  1. 1. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 1 CHEE WONG – Civil & Structural Engineer PE (Mal), NPER (Aust), BE (Civil) A: 59 Balgownie Cres, Parkinson, QLD 4115 H: 07 3272 6441 M: +6012 7130 197 (currently working in Malaysia) E : cswong63@gmail.com (preferred); or cswong@ecoworld.my Summary With extensive experience in all aspects of project engineering and management, regularly demonstrating capabilities in implementing projects from design phase through to practical completion. Instrumental in liaising closely with multi- disciplinary teams, coordinating engineering and construction activities, influencing all phases of the projects. Strengths include delivering a wide range of structures and infrastructure projects on time and within budget. Possesses significant experience in both Australia and Malaysia design and inspections in building & civil structures, foundations & piling, access road, water and waste water pipelines, sewage treatment plants and also building services. A conscientious and dedicated team player enjoys identifying issues and generating practical solutions to ensure the successful completion of all projects. Liaises closely with stakeholders to ensure requirements from all parties are well informed and satisfied. A proven ability to understand the specific needs of a project through utilising an extensive range of transferrable skills and comprehensive knowledge of project development. Education and Professional Registrations  BE (Civil) University of New South Wales, Australia  Member of The Institution of Engineers Australia – NPER and CPEng  Registered Professional Engineer of Queensland - RPEQ  Registered Professional Engineer of Board of Engineers Malaysia - PE  Member of the Institution of Engineers Malaysia - MIEM Professional Experience EcoMajestic of Ecoworld Development Group Bhd. (Malaysia) Jul2016 - Present Township Developments on land area of more than 1500 acres (EcoMajestic & EcoForest) As assist. GM in EcoMajestic – Managing/Facilitating 1. Technical Departments, namely Project Planning, Project Implementation and Contract Administration. This includes management of external Consultants and Contractors 2. Ecoworld Residence Club - Handing over vacant possession and customer management 3. Sales and Marketing Departments - provide the necessary as required and help in promotion of sales of properties
  2. 2. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 2 EcoSprings & EcoMajestic of Ecoworld Development Group Bhd. (Malaysia) Nov2013 – Jun2016 Township Development on a land area of more than 1000 acres As Senior Project Manager/Technical Head in project implementation – managing project schedule and workforce for stages of targeted completion times as well as managing design-construction interphase works in residential and commercial construction works. Key responsibilities included:  Project management for work package which included, but not limited to, quality checks according to technical specifications & drawings for earthworks, access road, drainage, pipelines, civil & building structural works and work progress monitoring. Also on recordings and reporting and stakeholders management;  Design-Construction interface works on design approach and construction drawings details with Designer and Contractors  Review and complete QA documentation from Contractor as detailed in Project Quality Plan which includes Safe Working Method Statement’s (SWMS), Work Method Statement’s (WMS), Inspection Test Plans (ITPs), Workshop & Construction drawings, Test Results, Request for Information (RFI) and Non Conformance Reports (NCRs);  Review Contractor’s work progress; Liaise & chair site meetings with multi- disciplinary Consultants and Contractors;  Provide work progress updates, reporting and recordings of the construction works to Contract Administrator and Finance Department;  Discuss and issue Site Instructions, Contract Notices and Variation of Work to the Contractor;  Resolve design/construction site constraints and concerns;  Working closely with HSE Officer and Supervisors implementing and enforcing HSE requirements around all workplaces Career Gap Year Dec2012-Oct2013 GHD Pty. Ltd. Oct-Nov2012 Yelgun to Chinderah Road Upgrade (RMS-NSW) – Structural Inspector Bridge Structures Rectification – Abutment, Bearing Pads, Approach Slabs As Structural Inspector on rectification works for 3 nos of bridges at end of defect liability period. Responsibility included detail studies, liaison, discussion, site inspections, verifications, recording and reporting progressively of the rectified structural components for Client (RMS) according to requirements in Construction Drawings from an Independent Engineering Consultant with Principal Contractor (Abi Group) and RMS Representatives. GHD Pty. Ltd. 2011-2012 Gladstone Area Water Board (GAWB) Curtis Island Water and Sewerage Infrastructure (FIFO work) Construction of the potable water supply and sewerage services to and from Curtis Island with HDPE pipelines including associated infrastructures. A site-based Project Engineer (representing the Client, GAWB) responsible for structures, civil & buildings inspections and quality control, resolution of site issues for the project during the Construction Phase. Key responsibilities included:
  3. 3. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 3  Project management for work package which included, but not limited to, QA/QC checks according to technical specifications & drawings for earthworks, access road, drainage, pipelines, civil & building structural works and work progress monitoring. Also on recordings and reporting and stakeholders management;  RPEQ for steel & concrete building structures – including certification sign off and completion of Form 16;  Design-Construction interface works on design approach and construction drawings details with Designer and Contractors  Review and complete QA documentation from Contractor which includes Safe Working Method Statement’s (SWMS), Work Method Statement’s (WMS), Inspection Test Plans (ITPs), Workshop & Construction drawings, Test Results, Request for Information (RFI) and Non Conformance Reports (NCRs);  Liaise, chair & minute site meetings with Stakeholder and Contractors;  Provide work progress updates, reporting and recordings of the construction works;  Discuss and issue Site Instructions, Contract Notices and Variation of Work to the Contractor;  Resolve design/construction site concerns.  Continuous collaboration with both Client-side and Main Contractor’s Safety Officers on safety concerns and good practices around workplaces as safety is everybody’s responsibility Achievements:  Worked collaboratively with the design and construction teams to enhance and develop a mutually beneficial outcome for the company and client;  Good coordination with a team of Engineers of various disciplines (Chemical, Water, Electrical, Mechanical and Civil);  Excellent working relationship with the Principal Contractor and Sub-Contractors (Pipelines, Piling, Plumbing, Electrical, Mechanical, Structural and Civil) ensuring work progress, resolving site constraints with practical solutions involving design changes and material sourcing;  Resolved design construction issues and developed solutions which met Client and Stakeholders’ requirements;  Improved and completed QA documentations such as reviews, signoffs, Site Instructions & Variation Work records;  RPEQ signoff for all building structures  Coordination with Safety Officer and Environmental Engineer for both the team and the contractors during construction phase to ensure site safety is understood and requirements adhered to. Observed and reported on work procedures as required;  Complete record of work progress by way of progress reports and photographs etc. GHD Pty. Ltd. 2010-2011 Northern Network Alliance (NNA) Northern Pipeline Interconnector (NPI Stage 2) Water supply pipeline construction from Brisbane to Noosa, as part of the SEQ Water Grid, for drought mitigation. The Project stretched from North Pine areas to Noosa. Stage 2 was the construction of 48kms of 1200mm diameter mild steel cement lined pipe from Eudlo to Noosa. Construction included Facilities such as water quality boosting stations, pump stations, reservoirs, chemical dosing and other associated buildings in Cooroy, Nambour, Ferntree, Chevallum, Landsborough, Eudlo, Narangba and North Pine.
  4. 4. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 4 Performed three site-based roles –  Independent Quality Verifier (on behalf of the Client, LinkWater) for pipelines and facilities construction with associated infrastructures, roads and drainage etc.  RPEQ Structural Inspector (on behalf of the Alliance) for all steel and reinforced concrete structural works.  Coordinate and oversee CCTV inspections of all pipelines to confirm pipe cleanliness and general joint integrity fulfilling requirements by LinkWater. Key responsibilities included:  FORM 16 certification involving inspection to both sub-structures and super- structures of all buildings, pits, blockwalls and retaining walls etc. which consist of reinforced concrete, steel and aluminum members;  Quality verification involving inspections of structures for all the sites to ascertain construction methodologies, materials and processes used are in accordance with the design documentation, relevant Specifications and Construction Execution Procedures, as well as QA Documentation, ITP’s and Verification Checklists for Civil, Structural Works and Pipelines;  Check and comment on Alliance’s QA documentation process and progress;  Observe site construction methods, and report any deviation from SWMS, WMS and HSE policies and procedures. Take immediate action if deemed necessary;  Prepare monthly reports on Quality Verification of the Alliance work for the Client;  Lead, coordinate and report on CCTV inspection works on pipeline cleanliness for all laid pipes. Achievements:  Developed time saving processes by reducing double handling, identifying required rectifications through inspections and monitoring during the preconstruction phase;  Built a strong rapport between the Client, Construction Quality team and Construction teams through fostering good coordination, and cooperation by working closely with all parties and resolving difference in opinion. Took time to explain the concepts and fundamental principles behind the requirements, and motivated the team by showing appreciation and reporting work done well;  Signed off and issued Form 16 for structural works of all constructed buildings GHD Pty. Ltd. 2009-2010 Department of Defence Oakey Multi-Role Helicopter Facilities Construction of hangars and facilities structures (both concrete & steel) with associated infrastructures and building services (mechanical & electrical) for Oakey Army Aviation Centre. Worked as a Coordinator (design-construction interface) on multi-discipline project, coordinating and responding to RFI. Responsible for Checking on structural details during the construction phase. Key Responsibilities included:  Coordinated responses to Contractor’s RFI’s in a timely and precise manner through organised discussions/negotiation with members of Design Team consisting of Architects and various engineering disciplines;  Conducted reviews on structural Workshop Drawings which included meetings with fabricators to clarify design intent, product and finish requirements;  Attended regular meetings with external Project Managers and Contractors to provide resolutions and clarifications on RFIs and requirements;  Check and redesign structural details, as necessary, to suit site condition, which included coordination of multi-disciplinary drawings.
  5. 5. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 5 Achievements:  Established and managed a RFI reply process minimising time taken to provide a response through prioritisation, negotiation, monitoring, understanding fundamentals of requirements and coordination among team members;  Communicated directly with fabricators (with prior agreement of Principal Contractor) on details and requirements to successfully provide clarification on doubts/discrepancies to prevent unnecessary time lost. This created a smoother work process in both fabrication and construction stages to improve project progress. Previous Professional Experience Project Director – Perunding YSL Sdn. Bhd. (Malaysia) 1995-2008 Project managements in both design phase and construction phase of the civil & structural engineering aspects which comprised of water and waste water systems, pumping stations, sewage treatment plants, drainage systems, roads and structures in residential, commercial, industrial & recreational developments by renowned Developers like Sunway City Bhd. and YTL Corporation Bhd. and others. Key Responsibilities included:  Design & drawings reviews, certifications/sign-offs. Submissions to and obtain approvals from Local Councils and/or Public Works Department;  Close liaison/dealings with Client, Stakeholders, Government Authorities, Architects, M&E Engineers, Principal and Specialist Contractors;  Technical specification preparation, tender documentation, tender evaluation and contract administration works;  Chaired or attended regular Client-Consultant meetings and Site meetings on progress of works, provide resolutions, clarifications and specific requirements;  Periodical site inspections and discussions with Clients’ Representatives, Authorities’ Inspectors/Certifiers and Contractors. Work included handing over constructed infrastructures, like roads, drainage, water and sewerage systems, to relevant Local Councils and Utilities Departments;  Managed RFI responses, design/drawing amendments initiated by Client and/or Contractor on changes in concepts or site constraints;  Final signing-off of inspected works for both infrastructures and building structures as required for Certificate of Occupancies issued by relevant Authorities;  Managed a team of 15 people consisted of Engineers, Technical Assistance, Drafters and Administration Assistance. Achievements:  Worked collaboratively with various teams of multi-discipline professionals to enhance and develop a mutually beneficial outcome for the company and Clients. Majority of the Clients were repeat-Client as they had the confidence and trust built up through the way issues were managed;
  6. 6. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 6  Maintained good working relationship with the Principal and Specialist Contractors and Sub-Contractors ensuring work progress, resolving site constraints with practical solutions;  Built excellent rapport with Government Authorities through fulfillment of obligations, good QA management and well informed reporting;  Ensured Clients’ requirements were not compromised;  Encouraged Design Engineers to continuously improve the design and drawing details with feedback and onsite discussions with experienced tradesmen. Design/Project Engineer – Zath Perunding Sdn. Bhd. (Malaysia) 1990-1994 Diligently worked as Design & Project Engineer from design through to completion of construction in the aspects of water reticulation systems, roads & drainage and structures for developments of residential and commercials. Key Responsibilities included:  Design & drawings productions, submissions to, liaison and obtain approvals from Local Councils and/or Public Works Department;  Close liaison/dealings with Client, Stakeholders, Government Authorities, Architects, M&E Engineers, Principal and Specialist Contractors;  Attended regular Client-Consultant meetings and Site meetings on progress of works, provide resolutions, clarifications and specific requirements;  Periodical site inspections and discussions with Clients’ Representatives, Authorities’ Inspectors/Certifiers and Contractors. Work included handing over constructed infrastructures, like roads, drainage, water and sewerage systems, to relevant Local Councils and Utilities Departments;  Managed RFI responses, design/drawing amendments initiated by Client and/or Contractor due to changes in concepts or site constraints;  Preparation of QA documentations for inspected works of both infrastructures and building structures for submissions to relevant Authorities;  Managed a handful of Technical Assistance, Drafters and Administration Assistance. Achievements:  Worked well with various teams of multi-discipline professionals to enhance and develop a mutually beneficial outcome for the company and Clients.  Maintained good working relationship with the Principal and Specialist Contractors and Sub-Contractors ensuring work progress, resolving site constraints with practical solutions;  Ensured Clients’ requirements were not compromised;  Continuous improvements in design and drawing details through feedback and onsite discussions with experienced tradesmen;  Successful in attaining Professional Engineer status (in year 1994) which has the capacity to sign off project/development submissions to Government Authorities. Languages  English  Chinese  Bahasa Malaysia
  7. 7. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 7 Interests  Travel  Cooking Referees  Available on request

×