SlideShare a Scribd company logo
1 of 7
Glenn Ross
Address: BURIRAM, 31210, Thailand
Telephone (home): +66 (0) 44190121
Mobile: +66 860 984 501
Mobile: +66 899 475 056
Email: rosszed56@hotmail.com
Professional profile
A highly experienced OGP Client Representative / Diving Superintendent / Buoy Maintenance Supervisor combining a
strong academic background with extensive experience gained working in a broad range of offshore projects in the oil
and gas industry and in health and safety regulations and best practice. Consistently providing outstanding levels of
project management and research development whilst remaining focused on the achievement of strategic goals. Adept
at effectively planning, scheduling, developing and maintaining stability, functionality and efficiency with precise attention
to detail. Quick to assimilate new ideas and concepts whilst demonstrating a logical and analytical approach to solving
complex problems and issues and using innovative means to overcome obstacles. Meticulous and well-organised
ensuring that projects are completed on time, within budget and to nothing less than the highest standard of excellence.
A motivational and inspirational leader and a strong team builder. Enjoys being part of as well as managing and
supporting a successful and productive team, and is passionate about environmental projects and developments.
Possesses excellent interpersonal and liaison skills and is expert at communicating with professionals at all levels as well
as managing both internal and external working relationships.
Career Summary
The following in a brief outline of skills and experience followed by a summary of projects undertaken from1997 to 2013.
Between 1979 and 1996 responsibilities included multiple projects and diving jobs summarised below.
Management & Administration
 Organising and attending meetings on a regular basis to clarify operational requirements
 Briefing all divers on the operational and contingency plans and procedures to be followed
 Preparing daily progress reports for presentation to all departments and Head Office
Health & Safety
 Responsible for acquiring information and knowledge of all legislation relevant to working in onshore and
offshore environments including ACOP (Approved Code of Practice) and Health and Safety guidelines
 Overseeing diving operations to ensure that their execution complies with the legal requirements
 Maintaining safety of dive team and ensuring that the diving operation is carried out from dive site equipped to
deal with emergencies as per diving operation manual
 Ensuring that the diving equipment is adequate and in good operating condition
Technical
 Working on a wide range of international projects, including NDT inspection programmes, boat landing installation
projects and pipe line installations. Duties include:
 Completing debris surveys, anode mapping, CP, UT and scouring
 Installation of spool pieces, SBM reconnect hoses, screw anchors, J tubes, risers and clamps and completing as built
surveying
 Installation of MORGRIP and Smart Flanges and PLIDCO Sleeves
 Decommissioning and removal of jackets and diamond wire cutting of caissons and legs
 Routine inspection and maintenance of CBM
 Completion of seabed surveys
 Repair of water trunk line
 Replacement of ball valve
 Various diving jobs covering welding, burning, jack hammering, concreting and drilling for installation of piles
 Summary of Projects
27/08/2013-23/12/13 BMS
Smit Lamnalco, Georgia
 BP Project Blue Water SPM
BMS reports to the BP PLM. BMS is overall responsible for planning, permission to
proceed with setting up and granting permission for vessel to conduct the tanker
loading operation in general. He is the responsible person for the activity being
carried out under the Diving Intervention PTW. He reports and interacts regularly
with the AA on any issues to ensure the risks from all hazards are mitigated by
controls to ALARP. The BMS can order the creation of the Permit and identify the
hazards and control measures. (Level 1 Risk Assessment).
Page 1 of 6
09/07/2013-10/08/13
29/11/2012-15/6/13
08/2012-09/2012
07/2012-07/2012
06/2011-08/2011
Participates in any Level 2 Risk Assessment and ensures that where other persons
are involved in the task, they fully understand the scope of the work and the
hazards and controls for the job by holding a toolbox talk meeting. This includes
ensuring that all of those involved in the specific work activity sign off the worksite
hard copy of the Permit.
BMS is the focal point for all project activities and thus has overall responsibility
for SHE-Q during all works and activities conducted by Smit Lamnalco employees.
He will also ensure compliance with GPC and Smit Lamnalco SHE-Q policies. He
has responsibility for ensuring that all levels of personnel actively support and
understand their responsibilities within the GPC and Smit Lamnalco SHE-Q
policies.
He will publicly support all systems, procedures and initiatives in carrying out the
requirements of the policies.
BMS liaises daily with the GPC SUPSA Terminal OTL, BP nominated Diving
Responsible Person & Diving Supervisor to ensure that the operations are
conducted according to the approved project procedures, UDP BP Global Diving,
IMCA Guidance and Best Industry Practices.
Diving Supervisor Sub-tech Saudi Arabia Aramco
Reinstate Chains and Carrie out remedial work on SPM Buoy’s # 31 # 36 # 33
Diving CS R
PENSPEN
KJO KCROP Project Involving the installation of Power Distribution Platforms 4 & 5
Integrated Well Jackets 6 & 7 and Control Living Platform which is part of the Joint
Venture between Aramco Gulf Operations and Kuwait Gulf oil Company. Operating
the KHAFJLAND HOUT Field (40km) Offshore of Kuwait / Saudi Arabia border
Diving Operations C S R
ALKARIM
Job Description Oversee Riser And Clamp Installation
Insuring Risk Evaluation Matrix, Risk Management Guidelines and other relevant
Codes of Particles and HSE Guidelines are followed
Daily progress reports, planning of next day’s scope of work including permits and
any safety concerns that need to be discussed and evaluated
SUPERVISOR FULMAR ALPHA PLATFROM NORTH SEA
CLIENT TALIASMAN INDEPWNDENT OIL AND GAS EXPLORATION AND
PRODUTION COMPANY
Job Description
Ndt Pre-Installation inspection involving. Grit blasting of weld for as-built video of
MPI and measurements for the installation of horizontal clamp at 14m+
SUPERVISOR, DCN ABU DHABI
CLIENT SIXCO / HYUNDIA
Job Description-Integrated Gas Development Project ( IGD Project Das Island )
The scope of the Quay wall block work include construction of about 700m long
Quay wall along the extended area from the existing area up to a water depth of (-)
14.0m DID. Quay wall is positioned along the inside face of the reclamations to
accommodate a water depth of (-) 4.0m – 12m A crushed rock base is to be
constructed in a trench to serve as a foundation of a mass concrete gravity quay
wall. The quay wall is constructed by successively placing mass precast block
units up to mass of approximately 100ton on the prepared base
Placing of manual/hydraulic frame for levelling purposes. After placing on the rock
foundation layer, a levelling staff will is used to adjust its level. The staffs are
constructed of metal tubing with a plate at the bottom and survey target at the top.
The staffs are kept rigidly vertical by a steel floatation which can slide on metal
pipe and accommodate therefore various depths and tides. Surveyor is position
shore side and communicates with Diving supervisor by UFH. Once the four
corners are level the first layer crushed rock 50 – 150mm Divers will use a levelling
beam. The gravel shall be accurately levelled to a tolerance of +/- 25mm. Second
layer 40mm gravel etc.
Placing of scour protection apron in front of the quay wall and the rock fill at the
base will be part of the quay wall
Page 2 of 6
05/2011-05/2011 SUPERVISOR, NOORDHOEK NETHERLANDS
Job Description-NOGAT Project
Inspection of pipeline’s and flanges, Checking for wait cost damage and free spans
04/2010-08/2010
04/2008-05/2009
SUPERVISOR, PT PATRA DINAMIKA DIVING INDONESIA
Client-Total EP Indonesia Bekapi
Job Description- 2010 NDT yearly Inspection Program also Replacement of subsea
actuator valve SBM
Full Ndt inspection from surface to seabed involving Grit blasting of welds for MPI /
UT / CP / complete anode mapping IE missing / % of depletion / contact bolts / sea-
bed surveys / scour surveys / check all riser clamps for missing or loses bolts,
gaps etc CP / UT readings including conductors, checking of all levels for any
debris and removal of any debris found, mooring rope, scaffolding tubes etc,
measurements ‘from bottom of risers to sea-bed and 25Fj out, check for scour and
wait coat damage, anode measurements, distances from legs to anode and
distance between anodes that are required, all visual records recorded,
Photograph of all welds and As-built surveys as stated in the scope of work and
additional information that the Client my request or require, The inspection was of
Bekapai platforms and Jacks B Q / B K / B J / B H / B L / B G –Bekapai MWP 05 /
MWP.C Peciko / MWP.A Peciko / MWP .B Peciko
SUPERVISOR, AQUA DIVING SHARJAH
CLIENT Argas CCG Saudi Arabia
Job Description - 3D Block Survey location South Safaniya
10/2008-12/2008 SUPERVISOR, SUFFOLK PETROLEUM NIGERIA
Job Description - EDOP Manifolds General Visual Inspection and cleaning of valves
and checking hand operational valves and function test hydraulic valves and
observe operation of those valves, removal of various types’ debris. Mooring
ropes, fishing net’s, scaffolding etc, As-built survey
05/2008-07/2008
12/2007-02/2008
SUPERVISOR, AQUA DIVING SHARJAH
Qatar Al Khalj Field
Job Description Installation of Boat Landings
Grit Blasting and inspection of area for installation of boat landing, clamps to be
hydra tight, As-Built survey
SUPERVISOR, MASTER-TECH SINGAPORE
Client SAIPEM Location BP Tangguh
Job Description-Installation of 24”18”&10” Risers & Clamps
Measurements taken and areas mark out and grit blasted for placement of riser clamps
1st
stage in accordance with scope of work for installation of clamps using hydra tight
Risers are installed according to scope of work which has been agreed by Parties
08/2007-11/2007 SUPERVISOR, HALLIN MARINE SINGAPORE
Job Description 36” Pipeline Installation Instalment of Stinger and stinger Checks
pipeline profile, removal of stinger
07/2006-06/2007 SUPERVISOR, CCC
DLB 750 Pipeline Installation
DLB 1000 Installation of Risers, Clamps & Spool Pieces
SEP 150 free span correction
07/2006-08/2006
04/2006/06/2006
SUPERVISOR, C.D.I.SS. QATAR
Job Description Installation 42”/38”/30”pipelines and tie-in Spool Pieces
Laying of Concrete support blocks 10Ft long 4Ft Wide for pipelines with steel tube
Insert’s for separation
SUPERVISOR, PT KOMARITIM JAKARTA
Pipeline Trenching & Screw Anchor Installation
01/2004-10/2005 SUPERVSOR,CCC
Working on Various Projects from DLB 750, PLB-648 Qatar, SEP 250 and DLB 1000
Pipeline laying, Risers and Clamps, Free span corrections, As-built surveys of pipeline
Page 3 of 6
10/2003-11/2003 SUPERVISOR, HALLIN MARINE BP Con Son Gas Project Vietnam
Pipeline installation involving beach pull
06/2003-09/2003 SUPERVISOR, CCC
DLB 1000 installation of SBM Plem and anchors
03/2003-04/2003 SUPERVISOR, FRASER SINGAPORE
Rectification work for Sing Tel on telephone cable
01/2002-02/2003 SUPERVISOR, CCC
Projects: 150 and Naash 4302
Free span corrections 36” and 16” pipelines using grout bags
08/2001-11/2001 SUPERVISOR, NOORHOEK SINGAPORE TAIWAN
Decommissioning of 4 Jackets
Job Description Removal of riser/conductors and caissons equipment used broco
burning and diamond wire cutting hydraulic machine
07/2001-08/2001 SUPERVISOR, GLOBAL BATAM INDONESIA
Arco China NDT Inspection of damage caused by supply vessels to VDM and Horizontal
04/2001-06/2001
Going into leg A
SUPERVISOR, GLOBAL BATAM INDONESIA
Tambang West Natuna Pipe Laying, stinger checks and removal of stinger
06/2000-02/2001
SUPERVISOR,QSS
Shore Team Work involving Daily maintenance, week, Monthly, Six Monthly, and
yearly inspection of CBM, SPM, Inspection and Maintenance program. Yearly
inspection of quay wall
Assist Tankers with pick up of SPM floating hoses and CBM subsea hose and
release and inspection after, Rig moves at Ras Laffan, Work daily reports, time
sheets and other General reports and duties
03/2000-04/2000 SUPERVISOR, COMEX FRANCE
Location Escravos Nigeria
Charlie Cobb Jack up
Job Description Removal of risers
08/199-12/1999
04/1999-07/1999
SUPERVISOR, OCEANEERING
Location Cabinda Angola
C B L 101 EPTM
Job Description Risers and clamp installation and flare stack
DLB Polaris North Nembia
Job Description installation of Top package of Jack work involved removal of
matting flood ladder hydraulic hose and matting flood ladder hydraulic hose, Bouncy
tanks etc
SUPERVISOR FRASER
Location INDIA JAMNAGAR REGINA 250
Job Description Plem & Plem anchors and SBM Installation
01/1997-01/1999 SUPERVISOR, ADAMS ARAMCO
Seabed Surveys / Rig Moves / Inspections of jacks, pipelines checking for free
spans, grout and placement of cement bags for correction of free spans, Buoying of
pipeline for rig moves / Rig leg inspections etc
05/1997-08/1997 ASSISTANT LST / SAT DIVER, OCEANEERING DUBAI
Egypt Petro Jet 12
Job Description installation of 42” pipeline, attachment of davits, Flange alignment,
Ax-ring, Hydra tighten etc
01/1997-04/1997 ASSISTANT SUPERVISOR, ADAMS ARAMCO
Job Description Pipeline laying stinger checks, Rig moves, Jack inspection, Debris
surveys and removal
09/1996-11/1996 LEAD DIVER, OCEANEERING OMAN
Page 4 of 6
SBM Change Out & Installation
06/1996-07/1996 DIVER, OCEANEERING DUBAI DPC
NDT Yearly Inspection
04/1996-05/1996 LEAD DIVER, TAYLOR INTERNATIONAL
Bombay Rava Field
01/1996-05/1996 SAT DIVER, OCEANEERING DUBAI KHARG
Pipeline Alignment
10/1995-12/1998 DIVER, CCC ABU DHABI
Free span corrections, Jack and Gosp inspections, Removal of Risers and boat
landings as well installation of both, Grouting, pipeline inspections and installation,
Hydra tight, Installation of Morgrip, Plidco Sleeves and various other jobs
01/1995-09/1995 DIVER, QSS QATAR
Jacket & Pipeline Inspections
09/1994-12/1994 DIVER, CCC ABU DHABI
Pipeline and jack Inspection, sea bed surveys
07/1994-08/1994 DIVER, ADAMS ARAMCO SAUDI ARABIA
Job Description Replacement of 6 x 36” Ball Valve at J-trestle
01/1994-04/1994 SAT DIVER, OCEANEERING DUBAI
Installation of Coflexip Control Umbilical
02/1993-12/1993 DIVER, CCC ABU DHABI
Spool Piece Installation / Pipeline / Inspection etc
09/1992-12/1992 SAT DIVER, QSS QATAR
NDT Jacket Inspection
03/1990-06/1992 DIVER, ROCK WATER DUBAI, INDIA
Pipeline Trenching
02/1989-01/1990 DIVER, WHARTON WILLIAM’S SHARJA
MV Boa Canpus SBM change out
01/1987-12/1989 DIVER, SHEPERHERD HILL
The building of Jersey St Helier Pier
02/1985-05/1987 DIVER, BURMAC SCOTLAND
Various civil diving jobs / British Rail Bridge Program
04/1983-12/1985 DIVER, ALGOSABI SAUDI ARABIA
Various Projects rig moves/pipeline inspection/jack inspection/debris removal/rig leg
inspection/free span corrections/Ndt inspection on jackets UT.CP.D.METRE
Readings anode depletion
01/1979-10/1982 DIVER, FOX DIVING SCOTLAND
Various civil Diving jobs
Education and Qualifications
ROV Systems Auditing
and Assurance Course
OGP
NEBOSH
Hyperbaric Centre SINGPORE
Client Worksite Representative
International Diploma in Occupational Health and Safety - Currently Studying
NEBOSH International General Certificate in Occupational Safety & Health Parts 2 & 3 (2012)
IMCA
IMCA
IMCA
Diving Supervisor Number 5807 UK/Norway;
Assistant Mixed Gas Supervisor :
Saturation Diver Part 2
ADGAS Advance Safety Audit Course
UNIFY Completed 2012. Expires 22 July 2015
Authorised Gas Testing Level 2v9/3v9 (OPITO Approved )
TALISMAN Task Risk Assessment
ISSOW Roles and Responsibilities
Page 5 of 6
BOSIET Including Additional Modules OLF
Dual Citizenship British & Canadian
Page 6 of 6
BOSIET Including Additional Modules OLF
Dual Citizenship British & Canadian
Page 6 of 6

More Related Content

What's hot

Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015NIVALDO CURCIO
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner UpdatedEric Viner
 
Resume ali mohamed mahmoud 2018
Resume ali mohamed mahmoud   2018Resume ali mohamed mahmoud   2018
Resume ali mohamed mahmoud 2018Ali Mahmoud
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000daniel cobar
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)Mohd Zaini Baharum
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huuhuu ho
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievementsJoseph Bracic
 
Namig Osmanov Resume 10.06.2016
Namig Osmanov Resume 10.06.2016Namig Osmanov Resume 10.06.2016
Namig Osmanov Resume 10.06.2016Namig Osmanov
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 FinalGary Whyte
 
MARTIN JC - JD_FSV_OpsMan_signed
MARTIN JC - JD_FSV_OpsMan_signedMARTIN JC - JD_FSV_OpsMan_signed
MARTIN JC - JD_FSV_OpsMan_signedJean-Charles Martin
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cvGeoff Chandler
 
My Updated CV Aug 2016
My Updated CV Aug 2016My Updated CV Aug 2016
My Updated CV Aug 2016David Scott
 
Position Description Mine Geologist 20141124
Position Description Mine Geologist 20141124Position Description Mine Geologist 20141124
Position Description Mine Geologist 20141124Stewart James
 
Hai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insHai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insVuong Huy Hai
 

What's hot (20)

AHMED SOLIMAN.C.V.
AHMED SOLIMAN.C.V.AHMED SOLIMAN.C.V.
AHMED SOLIMAN.C.V.
 
Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015Nivaldo Curcio CV Feb 2015
Nivaldo Curcio CV Feb 2015
 
Resume CV
Resume CVResume CV
Resume CV
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner Updated
 
Resume ali mohamed mahmoud 2018
Resume ali mohamed mahmoud   2018Resume ali mohamed mahmoud   2018
Resume ali mohamed mahmoud 2018
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
 
CV 3
CV 3CV 3
CV 3
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huu
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
Namig Osmanov Resume 10.06.2016
Namig Osmanov Resume 10.06.2016Namig Osmanov Resume 10.06.2016
Namig Osmanov Resume 10.06.2016
 
Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
MARTIN JC - JD_FSV_OpsMan_signed
MARTIN JC - JD_FSV_OpsMan_signedMARTIN JC - JD_FSV_OpsMan_signed
MARTIN JC - JD_FSV_OpsMan_signed
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
Farhad SL CV
Farhad SL CVFarhad SL CV
Farhad SL CV
 
My Updated CV Aug 2016
My Updated CV Aug 2016My Updated CV Aug 2016
My Updated CV Aug 2016
 
Position Description Mine Geologist 20141124
Position Description Mine Geologist 20141124Position Description Mine Geologist 20141124
Position Description Mine Geologist 20141124
 
Hai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insHai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_ins
 

Viewers also liked

28 july 2015 yashoman1
28 july 2015 yashoman128 july 2015 yashoman1
28 july 2015 yashoman1Santosh Tiwari
 
Подписание паспорта готовности электронной цифровой подписью в ЕКИС
Подписание паспорта готовности электронной цифровой подписью в ЕКИСПодписание паспорта готовности электронной цифровой подписью в ЕКИС
Подписание паспорта готовности электронной цифровой подписью в ЕКИСTCenter500
 
Presentación. inducción
Presentación. inducciónPresentación. inducción
Presentación. inducciónLuis Duran
 
Eclesiologia 4 Igl Sacramental
Eclesiologia 4 Igl SacramentalEclesiologia 4 Igl Sacramental
Eclesiologia 4 Igl SacramentalAdriana Delgadillo
 
Final Year Project - Stephen Reidy
Final Year Project - Stephen ReidyFinal Year Project - Stephen Reidy
Final Year Project - Stephen ReidyStephen Reidy
 
последовательность+слайдов+з.с.ю.(1)
последовательность+слайдов+з.с.ю.(1)последовательность+слайдов+з.с.ю.(1)
последовательность+слайдов+з.с.ю.(1)Ann Sazonenko
 
The Direct Continuum
The Direct ContinuumThe Direct Continuum
The Direct ContinuumKevin Cherry
 
MSHA Training Certificates_Terence Whitfield
MSHA Training Certificates_Terence WhitfieldMSHA Training Certificates_Terence Whitfield
MSHA Training Certificates_Terence WhitfieldTerence Whitfield
 
Gosto de gente_como_voce ok
Gosto de gente_como_voce    okGosto de gente_como_voce    ok
Gosto de gente_como_voce okhelena takahashi
 
Jorge Vilches - Intérprete Simultáneo World Class
Jorge Vilches - Intérprete Simultáneo World ClassJorge Vilches - Intérprete Simultáneo World Class
Jorge Vilches - Intérprete Simultáneo World ClassJorgeVilches1
 
Referance fra Bergen Group Engineering - på Norsk
Referance fra Bergen Group Engineering - på NorskReferance fra Bergen Group Engineering - på Norsk
Referance fra Bergen Group Engineering - på NorskDaniel Razvan Picioroaga
 
Intercalation overview
Intercalation overviewIntercalation overview
Intercalation overviewShafiq Pradhan
 
Using social media in assessment july 2015
Using social media in assessment   july 2015Using social media in assessment   july 2015
Using social media in assessment july 2015Chris Rowell
 
ipsum.pdf
ipsum.pdfipsum.pdf
ipsum.pdfreezo21
 

Viewers also liked (20)

28 july 2015 yashoman1
28 july 2015 yashoman128 july 2015 yashoman1
28 july 2015 yashoman1
 
Anupriyappt
AnupriyapptAnupriyappt
Anupriyappt
 
Подписание паспорта готовности электронной цифровой подписью в ЕКИС
Подписание паспорта готовности электронной цифровой подписью в ЕКИСПодписание паспорта готовности электронной цифровой подписью в ЕКИС
Подписание паспорта готовности электронной цифровой подписью в ЕКИС
 
Natalia Kosana Goldysiak
Natalia Kosana GoldysiakNatalia Kosana Goldysiak
Natalia Kosana Goldysiak
 
Presentación. inducción
Presentación. inducciónPresentación. inducción
Presentación. inducción
 
Eclesiologia 4 Igl Sacramental
Eclesiologia 4 Igl SacramentalEclesiologia 4 Igl Sacramental
Eclesiologia 4 Igl Sacramental
 
Emmy powerpoint
Emmy powerpointEmmy powerpoint
Emmy powerpoint
 
Final Year Project - Stephen Reidy
Final Year Project - Stephen ReidyFinal Year Project - Stephen Reidy
Final Year Project - Stephen Reidy
 
последовательность+слайдов+з.с.ю.(1)
последовательность+слайдов+з.с.ю.(1)последовательность+слайдов+з.с.ю.(1)
последовательность+слайдов+з.с.ю.(1)
 
The Direct Continuum
The Direct ContinuumThe Direct Continuum
The Direct Continuum
 
MSHA Training Certificates_Terence Whitfield
MSHA Training Certificates_Terence WhitfieldMSHA Training Certificates_Terence Whitfield
MSHA Training Certificates_Terence Whitfield
 
Gosto de gente_como_voce ok
Gosto de gente_como_voce    okGosto de gente_como_voce    ok
Gosto de gente_como_voce ok
 
25 toques
25 toques25 toques
25 toques
 
A vida ok
A vida       okA vida       ok
A vida ok
 
Jorge Vilches - Intérprete Simultáneo World Class
Jorge Vilches - Intérprete Simultáneo World ClassJorge Vilches - Intérprete Simultáneo World Class
Jorge Vilches - Intérprete Simultáneo World Class
 
Referance fra Bergen Group Engineering - på Norsk
Referance fra Bergen Group Engineering - på NorskReferance fra Bergen Group Engineering - på Norsk
Referance fra Bergen Group Engineering - på Norsk
 
Intercalation overview
Intercalation overviewIntercalation overview
Intercalation overview
 
Using social media in assessment july 2015
Using social media in assessment   july 2015Using social media in assessment   july 2015
Using social media in assessment july 2015
 
ipsum.pdf
ipsum.pdfipsum.pdf
ipsum.pdf
 
Nghi duong gia dinh hoan hao
Nghi duong gia dinh hoan haoNghi duong gia dinh hoan hao
Nghi duong gia dinh hoan hao
 

Similar to Glenn Ross CV .doc 1 (20)

Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
CV of KB.Smith
CV of KB.SmithCV of KB.Smith
CV of KB.Smith
 
JOSEPH_RESUME.DOC
JOSEPH_RESUME.DOCJOSEPH_RESUME.DOC
JOSEPH_RESUME.DOC
 
Joseph raj resume
Joseph raj resumeJoseph raj resume
Joseph raj resume
 
KOM 15082014 HUC
KOM 15082014 HUCKOM 15082014 HUC
KOM 15082014 HUC
 
Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick C.V._2015
Keith Patrick C.V._2015
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
 
Pgt resume 042416
Pgt resume 042416Pgt resume 042416
Pgt resume 042416
 
A.Bremner c.v (10)
A.Bremner c.v (10)A.Bremner c.v (10)
A.Bremner c.v (10)
 
SSolano2016new
SSolano2016newSSolano2016new
SSolano2016new
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
 
CV_Chibuzo_Temple_Ochulo2
CV_Chibuzo_Temple_Ochulo2CV_Chibuzo_Temple_Ochulo2
CV_Chibuzo_Temple_Ochulo2
 
Henrys Resume 2016 Q3
Henrys Resume 2016 Q3Henrys Resume 2016 Q3
Henrys Resume 2016 Q3
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
MAMDOUH_CV
MAMDOUH_CVMAMDOUH_CV
MAMDOUH_CV
 
Resume
Resume Resume
Resume
 
MURUGU SUNDARAN - CV
MURUGU SUNDARAN - CVMURUGU SUNDARAN - CV
MURUGU SUNDARAN - CV
 
NM SM
NM SMNM SM
NM SM
 
CV
CVCV
CV
 

Glenn Ross CV .doc 1

  • 1. Glenn Ross Address: BURIRAM, 31210, Thailand Telephone (home): +66 (0) 44190121 Mobile: +66 860 984 501 Mobile: +66 899 475 056 Email: rosszed56@hotmail.com Professional profile A highly experienced OGP Client Representative / Diving Superintendent / Buoy Maintenance Supervisor combining a strong academic background with extensive experience gained working in a broad range of offshore projects in the oil and gas industry and in health and safety regulations and best practice. Consistently providing outstanding levels of project management and research development whilst remaining focused on the achievement of strategic goals. Adept at effectively planning, scheduling, developing and maintaining stability, functionality and efficiency with precise attention to detail. Quick to assimilate new ideas and concepts whilst demonstrating a logical and analytical approach to solving complex problems and issues and using innovative means to overcome obstacles. Meticulous and well-organised ensuring that projects are completed on time, within budget and to nothing less than the highest standard of excellence. A motivational and inspirational leader and a strong team builder. Enjoys being part of as well as managing and supporting a successful and productive team, and is passionate about environmental projects and developments. Possesses excellent interpersonal and liaison skills and is expert at communicating with professionals at all levels as well as managing both internal and external working relationships. Career Summary The following in a brief outline of skills and experience followed by a summary of projects undertaken from1997 to 2013. Between 1979 and 1996 responsibilities included multiple projects and diving jobs summarised below. Management & Administration  Organising and attending meetings on a regular basis to clarify operational requirements  Briefing all divers on the operational and contingency plans and procedures to be followed  Preparing daily progress reports for presentation to all departments and Head Office Health & Safety  Responsible for acquiring information and knowledge of all legislation relevant to working in onshore and offshore environments including ACOP (Approved Code of Practice) and Health and Safety guidelines  Overseeing diving operations to ensure that their execution complies with the legal requirements  Maintaining safety of dive team and ensuring that the diving operation is carried out from dive site equipped to deal with emergencies as per diving operation manual  Ensuring that the diving equipment is adequate and in good operating condition Technical  Working on a wide range of international projects, including NDT inspection programmes, boat landing installation projects and pipe line installations. Duties include:  Completing debris surveys, anode mapping, CP, UT and scouring  Installation of spool pieces, SBM reconnect hoses, screw anchors, J tubes, risers and clamps and completing as built surveying  Installation of MORGRIP and Smart Flanges and PLIDCO Sleeves  Decommissioning and removal of jackets and diamond wire cutting of caissons and legs  Routine inspection and maintenance of CBM  Completion of seabed surveys  Repair of water trunk line  Replacement of ball valve  Various diving jobs covering welding, burning, jack hammering, concreting and drilling for installation of piles  Summary of Projects 27/08/2013-23/12/13 BMS Smit Lamnalco, Georgia  BP Project Blue Water SPM BMS reports to the BP PLM. BMS is overall responsible for planning, permission to proceed with setting up and granting permission for vessel to conduct the tanker loading operation in general. He is the responsible person for the activity being carried out under the Diving Intervention PTW. He reports and interacts regularly with the AA on any issues to ensure the risks from all hazards are mitigated by controls to ALARP. The BMS can order the creation of the Permit and identify the hazards and control measures. (Level 1 Risk Assessment). Page 1 of 6
  • 2. 09/07/2013-10/08/13 29/11/2012-15/6/13 08/2012-09/2012 07/2012-07/2012 06/2011-08/2011 Participates in any Level 2 Risk Assessment and ensures that where other persons are involved in the task, they fully understand the scope of the work and the hazards and controls for the job by holding a toolbox talk meeting. This includes ensuring that all of those involved in the specific work activity sign off the worksite hard copy of the Permit. BMS is the focal point for all project activities and thus has overall responsibility for SHE-Q during all works and activities conducted by Smit Lamnalco employees. He will also ensure compliance with GPC and Smit Lamnalco SHE-Q policies. He has responsibility for ensuring that all levels of personnel actively support and understand their responsibilities within the GPC and Smit Lamnalco SHE-Q policies. He will publicly support all systems, procedures and initiatives in carrying out the requirements of the policies. BMS liaises daily with the GPC SUPSA Terminal OTL, BP nominated Diving Responsible Person & Diving Supervisor to ensure that the operations are conducted according to the approved project procedures, UDP BP Global Diving, IMCA Guidance and Best Industry Practices. Diving Supervisor Sub-tech Saudi Arabia Aramco Reinstate Chains and Carrie out remedial work on SPM Buoy’s # 31 # 36 # 33 Diving CS R PENSPEN KJO KCROP Project Involving the installation of Power Distribution Platforms 4 & 5 Integrated Well Jackets 6 & 7 and Control Living Platform which is part of the Joint Venture between Aramco Gulf Operations and Kuwait Gulf oil Company. Operating the KHAFJLAND HOUT Field (40km) Offshore of Kuwait / Saudi Arabia border Diving Operations C S R ALKARIM Job Description Oversee Riser And Clamp Installation Insuring Risk Evaluation Matrix, Risk Management Guidelines and other relevant Codes of Particles and HSE Guidelines are followed Daily progress reports, planning of next day’s scope of work including permits and any safety concerns that need to be discussed and evaluated SUPERVISOR FULMAR ALPHA PLATFROM NORTH SEA CLIENT TALIASMAN INDEPWNDENT OIL AND GAS EXPLORATION AND PRODUTION COMPANY Job Description Ndt Pre-Installation inspection involving. Grit blasting of weld for as-built video of MPI and measurements for the installation of horizontal clamp at 14m+ SUPERVISOR, DCN ABU DHABI CLIENT SIXCO / HYUNDIA Job Description-Integrated Gas Development Project ( IGD Project Das Island ) The scope of the Quay wall block work include construction of about 700m long Quay wall along the extended area from the existing area up to a water depth of (-) 14.0m DID. Quay wall is positioned along the inside face of the reclamations to accommodate a water depth of (-) 4.0m – 12m A crushed rock base is to be constructed in a trench to serve as a foundation of a mass concrete gravity quay wall. The quay wall is constructed by successively placing mass precast block units up to mass of approximately 100ton on the prepared base Placing of manual/hydraulic frame for levelling purposes. After placing on the rock foundation layer, a levelling staff will is used to adjust its level. The staffs are constructed of metal tubing with a plate at the bottom and survey target at the top. The staffs are kept rigidly vertical by a steel floatation which can slide on metal pipe and accommodate therefore various depths and tides. Surveyor is position shore side and communicates with Diving supervisor by UFH. Once the four corners are level the first layer crushed rock 50 – 150mm Divers will use a levelling beam. The gravel shall be accurately levelled to a tolerance of +/- 25mm. Second layer 40mm gravel etc. Placing of scour protection apron in front of the quay wall and the rock fill at the base will be part of the quay wall Page 2 of 6
  • 3. 05/2011-05/2011 SUPERVISOR, NOORDHOEK NETHERLANDS Job Description-NOGAT Project Inspection of pipeline’s and flanges, Checking for wait cost damage and free spans 04/2010-08/2010 04/2008-05/2009 SUPERVISOR, PT PATRA DINAMIKA DIVING INDONESIA Client-Total EP Indonesia Bekapi Job Description- 2010 NDT yearly Inspection Program also Replacement of subsea actuator valve SBM Full Ndt inspection from surface to seabed involving Grit blasting of welds for MPI / UT / CP / complete anode mapping IE missing / % of depletion / contact bolts / sea- bed surveys / scour surveys / check all riser clamps for missing or loses bolts, gaps etc CP / UT readings including conductors, checking of all levels for any debris and removal of any debris found, mooring rope, scaffolding tubes etc, measurements ‘from bottom of risers to sea-bed and 25Fj out, check for scour and wait coat damage, anode measurements, distances from legs to anode and distance between anodes that are required, all visual records recorded, Photograph of all welds and As-built surveys as stated in the scope of work and additional information that the Client my request or require, The inspection was of Bekapai platforms and Jacks B Q / B K / B J / B H / B L / B G –Bekapai MWP 05 / MWP.C Peciko / MWP.A Peciko / MWP .B Peciko SUPERVISOR, AQUA DIVING SHARJAH CLIENT Argas CCG Saudi Arabia Job Description - 3D Block Survey location South Safaniya 10/2008-12/2008 SUPERVISOR, SUFFOLK PETROLEUM NIGERIA Job Description - EDOP Manifolds General Visual Inspection and cleaning of valves and checking hand operational valves and function test hydraulic valves and observe operation of those valves, removal of various types’ debris. Mooring ropes, fishing net’s, scaffolding etc, As-built survey 05/2008-07/2008 12/2007-02/2008 SUPERVISOR, AQUA DIVING SHARJAH Qatar Al Khalj Field Job Description Installation of Boat Landings Grit Blasting and inspection of area for installation of boat landing, clamps to be hydra tight, As-Built survey SUPERVISOR, MASTER-TECH SINGAPORE Client SAIPEM Location BP Tangguh Job Description-Installation of 24”18”&10” Risers & Clamps Measurements taken and areas mark out and grit blasted for placement of riser clamps 1st stage in accordance with scope of work for installation of clamps using hydra tight Risers are installed according to scope of work which has been agreed by Parties 08/2007-11/2007 SUPERVISOR, HALLIN MARINE SINGAPORE Job Description 36” Pipeline Installation Instalment of Stinger and stinger Checks pipeline profile, removal of stinger 07/2006-06/2007 SUPERVISOR, CCC DLB 750 Pipeline Installation DLB 1000 Installation of Risers, Clamps & Spool Pieces SEP 150 free span correction 07/2006-08/2006 04/2006/06/2006 SUPERVISOR, C.D.I.SS. QATAR Job Description Installation 42”/38”/30”pipelines and tie-in Spool Pieces Laying of Concrete support blocks 10Ft long 4Ft Wide for pipelines with steel tube Insert’s for separation SUPERVISOR, PT KOMARITIM JAKARTA Pipeline Trenching & Screw Anchor Installation 01/2004-10/2005 SUPERVSOR,CCC Working on Various Projects from DLB 750, PLB-648 Qatar, SEP 250 and DLB 1000 Pipeline laying, Risers and Clamps, Free span corrections, As-built surveys of pipeline Page 3 of 6
  • 4. 10/2003-11/2003 SUPERVISOR, HALLIN MARINE BP Con Son Gas Project Vietnam Pipeline installation involving beach pull 06/2003-09/2003 SUPERVISOR, CCC DLB 1000 installation of SBM Plem and anchors 03/2003-04/2003 SUPERVISOR, FRASER SINGAPORE Rectification work for Sing Tel on telephone cable 01/2002-02/2003 SUPERVISOR, CCC Projects: 150 and Naash 4302 Free span corrections 36” and 16” pipelines using grout bags 08/2001-11/2001 SUPERVISOR, NOORHOEK SINGAPORE TAIWAN Decommissioning of 4 Jackets Job Description Removal of riser/conductors and caissons equipment used broco burning and diamond wire cutting hydraulic machine 07/2001-08/2001 SUPERVISOR, GLOBAL BATAM INDONESIA Arco China NDT Inspection of damage caused by supply vessels to VDM and Horizontal 04/2001-06/2001 Going into leg A SUPERVISOR, GLOBAL BATAM INDONESIA Tambang West Natuna Pipe Laying, stinger checks and removal of stinger 06/2000-02/2001 SUPERVISOR,QSS Shore Team Work involving Daily maintenance, week, Monthly, Six Monthly, and yearly inspection of CBM, SPM, Inspection and Maintenance program. Yearly inspection of quay wall Assist Tankers with pick up of SPM floating hoses and CBM subsea hose and release and inspection after, Rig moves at Ras Laffan, Work daily reports, time sheets and other General reports and duties 03/2000-04/2000 SUPERVISOR, COMEX FRANCE Location Escravos Nigeria Charlie Cobb Jack up Job Description Removal of risers 08/199-12/1999 04/1999-07/1999 SUPERVISOR, OCEANEERING Location Cabinda Angola C B L 101 EPTM Job Description Risers and clamp installation and flare stack DLB Polaris North Nembia Job Description installation of Top package of Jack work involved removal of matting flood ladder hydraulic hose and matting flood ladder hydraulic hose, Bouncy tanks etc SUPERVISOR FRASER Location INDIA JAMNAGAR REGINA 250 Job Description Plem & Plem anchors and SBM Installation 01/1997-01/1999 SUPERVISOR, ADAMS ARAMCO Seabed Surveys / Rig Moves / Inspections of jacks, pipelines checking for free spans, grout and placement of cement bags for correction of free spans, Buoying of pipeline for rig moves / Rig leg inspections etc 05/1997-08/1997 ASSISTANT LST / SAT DIVER, OCEANEERING DUBAI Egypt Petro Jet 12 Job Description installation of 42” pipeline, attachment of davits, Flange alignment, Ax-ring, Hydra tighten etc 01/1997-04/1997 ASSISTANT SUPERVISOR, ADAMS ARAMCO Job Description Pipeline laying stinger checks, Rig moves, Jack inspection, Debris surveys and removal 09/1996-11/1996 LEAD DIVER, OCEANEERING OMAN Page 4 of 6
  • 5. SBM Change Out & Installation 06/1996-07/1996 DIVER, OCEANEERING DUBAI DPC NDT Yearly Inspection 04/1996-05/1996 LEAD DIVER, TAYLOR INTERNATIONAL Bombay Rava Field 01/1996-05/1996 SAT DIVER, OCEANEERING DUBAI KHARG Pipeline Alignment 10/1995-12/1998 DIVER, CCC ABU DHABI Free span corrections, Jack and Gosp inspections, Removal of Risers and boat landings as well installation of both, Grouting, pipeline inspections and installation, Hydra tight, Installation of Morgrip, Plidco Sleeves and various other jobs 01/1995-09/1995 DIVER, QSS QATAR Jacket & Pipeline Inspections 09/1994-12/1994 DIVER, CCC ABU DHABI Pipeline and jack Inspection, sea bed surveys 07/1994-08/1994 DIVER, ADAMS ARAMCO SAUDI ARABIA Job Description Replacement of 6 x 36” Ball Valve at J-trestle 01/1994-04/1994 SAT DIVER, OCEANEERING DUBAI Installation of Coflexip Control Umbilical 02/1993-12/1993 DIVER, CCC ABU DHABI Spool Piece Installation / Pipeline / Inspection etc 09/1992-12/1992 SAT DIVER, QSS QATAR NDT Jacket Inspection 03/1990-06/1992 DIVER, ROCK WATER DUBAI, INDIA Pipeline Trenching 02/1989-01/1990 DIVER, WHARTON WILLIAM’S SHARJA MV Boa Canpus SBM change out 01/1987-12/1989 DIVER, SHEPERHERD HILL The building of Jersey St Helier Pier 02/1985-05/1987 DIVER, BURMAC SCOTLAND Various civil diving jobs / British Rail Bridge Program 04/1983-12/1985 DIVER, ALGOSABI SAUDI ARABIA Various Projects rig moves/pipeline inspection/jack inspection/debris removal/rig leg inspection/free span corrections/Ndt inspection on jackets UT.CP.D.METRE Readings anode depletion 01/1979-10/1982 DIVER, FOX DIVING SCOTLAND Various civil Diving jobs Education and Qualifications ROV Systems Auditing and Assurance Course OGP NEBOSH Hyperbaric Centre SINGPORE Client Worksite Representative International Diploma in Occupational Health and Safety - Currently Studying NEBOSH International General Certificate in Occupational Safety & Health Parts 2 & 3 (2012) IMCA IMCA IMCA Diving Supervisor Number 5807 UK/Norway; Assistant Mixed Gas Supervisor : Saturation Diver Part 2 ADGAS Advance Safety Audit Course UNIFY Completed 2012. Expires 22 July 2015 Authorised Gas Testing Level 2v9/3v9 (OPITO Approved ) TALISMAN Task Risk Assessment ISSOW Roles and Responsibilities Page 5 of 6
  • 6. BOSIET Including Additional Modules OLF Dual Citizenship British & Canadian Page 6 of 6
  • 7. BOSIET Including Additional Modules OLF Dual Citizenship British & Canadian Page 6 of 6