gajah FL1/DL1, Alor Gajah,
Melaka.
Scope of Work And Responsibilities
o To lead project team for the executive of the Engineering, Procurement,
Construction and Commissioning of the natural gas distribution system to the
industrial, commercial and resident user.
• Position : Project Superintendent
Period : January 1997 – December 1999
Project Name : 1. EPCC of NGDS to Kulai Industries Area, Kulai, Johor.
2. EPCC of NGDS to Bangi Industries Area, Bangi, Selangor
3. EPCC of NGDS to Jalan Kapar, Klang, Selangor.
4. EPCC of NGDS to Pasir Gudang, Johor.
Scope of Work And Responsibilities
Timely Project Completion
o To continuously track the progress of the project.
o To give feedback on the contractor’s performance.
o To ensure the details of the project completion are in order.
o To give feedback on the adequacy of project resources.
o To enforce strict time management and scheduling by the contractor.
Safety
o Execution of project to the highest safety in accordance with the specification.
o To organize and establish a safety committee at site.
o To ensure the establishment of the safety checklist.
o To strictly enforce the usage of PPE staff/contractors.
Quality Control
o To monitor strict materials compliance to the specification at all stages.
o To ensure compilation of all QA/QC reports.
o To ensure free-issued materials are well utilized during construction.
o Relationship Building with the Approving Authority
o Regular contact with relevant authorities to strengthen networking and rapport.
o To keep abreast with authority requirements with regards to construction of gas
pipeline system.
• Project Supervisor September 1993 – December 1996
Project Name : 1. EPCC of NGDS to Jalan Kapar, Kapar, Selangor.
2. EPCC of NGDS to CPT Shah Alam, Selangor.
3. EPCC of NGDS to Shah Alam Phase II, Shah Alam,
4. EPCC of NGDS to Pestige Ceramic, Puchong, Selangor.
5. EPCC of NGDS to MRCB Sdn Bhd, Puchong, Selangor.
6. EPCC of NGDS to Jalan Klg-Banting, Banting, Selangor
Scope of Work And Responsibilities
o To monitor the construction work and assist contractors.
o To give feedback on the contractor performance.
o To ensure the establishment of the safety checklist.
o To monitor the materials compliance as per specifications.
o To ensure free-issued materials fully utilized during construction.
o To ensure that procedures are followed and implemented at work site.
INTEREST
Traveling, Golfing, Music, Swimming and Jamming
PERSONAL ATTIBUTE
• Interested in challenging job and interact well with people at all levels.
• Fast Learner, Independent person and High initiative to learn.
COURSE TAKEN
Year
• Basic Offshore Safety, Sea Survival & Helicopter Underwater Escape
2003
Training, Basic Fire Fighting, First Aid CPR/EAR
• Gas Technology for competency at UTM, Jalan Semarak, Kuala Lumpur. 2001
• Hot Tapping Operation Procedure Course 1996
• Horizontal Directional Drilling at Seattle, United State.
1995
• Cathodic Protection for steel pipeline at Heaven Corrosion. 1995
• Odoriser Station M&E works.(Gerog Fischer)
1995
• Train the Trainer
1995
• Training on Project Management Hand Book for Construction
1995
• First Aider 1995
• How To Reduce Operator Error
1995
• Incident Investigation 1995
• Quality Assurance in Welded Fabrication 1995
• Pipeline Engineering at Tokyo Gas, Tokyo, Japan. 1994
• Certificate of Distribution Piping Systems 1994
• Manufacturing Management Workshop Specialist 1993
• Manufacturing Management Course 1993
• Manufacturing Technology, ASAHI Japan 1991
TRAINER
• Conduct training session in Gas Malaysia for new staff and all contractors.
- Construction practice
- Piping problems I & II
- Horizontal Directional Drilling (HDD)
- Hot Tapping
- Cathodic Protection
REFERENCES
Name Maslan Othman
Phone 019-383 4463
E-mail maslan@gasmalaysia.com
Position Senior General Manager
Company Name Gas Malaysia Sdn Bhd
Name Mr. Tetsuhiko Matsuzaki
E-mail tmatsuzaki@myjaring.net
Phone 603-2710 0366
Position Executive Director
Company Name Nippon Steel Construction (M) Sdn Bhd

More Related Content

What's hot (20)

CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
cv.dchand copy
cv.dchand copycv.dchand copy
cv.dchand copy
 
Hassby's CV 2015
Hassby's CV 2015Hassby's CV 2015
Hassby's CV 2015
 
Final Mukesh Resume
Final Mukesh Resume Final Mukesh Resume
Final Mukesh Resume
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
CV_Romeo_2016Latest
CV_Romeo_2016LatestCV_Romeo_2016Latest
CV_Romeo_2016Latest
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014
 
Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
MNFirdaus Resume
MNFirdaus ResumeMNFirdaus Resume
MNFirdaus Resume
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_external
 
Gaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical EngineerGaby. Aoude Mechanical Engineer
Gaby. Aoude Mechanical Engineer
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resume
 
Topside
TopsideTopside
Topside
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCX
 

Viewers also liked (20)

RURI CV 2 w
RURI CV 2 wRURI CV 2 w
RURI CV 2 w
 
SHAIKH MUNNAWAR. CV NEW
SHAIKH MUNNAWAR.  CV NEWSHAIKH MUNNAWAR.  CV NEW
SHAIKH MUNNAWAR. CV NEW
 
Resume - Ajish George
Resume - Ajish GeorgeResume - Ajish George
Resume - Ajish George
 
Cv Bruce
Cv BruceCv Bruce
Cv Bruce
 
Sattakun Khongsong CV 2015-new
Sattakun Khongsong CV 2015-newSattakun Khongsong CV 2015-new
Sattakun Khongsong CV 2015-new
 
Mzaghloul CV Rev 1
Mzaghloul CV Rev 1Mzaghloul CV Rev 1
Mzaghloul CV Rev 1
 
Abe Resume
Abe ResumeAbe Resume
Abe Resume
 
Resume
ResumeResume
Resume
 
Resume 02
Resume 02Resume 02
Resume 02
 
CV_Radhakrishnan_Oct 16
CV_Radhakrishnan_Oct 16CV_Radhakrishnan_Oct 16
CV_Radhakrishnan_Oct 16
 
Resume_AbgHaider
Resume_AbgHaiderResume_AbgHaider
Resume_AbgHaider
 
CV karim convert[1] (2)
CV karim convert[1] (2)CV karim convert[1] (2)
CV karim convert[1] (2)
 
CV1
CV1CV1
CV1
 
CV Madi
CV MadiCV Madi
CV Madi
 
cv ibrahim (edited)
cv ibrahim (edited)cv ibrahim (edited)
cv ibrahim (edited)
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
JULY 2016 RESUME
JULY 2016 RESUMEJULY 2016 RESUME
JULY 2016 RESUME
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Arkar Tun Lin CV - AB
Arkar Tun Lin CV - ABArkar Tun Lin CV - AB
Arkar Tun Lin CV - AB
 
CV_Iqbal Bunyamin_Hairuddin
CV_Iqbal Bunyamin_HairuddinCV_Iqbal Bunyamin_Hairuddin
CV_Iqbal Bunyamin_Hairuddin
 

Similar to CV Latest Rosdi PL381 (20)

Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Ang kwang Wee_CV-Hertel
Ang kwang Wee_CV-HertelAng kwang Wee_CV-Hertel
Ang kwang Wee_CV-Hertel
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
CV
CVCV
CV
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
Resume latest
Resume latestResume latest
Resume latest
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 

CV Latest Rosdi PL381

  • 1. Rosdi Bin Baharuddin Residence Address: No 2, Jalan Paya Lebar Empat 27/10D Laman Seri, Seksyen 27, 40400 Shah Alam Selangor Darul Ehsan. Malaysia. Tel : 603-51031727 H/p : 012-3935521 Email Address : didirasta63@gmail.com : dd_rasta@yahoo.com CAREER OBJEVTIVE A high experienced and motivated person seeking for any challenging position within private firm or corporation. Desire opportunity for advancement to pursue knowledge, credibility and interest. EDUCATION & QUALIFICATION • Bachelor of Engineering Mechanical Mara Institute of Technology (ITM), Shah Alam, Selangor. • Diploma in Mechanical Engineering Federal Institute of Technology • Malaysian Certificate of Education Technical Institute Kuantan, Pahang. WORKING EXPERIENCE • Company : PETROVIETNAM ENERGY TECHNOLOGICAL CORPORATION (PV EIC) Position : Client Site Representative (CSR) Period : April 2015 – Current (Free Lance) Project Name : Provision Of Design And Execution Of Disconnection, Towing And Re-Installation Dai Hung FPU & CALM Buoy System At
  • 2. Dai Hung Oil Field, Block 05.1A • Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD) Position : Offshore Construction Superintendent (OCS) Period : November 2014 – March 2015 Project Name : Transportation & Installation of Offshore Facilities for Year 2014 – 2016 (Package A) 10’’ Pipeline SKO PL381 from TKP-A to WLDP-C. • Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD) Position : Offshore Construction Superintendent (OCS) Period : October 2014 Project Name : Transportation & Installation of Offshore Facilities for Year 2014 – 2016 (Package A) Cable and J-Tube Installations for Dulang-B to Dulang-C • Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD) Position : Offshore Construction Superintendent (OCS) Period : August 2014 – October 2014 Project Name : Transportation & Installation of Offshore Facilities for Year 2014 – 2016 (Package A) 16’’ Pipeline Dalak Pipeline for PML-2 to SSGP Tee-Off Sipitang, Sabah. • Company : SHANGHAI EB PIPELINE ENGINEERING CO. LTD Position : Offshore Construction Superintendent (OCS) Period : March 2014 – Current (Free Lance) Project Name : Large Scale Offshore Installation Test Qualification Program For Flexible Pipe For Offshore Pipelines And Riser, China. 1. 6” 4L RTP 460m c/w 10 m (D) x 2.4m(W) storage reel 2. 12” 4L RTP 300m c/w 10 m (D) x 2.4m(W) storage reel 3. 6” PE100TCP 422m c/w 7.1 m (D) x 3.95 m(W) storage reel
  • 3. 4. 6” PA12 TCP 422m c/w 7.1m (D) x 3.95 m(W) storage reel • Company : OMBAK MARINE GROUP SDN BHD Position : Senior Project Advisor Period : August 2013 – December 2013 (Free Lance) Project Name : Provision of Procurement, Construction and Commissioning for PC Methanol Plant 1 Jetty Refurbishment. W P Labuan. • Company : PREMIER VIABLE SDN BHD (Shah Alam, Selangor) Position : Senior Project Manager Period : August 2009 – July 2013 Project Name : 1. Provision of Pig Trap Inspection, Maintenance & Procurement Services for PCSB SKO (3+2 years Contract) 2. Provision of Site Installation and Maintenance Work of 5 nos New Channel Head for Gas Pre-Heater at LGAST. 3. Provision of fitness for services (FFS) assessment of pipeline For Petronas Carigali Sdn Bhd - Sarawak Operations Petronas Carigali Sdn Bhd - SKO) on once off basis. 4. Pre-Commisioning foor cleaning,gauging,filling Pipeline, Hydortesting, System leak testing and Bulk Dewatering. 5. Pre-Commisioning for cleaning,gauging,filling Pipeline, Hydrotesting, System leak testing and Bulk Dewatering for 28 & 36 Inches for SOGT, Kimanis Sabah. 6. Provision of Preservation pipeline for 28 & 36 Inches Pipeline for SOGT, Kimanis, Sabah. • Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD) Position : Offshore Construction Superintendent (OCS) Period : March 2009 – May 2009 Project Name : Pipeline Replacement 400m At Kepong A- Tiong A, PMO, Kerteh, Kuala Trengganu.
  • 4. • Company : PBJV GROUP SDN BHD (PTIS-BAXTECH JV SDN BHD) Position : Project Manager Period : June 2007 – October 2008 Project Name : Labuan Gas Terminal Upgrade. Wilayah Persekutuan Labuan Malaysia. PML Mega Methanol Plant (PML2) in Labuan. This new development will include a new gas pipeline from Kikeh offchore field to Labuan Gas Terrminal (LGAST), upgrading of the LGAST facilities and new gas pipeline from LGAST to PML 2 in Labuan. This Procurement, Construction and Commissioning package 1 (PCC #2) work scope comprises the following scope of work: • 12-inch Export Gas Pipeline from LGAST to GRT-2. • 8-inch Fuel Gas Pipeline From GRT-1 to GRT-2 • 6-inch Condensate Line from GRT-1 to GRT-2 1.1 Detail Scope of Work The Procurement, Construction and Commissioning scope of work to be performed by PBJV under the project is covering the following scope: a) Project and General Site Management Services. b) Review of all drawings and documents for completeness and constructability. c) Site preparation, route survey, construction of Temporary Facilities and liaison with the local authority. d) Procurement of material, including logistic, handling, temporary storage and controlling at site, which shall include transportation of Free Issue Material from a location that will be detailed out during the contract execution. e) Carry out site clearance for the pipeline route ROW and prepare linepipes stockpile area. f) Handling and stringing of linepipes at the fabrication area. g) Carry out welding and stack on the rollers before pipepulling. h) Perform Hydrotesting and Pre-Commissioning work for the whole length of completed pipeline.
  • 5. i) Perform follow-on construction engineering and updating them into the As Built documentation. j) Prepare Final Documentation compilation and provide the project Close Out Report. PBJV objective is to perform major part of Engineering, Planning and Procurement activities in Shah Alam Office and installation, erection, tie-ins, hook-up Inspection, Testing Commissioning and Documentation of this project fully at Labuan project site in accordance with the execution methodology as described herein. The objective is to achieve satisfactory project completion to the required schedule and specified milestone. • Position : Offshore Construction Superintendent (OCS) Period : November 2006 – April 2007 Project Name : West Lutong Pipeline Replacement Project, Petronas Carigali Sdn Bhd . TL Offshore Sdn Bhd. • Position : Offshore Construction Superintendent (OCS) Period : November 2005 – January 2006 Project Name : Construction of 16” Diam. BAP-AA to MCOT Shore Approach Pipeline And Offshore Pipelaying, Miri, Serawak, Malaysia. • Position : Project Manager Period : May 2003 – December 2005 Project Name : 1. EPCC of NGDS to Kluang FL Stage 2/05, Kluang, Johor 2. EPCC of NGDS to Ayer Keroh FL Stage 1/05, Ayer Keroh Industrial Area, Melaka. 3. EPCC of NGDS to Batu Berendam FL Stage 1/05, Batu Berendam Industrial Area, Melaka. 4. EPCC of NGDS to Parit Buntar FL Stage 1/05, Parit Buntar Industrial Area, Parit Buntar, Perak. 5. EPCC of NGDS to Puchong DL Stage 1/05, Puchong Industrial Area, Puchong, Selangor
  • 6. 6. EPCC of NGDS to Kuantan Port FL Stage 3/04, Kuantan, Pahang 7. EPCC of NGDS to Prai FL DL Stage 1/04, Prai Industrial Area, Pulau Pinang. 8. EPCC of NGDS to Cheng FL1/DL1, Melaka. 9. EPCC of NGDS to Top Glove 2 (Reinforcement), Meru, Selangor. 10. EPCC of NGDS to Segambut Looping, Segambut, Kuala Lumpur. Scope of Work and Responsibilities o To lead project team on Engineering, Procurement, Construction and Commissioning of pipeline. o To establish overall project schedule and work planning based on contractual dates with project engineer and team members. o To liaise and keeping client informed on project progress based on daily reports, action plan and other operational issues through monthly progress reports. o To liaise with sub-contractor on technical problems if the subject arise. o To ensure all procedures, manuals and specifications are followed and implemented at the work place. o To monitor and supervised as well as to maintain safety culture as required by the client. • Position : Project Manager Period : January 2003 – May 2003 Project Name : Petronas Carigali/TLO MLNG 3, Bintulu, Sarawak, Trunkline 5, 32”x 120km Offshore Project Scope of Work And Responsibilities o To lead project team on the pre-commissioning activities at Trunkline 5, 32” x 120km Offshore Project which included the line check, cleaning, pressure testing, vacuum drying, nitrogen packing and reinstatement of pipeline.
  • 7. o To establish overall project schedule and work planning based on contractual dates with project engineer and team members. o To liaise and keeping main contractor/client informed on project progress based on daily reports, action plan and other operational issues through monthly progress reports. o To liaise with main-contractor on technical problems if the subject arise. o To ensure all procedures, manuals and specifications are followed and implemented at the work place. o To monitor and supervised as well as to maintain safety culture as required by the client. • Position : Project Manager Period : August 2002 – December 2002 Project Name : Petronas MLNG 3’s, Bintulu, Sarawak Contract with Ranhill Engineer and Contractors (REC) Scope of Work And Responsibilities o To lead project team on the pre-commissioning activities at MLNG 3-Slugcatcher 3 which included the line check, cleaning and pressure testing of pipeline. o To establish overall project schedule and work planning based on contractual dates with project engineer and team members. o To liaise and keeping main contractor/client informed on project progress based on daily reports, action plan and other operational issues through monthly progress reports. o To liaise with main contractor on technical problems if the subject arise. o To ensure all procedures, manuals and specifications are followed and implemented at the work place. o To monitor and supervised as well as to maintain safety culture as required by the client. • Company : GAS MALAYSIA SDN BHD (Shah Alam, Selangor) Position : Project Engineer
  • 8. Period : January 2000 – April 2002 Project Name : 1. EPCC of NGDS to KL-Bangi Looping, Serdang, Selangor. 2. EPCC of NGDS to PJ FL1/DL1, PJ Selangor. 3. EPCC of NGDS to Air Hitam-Kluang, Kluang, Johor. 4. EPCC of NGDS to Alor Gajah FL1/DL1, Alor Gajah, Melaka. Scope of Work And Responsibilities o To lead project team for the executive of the Engineering, Procurement, Construction and Commissioning of the natural gas distribution system to the industrial, commercial and resident user. • Position : Project Superintendent Period : January 1997 – December 1999 Project Name : 1. EPCC of NGDS to Kulai Industries Area, Kulai, Johor. 2. EPCC of NGDS to Bangi Industries Area, Bangi, Selangor 3. EPCC of NGDS to Jalan Kapar, Klang, Selangor. 4. EPCC of NGDS to Pasir Gudang, Johor. Scope of Work And Responsibilities Timely Project Completion o To continuously track the progress of the project. o To give feedback on the contractor’s performance. o To ensure the details of the project completion are in order. o To give feedback on the adequacy of project resources. o To enforce strict time management and scheduling by the contractor. Safety
  • 9. o Execution of project to the highest safety in accordance with the specification. o To organize and establish a safety committee at site. o To ensure the establishment of the safety checklist. o To strictly enforce the usage of PPE staff/contractors. Quality Control o To monitor strict materials compliance to the specification at all stages. o To ensure compilation of all QA/QC reports. o To ensure free-issued materials are well utilized during construction. o Relationship Building with the Approving Authority o Regular contact with relevant authorities to strengthen networking and rapport. o To keep abreast with authority requirements with regards to construction of gas pipeline system. • Project Supervisor September 1993 – December 1996 Project Name : 1. EPCC of NGDS to Jalan Kapar, Kapar, Selangor. 2. EPCC of NGDS to CPT Shah Alam, Selangor. 3. EPCC of NGDS to Shah Alam Phase II, Shah Alam, 4. EPCC of NGDS to Pestige Ceramic, Puchong, Selangor. 5. EPCC of NGDS to MRCB Sdn Bhd, Puchong, Selangor. 6. EPCC of NGDS to Jalan Klg-Banting, Banting, Selangor Scope of Work And Responsibilities o To monitor the construction work and assist contractors. o To give feedback on the contractor performance. o To ensure the establishment of the safety checklist. o To monitor the materials compliance as per specifications.
  • 10. o To ensure free-issued materials fully utilized during construction. o To ensure that procedures are followed and implemented at work site. INTEREST Traveling, Golfing, Music, Swimming and Jamming PERSONAL ATTIBUTE • Interested in challenging job and interact well with people at all levels. • Fast Learner, Independent person and High initiative to learn. COURSE TAKEN Year • Basic Offshore Safety, Sea Survival & Helicopter Underwater Escape 2003 Training, Basic Fire Fighting, First Aid CPR/EAR • Gas Technology for competency at UTM, Jalan Semarak, Kuala Lumpur. 2001 • Hot Tapping Operation Procedure Course 1996 • Horizontal Directional Drilling at Seattle, United State. 1995 • Cathodic Protection for steel pipeline at Heaven Corrosion. 1995 • Odoriser Station M&E works.(Gerog Fischer) 1995 • Train the Trainer 1995 • Training on Project Management Hand Book for Construction 1995 • First Aider 1995 • How To Reduce Operator Error 1995 • Incident Investigation 1995 • Quality Assurance in Welded Fabrication 1995 • Pipeline Engineering at Tokyo Gas, Tokyo, Japan. 1994 • Certificate of Distribution Piping Systems 1994 • Manufacturing Management Workshop Specialist 1993 • Manufacturing Management Course 1993
  • 11. • Manufacturing Technology, ASAHI Japan 1991 TRAINER • Conduct training session in Gas Malaysia for new staff and all contractors. - Construction practice - Piping problems I & II - Horizontal Directional Drilling (HDD) - Hot Tapping - Cathodic Protection REFERENCES Name Maslan Othman Phone 019-383 4463 E-mail maslan@gasmalaysia.com Position Senior General Manager Company Name Gas Malaysia Sdn Bhd Name Mr. Tetsuhiko Matsuzaki E-mail tmatsuzaki@myjaring.net Phone 603-2710 0366 Position Executive Director Company Name Nippon Steel Construction (M) Sdn Bhd