SlideShare a Scribd company logo
1 of 12
CURRICULUM VITAE
AL
FREDO T. ALATA JR.
Email Address: freddie_alata1108@yahoo.com.ph
B-26 L-7 Tatlong Hari St., Brgy Greater Lagro, Novaliches, Quezon City
Mobile No. +63-9477030675 ( Smart )
OBJECTIVE: To offer my services to the best of my ability and further enhance my
knowledge in the field of specialization through experience to attain my maximum level of
professionalism.
EDUCATIONAL ATTAINMENT:
DEGREE : BACHELOR OF SCIENCE IN CIVIL ENGINEERING
SCHOOL : UNIVERSITY OF THE EAST, MANILA
YEAR COMPLETED : JUNE 1975 upto MARCH 1978 ( 3years )
JUNE 1983 upto MARCH 1985 ( 2years )
CHARACTER REFERENCES :
1) USEC. EDMUNDO V. MIR,CE
DEPARTMENT OF PUBLICWORKS & HIGHWAYS, MANILA
2) GEN. FLORO GASCON, MD
CHIEF RADIOLOGIST
V. LUNA GENERAL HOSPITAL, QUEZON CITY
3) ATTY. ERNESTO TENDERO, PNP
POLICE SUPERINTENDENT / STATION COMMANDER
NATIONAL CAPITAL REGION POLICE OFFICE
BASIC COURSE ATTENDED :
COURSE : 72 HOURS COMPUTER BASIC COURSE :
EXCELL / WORD PROCESSING
SCHOOL : STI COLLEGE
DATE COMPLETED : OCTOBER 1, 2001 to DECEMBER 30, 2001
TRAINING / SEMINAR ATTENDED :
• Philipp’s Technical Consultant Corp.
Echo Seminar of Effective Construction and Contract Management
Through the Provincial Roads Management Facility (PRMF)
October 12-13, 2010
Prosperidad, Agusan Del Sur (Phil.)
Funded by : Australian Government Aid Program
Supported by: Coffey International Development
• Al-Futtaim – Bodycote Materials Testing Corp.
10SH Working Safety Training Course
May 8, 2008
Basic First Aid
June 23, 2006
Jebel Ali, Dubai, U.A.E
• Bonifacio – Stanger Materials Testing Corp.
First Aid Training (Basic)
July 5-7, 2000
Construction Project Quality Management
September 16, 2000
Bonifacio Center, Fort Bonifacio, Global City, Taguig, Metro Manila (Phil.)
• ABV Rock Group KB
Basic Fire Training
July 19 , 1991
Site 7 Medinah, K.S.A
EMPLOYMENT HISTORY:
Company : Department of Public Works and Highways
( National Capital Region )
Quezon City First District Engineering Office
Address : Sta. Catalina St., Brgy. Holy Spirit, Quezon City
Position Held : Materials Engineer
Inclusive Dates : March 2, 2014 up to present
Project Location : Road Concreting ( 6km ) / Concrete Re-blocking
Construction of School Building /Rehabilitation of Bridges
Road Rehabilitation for Asphalt Laying
Duties and Responsibilities
• Detailed implementation work activities will be reliably guided in preparing the scope
of work to complete the clearing of entire road right-of-way stakes, side drainage and
side slopes stakes and other reference point of construction in road pavement.
• List down the general activities that involved in the project, manpower, equipment
used and weather condition.
• Checking and evaluating the contractor’s job layout plan in order to assure proper
management of construction activities, economy in the use of construction time and
manpower.
• Discussing the Quality Control Program so that the schedule of all construction
materials subject of field or in laboratory for sampling and testing of quality test of
embankment materials as to comply as detailed with standard specification.
• Checked the bench marks and turning point to obtain and record the various ground
elevation and center line of the access road.
• Checked the earthworks movement involve filling materials backfill materials and
embankment works if the soil particles are graded to determine the compaction effort
attainable.
• Checked and inspection the moisture condition of the materials it must be sprinkled
with water to attain the working moisture content , if too wet then, it must be dried by
using a motor grader, through its blade moving back and forth until the excess
moisture has evaporated and to attain the qualified optimum moisture content and
maximum dry density.
• Checked the thickness of the sub base layer before rolling and compaction.
• Checked the compaction operation is done grade elevation according to the plans and
specification and undertake the field density test if they comply the relative density as
detailed with standard specification.
Company : SATCO Batching Plant ( Concrete )
( Saudi Arabian Trading and Construction Company )
Address : Tayma Tabuk, kingdom of Saudi Arabia
Position Held : QA/QC Engineer
Inclusive Dates : September 1, 2012 to September 2, 2013
Project Location : Ministry of Housing Project, Tayma Tabuk, KSA
Duties and Responsibilities
• Preparation of detailed work procedure for all site activities.
• Implementing proper material testing requirements and Quality Control policies.
• Weekly checking the deliveries of materials such as Coarse and Fine Aggregates,
Cement (OPC/SRC) and Admixture,if they complied with standard specification.
• Implements and establised the Concrete Mix Design in accordance with ACI Standard
upon approval.
• Undertaking and reporting statistical analysis of concrete test results in progress upon
work completed.
• Supervising the performance of laboratory personnel and related documents to ensure
that they maintained and appropriate client file when verification and testing was
completed.
• Organized and scheduling of laboratory personnel to carried out testing procedure if
they complied with relevant standard specification.
• Checked the slump in every delivery of concrete mixing before transporting on site if
they comply the approved mix design.
Company : PHILIPP’S TECHNICAL CONSULTANT CORP.
Address : 8/F España Tower 2203 España Ave. cor. Josefina St.,
Sampaloc 1008, Manila ( Phil. )
Position Held : Materials Engineer
Inclusive Date : July 5, 2010 to December 31, 2010
Project Location : PRMF-ADS-01: Rehabilitation of NRJ
Pisaan – Borbon Road (6km.)
PRMF-ADS-02: Rehabilitation of NRJ
Crossing Luna – Duangan Road (6 km.)
Through the Provincial Roads Management Facility (PRMF)
Funded by : Australian Government Aid Program
Supported by : Facility Managing Contractor by :
Coffey International Development
Duties and Responsibilities
• Checked inventory of the site laboratory against the equipment required by the
Contractor in order to carry out all the tests required to meet Specification
compliance, and also its calibration.
• Instruction and supervised the contractor’s laboratory staff.
• Checked the source of materials proposed by the contractor if they can provide the
required quality, quantity and rates of delivery throughout the estimated period of
construction.
• Oversee initial and subsequent periodic tests on all aggregates, cement, reinforced
steel, cup base materials etc. to confirm that they comply with the Specifications.
• Immediately notify the Contractor’s Engineer’s Representative of materials, which
have are considered likely failed if they comply with the standard specifications.
• Carry out periodic checks of all concrete batching, mixing and transporting equipment
including calibration. As to compile and maintain comprehensive records of all
concrete placed.
• Ensure the proper execution by Contractor’s technicians of in-situ density testing of
soils and pavement materials to establish in laboratory trials the properties of soil
being used in road base construction, backfilling etc.
• Supervised whatever other in-situ testing soils is required by the specifications.
• Supervise the contractor’s testing trials to establish the design of concrete mixes and
submit recommendations to the engineer.
• Responsible that all supplies of materials are within the Specification and should
ensure the Site inspector that the stockpile is approved before permitting the
Contractor to use it.
• Responsible to supervised for testing remains with the contractor through the
laboratory provided and under the supervision of the materials.
Company : AL FUTTAIM - BODYCOTE MATERIALS
TESTING SERVICES
Address : PO Box 34924 Dubai Investment Park, Dubai,
United Arab Emirates
Position Held : Laboratory Supervisor
Inclusive Date : May 6, 2006 to January 2, 2009
Project Location : Dubai Metro Train, Jebel Ali, Dubai U.A.E.
Duties and Responsibilities
• Supervised field testing, laboratory testing and equipment maintenance/ Calibration
within the concrete laboratory/Soil/Steel/Special Testing sections offering services
related to steel reinforcement, soil, aggregate and concrete.
• Checked the sampling and testing of collected sample in accordance with internal and
or system procedure.
• Lend assistance within other areas of the laboratory including structural investigation,
condition surveys and specialist civil engineering testing services.
• Organization of testing staff to enable clients’ testing requirements to be fully
completed to the agreed time scale.
• Dissemination of testing documentation to appropriate staff.
• Calculation of test results and reporting.
• Ensuring reporting dates are adhered to and the timely preparation of reports.
• Ensuring personal responsibilities are discharged strictly in accordance with Quality
Management System and the requirement of ISO/IEC 17025.
• Checking and calibration of laboratory equipment
• Maintain records of technical work carried out
• Maintain equipment according to schedule
Company : J.V. ANGELES CONSTRUCTION CORPORATION
Address : JVACC Building, E. Rodriguez Jr. Ave., Pasig City ( Phil. )
Position Held : Quality Control Engineer
Inclusive Date : January 20, 2003 to March 3, 2005
Project Location : Pilot Septage Treatment Plant and Rehabilitation / Upgrading
of Sewage Treatment Plant at Dagat-dagatan Extension,
Malabon, Caloocan City
Duties and Responsibilities
• Responsible to check and inspection of materials for backfiling at quarry site.
• Inspection and monitoring in laying of rip rapping and checking the dimension of
boulders to150x300mm.
• Responsible to implement the concrete mix design as recommended indication
approval of materials.
• Responsible to check the incoming of materials, purchase order and delivery receipt if
they comply as detailed with standard specification.
Company : ACAN BUILDERS AND TRADING
Address : No. 27 Concepcion St., Marulas, Valenzuela City ( Phil. )
Position Held : Project Supervisor
Inclusive Date : September 1, 2001 to July 15, 2002
Project Location : Road Concreting, Box Culvert, Building Auditorium
Duties and Responsibilities
• Supervised and monitoring the specific project results to determine if they comply
with relevant quality standards and identifying ways to eliminate causes of
unsatisfactory performance.
• Implements the construction Project Quality Management to ensure that the project
will satisfy the quality policy, objectives and responsibilities.
• Implements the over-all controlled in civil works and quality procedure to determine
if they comply with relevant quality standards and performance on a regular basis to
provide confidence to the project.
Company : BONIFACIO-STANGER MATERIALS TESTING CORP.
Address : Bldg. C, NDCP Compound, Fort Bonifacio,
Taguig, Metro Manila ( Phil. )
Position : Sr. Laboratory Technician
Inclusive Date : September 1, 1997 to July 15, 2001
Project Location : Fort Bonifacio Global City Infrastructure Project /
San Lorenzo 500 Megawatch, Batangas City/
Evaluation of Tests Report in DMCI Project
Duties and Responsibilities
• Supervised and monitor the jaw crusher and secondary crusher to apply the crushed
stone, crushed slag, and gravel retained on a no. 4 sieve which shall conform to the
following requirements and standard specification.
• Responsible for tests the physical properties of materials consist of the crushed slag,
crushed stone or gravel suitable for use in construction such as grading of coarse
aggregates, unit weight of slag, soundness test, abrasion and choking materials which
shall conform to the specified requirement and approval with the clients.
• Responsible and perform of physical tests on fresh and hardened concrete, cement,
aggregates, pressurized fuel ash, admixture, concrete hollow blocks, steel
reinforcement, asphalt and soils in accordance with ASTM and ACI procedures.
• Developed and perform pre-construction program to formulate accepted mix of design
to use of project in accordance of standard specification.
• Conduct testing of cover meter survey to locate of embedded steel reinforcement to
assess its sizes with concrete cover.
• Evaluation and signatory of concrete testing in DMCI project and such is deemed its
representative and providing the services of Laboratory Staff to operate the
compression machine in the conduction of tests of DM Consuji Inc. in Taguig
Batching Plant.
Company : MATERIALAB LTD.
Address : 5 Lok Yi St., 17 MS Castle Peak Rd., Tailam, NT Hongkong
Position : Laboratory Technician
Project : Chek Lap Kok International Airport, Hongkong
Inclusive Date : April 22, 1996 to August 16, 1997
Duties and Responsibilities
• Responsible for testing of construction materials such as aggregates, soils, concrete,
asphalt and flexural strength.
• Developed laboratory work procedure to formulate pre-construction materials in
accordance with technical specification.
• Aggregates – conduct testing to different international standards, which are being
carried out daily for quality control progress.
• Soils – Conduction of tests which shall carried out in accordance with British
Standard
• Asphalt – Determination and perform laboratory work which can be carried out
standard specification in accordance of BS and ASTM standards.
Company : DEPARTMENT OF PUBLIC WORKS & HIGHWAYS (R02)
Address : Nursery Compound, Diversion Road, Tuguegarao Cag. ( Phil.)
Position : Materials Inspector/Lab. Tech.11
Project Location : River Control Project,Tuguegarao Cagayan Valley
Inclusive Date : January 24, 1995 to April 16, 1996
Duties and Responsibilities
• Supervised and check various testing of materials performed by the technician in field
and laboratory. To ensure that all tests are performed in accordance with prescribe
testing procedure. Checking and inspection provable materials to be used in
construction project. Prepare and submit a concise copy or summary of all test carried
out the client.
• Coordinate with the contractor’s according to plans and able to make necessary
adjustments in the fieldwork if problem arises.
• Knowledge and implementation or relevant technical specification procedure.
• Assisted with Project Engineer for preparation of as built plan for contractor’s final
collection, basis on actual work of the project. If there is a change order to the project,
you must be revised the plans to actual work of the project.
Company : ABV ROCK GROUP KB
Address : P.O. Box 4538 Medinah 21411, Kingdom of Saudi Arabia
Position : Laboratory Technician
Project : Underground Tunnel
Inclusive Date : March 21, 1991 to April 2, 1994
Duties and Responsibilities

• Tests of elliptical tunnel openings carried out to establish an artificial material,
apparatus and a loading system. It examined about the materials, the loading system at
the failure modes of openings. Models are tested in biaxial compression and only
isotropic loading. To investigate the fracture propagation.
• Responsible for tests in line soils, asphalt and concrete such a blending proportioning
of approved materials used in each CONCRETE (Grouting of Rock Bolt Shotcrete)
ASPHALT (Bituminous base course, Intermediate base course, and wearing course)
EARTHWORK/SOIL (Physical, mechanical and chemical analysis).
• Supervised and monitoring of concrete works with sub-contractors in batching plant
for proper mixing of concrete.
• Checked the water content of aggregates in batching plant daily for proper mixing
and proportioning mix design based on standard which shall conform to specified
requirement of project specification.
• Organized and scheduling the laboratory personnel to carry out inspection.
Company : ALLIED CONSULTANTS & TECHNOLOGIES, INC.
Address : Suite 311-B Delta Bldg., West Ave., Q.C. ( Phil. )
Position : Materials Inspector
Project : Meycauayan Public Market
Inclusive Date : November 15, 1989 to February 15, 1991
Duties and Responsibilities
• Organized and scheduling of contractors to carry out inspection and test when
requested by production, or in accordance with test program.
• Supervised and witnesses all tests performed by the contractor in independent
laboratory and shall conform to specified requirements as detailed in specification
national standard codes practices.
• Formulate, summarized of test report daily and weekly basis for submission of
materials results accordingly.
Company : R.C. IGNACIO CONSTRUCTION
Address : R.G.H. Bldg., No. 3 Corner Panay Ave., Quezon City ( Phil.)
Position : Project Coordinator
Project : Site Investigation for Drilling (Offshore / Inland)
Inclusive Date : October 18, 1986 to March 15, 1987
Duties and Responsibilities
• Supervised and monitoring of sampling testing of drilling machine
• Responsible for test in line with soils such as liquid limit, plastic limit, moisture
density relations (M.D.R.) and California Bearing Ratio (C.B.R.) which shall
conformed to the specified requirements of the project.
• Soil investigation and sampling by auger boring and diamond core drilling in bridges.
• Formulate and summarized test report daily and weekly basis.
• Reporting of boring log and evaluation of soil classification from the depth of hole.
Company : BALLAST NEDAM GROEP NV
Address : P.O. Box 5898 Riyadh, K.S.A
Position : Soil/Concrete Inspector
Project : Industrial Port, Yanbu,( RO-RO ) KSA
Inclusive Date : May 13, 1981 to May 27, 1983
Duties and Responsibilities
• Earthwork and slope protection inspection in RO-RO Berth of backfill materials and
laying of rock.
• Conduct sampling and testing of soils/aggregates used in various structures for
construction.
• Perform laboratory and in-situ based inspections and tests are required by project
specification.
• Over-all control of Civil Engineering tests and all personnel therein.
• Develop laboratory work procedures.
• Coordinate with the surveyor regarding the actual elevation and alignment in Ro-Ro
Berth before its proper implementation.
Company : INTEGRATED SOILAB SERVICES, INC.
Address : 29 Kabignayan St., Sta. Mesa Heights, Q.C. ( Phil.)
Position : Soil Technician
Inclusive Date : August 1978 to May 1981
Project Location : Masbate, Romblon, Leyte, Botolan and Metro Manila
Duties and Responsibilities
• Soil Investigation and sampling by Auger Boring.
• Diamond core drilling for site investigation in bridges.
• Wet preparation of soil samples for particle size analysis and determination of soil
constant.
• Laboratory determination of moisture content of soil.
• Unit weight of concrete aggregates.
• Penetration test of soil using California Bearing Ratio (CBR).
• Test for liquid limit of soils.
• Test for plastic limit and plasticity index of soil.
• Sieve analysis of soils and coarse aggregates.

More Related Content

What's hot (20)

Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
 
VICTOR L. LAVALLE - Resume qa-qc Inspector
VICTOR L. LAVALLE - Resume qa-qc InspectorVICTOR L. LAVALLE - Resume qa-qc Inspector
VICTOR L. LAVALLE - Resume qa-qc Inspector
 
Cv precast concrete
Cv   precast concreteCv   precast concrete
Cv precast concrete
 
CV (2)
CV (2)CV (2)
CV (2)
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
CV
CVCV
CV
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 

Viewers also liked

13 алгоритмизация, программирование, инструментальное по
13 алгоритмизация, программирование, инструментальное по13 алгоритмизация, программирование, инструментальное по
13 алгоритмизация, программирование, инструментальное поSergey Lomakin
 
Ost 1 10907 73
Ost 1 10907 73Ost 1 10907 73
Ost 1 10907 73Grant Cole
 
Foo Mei Yih_Cocurriculum certificates
Foo Mei Yih_Cocurriculum certificatesFoo Mei Yih_Cocurriculum certificates
Foo Mei Yih_Cocurriculum certificatesFOO MEI YIH
 
Bad Advisor Syndrome Article
Bad Advisor Syndrome ArticleBad Advisor Syndrome Article
Bad Advisor Syndrome ArticleCharles Bedard
 
What are sarms
What are sarmsWhat are sarms
What are sarmssarmstore
 
Strategic Clarity: Entrepreneur Prep before raising Institutional Capital
Strategic Clarity: Entrepreneur Prep before raising Institutional CapitalStrategic Clarity: Entrepreneur Prep before raising Institutional Capital
Strategic Clarity: Entrepreneur Prep before raising Institutional CapitalCharles Bedard
 
11 Major Lawsuits Involving Employee Distracted Driving
11 Major Lawsuits Involving Employee Distracted Driving11 Major Lawsuits Involving Employee Distracted Driving
11 Major Lawsuits Involving Employee Distracted DrivingZoomSafer
 
Solving the Value Equation eBook
Solving the Value Equation eBookSolving the Value Equation eBook
Solving the Value Equation eBookCharles Bedard
 
Fiestas del carmen
Fiestas del carmenFiestas del carmen
Fiestas del carmenmariale78
 
Distracted Driving: Understanding Your Corporate Risk and What to Do About It
Distracted Driving: Understanding Your Corporate Risk and What to Do About ItDistracted Driving: Understanding Your Corporate Risk and What to Do About It
Distracted Driving: Understanding Your Corporate Risk and What to Do About ItZoomSafer
 
программируем с черепашкой
программируем с черепашкойпрограммируем с черепашкой
программируем с черепашкойzarechneva
 
14 история развития и поколения эвм
14 история развития и поколения эвм14 история развития и поколения эвм
14 история развития и поколения эвмSergey Lomakin
 

Viewers also liked (15)

1 subsidies
1 subsidies1 subsidies
1 subsidies
 
13 алгоритмизация, программирование, инструментальное по
13 алгоритмизация, программирование, инструментальное по13 алгоритмизация, программирование, инструментальное по
13 алгоритмизация, программирование, инструментальное по
 
Ost 1 10907 73
Ost 1 10907 73Ost 1 10907 73
Ost 1 10907 73
 
Foo Mei Yih_Cocurriculum certificates
Foo Mei Yih_Cocurriculum certificatesFoo Mei Yih_Cocurriculum certificates
Foo Mei Yih_Cocurriculum certificates
 
Bad Advisor Syndrome Article
Bad Advisor Syndrome ArticleBad Advisor Syndrome Article
Bad Advisor Syndrome Article
 
What are sarms
What are sarmsWhat are sarms
What are sarms
 
Strategic Clarity: Entrepreneur Prep before raising Institutional Capital
Strategic Clarity: Entrepreneur Prep before raising Institutional CapitalStrategic Clarity: Entrepreneur Prep before raising Institutional Capital
Strategic Clarity: Entrepreneur Prep before raising Institutional Capital
 
11 Major Lawsuits Involving Employee Distracted Driving
11 Major Lawsuits Involving Employee Distracted Driving11 Major Lawsuits Involving Employee Distracted Driving
11 Major Lawsuits Involving Employee Distracted Driving
 
Solving the Value Equation eBook
Solving the Value Equation eBookSolving the Value Equation eBook
Solving the Value Equation eBook
 
Fiestas del carmen
Fiestas del carmenFiestas del carmen
Fiestas del carmen
 
Distracted Driving: Understanding Your Corporate Risk and What to Do About It
Distracted Driving: Understanding Your Corporate Risk and What to Do About ItDistracted Driving: Understanding Your Corporate Risk and What to Do About It
Distracted Driving: Understanding Your Corporate Risk and What to Do About It
 
программируем с черепашкой
программируем с черепашкойпрограммируем с черепашкой
программируем с черепашкой
 
14 история развития и поколения эвм
14 история развития и поколения эвм14 история развития и поколения эвм
14 история развития и поколения эвм
 
Digital storyboard
Digital storyboardDigital storyboard
Digital storyboard
 
2016 STS - Chris Nelson: The ABC’s of the Looming ELD Mandate
2016 STS - Chris Nelson: The ABC’s of the Looming ELD Mandate2016 STS - Chris Nelson: The ABC’s of the Looming ELD Mandate
2016 STS - Chris Nelson: The ABC’s of the Looming ELD Mandate
 

Similar to QA/QC Inspector or Engineer

Similar to QA/QC Inspector or Engineer (20)

Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
ACE TRIA
ACE TRIAACE TRIA
ACE TRIA
 
CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer II
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
PERSONAL DATA John Fabian
PERSONAL DATA John FabianPERSONAL DATA John Fabian
PERSONAL DATA John Fabian
 
MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1
 
wilson cv
wilson cvwilson cv
wilson cv
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016
 
WEC CV_2016 09 06
WEC CV_2016 09 06WEC CV_2016 09 06
WEC CV_2016 09 06
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
Hillary CV
Hillary CVHillary CV
Hillary CV
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
updated generally 04apr16
updated generally 04apr16updated generally 04apr16
updated generally 04apr16
 
Glenn updated cv
Glenn updated cvGlenn updated cv
Glenn updated cv
 
CVFTCabunoc
CVFTCabunocCVFTCabunoc
CVFTCabunoc
 
My Resume
My ResumeMy Resume
My Resume
 
resume of Mr Roy2
resume of Mr Roy2resume of Mr Roy2
resume of Mr Roy2
 

Recently uploaded

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

QA/QC Inspector or Engineer

  • 1. CURRICULUM VITAE AL FREDO T. ALATA JR. Email Address: freddie_alata1108@yahoo.com.ph B-26 L-7 Tatlong Hari St., Brgy Greater Lagro, Novaliches, Quezon City Mobile No. +63-9477030675 ( Smart ) OBJECTIVE: To offer my services to the best of my ability and further enhance my knowledge in the field of specialization through experience to attain my maximum level of professionalism. EDUCATIONAL ATTAINMENT: DEGREE : BACHELOR OF SCIENCE IN CIVIL ENGINEERING SCHOOL : UNIVERSITY OF THE EAST, MANILA YEAR COMPLETED : JUNE 1975 upto MARCH 1978 ( 3years ) JUNE 1983 upto MARCH 1985 ( 2years ) CHARACTER REFERENCES : 1) USEC. EDMUNDO V. MIR,CE DEPARTMENT OF PUBLICWORKS & HIGHWAYS, MANILA 2) GEN. FLORO GASCON, MD CHIEF RADIOLOGIST V. LUNA GENERAL HOSPITAL, QUEZON CITY 3) ATTY. ERNESTO TENDERO, PNP POLICE SUPERINTENDENT / STATION COMMANDER NATIONAL CAPITAL REGION POLICE OFFICE
  • 2. BASIC COURSE ATTENDED : COURSE : 72 HOURS COMPUTER BASIC COURSE : EXCELL / WORD PROCESSING SCHOOL : STI COLLEGE DATE COMPLETED : OCTOBER 1, 2001 to DECEMBER 30, 2001 TRAINING / SEMINAR ATTENDED : • Philipp’s Technical Consultant Corp. Echo Seminar of Effective Construction and Contract Management Through the Provincial Roads Management Facility (PRMF) October 12-13, 2010 Prosperidad, Agusan Del Sur (Phil.) Funded by : Australian Government Aid Program Supported by: Coffey International Development • Al-Futtaim – Bodycote Materials Testing Corp. 10SH Working Safety Training Course May 8, 2008 Basic First Aid June 23, 2006 Jebel Ali, Dubai, U.A.E • Bonifacio – Stanger Materials Testing Corp. First Aid Training (Basic) July 5-7, 2000 Construction Project Quality Management September 16, 2000 Bonifacio Center, Fort Bonifacio, Global City, Taguig, Metro Manila (Phil.) • ABV Rock Group KB Basic Fire Training July 19 , 1991 Site 7 Medinah, K.S.A
  • 3. EMPLOYMENT HISTORY: Company : Department of Public Works and Highways ( National Capital Region ) Quezon City First District Engineering Office Address : Sta. Catalina St., Brgy. Holy Spirit, Quezon City Position Held : Materials Engineer Inclusive Dates : March 2, 2014 up to present Project Location : Road Concreting ( 6km ) / Concrete Re-blocking Construction of School Building /Rehabilitation of Bridges Road Rehabilitation for Asphalt Laying Duties and Responsibilities • Detailed implementation work activities will be reliably guided in preparing the scope of work to complete the clearing of entire road right-of-way stakes, side drainage and side slopes stakes and other reference point of construction in road pavement. • List down the general activities that involved in the project, manpower, equipment used and weather condition. • Checking and evaluating the contractor’s job layout plan in order to assure proper management of construction activities, economy in the use of construction time and manpower. • Discussing the Quality Control Program so that the schedule of all construction materials subject of field or in laboratory for sampling and testing of quality test of embankment materials as to comply as detailed with standard specification. • Checked the bench marks and turning point to obtain and record the various ground elevation and center line of the access road. • Checked the earthworks movement involve filling materials backfill materials and embankment works if the soil particles are graded to determine the compaction effort attainable. • Checked and inspection the moisture condition of the materials it must be sprinkled with water to attain the working moisture content , if too wet then, it must be dried by using a motor grader, through its blade moving back and forth until the excess moisture has evaporated and to attain the qualified optimum moisture content and maximum dry density. • Checked the thickness of the sub base layer before rolling and compaction. • Checked the compaction operation is done grade elevation according to the plans and specification and undertake the field density test if they comply the relative density as detailed with standard specification.
  • 4. Company : SATCO Batching Plant ( Concrete ) ( Saudi Arabian Trading and Construction Company ) Address : Tayma Tabuk, kingdom of Saudi Arabia Position Held : QA/QC Engineer Inclusive Dates : September 1, 2012 to September 2, 2013 Project Location : Ministry of Housing Project, Tayma Tabuk, KSA Duties and Responsibilities • Preparation of detailed work procedure for all site activities. • Implementing proper material testing requirements and Quality Control policies. • Weekly checking the deliveries of materials such as Coarse and Fine Aggregates, Cement (OPC/SRC) and Admixture,if they complied with standard specification. • Implements and establised the Concrete Mix Design in accordance with ACI Standard upon approval. • Undertaking and reporting statistical analysis of concrete test results in progress upon work completed. • Supervising the performance of laboratory personnel and related documents to ensure that they maintained and appropriate client file when verification and testing was completed. • Organized and scheduling of laboratory personnel to carried out testing procedure if they complied with relevant standard specification. • Checked the slump in every delivery of concrete mixing before transporting on site if they comply the approved mix design. Company : PHILIPP’S TECHNICAL CONSULTANT CORP. Address : 8/F España Tower 2203 España Ave. cor. Josefina St., Sampaloc 1008, Manila ( Phil. ) Position Held : Materials Engineer Inclusive Date : July 5, 2010 to December 31, 2010 Project Location : PRMF-ADS-01: Rehabilitation of NRJ Pisaan – Borbon Road (6km.) PRMF-ADS-02: Rehabilitation of NRJ Crossing Luna – Duangan Road (6 km.) Through the Provincial Roads Management Facility (PRMF) Funded by : Australian Government Aid Program Supported by : Facility Managing Contractor by : Coffey International Development
  • 5. Duties and Responsibilities • Checked inventory of the site laboratory against the equipment required by the Contractor in order to carry out all the tests required to meet Specification compliance, and also its calibration. • Instruction and supervised the contractor’s laboratory staff. • Checked the source of materials proposed by the contractor if they can provide the required quality, quantity and rates of delivery throughout the estimated period of construction. • Oversee initial and subsequent periodic tests on all aggregates, cement, reinforced steel, cup base materials etc. to confirm that they comply with the Specifications. • Immediately notify the Contractor’s Engineer’s Representative of materials, which have are considered likely failed if they comply with the standard specifications. • Carry out periodic checks of all concrete batching, mixing and transporting equipment including calibration. As to compile and maintain comprehensive records of all concrete placed. • Ensure the proper execution by Contractor’s technicians of in-situ density testing of soils and pavement materials to establish in laboratory trials the properties of soil being used in road base construction, backfilling etc. • Supervised whatever other in-situ testing soils is required by the specifications. • Supervise the contractor’s testing trials to establish the design of concrete mixes and submit recommendations to the engineer. • Responsible that all supplies of materials are within the Specification and should ensure the Site inspector that the stockpile is approved before permitting the Contractor to use it. • Responsible to supervised for testing remains with the contractor through the laboratory provided and under the supervision of the materials. Company : AL FUTTAIM - BODYCOTE MATERIALS TESTING SERVICES Address : PO Box 34924 Dubai Investment Park, Dubai, United Arab Emirates Position Held : Laboratory Supervisor Inclusive Date : May 6, 2006 to January 2, 2009 Project Location : Dubai Metro Train, Jebel Ali, Dubai U.A.E.
  • 6. Duties and Responsibilities • Supervised field testing, laboratory testing and equipment maintenance/ Calibration within the concrete laboratory/Soil/Steel/Special Testing sections offering services related to steel reinforcement, soil, aggregate and concrete. • Checked the sampling and testing of collected sample in accordance with internal and or system procedure. • Lend assistance within other areas of the laboratory including structural investigation, condition surveys and specialist civil engineering testing services. • Organization of testing staff to enable clients’ testing requirements to be fully completed to the agreed time scale. • Dissemination of testing documentation to appropriate staff. • Calculation of test results and reporting. • Ensuring reporting dates are adhered to and the timely preparation of reports. • Ensuring personal responsibilities are discharged strictly in accordance with Quality Management System and the requirement of ISO/IEC 17025. • Checking and calibration of laboratory equipment • Maintain records of technical work carried out • Maintain equipment according to schedule Company : J.V. ANGELES CONSTRUCTION CORPORATION Address : JVACC Building, E. Rodriguez Jr. Ave., Pasig City ( Phil. ) Position Held : Quality Control Engineer Inclusive Date : January 20, 2003 to March 3, 2005 Project Location : Pilot Septage Treatment Plant and Rehabilitation / Upgrading of Sewage Treatment Plant at Dagat-dagatan Extension, Malabon, Caloocan City Duties and Responsibilities • Responsible to check and inspection of materials for backfiling at quarry site. • Inspection and monitoring in laying of rip rapping and checking the dimension of boulders to150x300mm. • Responsible to implement the concrete mix design as recommended indication approval of materials.
  • 7. • Responsible to check the incoming of materials, purchase order and delivery receipt if they comply as detailed with standard specification. Company : ACAN BUILDERS AND TRADING Address : No. 27 Concepcion St., Marulas, Valenzuela City ( Phil. ) Position Held : Project Supervisor Inclusive Date : September 1, 2001 to July 15, 2002 Project Location : Road Concreting, Box Culvert, Building Auditorium Duties and Responsibilities • Supervised and monitoring the specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance. • Implements the construction Project Quality Management to ensure that the project will satisfy the quality policy, objectives and responsibilities. • Implements the over-all controlled in civil works and quality procedure to determine if they comply with relevant quality standards and performance on a regular basis to provide confidence to the project. Company : BONIFACIO-STANGER MATERIALS TESTING CORP. Address : Bldg. C, NDCP Compound, Fort Bonifacio, Taguig, Metro Manila ( Phil. ) Position : Sr. Laboratory Technician Inclusive Date : September 1, 1997 to July 15, 2001 Project Location : Fort Bonifacio Global City Infrastructure Project / San Lorenzo 500 Megawatch, Batangas City/ Evaluation of Tests Report in DMCI Project Duties and Responsibilities • Supervised and monitor the jaw crusher and secondary crusher to apply the crushed stone, crushed slag, and gravel retained on a no. 4 sieve which shall conform to the following requirements and standard specification. • Responsible for tests the physical properties of materials consist of the crushed slag, crushed stone or gravel suitable for use in construction such as grading of coarse
  • 8. aggregates, unit weight of slag, soundness test, abrasion and choking materials which shall conform to the specified requirement and approval with the clients. • Responsible and perform of physical tests on fresh and hardened concrete, cement, aggregates, pressurized fuel ash, admixture, concrete hollow blocks, steel reinforcement, asphalt and soils in accordance with ASTM and ACI procedures. • Developed and perform pre-construction program to formulate accepted mix of design to use of project in accordance of standard specification. • Conduct testing of cover meter survey to locate of embedded steel reinforcement to assess its sizes with concrete cover. • Evaluation and signatory of concrete testing in DMCI project and such is deemed its representative and providing the services of Laboratory Staff to operate the compression machine in the conduction of tests of DM Consuji Inc. in Taguig Batching Plant. Company : MATERIALAB LTD. Address : 5 Lok Yi St., 17 MS Castle Peak Rd., Tailam, NT Hongkong Position : Laboratory Technician Project : Chek Lap Kok International Airport, Hongkong Inclusive Date : April 22, 1996 to August 16, 1997 Duties and Responsibilities • Responsible for testing of construction materials such as aggregates, soils, concrete, asphalt and flexural strength. • Developed laboratory work procedure to formulate pre-construction materials in accordance with technical specification. • Aggregates – conduct testing to different international standards, which are being carried out daily for quality control progress. • Soils – Conduction of tests which shall carried out in accordance with British Standard • Asphalt – Determination and perform laboratory work which can be carried out standard specification in accordance of BS and ASTM standards. Company : DEPARTMENT OF PUBLIC WORKS & HIGHWAYS (R02) Address : Nursery Compound, Diversion Road, Tuguegarao Cag. ( Phil.) Position : Materials Inspector/Lab. Tech.11 Project Location : River Control Project,Tuguegarao Cagayan Valley Inclusive Date : January 24, 1995 to April 16, 1996
  • 9. Duties and Responsibilities • Supervised and check various testing of materials performed by the technician in field and laboratory. To ensure that all tests are performed in accordance with prescribe testing procedure. Checking and inspection provable materials to be used in construction project. Prepare and submit a concise copy or summary of all test carried out the client. • Coordinate with the contractor’s according to plans and able to make necessary adjustments in the fieldwork if problem arises. • Knowledge and implementation or relevant technical specification procedure. • Assisted with Project Engineer for preparation of as built plan for contractor’s final collection, basis on actual work of the project. If there is a change order to the project, you must be revised the plans to actual work of the project. Company : ABV ROCK GROUP KB Address : P.O. Box 4538 Medinah 21411, Kingdom of Saudi Arabia Position : Laboratory Technician Project : Underground Tunnel Inclusive Date : March 21, 1991 to April 2, 1994 Duties and Responsibilities • Tests of elliptical tunnel openings carried out to establish an artificial material, apparatus and a loading system. It examined about the materials, the loading system at the failure modes of openings. Models are tested in biaxial compression and only isotropic loading. To investigate the fracture propagation. • Responsible for tests in line soils, asphalt and concrete such a blending proportioning of approved materials used in each CONCRETE (Grouting of Rock Bolt Shotcrete) ASPHALT (Bituminous base course, Intermediate base course, and wearing course) EARTHWORK/SOIL (Physical, mechanical and chemical analysis). • Supervised and monitoring of concrete works with sub-contractors in batching plant for proper mixing of concrete.
  • 10. • Checked the water content of aggregates in batching plant daily for proper mixing and proportioning mix design based on standard which shall conform to specified requirement of project specification. • Organized and scheduling the laboratory personnel to carry out inspection. Company : ALLIED CONSULTANTS & TECHNOLOGIES, INC. Address : Suite 311-B Delta Bldg., West Ave., Q.C. ( Phil. ) Position : Materials Inspector Project : Meycauayan Public Market Inclusive Date : November 15, 1989 to February 15, 1991 Duties and Responsibilities • Organized and scheduling of contractors to carry out inspection and test when requested by production, or in accordance with test program. • Supervised and witnesses all tests performed by the contractor in independent laboratory and shall conform to specified requirements as detailed in specification national standard codes practices. • Formulate, summarized of test report daily and weekly basis for submission of materials results accordingly. Company : R.C. IGNACIO CONSTRUCTION Address : R.G.H. Bldg., No. 3 Corner Panay Ave., Quezon City ( Phil.) Position : Project Coordinator Project : Site Investigation for Drilling (Offshore / Inland) Inclusive Date : October 18, 1986 to March 15, 1987 Duties and Responsibilities • Supervised and monitoring of sampling testing of drilling machine • Responsible for test in line with soils such as liquid limit, plastic limit, moisture density relations (M.D.R.) and California Bearing Ratio (C.B.R.) which shall conformed to the specified requirements of the project. • Soil investigation and sampling by auger boring and diamond core drilling in bridges. • Formulate and summarized test report daily and weekly basis.
  • 11. • Reporting of boring log and evaluation of soil classification from the depth of hole. Company : BALLAST NEDAM GROEP NV Address : P.O. Box 5898 Riyadh, K.S.A Position : Soil/Concrete Inspector Project : Industrial Port, Yanbu,( RO-RO ) KSA Inclusive Date : May 13, 1981 to May 27, 1983 Duties and Responsibilities • Earthwork and slope protection inspection in RO-RO Berth of backfill materials and laying of rock. • Conduct sampling and testing of soils/aggregates used in various structures for construction. • Perform laboratory and in-situ based inspections and tests are required by project specification. • Over-all control of Civil Engineering tests and all personnel therein. • Develop laboratory work procedures. • Coordinate with the surveyor regarding the actual elevation and alignment in Ro-Ro Berth before its proper implementation. Company : INTEGRATED SOILAB SERVICES, INC. Address : 29 Kabignayan St., Sta. Mesa Heights, Q.C. ( Phil.) Position : Soil Technician Inclusive Date : August 1978 to May 1981 Project Location : Masbate, Romblon, Leyte, Botolan and Metro Manila Duties and Responsibilities • Soil Investigation and sampling by Auger Boring. • Diamond core drilling for site investigation in bridges. • Wet preparation of soil samples for particle size analysis and determination of soil constant. • Laboratory determination of moisture content of soil. • Unit weight of concrete aggregates. • Penetration test of soil using California Bearing Ratio (CBR). • Test for liquid limit of soils.
  • 12. • Test for plastic limit and plasticity index of soil. • Sieve analysis of soils and coarse aggregates.