1. Glenn Ross
Address: BURIRAM, 31210, Thailand
Telephone (home): +66 (0) 44190121
Mobile: +66 860 984 501
Mobile: +66 899 475 056
Email: rosszed56@hotmail.com
Professional profile
A highly experienced OGP Client Representative / Diving Superintendent / Buoy Maintenance Supervisor combining a
strong academic background with extensive experience gained working in a broad range of offshore projects in the oil
and gas industry and in health and safety regulations and best practice. Consistently providing outstanding levels of
project management and research development whilst remaining focused on the achievement of strategic goals. Adept
at effectively planning, scheduling, developing and maintaining stability, functionality and efficiency with precise attention
to detail. Quick to assimilate new ideas and concepts whilst demonstrating a logical and analytical approach to solving
complex problems and issues and using innovative means to overcome obstacles. Meticulous and well-organised
ensuring that projects are completed on time, within budget and to nothing less than the highest standard of excellence.
A motivational and inspirational leader and a strong team builder. Enjoys being part of as well as managing and
supporting a successful and productive team, and is passionate about environmental projects and developments.
Possesses excellent interpersonal and liaison skills and is expert at communicating with professionals at all levels as well
as managing both internal and external working relationships.
Career Summary
The following in a brief outline of skills and experience followed by a summary of projects undertaken from1997 to 2013.
Between 1979 and 1996 responsibilities included multiple projects and diving jobs summarised below.
Management & Administration
Organising and attending meetings on a regular basis to clarify operational requirements
Briefing all divers on the operational and contingency plans and procedures to be followed
Preparing daily progress reports for presentation to all departments and Head Office
Health & Safety
Responsible for acquiring information and knowledge of all legislation relevant to working in onshore and
offshore environments including ACOP (Approved Code of Practice) and Health and Safety guidelines
Overseeing diving operations to ensure that their execution complies with the legal requirements
Maintaining safety of dive team and ensuring that the diving operation is carried out from dive site equipped to
deal with emergencies as per diving operation manual
Ensuring that the diving equipment is adequate and in good operating condition
Technical
Working on a wide range of international projects, including NDT inspection programmes, boat landing installation
projects and pipe line installations. Duties include:
Completing debris surveys, anode mapping, CP, UT and scouring
Installation of spool pieces, SBM reconnect hoses, screw anchors, J tubes, risers and clamps and completing as built
surveying
Installation of MORGRIP and Smart Flanges and PLIDCO Sleeves
Decommissioning and removal of jackets and diamond wire cutting of caissons and legs
Routine inspection and maintenance of CBM
Completion of seabed surveys
Repair of water trunk line
Replacement of ball valve
Various diving jobs covering welding, burning, jack hammering, concreting and drilling for installation of piles
Summary of Projects
27/08/2013-23/12/13 BMS
Smit Lamnalco, Georgia
BP Project Blue Water SPM
BMS reports to the BP PLM. BMS is overall responsible for planning, permission to
proceed with setting up and granting permission for vessel to conduct the tanker
loading operation in general. He is the responsible person for the activity being
carried out under the Diving Intervention PTW. He reports and interacts regularly
with the AA on any issues to ensure the risks from all hazards are mitigated by
controls to ALARP. The BMS can order the creation of the Permit and identify the
hazards and control measures. (Level 1 Risk Assessment).
Page 1 of 6
2. 09/07/2013-10/08/13
29/11/2012-15/6/13
08/2012-09/2012
07/2012-07/2012
06/2011-08/2011
Participates in any Level 2 Risk Assessment and ensures that where other persons
are involved in the task, they fully understand the scope of the work and the
hazards and controls for the job by holding a toolbox talk meeting. This includes
ensuring that all of those involved in the specific work activity sign off the worksite
hard copy of the Permit.
BMS is the focal point for all project activities and thus has overall responsibility
for SHE-Q during all works and activities conducted by Smit Lamnalco employees.
He will also ensure compliance with GPC and Smit Lamnalco SHE-Q policies. He
has responsibility for ensuring that all levels of personnel actively support and
understand their responsibilities within the GPC and Smit Lamnalco SHE-Q
policies.
He will publicly support all systems, procedures and initiatives in carrying out the
requirements of the policies.
BMS liaises daily with the GPC SUPSA Terminal OTL, BP nominated Diving
Responsible Person & Diving Supervisor to ensure that the operations are
conducted according to the approved project procedures, UDP BP Global Diving,
IMCA Guidance and Best Industry Practices.
Diving Supervisor Sub-tech Saudi Arabia Aramco
Reinstate Chains and Carrie out remedial work on SPM Buoy’s # 31 # 36 # 33
Diving CS R
PENSPEN
KJO KCROP Project Involving the installation of Power Distribution Platforms 4 & 5
Integrated Well Jackets 6 & 7 and Control Living Platform which is part of the Joint
Venture between Aramco Gulf Operations and Kuwait Gulf oil Company. Operating
the KHAFJLAND HOUT Field (40km) Offshore of Kuwait / Saudi Arabia border
Diving Operations C S R
ALKARIM
Job Description Oversee Riser And Clamp Installation
Insuring Risk Evaluation Matrix, Risk Management Guidelines and other relevant
Codes of Particles and HSE Guidelines are followed
Daily progress reports, planning of next day’s scope of work including permits and
any safety concerns that need to be discussed and evaluated
SUPERVISOR FULMAR ALPHA PLATFROM NORTH SEA
CLIENT TALIASMAN INDEPWNDENT OIL AND GAS EXPLORATION AND
PRODUTION COMPANY
Job Description
Ndt Pre-Installation inspection involving. Grit blasting of weld for as-built video of
MPI and measurements for the installation of horizontal clamp at 14m+
SUPERVISOR, DCN ABU DHABI
CLIENT SIXCO / HYUNDIA
Job Description-Integrated Gas Development Project ( IGD Project Das Island )
The scope of the Quay wall block work include construction of about 700m long
Quay wall along the extended area from the existing area up to a water depth of (-)
14.0m DID. Quay wall is positioned along the inside face of the reclamations to
accommodate a water depth of (-) 4.0m – 12m A crushed rock base is to be
constructed in a trench to serve as a foundation of a mass concrete gravity quay
wall. The quay wall is constructed by successively placing mass precast block
units up to mass of approximately 100ton on the prepared base
Placing of manual/hydraulic frame for levelling purposes. After placing on the rock
foundation layer, a levelling staff will is used to adjust its level. The staffs are
constructed of metal tubing with a plate at the bottom and survey target at the top.
The staffs are kept rigidly vertical by a steel floatation which can slide on metal
pipe and accommodate therefore various depths and tides. Surveyor is position
shore side and communicates with Diving supervisor by UFH. Once the four
corners are level the first layer crushed rock 50 – 150mm Divers will use a levelling
beam. The gravel shall be accurately levelled to a tolerance of +/- 25mm. Second
layer 40mm gravel etc.
Placing of scour protection apron in front of the quay wall and the rock fill at the
base will be part of the quay wall
Page 2 of 6
3. 05/2011-05/2011 SUPERVISOR, NOORDHOEK NETHERLANDS
Job Description-NOGAT Project
Inspection of pipeline’s and flanges, Checking for wait cost damage and free spans
04/2010-08/2010
04/2008-05/2009
SUPERVISOR, PT PATRA DINAMIKA DIVING INDONESIA
Client-Total EP Indonesia Bekapi
Job Description- 2010 NDT yearly Inspection Program also Replacement of subsea
actuator valve SBM
Full Ndt inspection from surface to seabed involving Grit blasting of welds for MPI /
UT / CP / complete anode mapping IE missing / % of depletion / contact bolts / sea-
bed surveys / scour surveys / check all riser clamps for missing or loses bolts,
gaps etc CP / UT readings including conductors, checking of all levels for any
debris and removal of any debris found, mooring rope, scaffolding tubes etc,
measurements ‘from bottom of risers to sea-bed and 25Fj out, check for scour and
wait coat damage, anode measurements, distances from legs to anode and
distance between anodes that are required, all visual records recorded,
Photograph of all welds and As-built surveys as stated in the scope of work and
additional information that the Client my request or require, The inspection was of
Bekapai platforms and Jacks B Q / B K / B J / B H / B L / B G –Bekapai MWP 05 /
MWP.C Peciko / MWP.A Peciko / MWP .B Peciko
SUPERVISOR, AQUA DIVING SHARJAH
CLIENT Argas CCG Saudi Arabia
Job Description - 3D Block Survey location South Safaniya
10/2008-12/2008 SUPERVISOR, SUFFOLK PETROLEUM NIGERIA
Job Description - EDOP Manifolds General Visual Inspection and cleaning of valves
and checking hand operational valves and function test hydraulic valves and
observe operation of those valves, removal of various types’ debris. Mooring
ropes, fishing net’s, scaffolding etc, As-built survey
05/2008-07/2008
12/2007-02/2008
SUPERVISOR, AQUA DIVING SHARJAH
Qatar Al Khalj Field
Job Description Installation of Boat Landings
Grit Blasting and inspection of area for installation of boat landing, clamps to be
hydra tight, As-Built survey
SUPERVISOR, MASTER-TECH SINGAPORE
Client SAIPEM Location BP Tangguh
Job Description-Installation of 24”18”&10” Risers & Clamps
Measurements taken and areas mark out and grit blasted for placement of riser clamps
1st
stage in accordance with scope of work for installation of clamps using hydra tight
Risers are installed according to scope of work which has been agreed by Parties
08/2007-11/2007 SUPERVISOR, HALLIN MARINE SINGAPORE
Job Description 36” Pipeline Installation Instalment of Stinger and stinger Checks
pipeline profile, removal of stinger
07/2006-06/2007 SUPERVISOR, CCC
DLB 750 Pipeline Installation
DLB 1000 Installation of Risers, Clamps & Spool Pieces
SEP 150 free span correction
07/2006-08/2006
04/2006/06/2006
SUPERVISOR, C.D.I.SS. QATAR
Job Description Installation 42”/38”/30”pipelines and tie-in Spool Pieces
Laying of Concrete support blocks 10Ft long 4Ft Wide for pipelines with steel tube
Insert’s for separation
SUPERVISOR, PT KOMARITIM JAKARTA
Pipeline Trenching & Screw Anchor Installation
01/2004-10/2005 SUPERVSOR,CCC
Working on Various Projects from DLB 750, PLB-648 Qatar, SEP 250 and DLB 1000
Pipeline laying, Risers and Clamps, Free span corrections, As-built surveys of pipeline
Page 3 of 6
4. 10/2003-11/2003 SUPERVISOR, HALLIN MARINE BP Con Son Gas Project Vietnam
Pipeline installation involving beach pull
06/2003-09/2003 SUPERVISOR, CCC
DLB 1000 installation of SBM Plem and anchors
03/2003-04/2003 SUPERVISOR, FRASER SINGAPORE
Rectification work for Sing Tel on telephone cable
01/2002-02/2003 SUPERVISOR, CCC
Projects: 150 and Naash 4302
Free span corrections 36” and 16” pipelines using grout bags
08/2001-11/2001 SUPERVISOR, NOORHOEK SINGAPORE TAIWAN
Decommissioning of 4 Jackets
Job Description Removal of riser/conductors and caissons equipment used broco
burning and diamond wire cutting hydraulic machine
07/2001-08/2001 SUPERVISOR, GLOBAL BATAM INDONESIA
Arco China NDT Inspection of damage caused by supply vessels to VDM and Horizontal
04/2001-06/2001
Going into leg A
SUPERVISOR, GLOBAL BATAM INDONESIA
Tambang West Natuna Pipe Laying, stinger checks and removal of stinger
06/2000-02/2001
SUPERVISOR,QSS
Shore Team Work involving Daily maintenance, week, Monthly, Six Monthly, and
yearly inspection of CBM, SPM, Inspection and Maintenance program. Yearly
inspection of quay wall
Assist Tankers with pick up of SPM floating hoses and CBM subsea hose and
release and inspection after, Rig moves at Ras Laffan, Work daily reports, time
sheets and other General reports and duties
03/2000-04/2000 SUPERVISOR, COMEX FRANCE
Location Escravos Nigeria
Charlie Cobb Jack up
Job Description Removal of risers
08/199-12/1999
04/1999-07/1999
SUPERVISOR, OCEANEERING
Location Cabinda Angola
C B L 101 EPTM
Job Description Risers and clamp installation and flare stack
DLB Polaris North Nembia
Job Description installation of Top package of Jack work involved removal of
matting flood ladder hydraulic hose and matting flood ladder hydraulic hose, Bouncy
tanks etc
SUPERVISOR FRASER
Location INDIA JAMNAGAR REGINA 250
Job Description Plem & Plem anchors and SBM Installation
01/1997-01/1999 SUPERVISOR, ADAMS ARAMCO
Seabed Surveys / Rig Moves / Inspections of jacks, pipelines checking for free
spans, grout and placement of cement bags for correction of free spans, Buoying of
pipeline for rig moves / Rig leg inspections etc
05/1997-08/1997 ASSISTANT LST / SAT DIVER, OCEANEERING DUBAI
Egypt Petro Jet 12
Job Description installation of 42” pipeline, attachment of davits, Flange alignment,
Ax-ring, Hydra tighten etc
01/1997-04/1997 ASSISTANT SUPERVISOR, ADAMS ARAMCO
Job Description Pipeline laying stinger checks, Rig moves, Jack inspection, Debris
surveys and removal
09/1996-11/1996 LEAD DIVER, OCEANEERING OMAN
Page 4 of 6
5. SBM Change Out & Installation
06/1996-07/1996 DIVER, OCEANEERING DUBAI DPC
NDT Yearly Inspection
04/1996-05/1996 LEAD DIVER, TAYLOR INTERNATIONAL
Bombay Rava Field
01/1996-05/1996 SAT DIVER, OCEANEERING DUBAI KHARG
Pipeline Alignment
10/1995-12/1998 DIVER, CCC ABU DHABI
Free span corrections, Jack and Gosp inspections, Removal of Risers and boat
landings as well installation of both, Grouting, pipeline inspections and installation,
Hydra tight, Installation of Morgrip, Plidco Sleeves and various other jobs
01/1995-09/1995 DIVER, QSS QATAR
Jacket & Pipeline Inspections
09/1994-12/1994 DIVER, CCC ABU DHABI
Pipeline and jack Inspection, sea bed surveys
07/1994-08/1994 DIVER, ADAMS ARAMCO SAUDI ARABIA
Job Description Replacement of 6 x 36” Ball Valve at J-trestle
01/1994-04/1994 SAT DIVER, OCEANEERING DUBAI
Installation of Coflexip Control Umbilical
02/1993-12/1993 DIVER, CCC ABU DHABI
Spool Piece Installation / Pipeline / Inspection etc
09/1992-12/1992 SAT DIVER, QSS QATAR
NDT Jacket Inspection
03/1990-06/1992 DIVER, ROCK WATER DUBAI, INDIA
Pipeline Trenching
02/1989-01/1990 DIVER, WHARTON WILLIAM’S SHARJA
MV Boa Canpus SBM change out
01/1987-12/1989 DIVER, SHEPERHERD HILL
The building of Jersey St Helier Pier
02/1985-05/1987 DIVER, BURMAC SCOTLAND
Various civil diving jobs / British Rail Bridge Program
04/1983-12/1985 DIVER, ALGOSABI SAUDI ARABIA
Various Projects rig moves/pipeline inspection/jack inspection/debris removal/rig leg
inspection/free span corrections/Ndt inspection on jackets UT.CP.D.METRE
Readings anode depletion
01/1979-10/1982 DIVER, FOX DIVING SCOTLAND
Various civil Diving jobs
Education and Qualifications
ROV Systems Auditing
and Assurance Course
OGP
NEBOSH
Hyperbaric Centre SINGPORE
Client Worksite Representative
International Diploma in Occupational Health and Safety - Currently Studying
NEBOSH International General Certificate in Occupational Safety & Health Parts 2 & 3 (2012)
IMCA
IMCA
IMCA
Diving Supervisor Number 5807 UK/Norway;
Assistant Mixed Gas Supervisor :
Saturation Diver Part 2
ADGAS Advance Safety Audit Course
UNIFY Completed 2012. Expires 22 July 2015
Authorised Gas Testing Level 2v9/3v9 (OPITO Approved )
TALISMAN Task Risk Assessment
ISSOW Roles and Responsibilities