CHAPTER 5
ADVANCED SURVEYING EQUIPMENT
(14 MARKS)
INTRODUCTION
In conventional surveying, chain and tape are used for making linear
measurements while compass and ordinary theodolites are used for
making angular measurements. Levelling work is carried out using a
Dumpy level and a leveling staff. With such surveying instruments,
survey work will be slow and tedious.
Hence modern surveying instruments are becoming more popular and
they are gradually replacing old surveying instruments such as
compass and Dumpy level. With modern surveying instruments,
survey work will be precise, faster and less tedious. Some of the
modern surveying instruments are discussed in this article.
ADVANCED SURVEYING EQUIPMENTS
ELECTRONIC DISTANCE
METER(EDM) MICROOPTIC THEODOLITE
ADVANCED SURVEYING EQUIPMENTS
ELECTRONIC/DIGITAL
THEODOLITE
TOTAL STATION
PRINCIPLE OF EDM
 Let the distance between P and Q be ‘D’ which is to be measured.
A wave transmitted from the transmitter at station ‘P’ with certain phase angle.
 There is a reflector at the other end ‘Q’ Reflector consist of prism. The wave strikes
on reflector at Q and then gets reflected from Q.
 It is received back at the transmitter end at ‘P’ with different phase angle.
 For finding the distance, the phase difference between transmitted and reflected
waves is measured and converted into distance.
PROCEDURE OF USING EDM
 Let distance AB is to be measured.
 Set EDM at station A. Touch ON/OFF switch. Display panel will give
reading 0.0.
 Hold the reflector at B
 Telescope of EDM sighted towards B with cross hair at center of
reflector.
 Press Range or Enter switch and in few seconds, distance will be
displayed.
 Distances displayed will be horizontal distance and sloping distance
between A and B, also elevation difference between A and B.
USES OF EDM
It is useful for measuring the distances
that are difficult to access.
It is useful in topographical survey.
It is useful in fixing alignment of road,
railways, canals etc.
Measurement of distances in difficult
work sites such as construction of
gravity dams.
Measurement of base line in
triangulation survey can be carried out
speedily and accurately.
MICROOPTIC THEODOLITE
MICROOPTIC THEODOLITE
https://youtu.be/tx19ne2InDM
MICROOPTIC THEODOLITE
Angle -
94°12’44’’
Main scale
reading- 94°10’
Micrometer
reading - 0°2’44’’
i) Set up the instrument at station O’ as
shown in fig.
ii) Carry out centering and leveling of the
instrument with the help of optical plummet
and leveling screw respectively.
iii) Bisect the object using micrometer knob.
iv) Take reading of angle on window.
PROCEDURE OF MEASURING ANGLE
BY MICROOPTIC THEODOLITE
ELECTRONIC/ DIGITAL THEODOLITE
https://youtu.be/PH_OLQq5Qc0
FEATURES OF ELECTRONIC/ DIGITAL THEODOLITE
Dual side display and keyboard with
push button keys
Built in illumination for night operation
Rechargeable Ni-Cd battery with auto
power cut off.
Compatibility with EDMs
COMPONENT PARTS OF
ELECTRONIC/ DIGITAL THEODOLITE
Components Purpose
Levelling head Support the theodolite and enable leveling of
instrument.
Clamping screw To controlled the circular motion of telescope.
Telescope To bisect the object.
Plate level To check the leveling of instrument.
Optical plummet Centering of the instrument.
PROCEDURE OF MEASURING ANGLE BY
ELECTRONIC/ DIGITAL THEODOLITE
1)Taking out digital theodolite for box
and fix it on tripod over required station.
2) Accurate centering and approximate
leveling by leg adjustment is done.
3) Levelling the digital theodolite using foot
screws by usual method i.e. plate level
parallel to pair of foot screw and
perpendicular position
PROCEDURE OF MEASURING ANGLE BY
ELECTRONIC/ DIGITAL THEODOLITE
4) Focusing of eyepiece and object glass is done using
eyepiece and focusing screws.
5) Switch on the digital theodolite.
6) Direct the telescope toward the object of which angle is
to be measured say A, bisect it. Clamp the instrument,
accurate bisection is done by slow motion screw.
7) Press hold button, LCD gives required vertical angle
from zenith point or horizontal plane as per setting of the
instrument.
TOTAL STATION
TOTAL STATION
TOTAL STATION
1) Measurement of horizontal, slope and vertical
distance can be accurately found out.
2) It gives the complete basic surveying exercise in
order to appreciate how land survey measurements
can be used in engineering construction and
environmental restoration activities.
3) Vertical and horizontal angles can be accurately
measured by total station.
TOTAL STATION
4) Increasingly used now a days for levelling operation
in road, airport etc. public works.
5) Useful for preparing contour map
6) Setting out work can be carried out accurately with
help of total station.
1. High accuracy.
2. Long measuring range.
3. Large internal memory.
4. It is water resistance and dust proof.
5. Easy access to any desired programme and mode of
selection.
6. Try axis compensation.
FEATURES OF TOTAL STATION
FEATURES OF TOTAL STATION
7. Easy to read arrangement.
8. Automatic atmospheric correction.
9. Guide message arrangement.
10. Higher distance resolution.
11. Two speed tangent movement.
12. Detachable tribrach facility.
13. Eighteen different programmes (modes of
measurements).
TEMPORARY ADJUSTMENTS TOTAL STATION
Setting on tripod and centering through
laser plummet
Approximate levelling by tripod legs
Accurate leveling with foot screws
Focusing eyepiece and object glass
TEMPORARY ADJUSTMENTS TOTAL STATION
Checking plate level time to time during
measurement
Station set up
Back sighting
TEMPORARY ADJUSTMENTS TOTAL STATION
Station set up
It includes entering name of point ,
independent coordinates , reduced
level and height of instrument at
instrument station in total station.
TEMPORARY ADJUSTMENTS TOTAL STATION
Back sighting
It means selecting a reference point to form
the basis for the angular direction and
bisecting it and entering its details like name ,
elevation, height of prism, etc.
This work must be carried out with prism
mode for accurate measurement.
FUNCTION KEYS OF TRIMBLE M3 TOTAL STATION
FUNCTION KEYS OF TRIMBLE M3 TOTAL STATION
MEASUREMENTS USING TRIMBLE M3 TOTAL STATION
Select Station set up and enter details
Select ‘Job’ and create job by entering
details
Carry out all temporary adjustments
Select ‘General survey’ form menu
MEASUREMENTS USING TRIMBLE M3 TOTAL STATION
Carry out back sighting
Select measure point and bisect the
required point and select ‘Measure’ on
screen
Select Measure tab on screen
MEASUREMENTS USING TRIMBLE M3 TOTAL STATION
In a few seconds Horizontal angle, slope
distance, vertical angle will be displayed
on screen
Also horizontal distance, vertical
distance, northing , easting can be seen
by selecting side arrow
These details can be stored by selecting
‘store’
LAYOUT OF SMALL BUILDING USING TOTAL STATION
1. On the plan supplied by an architect, number the
column serially from left to right and top to bottom
starting from top left corner.
2. Work out coordinates of column centre with
respect to one plot corner or well defined point,
assuming line parallel to any one face of building as
meridian.
3. Create an excel document with 4 independent
columns one for column number and rest three for
N, E & H coordinates. Upload this file to total station
by using transfer software provided with
instrument.
LAYOUT OF SMALL BUILDING USING TOTAL STATION
4. Set the total station at site at a point with respect
which the coordinates of column centre are work
out. Initiate the total station by proving with the
coordinates of station and by orienting the
telescope along the reference meridian.
5. Now, activate the setting out programme of the
total station. Open the uploaded file & bring in the
coordinates of any column to be set out.
6. Hold prism pole at tentative position of that
column on ground, bisect it & get measured its
coordinates.
LAYOUT OF SMALL BUILDING USING TOTAL STATION
7.In next reading machine will display the discrepancies
in the coordinates of the point & point to be set out.
8.Direct the reflector man accordingly to occupy the
new position, bisect him again & get measured its
coordinates to know the discrepancy.
9.Repeat the process till you get no discrepancy in the
coordinates of point occupied & point to be set out. In
this way get marked centres of rest of the columns.
10. Check the accuracy of the process of setting out by
comparing the diagonal distance between the extreme
column centres to their calculated values.
CONTOUR MAP USING TOTAL STATION
1. Preliminary set up –
Fix the total station over a station and level
it.
Press the power button to switch on the
instrument. level instrument using
electronic vial. Set bisection target as
prism.
Select MODE B -------> S function------->file
management------>create (enter a name)----
--->accept.
Then press ESC to go to the starting page.
CONTOUR MAP USING TOTAL STATION
2. Then go to S function ------> measure----->
rectangular co-ordinate---->station --- >press enter.
Here enter the point number or name, X,Y,Z co-
ordnates, instrument height and prism code. Then
press accept (Fs)
3. Adopt Cross section method for establishing the
major grid around the study area. Project suitably
spaced cross sections on either side of the centre
line of the area. Choose several points at
reasonable distances on either side.
4. Orient the instrument to the magnetic north, or
any other referance direction. Then set zero by
double clicking on 0 set (F3).
CONTOUR MAP USING TOTAL STATION
5. Keep the reflecting prism on the first point and
turn the total station to the prism, focus it and
bisect it exactly using horizontal and vertical
clamps. Then select MEAS and the display panel
will show the point specification. Now select edit
and re-enter the point number or name point code
and enter the prism height that we have set.
6. Then press MEAS/SAVE (F3) so that the
measurement to the first point will automatically
be saved and the display panel will show the
second point. Then turn the total station to second
point and do the same procedure. Repeat the
steps to the rest of the stations and get all point
details.
CONTOUR MAP USING TOTAL STATION
7. Transfer the data stored in file to computer in
the appropriate format.
8. Using appropriate application software, contour
map will be prepared.
Thank you!

More Related Content

What's hot

Theodolite surveying part1
Theodolite surveying part1Theodolite surveying part1
Theodolite surveying part1Naufil Sayyad
 
Theodolites
TheodolitesTheodolites
Theodolitesillpa
 
Welcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationWelcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationShashank Javalagi
 
Total station Surveying
Total station SurveyingTotal station Surveying
Total station SurveyingKiran M
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying neharajpl
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying pptNaufil Sayyad
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveyingMujeeb Muji
 
Theodolite & measurment
Theodolite  & measurmentTheodolite  & measurment
Theodolite & measurmentMahendra meena
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basicsSavitha Pradeep
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTUVATSAL PATEL
 
Modern surveying instruments
Modern surveying instrumentsModern surveying instruments
Modern surveying instrumentsAditya Mistry
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptxSaddoAjmal
 

What's hot (20)

Theodolite surveying part1
Theodolite surveying part1Theodolite surveying part1
Theodolite surveying part1
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
Theodolites
TheodolitesTheodolites
Theodolites
 
Welcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationWelcome to the presentation on ‘total station
Welcome to the presentation on ‘total station
 
Total station Surveying
Total station SurveyingTotal station Surveying
Total station Surveying
 
GPS Surveying
GPS SurveyingGPS Surveying
GPS Surveying
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
 
Theodolite & measurment
Theodolite  & measurmentTheodolite  & measurment
Theodolite & measurment
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basics
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Total station
Total stationTotal station
Total station
 
Module 1 tacheometry
Module 1 tacheometryModule 1 tacheometry
Module 1 tacheometry
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
 
Traversing
TraversingTraversing
Traversing
 
Modern surveying instruments
Modern surveying instrumentsModern surveying instruments
Modern surveying instruments
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 

Similar to Advanced Surveying Equipment Guide

Lecture total Station Theory
Lecture total Station TheoryLecture total Station Theory
Lecture total Station TheoryBahzad5
 
Total Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfTotal Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfDenish Jangid
 
Total station surveying and its application
Total station surveying and its applicationTotal station surveying and its application
Total station surveying and its applicationChavanRavishankar
 
Tacheometry survey of detailing
Tacheometry survey of detailingTacheometry survey of detailing
Tacheometry survey of detailingSuman Jyoti
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfNkosiAnsari
 
Total_station_and_its_application_in_sur.pptx
Total_station_and_its_application_in_sur.pptxTotal_station_and_its_application_in_sur.pptx
Total_station_and_its_application_in_sur.pptxrahulsharma76abc
 
Surveying,ADVANCE EQUIPMENT IN SURVEY
Surveying,ADVANCE EQUIPMENT  IN SURVEYSurveying,ADVANCE EQUIPMENT  IN SURVEY
Surveying,ADVANCE EQUIPMENT IN SURVEYPRAJWAL SHRIRAO
 
Total station Advanced Surveying Instrument
Total station Advanced Surveying InstrumentTotal station Advanced Surveying Instrument
Total station Advanced Surveying Instrumentsapna80328
 
Lecture 09 total station instruments and angle observations
Lecture 09 total station instruments and angle observationsLecture 09 total station instruments and angle observations
Lecture 09 total station instruments and angle observationsAwais Ahmad
 
Total station
Total stationTotal station
Total stationSumit Jha
 
Leveling basic surveying third year engineering
Leveling basic surveying third year engineeringLeveling basic surveying third year engineering
Leveling basic surveying third year engineeringKetan Mahajan
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
 
Modern Surveying Instrument.pptx
Modern Surveying Instrument.pptxModern Surveying Instrument.pptx
Modern Surveying Instrument.pptxmrunmayee20
 
total station topo III.pptx
total station topo III.pptxtotal station topo III.pptx
total station topo III.pptxmaritzaDazOrtz
 

Similar to Advanced Surveying Equipment Guide (20)

Lecture total Station Theory
Lecture total Station TheoryLecture total Station Theory
Lecture total Station Theory
 
Total station .pptx
Total station .pptxTotal station .pptx
Total station .pptx
 
Total station .pdf
Total station .pdfTotal station .pdf
Total station .pdf
 
Total Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdfTotal Station by Denis Jangeed.pdf
Total Station by Denis Jangeed.pdf
 
Total station surveying and its application
Total station surveying and its applicationTotal station surveying and its application
Total station surveying and its application
 
Tacheometry survey of detailing
Tacheometry survey of detailingTacheometry survey of detailing
Tacheometry survey of detailing
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdf
 
Total_station_and_its_application_in_sur.pptx
Total_station_and_its_application_in_sur.pptxTotal_station_and_its_application_in_sur.pptx
Total_station_and_its_application_in_sur.pptx
 
Surveying,ADVANCE EQUIPMENT IN SURVEY
Surveying,ADVANCE EQUIPMENT  IN SURVEYSurveying,ADVANCE EQUIPMENT  IN SURVEY
Surveying,ADVANCE EQUIPMENT IN SURVEY
 
Total station Advanced Surveying Instrument
Total station Advanced Surveying InstrumentTotal station Advanced Surveying Instrument
Total station Advanced Surveying Instrument
 
Total Station.pptx
Total Station.pptxTotal Station.pptx
Total Station.pptx
 
MODERN SURVEYING TECHNIQUES
MODERN SURVEYING TECHNIQUESMODERN SURVEYING TECHNIQUES
MODERN SURVEYING TECHNIQUES
 
Lecture 09 total station instruments and angle observations
Lecture 09 total station instruments and angle observationsLecture 09 total station instruments and angle observations
Lecture 09 total station instruments and angle observations
 
Total station
Total stationTotal station
Total station
 
Leveling basic surveying third year engineering
Leveling basic surveying third year engineeringLeveling basic surveying third year engineering
Leveling basic surveying third year engineering
 
Total Station surveying
Total Station surveyingTotal Station surveying
Total Station surveying
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 
Modern Surveying Instrument.pptx
Modern Surveying Instrument.pptxModern Surveying Instrument.pptx
Modern Surveying Instrument.pptx
 
total station topo III.pptx
total station topo III.pptxtotal station topo III.pptx
total station topo III.pptx
 
Group 1.pptx
Group 1.pptxGroup 1.pptx
Group 1.pptx
 

Recently uploaded

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationAadityaSharma884161
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 

Recently uploaded (20)

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint Presentation
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 

Advanced Surveying Equipment Guide

  • 1. CHAPTER 5 ADVANCED SURVEYING EQUIPMENT (14 MARKS)
  • 2. INTRODUCTION In conventional surveying, chain and tape are used for making linear measurements while compass and ordinary theodolites are used for making angular measurements. Levelling work is carried out using a Dumpy level and a leveling staff. With such surveying instruments, survey work will be slow and tedious. Hence modern surveying instruments are becoming more popular and they are gradually replacing old surveying instruments such as compass and Dumpy level. With modern surveying instruments, survey work will be precise, faster and less tedious. Some of the modern surveying instruments are discussed in this article.
  • 3. ADVANCED SURVEYING EQUIPMENTS ELECTRONIC DISTANCE METER(EDM) MICROOPTIC THEODOLITE
  • 5. PRINCIPLE OF EDM  Let the distance between P and Q be ‘D’ which is to be measured. A wave transmitted from the transmitter at station ‘P’ with certain phase angle.  There is a reflector at the other end ‘Q’ Reflector consist of prism. The wave strikes on reflector at Q and then gets reflected from Q.  It is received back at the transmitter end at ‘P’ with different phase angle.  For finding the distance, the phase difference between transmitted and reflected waves is measured and converted into distance.
  • 6.
  • 7.
  • 8. PROCEDURE OF USING EDM  Let distance AB is to be measured.  Set EDM at station A. Touch ON/OFF switch. Display panel will give reading 0.0.  Hold the reflector at B  Telescope of EDM sighted towards B with cross hair at center of reflector.  Press Range or Enter switch and in few seconds, distance will be displayed.  Distances displayed will be horizontal distance and sloping distance between A and B, also elevation difference between A and B.
  • 9. USES OF EDM It is useful for measuring the distances that are difficult to access. It is useful in topographical survey. It is useful in fixing alignment of road, railways, canals etc. Measurement of distances in difficult work sites such as construction of gravity dams. Measurement of base line in triangulation survey can be carried out speedily and accurately.
  • 12. MICROOPTIC THEODOLITE Angle - 94°12’44’’ Main scale reading- 94°10’ Micrometer reading - 0°2’44’’
  • 13. i) Set up the instrument at station O’ as shown in fig. ii) Carry out centering and leveling of the instrument with the help of optical plummet and leveling screw respectively. iii) Bisect the object using micrometer knob. iv) Take reading of angle on window. PROCEDURE OF MEASURING ANGLE BY MICROOPTIC THEODOLITE
  • 15. FEATURES OF ELECTRONIC/ DIGITAL THEODOLITE Dual side display and keyboard with push button keys Built in illumination for night operation Rechargeable Ni-Cd battery with auto power cut off. Compatibility with EDMs
  • 16. COMPONENT PARTS OF ELECTRONIC/ DIGITAL THEODOLITE Components Purpose Levelling head Support the theodolite and enable leveling of instrument. Clamping screw To controlled the circular motion of telescope. Telescope To bisect the object. Plate level To check the leveling of instrument. Optical plummet Centering of the instrument.
  • 17. PROCEDURE OF MEASURING ANGLE BY ELECTRONIC/ DIGITAL THEODOLITE 1)Taking out digital theodolite for box and fix it on tripod over required station. 2) Accurate centering and approximate leveling by leg adjustment is done. 3) Levelling the digital theodolite using foot screws by usual method i.e. plate level parallel to pair of foot screw and perpendicular position
  • 18. PROCEDURE OF MEASURING ANGLE BY ELECTRONIC/ DIGITAL THEODOLITE 4) Focusing of eyepiece and object glass is done using eyepiece and focusing screws. 5) Switch on the digital theodolite. 6) Direct the telescope toward the object of which angle is to be measured say A, bisect it. Clamp the instrument, accurate bisection is done by slow motion screw. 7) Press hold button, LCD gives required vertical angle from zenith point or horizontal plane as per setting of the instrument.
  • 21. TOTAL STATION 1) Measurement of horizontal, slope and vertical distance can be accurately found out. 2) It gives the complete basic surveying exercise in order to appreciate how land survey measurements can be used in engineering construction and environmental restoration activities. 3) Vertical and horizontal angles can be accurately measured by total station.
  • 22. TOTAL STATION 4) Increasingly used now a days for levelling operation in road, airport etc. public works. 5) Useful for preparing contour map 6) Setting out work can be carried out accurately with help of total station.
  • 23. 1. High accuracy. 2. Long measuring range. 3. Large internal memory. 4. It is water resistance and dust proof. 5. Easy access to any desired programme and mode of selection. 6. Try axis compensation. FEATURES OF TOTAL STATION
  • 24. FEATURES OF TOTAL STATION 7. Easy to read arrangement. 8. Automatic atmospheric correction. 9. Guide message arrangement. 10. Higher distance resolution. 11. Two speed tangent movement. 12. Detachable tribrach facility. 13. Eighteen different programmes (modes of measurements).
  • 25. TEMPORARY ADJUSTMENTS TOTAL STATION Setting on tripod and centering through laser plummet Approximate levelling by tripod legs Accurate leveling with foot screws Focusing eyepiece and object glass
  • 26. TEMPORARY ADJUSTMENTS TOTAL STATION Checking plate level time to time during measurement Station set up Back sighting
  • 27. TEMPORARY ADJUSTMENTS TOTAL STATION Station set up It includes entering name of point , independent coordinates , reduced level and height of instrument at instrument station in total station.
  • 28. TEMPORARY ADJUSTMENTS TOTAL STATION Back sighting It means selecting a reference point to form the basis for the angular direction and bisecting it and entering its details like name , elevation, height of prism, etc. This work must be carried out with prism mode for accurate measurement.
  • 29. FUNCTION KEYS OF TRIMBLE M3 TOTAL STATION
  • 30. FUNCTION KEYS OF TRIMBLE M3 TOTAL STATION
  • 31. MEASUREMENTS USING TRIMBLE M3 TOTAL STATION Select Station set up and enter details Select ‘Job’ and create job by entering details Carry out all temporary adjustments Select ‘General survey’ form menu
  • 32. MEASUREMENTS USING TRIMBLE M3 TOTAL STATION Carry out back sighting Select measure point and bisect the required point and select ‘Measure’ on screen Select Measure tab on screen
  • 33. MEASUREMENTS USING TRIMBLE M3 TOTAL STATION In a few seconds Horizontal angle, slope distance, vertical angle will be displayed on screen Also horizontal distance, vertical distance, northing , easting can be seen by selecting side arrow These details can be stored by selecting ‘store’
  • 34. LAYOUT OF SMALL BUILDING USING TOTAL STATION 1. On the plan supplied by an architect, number the column serially from left to right and top to bottom starting from top left corner. 2. Work out coordinates of column centre with respect to one plot corner or well defined point, assuming line parallel to any one face of building as meridian. 3. Create an excel document with 4 independent columns one for column number and rest three for N, E & H coordinates. Upload this file to total station by using transfer software provided with instrument.
  • 35. LAYOUT OF SMALL BUILDING USING TOTAL STATION 4. Set the total station at site at a point with respect which the coordinates of column centre are work out. Initiate the total station by proving with the coordinates of station and by orienting the telescope along the reference meridian. 5. Now, activate the setting out programme of the total station. Open the uploaded file & bring in the coordinates of any column to be set out. 6. Hold prism pole at tentative position of that column on ground, bisect it & get measured its coordinates.
  • 36. LAYOUT OF SMALL BUILDING USING TOTAL STATION 7.In next reading machine will display the discrepancies in the coordinates of the point & point to be set out. 8.Direct the reflector man accordingly to occupy the new position, bisect him again & get measured its coordinates to know the discrepancy. 9.Repeat the process till you get no discrepancy in the coordinates of point occupied & point to be set out. In this way get marked centres of rest of the columns. 10. Check the accuracy of the process of setting out by comparing the diagonal distance between the extreme column centres to their calculated values.
  • 37. CONTOUR MAP USING TOTAL STATION 1. Preliminary set up – Fix the total station over a station and level it. Press the power button to switch on the instrument. level instrument using electronic vial. Set bisection target as prism. Select MODE B -------> S function------->file management------>create (enter a name)---- --->accept. Then press ESC to go to the starting page.
  • 38. CONTOUR MAP USING TOTAL STATION 2. Then go to S function ------> measure-----> rectangular co-ordinate---->station --- >press enter. Here enter the point number or name, X,Y,Z co- ordnates, instrument height and prism code. Then press accept (Fs) 3. Adopt Cross section method for establishing the major grid around the study area. Project suitably spaced cross sections on either side of the centre line of the area. Choose several points at reasonable distances on either side. 4. Orient the instrument to the magnetic north, or any other referance direction. Then set zero by double clicking on 0 set (F3).
  • 39. CONTOUR MAP USING TOTAL STATION 5. Keep the reflecting prism on the first point and turn the total station to the prism, focus it and bisect it exactly using horizontal and vertical clamps. Then select MEAS and the display panel will show the point specification. Now select edit and re-enter the point number or name point code and enter the prism height that we have set. 6. Then press MEAS/SAVE (F3) so that the measurement to the first point will automatically be saved and the display panel will show the second point. Then turn the total station to second point and do the same procedure. Repeat the steps to the rest of the stations and get all point details.
  • 40. CONTOUR MAP USING TOTAL STATION 7. Transfer the data stored in file to computer in the appropriate format. 8. Using appropriate application software, contour map will be prepared.