SCHOOL OF ARCHITECTURE, BUILDING AND
DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
SITE SURVEYING [QSB 60103]
FIELD WORK 2 REPORT
TRAVERSING
DARREN TAN QUAN WEN 0322662
YEAP PHAY SHIAN 0322243
LEE XIN YING 0322432
MICHELLE TUNG MAN KAYE 0324175
LOH MUN TONG 0323680
LECTURER: MR. CHAI VOON CHIET
SUBMISSION DATE: 8th DECEMBER 2016
1
TABLE OF CONTENT
NO. TOPIC PAGE
1. INTRODUCTION TO TRAVERSING 2 - 3
2. OBJECTIVES 4
3. APPARATUS USED 5 - 6
4. FIELD DATA 1
4.1 Unadjusted Field Data
4.2 Average Field Data
4.3 Angular error and angle adjustment
4.4 Course Bearings & Azimuths
4.5 Course Latitudes & Departures
4.6 Adjusted Latitudes & Departures
4.7 Table and Graph of Station Coordinate
7 - 14
5. FIELD DATA 2
5.1 Unadjusted Field Data
5.2 Average Field Data
5.3 Angular error and angle adjustment
5.4 Course Bearings & Azimuths
5.5 Course Latitudes & Departures
5.6 Adjusted Latitudes & Departures
5.7 Table and Graph of Station Coordinate
15 - 22
6. FIELD DATA 3
6.1 Unadjusted Field Data
6.2 Average Field Data
6.3 Angular error and angle adjustment
6.4 Course Bearings & Azimuths
6.5 Course Latitudes & Departures
6.6 Adjusted Latitudes & Departures
6.7 Table and Graph of Station Coordinate
23 - 30
9. DISCUSSION 31
2
INTRODUCTION TO TRAVERSING
A traverse survey involves a connected sequence of lines whose length and directions
are measured. It is perhaps the most common type of control survey performed by surveyors in
private practice or employed by local government agencies. Precise traverse surveys are much
more practical nowadays with the use of electronic distance measuring (EDM) devices.
Traversing is a type of survey in which a number of connected survey lines from the
framework and the directions and lengths of the survey lines are measured with the help of an
angle measuring instrument and a tape or chain respectively. The angles are measured using
theodolites, or total stations, whereas the distances can be measured using total stations, steel
tapes or electronic distance-measurement instruments (EDMs).
There are two types of traverse:
(1) Open traverse: When the lines from a circuit ends elsewhere
(2) Closed traverse: When the lines from a circuit which ends at the starting point
3
(1) Open traverse
An open traverse is a series of measured straight lines that do not intersect or form a loop. This
lack of geometric closure means that there is no geometric verification possible with respect to
the actual positioning of the traverse stations. In route surveys, open traverse station positioning
can be verified by computation from available tied-in field markers as shown on property plans,
or through the use of global positioning system (GPS) receivers.
(2) Closed traverse
A closed traverse is connected lines that start at a point and ends at the same point or at a point
whose relative position is known. The errors during measurement are minimized and adjusted to
get accurate data. Closed traverse is the primary method used in checking surveying field work.
There are two types of closed traverse:
(a) Loop traverse – A loop traverse starts and ends at the same point, forming a closed
geometric figure called a polygon.
(b) Connecting traverse – A connecting traverse looks like an open traverse, however
the only difference is, it begins and ends at points (or lines) of
known position (and direction) at each end of the traverse.
4
OBJECTIVES
● To enhance a better understanding of the traverse process.
● To determine the area encompassed within a boundary.
● To determine the angular error and closing error of traverse conducted.
● To make necessary adjustments in obtaining an accurate data.
● To experience the life of being as a Quantity Surveyor and experience the actual
working environment.
● To help them to understand the correct way to read the reading on the theodolite
and record the data.
● To give the students a chance to familiarize with the actual working atmosphere
on the site including uncertainty situations.
● To provide them the opportunity of hands on experience of setting up the
theodolite for angle measurements.
5
APPARATUS USED
Theodolite
Theodolite is a basic surveying instrument that is commonly used in traversing. It is used to
measure horizontal and vertical angle. Theodolite is a tool used in the land surveying and
engineering industry. Moreover, it has been adapted for other specialized purposes as well.
Modern theodolites consist of telescope mounted to swivel both horizontally and vertically. The
levelling is accomplished with the aid of a spirit level and crosshairs in the telescope allow
accurate alignment with the object sighted. When the telescope is set up and adjusted precisely,
the two accompanying scales, that are vertical and horizontal, are read.
Tripod
A tripod is a device which is used to support surveying instruments. These surveying instrument
include theodolite, auto-level and so on. The tripod’s head supports the surveying instrument
whereas the feet are spiked to anchor the tripod to the ground. The level base provided will
ensure that the instrument is held securely, thus allowing accurate readings.
6
Plumb bob
A plumb bob or a plummet is a weight with a pointed tip on the bottom that is suspended from a
string and used as a vertical reference line. This instrument used in surveying to sight a point on
the ground that is not readily visible. They are used to set the instrument exactly over a fixed
datum marker, prior to taking fresh readings.
Levelling Staff
The levelling staff is simply a large ruler, available in lengths of 3, 4, or 5 metres and usually
made of aluminium with telescopic sections. The levelling staff is sectional so that can be
adjusted in length to allow for easy storage and transport. The sections have locking buttons to
ensure accurate length is maintained.
The β€œE” pattern is designed to make it easy to read a small section of the scale when see
through a telescope.
7
FIELD DATA 1
4.1 Unadjusted Field Data
Station Height of
instrume
nt (m)
Station
sight
Stadia Reading (m) Horizontal Vertical
Facing Top Middle Bottom
A 131.0 B L 143.2 131.0 118.5 94ΒΊ18’00” 90ΒΊ28’40”
R 143.2 131.0 118.0
D L 149.5 131.0 112.0 90ΒΊ06’10”
R 149.5 131.0 112.0
B 125.0 A L 137.0 125.0 112.0 71ΒΊ55’50” 89ΒΊ30’50”
R 137.5 125.0 112.5
C L 151.0 125.0 99.0 89ΒΊ56’50”
R 151.0 125.0 99.0
C 176.0 D L 184.5 176.0 167.5 61ΒΊ01’40” 88ΒΊ04’30”
R 184.5 176.0 167.5
B L 202.0 176.0 149.5 89ΒΊ33’00”
R 202.0 176.0 149.5
D 176.0 A L 194.5 176.0 157.0 134ΒΊ22’50
”
89ΒΊ13’30”
R 194.5 176.0 157.0
C L 184.5 176.0 167.5 88ΒΊ51’20”
R 184.5 176.0 167.5
8
4.2 Average Field Data
Station Height of
instrument
(m)
Station
sight
Stadia Reading (m) Horizontal Vertical
Top Middl
e
Botto
m
A 131.0 B 143.2 131.0 118.3 94ΒΊ18’00” 90ΒΊ28’40”
D 149.5 131.0 112.0 90ΒΊ06’10”
B 125.0 A 137.3 125.0 112.3 71ΒΊ55’50” 89ΒΊ30’50”
C 151.0 125.0 99.0 89ΒΊ56’50”
C 176.0 D 184.5 176.0 167.5 61ΒΊ01’40” 88ΒΊ04’30”
B 202.0 176.0 149.5 89ΒΊ33’00”
D 176.0 A 194.5 176.0 157.0 134ΒΊ22’50” 89ΒΊ13’30”
C 184.5 176.0 167.5 88ΒΊ51’20”
Station Field Angles
A
B
C
D
94Β° 18’ 00”
71Β° 55’ 50”
61Β° 01’ 40”
134Β° 22’ 50”
Sum = 360Β° 96β€˜ 140β€œ
361Β° 38’ 20”
9
4.3 Angular Error and Angle Adjustment
(4-2)(180Β°) = (2)(180Β°) = 360Β°, the sum of interior angle of the traverse must be 360Β°.
Total angular error = 360Β° - 361Β° 38’ 20’ = -1Β° 38’ 20”
Therefore, error per angle = -1Β° 38’ 20”/4 = -5900”/4 = -24’ 35” per angle
Station Field Angles Correction Adjusted Angles
A
B
C
D
94Β° 18’ 00”
71Β° 55’ 50”
61Β° 01’ 40”
134Β° 22’ 50”
- 24’ 35”
- 24’ 35”
- 24’ 35”
- 24’ 35”
93Β° 53’ 25”
71Β° 31’ 15”
60Β° 37’ 05”
133Β° 58’ 15”
Sum = 360Β° 96β€˜ 140β€œ 360Β° 0’ 0”
361Β° 38’ 20”
10
4.4 Course Bearings & Azimuths
AB BC
Azimuth N: 180Β° - 93Β°53’25” = 86Β°06’35” 180Β° + (90Β° - 03Β°53’25” - 71Β°31β€˜15β€œ) =
194Β°35’20”
Bearing: N 86Β°06’35” E 90Β° - 03Β°53’25” - 71Β°31’15” = S 14Β°35’20” W
CD DA
Azimuth N: 270Β° + (90Β°- 46Β°01’45”) = 313Β°58’15” 360Β°
Bearing: 60Β°37’05” - 14Β°35’20” = N 46Β°01’45” W 0Β°
11
4.5 Course Latitudes & Departures
Cos Ξ² Sin Ξ² L cosΞ² L sinΞ²
Station Bearing, Ξ² Length, L Cosine Sine Latitude Departure
A
B
C
D
A
N 86Β°06’35” E
S 14Β°35’20” W
N 46Β°01’45” W
0Β°
24.950
52.250
16.990
37.495
0.0678
0.9678
0.6943
1.000
0.9977
0.2519
0.7197
0.000
+ 1.69161
- 50.56755
+ 11.79620
+ 37.49500
+ 24.8926
- 13.1618
- 12.2277
0.0000
Sum = 131.685 + 0.41526 - 0.4969
Accuracy = 1: (P/Ec)
For average land surveying, an accuracy is typically about 1:3000.
Ec = [(Error in Latitude)2
+ (Error in Departure)2
] 1/2
= [(0.41526)
2
+ (-0.4969)
2
]
1/2
= 0.6476
P = 131.685
Accuracy = 1: (131.685 / 0.6478)
= 1: 203.28
∴ The traversing is not acceptable.
12
4.6 Adjusted Latitudes & Departures
The Compass Rule
Correction = – [βˆ‘βˆ†y] / P Γ— L or – [βˆ‘βˆ†x] / P Γ— L
Where
βˆ‘βˆ†y and βˆ‘βˆ†x = the error in latitude or in departure
P = the total length or perimeter of the traverse
L = the length of a particular course
Compass rule correction to latitude and departure
Unadjusted Correction Adjusted
Latitude Departure Latitude Departure Latitude Departure
A
+1.8418 +24.9225 0.0214 0.02230 +1.8632 +24.9448
B
-51.1381 -12.5647 0.0452 0.04697 -51.0929 -12.51773
C
+11.5328 -12.4758 0.0146 0.01515 +11.5474 -12.46065
D
+37.65 0 0.0323 0.03358 +37.6823 +0.03358
A
-0.1135 -0.118 0.1135 0.118 0.0 0.0
Check Check
13
4.7 Table and Graph of Station Coordinate
Compute station coordinates
N2 = N1+ Lat1-2
E2 = E1+ Dep1-2
Where
N2 and E2 = the Y and X coordinates of station 2
N1 and E1= the Y and X coordinates of station 1
Lat1-2 = the latitude of course 1-2
Dep 1-2 = the departure of course 1-2
Computation of station coordination
N coordination
*Latitude
E coordinate
*Departure
N(Y) E(X)
A 1037.6823 1000.00
+1.8632 +24.9448
B 1039.5455 1024.9448
-51.0929 -12.51773
C 988.4526 1012.42707
+11.5474 -12.46065
D 1000.00 999.96642
+37.6823 +0.03358
A 1037.0823 1000.00
14
Graph of Station Coordinate
15
FIELD DATA 2
5.1 Unadjusted Field Data
Station Height of
instrume
nt (m)
Station
sight
Stadia Reading (m) Horizontal Vertical
Facing Top Middle Bottom
A 176.0 B L 188.8 176.0 163.8 94ΒΊ12’30” 89ΒΊ30’20”
R 188.8 176.0 163.8
D L 194.8 176.0 157.2 89ΒΊ27’20”
R 194.7 176.0 157.0
B 176.0 A L 188.7 176.0 163.7 71ΒΊ57’20” 88ΒΊ34’50”
R 188.8 176.0 163.8
C L 202.5 176.0 149.8 88ΒΊ32’20”
R 202.5 176.0 149.8
C 176.0 D L 184.8 176.0 167.8 61ΒΊ02’10” 88ΒΊ04’20”
R 184.8 176.0 167.8
B L 202.5 176.0 149.8 88ΒΊ06’10”
R 202.5 176.0 149.8
D 176.0 A L 194.8 176.0 157.2 132ΒΊ44’00
”
89ΒΊ09’00”
R 194.8 176.0 157.2
C L 184.8 176.0 167.8 89ΒΊ09’00”
R 184.8 176.0 167.8
16
5.2 Average Field Data
Station Height of
instrument
(m)
Station
sight
Stadia Reading (m) Horizontal Vertical
Top Middl
e
Botto
m
A 176.0 B 188.8 176.0 163.8 94ΒΊ12’30” 89ΒΊ30’20”
D 194.8 176.0 157.1 89ΒΊ27’20”
B 176.0 A 188.8 176.0 163.8 71ΒΊ57’20” 88ΒΊ34’50”
C 202.5 176.0 149.8 88ΒΊ32’20”
C 176.0 D 184.8 176.0 167.8 61ΒΊ02’10” 88ΒΊ04’20”
B 202.5 176.0 149.8 88ΒΊ06’10”
D 176.0 A 194.8 176.0 157.2 132ΒΊ44’00” 89ΒΊ09’00”
C 184.8 176.0 167.8 89ΒΊ09’00”
Station Field Angles
A
B
C
D
94Β° 12’ 30”
71Β° 57’ 20”
61Β° 02’ 10”
132Β° 44’ 00”
Sum = 358Β° 115β€˜ 60β€œ
359Β° 56’ 00”
17
5.3 Angular Error and Angle Adjustment
(4-2)(180Β°) = (2)(180Β°) = 360Β°, the sum of interior angle of the traverse must be 360Β°.
Total angular error = 360Β° - 359Β° 56’ 00’ = 0Β° 04’ 00”
Therefore, error per angle = 0Β° 04’ 00”/4 = 0Β° 01’ 00” per angle
Station Field Angles Correction Adjusted Angles
A
B
C
D
94Β° 12’ 30”
71Β° 57’ 20”
61Β° 02’ 10”
132Β° 44’ 00”
+ 01’ 00”
+ 01’ 00”
+ 01’ 00”
+ 01’ 00”
94Β° 13’ 30”
71Β° 58’ 20”
61Β° 03’ 10”
132Β° 45’ 00”
Sum = 358Β° 115β€˜ 60β€œ 360Β° 0’ 0”
359Β° 56’ 00”
18
5.4 Course Bearings & Azimuths
AB BC
Azimuth N: 180Β° - 94Β°13’30” = 85Β°46’30” 180Β° + (90Β° - 04Β°13’30” - 71Β°58’20”) =
193Β°48’10”
Bearing: N 85Β°46’30” E 90Β° - 03Β°53’25” - 71Β°58’20” = S 13Β°48’10”
CD DA
Azimuth N: 270Β° + (90Β°- 47Β°15’00”) = 312Β°45’00” 360Β°
Bearing: 61Β°03’10” - 13Β°48’10” = N 47Β°15’00” W 0Β°
19
5.5 Course Latitudes & Departures
Cos Ξ² Sin Ξ² L cosΞ² L sinΞ²
Station Bearing, Ξ² Length, L Cosine Sine Latitude Departure
A
B
C
D
A
N 85Β°46’30” E
S 13Β°48’10” W
N 47Β°15’00” W
0Β°
24.990
52.660
16.990
37.650
0.0737
0.9711
0.6788
1.000
0.9973
0.2386
0.7343
0.000
+ 1.8418
- 51.1381
+ 11.5328
+ 37.650
+ 24.9225
- 12.5647
- 12.4758
0.0000
Sum = 132.290 - 0.1135 - 0.1180
Accuracy = 1: (P/Ec)
For average land surveying, an accuracy is typically about 1:3000.
Ec = [(Error in Latitude)2
+ (Error in Departure)2
] 1/2
= [(-0.1135)
2
+ (-0.1180)
2
]
1/2
= 0.1637
P = 132.290
Accuracy = 1: (132.290 / 0.1637)
= 1: 808.12
∴ The traversing is not acceptable.
20
5.6 Adjusted Latitudes & Departures
The Compass Rule
Correction = – [βˆ‘βˆ†y] / P Γ— L or – [βˆ‘βˆ†x] / P Γ— L
Where
βˆ‘βˆ†y and βˆ‘βˆ†x = the error in latitude or in departure
P = the total length or perimeter of the traverse
L = the length of a particular course
Compass rule correction to latitude and departure
Unadjusted Correction Adjusted
Latitude Departure Latitude Departure Latitude Departure
A
+1.69161 +24.8926 -0.078678 0.09415 +1.612932 +24.98675
B
-50.56755 -13.1618 -0.164767 0.19716 -50.732317 -12.96464
C
+11.7962 -12.2277 -0.053577 0.06411 +11.74262
3
-12.16359
D
+37.495 0 -0.118238 0.14148 +37.37676
2
+0.14148
A
0.41526 -0.4969 -0.41526 0.4969 0.0 0.0
Check Check
21
5.7 Table and Graph of Station Coordinate
Compute station coordinates
N2 = N1+ Lat1-2
E2 = E1+ Dep1-2
Where
N2 and E2 = the Y and X coordinates of station 2
N1 and E1= the Y and X coordinates of station 1
Lat1-2 = the latitude of course 1-2
Dep 1-2 = the departure of course 1-2
Computation of station coordination
N coordination
*Latitude
E coordinate
*Departure
N(Y) E(X)
A 1037.376762 1000.00
+1.612932 +24.98675
B 1038.989694 1024.98675
-50.732317 -12.96464
C 988.257377 1012.02211
+11.742623 -12.16359
D 1000.00 999.85852
37.376762 +0.14148
A 1037.376762 1000.00
22
Graph of Station Coordinate
23
FIELD DATA 3
6.1 Unadjusted Field Data
Station Height of
instrument
(m)
Station
sight
Stadia Reading (m) Horizontal Vertical
Facing Top Middle Bottom
A 176.0 B L 188.0 176.0 163.1 94ΒΊ12’30” 89ΒΊ30’20”
R 188.0 176.0 163.1
D L 194.8 176.0 157.2 89ΒΊ27’20”
R 194.7 176.0 157.0
B 136.5 A L 149.0 136.5 123.5 71ΒΊ55’50” 89ΒΊ31’10”
R 148.5 136.5 124.0
C L 162.5 136.5 110.0 89ΒΊ49’40”
R 162.5 136.5 110.0
C 176.0 D L 184.0 176.0 167.2 61ΒΊ02’10” 88ΒΊ04’40”
R 184.0 176.0 167.0
B L 202.5 176.0 149.8 88ΒΊ06’10”
R 202.5 176.0 149.8
D 176.0 A L 194.8 176.0 157.2 132ΒΊ44’00” 89ΒΊ09’00”
R 194.8 176.0 157.2
C L 184.0 176.0 167.2 89ΒΊ09’00”
R 184.0 176.0 167.0
24
6.2 Average Field Data
Station Height of
instrument
(m)
Station
sight
Stadia Reading (m) Horizontal Vertical
Top Middl
e
Botto
m
A 176.0 B 188.0 176.0 163.1 94ΒΊ12’30” 89ΒΊ30’40”
D 194.8 176.0 157.1 89ΒΊ27’20”
B 136.5 A 188.0 136.5 163.1 71ΒΊ55’50” 89ΒΊ31’10”
C 162.5 136.5 110.0 89ΒΊ49’40”
C 176.0 D 184.8 176.0 167.1 61ΒΊ02’10” 88ΒΊ04’40”
B 202.5 176.0 149.8 88ΒΊ06’10”
D 176.0 A 194.8 176.0 157.2 132ΒΊ44’00” 89ΒΊ09’00”
C 184.0 176.0 167.1 89ΒΊ09’00”
Station Field Angles
A
B
C
D
94Β° 12’ 30”
71Β° 55’ 50”
61Β° 02’ 10”
132Β° 44’ 00”
Sum = 359Β° 54β€˜ 30β€œ
25
6.3 Angular Error and Angle Adjustment
(4-2)(180Β°) = (2)(180Β°) = 360Β°, the sum of interior angle of the traverse must be 360Β°.
Total angular error = 360Β° - 359Β° 54’ 30’ = 0Β° 05’ 30”
Therefore, error per angle = 0Β° 05’ 30”/4 = 0Β° 01’ 22.5” per angle
Station Field Angles Correction Adjusted Angles
A
B
C
D
94Β° 12’ 30”
71Β° 55’ 50”
61Β° 02’ 10”
132Β° 44’ 00”
+ 01’ 22.5”
+ 01’ 22.5”
+ 01’ 22.5”
+ 01’ 22.5”
94Β° 13’ 52.5”
71Β° 57’ 12.5”
61Β° 03’ 32.5”
132Β° 45’ 22.5”
Sum = 359Β° 54β€˜ 30β€œ 360Β° 0’ 0”
26
6.4 Course Bearings & Azimuths
AB BC
Azimuth N: 180Β° - 94Β°13’52.5” = 85Β°46’7.5” 180Β°+(90Β°-04Β°13’52.5”-71Β°57β€˜12.5β€œ)= 193Β°48’55”
Bearing: N 85Β°46’7.5” E 90Β° - 04Β°13’52.5” - 71Β°57’12.5”= S 13Β°48’55”
CD DA
Azimuth N: 270Β° + (90Β°- 47Β°39’44.5”)= 313Β°20’15.5” 360Β°
Bearing: 61Β°03’32.5” - 13Β°48’55” = N 46Β°39’44.5” W 0Β°
27
6.5 Course Latitudes & Departures
Cos Ξ² Sin Ξ² L cosΞ² L sinΞ²
Station Bearing, Ξ² Length, L Cosine Sine Latitude Departure
A
B
C
D
A
N 85Β°46’7.5” E
S 13Β°48’55” W
N 46Β°39’44.5”
W
0Β°
24.898
52.571
16.889
37.645
0.0738
0.9711
0.6863
1.000
0.9973
0.2388
0.7273
0.000
+ 1.8371
- 51.0517
+ 11.5909
+ 37.6450
+ 24.8301
- 12.5540
- 12.2834
0.0000
Sum = 132.003 0.0213 - 0.0073
Accuracy = 1: (P/Ec)
For average land surveying, accuracy is typically about 1:3000.
Ec = [(Error in Latitude) 2
+ (Error in Departure) 2
] 1/2
= [(0.0213) 2
+ (- 0.0073) 2
] 1/2
= 0.0225
P = 132.003
Accuracy = 1: (132.003 / 0.0225)
= 1: 5866.80
∴ The traversing is acceptable.
28
6.6 Adjusted Latitudes & Departures
The Compass Rule
Correction = – [βˆ‘βˆ†y] / P Γ— L or – [βˆ‘βˆ†x] / P Γ— L
Where
βˆ‘βˆ†y and βˆ‘βˆ†x = the error in latitude or in departure
P = the total length or perimeter of the traverse
L = the length of a particular course
Correction to latitude and departure
Unadjusted Correction Adjusted
Latitude Departure Latitude Departure Latitude Departure
A
+ 1.8371 + 24.8301 -0.00402 + 0.00138 + 1.83308 +24.83148
B
-51.0517 -12.5540 - 0.00848 + 0.00291 -51.06018 -12.55109
C
+ 11.5909 -12.2834 - 0.00273 + 0.00093 +11.58817 -12.28247
D
+ 37.6450 0.0000 - 0.00607 + 0.00208 +37.63893 + 0.00208
A
+ 0.0213 - 0.0073 - 0.02130 + 0.00730 0.0000 0.0000
Checked Checked
29
6.7 Table and Graph of Station Coordinate
Compute station coordinates
N2 = N1+ Lat1-2
E2 = E1+ Dep1-2
Where
N2and E2 = the Y and X coordinates of station 2
N1 and E1= the Y and X coordinates of station 1
Lat1-2 = the latitude of course 1-2
Dep 1-2 = the departure of course 1-2
Computation of station coordination
N Coordinate
*Latitude
E Coordinate
*Departure
N (Y) E (X)
A 1037.63893 1000.0000
+ 1.83308 +24.83148
B 1039.47201 1024.83148
-51.06018 -12.55109
C 988.41183 1012.28039
+11.58817 -12.28247
D 1000.00000 999.99792
+37.63893 + 0.00208
A 1037.63893 1000.000
30
Graph of Station Coordinate
31
DISCUSSION
Traversing is a closed loop traverse. The equipment that we utilized overall are
the theodolite, tripod and plumb bob. The fieldwork was carried out at Taylor’s
University Lakeside Campus staff’s car park, near Academic Block E.
Each group was required to mark at least four points so that the traversing work
can be done. Furthermore, we were required to measure the horizontal and vertical
angles at the four points which are then labelled as point A, B, C and D.
One of the apparent obstacles in doing the fieldwork was to balance the air
bubble in the spirit level in order to get accurate results. We realised that the 5 person
count in each group is the optimal head-count to get our job done quickly and smoothly,
as each person was assigned to one specific task throughout the fieldwork.
In addition, with guidance from our lecturer, Mr Chai, we were able to identify the
important steps of the fieldwork and also the proper way to operate the theodolite.
However, after repeating the fieldwork 2 times, we were still unable to obtain an
accurate and acceptable result. We realised that even the slightest error in taking the
readings can result in final readings that stray off too much from the acceptable error.
We took our second set of readings which is more accurate than the first set, but still not
closed to the acceptable error. Mr. Chai then asked us to do the 3rd time, however this
time we used a different instrument. We manage to take all 4 points. Thankfully we
managed to close it with our 3rd data after using a different instrument.
In conclusion, practical experience in surveying is very important aside from
everything we have learnt in the classroom. We also learn that 3 problems will arise
when doing traversing such as human error, instrument error and random error such as
heavy rain, strong wind and others.

More Related Content

What's hot

traversing of survey
traversing of surveytraversing of survey
traversing of surveySelf-employed
Β 
Chapter 6 area & volume measurement, Digital Planimeter
Chapter 6 area & volume measurement, Digital PlanimeterChapter 6 area & volume measurement, Digital Planimeter
Chapter 6 area & volume measurement, Digital PlanimeterAbhay Abhale
Β 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting pptNaufil Sayyad
Β 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry pptVilas Nikam
Β 
Lecture 1 introdcution to engineering surveying
Lecture 1 introdcution to engineering surveyingLecture 1 introdcution to engineering surveying
Lecture 1 introdcution to engineering surveyingSarhat Adam
Β 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINEKiplimoCalvin
Β 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingDolat Ram
Β 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - ReportSarchia Khursheed
Β 
Instruments used in surveying
Instruments used in surveyingInstruments used in surveying
Instruments used in surveyingMir Zafarullah
Β 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in SurveyLord1911
Β 
Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringA Makwana
Β 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation surveyHastarajPandey
Β 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingParimal Jha
Β 
Compass survey part 1
Compass survey part 1Compass survey part 1
Compass survey part 1ArunRavi43
Β 
Fly Levelling
Fly LevellingFly Levelling
Fly LevellingBahzad5
Β 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
Β 

What's hot (20)

EDM
EDMEDM
EDM
Β 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
Β 
Chapter 6 area & volume measurement, Digital Planimeter
Chapter 6 area & volume measurement, Digital PlanimeterChapter 6 area & volume measurement, Digital Planimeter
Chapter 6 area & volume measurement, Digital Planimeter
Β 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
Β 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
Β 
Lecture 1 introdcution to engineering surveying
Lecture 1 introdcution to engineering surveyingLecture 1 introdcution to engineering surveying
Lecture 1 introdcution to engineering surveying
Β 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
Β 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
Β 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
Β 
2.2 linear measurement
2.2 linear measurement2.2 linear measurement
2.2 linear measurement
Β 
Instruments used in surveying
Instruments used in surveyingInstruments used in surveying
Instruments used in surveying
Β 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
Β 
Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil Engineering
Β 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
Β 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
Β 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
Β 
Compass survey part 1
Compass survey part 1Compass survey part 1
Compass survey part 1
Β 
Levelling
LevellingLevelling
Levelling
Β 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
Β 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
Β 

Viewers also liked

Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Tee Joanne
Β 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversingashleyyeap
Β 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Haziq1511
Β 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
Β 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-reportFelix Vong
Β 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveyingMohammed_82
Β 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-iiMarvin Ken
Β 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingRAHUL SINHA
Β 

Viewers also liked (10)

Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
Β 
Levelling
LevellingLevelling
Levelling
Β 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
Β 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
Β 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
Β 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
Β 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
Β 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-ii
Β 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
Β 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
Β 

Similar to Fieldwork 2 Report Traversing

Ss report 2
Ss report 2Ss report 2
Ss report 2Shen Sin
Β 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
Β 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Est
Β 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
Β 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Enoch Wong
Β 
Tranverse report
Tranverse report Tranverse report
Tranverse report Wen Crystal
Β 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - TraverseKai Yun Pang
Β 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
Β 
Ss report 2 report
Ss report 2 reportSs report 2 report
Ss report 2 reportMELVIN tan
Β 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSheng Zhe
Β 
Tacheometry survey of detailing
Tacheometry survey of detailingTacheometry survey of detailing
Tacheometry survey of detailingSuman Jyoti
Β 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2 JamesMoy7
Β 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2 Melvin Lim
Β 
Ss report 2
Ss report 2Ss report 2
Ss report 2Hasif Alias
Β 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2Shane Ah
Β 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptNITINSURESH30
Β 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignmentSze Ting Kuek
Β 
Leveling report
Leveling reportLeveling report
Leveling reportWen Crystal
Β 

Similar to Fieldwork 2 Report Traversing (20)

Ss report 2
Ss report 2Ss report 2
Ss report 2
Β 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
Β 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
Β 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
Β 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
Β 
Tranverse report
Tranverse report Tranverse report
Tranverse report
Β 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
Β 
Site survey report 1
Site survey report 1Site survey report 1
Site survey report 1
Β 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
Β 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
Β 
Ss report 2 report
Ss report 2 reportSs report 2 report
Ss report 2 report
Β 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
Β 
Tacheometry survey of detailing
Tacheometry survey of detailingTacheometry survey of detailing
Tacheometry survey of detailing
Β 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
Β 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
Β 
Ss report 2
Ss report 2Ss report 2
Ss report 2
Β 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2
Β 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .ppt
Β 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
Β 
Leveling report
Leveling reportLeveling report
Leveling report
Β 

More from Arissa Loh

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final ReportArissa Loh
Β 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group AssignmentArissa Loh
Β 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual AssignmentArissa Loh
Β 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final ReportArissa Loh
Β 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation SlidesArissa Loh
Β 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of ContractArissa Loh
Β 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost AppraisalArissa Loh
Β 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final ReportArissa Loh
Β 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation SlidesArissa Loh
Β 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Arissa Loh
Β 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentationArissa Loh
Β 
PP2 final report
PP2 final reportPP2 final report
PP2 final reportArissa Loh
Β 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808Arissa Loh
Β 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesArissa Loh
Β 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportArissa Loh
Β 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slidesArissa Loh
Β 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation Arissa Loh
Β 
Tender Presentation
Tender PresentationTender Presentation
Tender PresentationArissa Loh
Β 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishesArissa Loh
Β 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesArissa Loh
Β 

More from Arissa Loh (20)

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
Β 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
Β 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
Β 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final Report
Β 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation Slides
Β 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of Contract
Β 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost Appraisal
Β 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final Report
Β 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation Slides
Β 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
Β 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentation
Β 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
Β 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
Β 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
Β 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
Β 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slides
Β 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation
Β 
Tender Presentation
Tender PresentationTender Presentation
Tender Presentation
Β 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishes
Β 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
Β 

Recently uploaded

James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !risocarla2016
Β 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
Β 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
Β 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
Β 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
Β 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxJohnree4
Β 
miladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxmiladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxCarrieButtitta
Β 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...marjmae69
Β 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...NETWAYS
Β 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
Β 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
Β 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
Β 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
Β 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
Β 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
Β 
Call Girls in Rohini Delhi πŸ’―Call Us πŸ”8264348440πŸ”
Call Girls in Rohini Delhi πŸ’―Call Us πŸ”8264348440πŸ”Call Girls in Rohini Delhi πŸ’―Call Us πŸ”8264348440πŸ”
Call Girls in Rohini Delhi πŸ’―Call Us πŸ”8264348440πŸ”soniya singh
Β 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
Β 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
Β 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGYpruthirajnayak525
Β 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)Basil Achie
Β 

Recently uploaded (20)

James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !
Β 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
Β 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
Β 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Β 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Β 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptx
Β 
miladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxmiladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptx
Β 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Β 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Β 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
Β 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Β 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Β 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
Β 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
Β 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
Β 
Call Girls in Rohini Delhi πŸ’―Call Us πŸ”8264348440πŸ”
Call Girls in Rohini Delhi πŸ’―Call Us πŸ”8264348440πŸ”Call Girls in Rohini Delhi πŸ’―Call Us πŸ”8264348440πŸ”
Call Girls in Rohini Delhi πŸ’―Call Us πŸ”8264348440πŸ”
Β 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Β 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
Β 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
Β 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
Β 

Fieldwork 2 Report Traversing

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) SITE SURVEYING [QSB 60103] FIELD WORK 2 REPORT TRAVERSING DARREN TAN QUAN WEN 0322662 YEAP PHAY SHIAN 0322243 LEE XIN YING 0322432 MICHELLE TUNG MAN KAYE 0324175 LOH MUN TONG 0323680 LECTURER: MR. CHAI VOON CHIET SUBMISSION DATE: 8th DECEMBER 2016
  • 2. 1 TABLE OF CONTENT NO. TOPIC PAGE 1. INTRODUCTION TO TRAVERSING 2 - 3 2. OBJECTIVES 4 3. APPARATUS USED 5 - 6 4. FIELD DATA 1 4.1 Unadjusted Field Data 4.2 Average Field Data 4.3 Angular error and angle adjustment 4.4 Course Bearings & Azimuths 4.5 Course Latitudes & Departures 4.6 Adjusted Latitudes & Departures 4.7 Table and Graph of Station Coordinate 7 - 14 5. FIELD DATA 2 5.1 Unadjusted Field Data 5.2 Average Field Data 5.3 Angular error and angle adjustment 5.4 Course Bearings & Azimuths 5.5 Course Latitudes & Departures 5.6 Adjusted Latitudes & Departures 5.7 Table and Graph of Station Coordinate 15 - 22 6. FIELD DATA 3 6.1 Unadjusted Field Data 6.2 Average Field Data 6.3 Angular error and angle adjustment 6.4 Course Bearings & Azimuths 6.5 Course Latitudes & Departures 6.6 Adjusted Latitudes & Departures 6.7 Table and Graph of Station Coordinate 23 - 30 9. DISCUSSION 31
  • 3. 2 INTRODUCTION TO TRAVERSING A traverse survey involves a connected sequence of lines whose length and directions are measured. It is perhaps the most common type of control survey performed by surveyors in private practice or employed by local government agencies. Precise traverse surveys are much more practical nowadays with the use of electronic distance measuring (EDM) devices. Traversing is a type of survey in which a number of connected survey lines from the framework and the directions and lengths of the survey lines are measured with the help of an angle measuring instrument and a tape or chain respectively. The angles are measured using theodolites, or total stations, whereas the distances can be measured using total stations, steel tapes or electronic distance-measurement instruments (EDMs). There are two types of traverse: (1) Open traverse: When the lines from a circuit ends elsewhere (2) Closed traverse: When the lines from a circuit which ends at the starting point
  • 4. 3 (1) Open traverse An open traverse is a series of measured straight lines that do not intersect or form a loop. This lack of geometric closure means that there is no geometric verification possible with respect to the actual positioning of the traverse stations. In route surveys, open traverse station positioning can be verified by computation from available tied-in field markers as shown on property plans, or through the use of global positioning system (GPS) receivers. (2) Closed traverse A closed traverse is connected lines that start at a point and ends at the same point or at a point whose relative position is known. The errors during measurement are minimized and adjusted to get accurate data. Closed traverse is the primary method used in checking surveying field work. There are two types of closed traverse: (a) Loop traverse – A loop traverse starts and ends at the same point, forming a closed geometric figure called a polygon. (b) Connecting traverse – A connecting traverse looks like an open traverse, however the only difference is, it begins and ends at points (or lines) of known position (and direction) at each end of the traverse.
  • 5. 4 OBJECTIVES ● To enhance a better understanding of the traverse process. ● To determine the area encompassed within a boundary. ● To determine the angular error and closing error of traverse conducted. ● To make necessary adjustments in obtaining an accurate data. ● To experience the life of being as a Quantity Surveyor and experience the actual working environment. ● To help them to understand the correct way to read the reading on the theodolite and record the data. ● To give the students a chance to familiarize with the actual working atmosphere on the site including uncertainty situations. ● To provide them the opportunity of hands on experience of setting up the theodolite for angle measurements.
  • 6. 5 APPARATUS USED Theodolite Theodolite is a basic surveying instrument that is commonly used in traversing. It is used to measure horizontal and vertical angle. Theodolite is a tool used in the land surveying and engineering industry. Moreover, it has been adapted for other specialized purposes as well. Modern theodolites consist of telescope mounted to swivel both horizontally and vertically. The levelling is accomplished with the aid of a spirit level and crosshairs in the telescope allow accurate alignment with the object sighted. When the telescope is set up and adjusted precisely, the two accompanying scales, that are vertical and horizontal, are read. Tripod A tripod is a device which is used to support surveying instruments. These surveying instrument include theodolite, auto-level and so on. The tripod’s head supports the surveying instrument whereas the feet are spiked to anchor the tripod to the ground. The level base provided will ensure that the instrument is held securely, thus allowing accurate readings.
  • 7. 6 Plumb bob A plumb bob or a plummet is a weight with a pointed tip on the bottom that is suspended from a string and used as a vertical reference line. This instrument used in surveying to sight a point on the ground that is not readily visible. They are used to set the instrument exactly over a fixed datum marker, prior to taking fresh readings. Levelling Staff The levelling staff is simply a large ruler, available in lengths of 3, 4, or 5 metres and usually made of aluminium with telescopic sections. The levelling staff is sectional so that can be adjusted in length to allow for easy storage and transport. The sections have locking buttons to ensure accurate length is maintained. The β€œE” pattern is designed to make it easy to read a small section of the scale when see through a telescope.
  • 8. 7 FIELD DATA 1 4.1 Unadjusted Field Data Station Height of instrume nt (m) Station sight Stadia Reading (m) Horizontal Vertical Facing Top Middle Bottom A 131.0 B L 143.2 131.0 118.5 94ΒΊ18’00” 90ΒΊ28’40” R 143.2 131.0 118.0 D L 149.5 131.0 112.0 90ΒΊ06’10” R 149.5 131.0 112.0 B 125.0 A L 137.0 125.0 112.0 71ΒΊ55’50” 89ΒΊ30’50” R 137.5 125.0 112.5 C L 151.0 125.0 99.0 89ΒΊ56’50” R 151.0 125.0 99.0 C 176.0 D L 184.5 176.0 167.5 61ΒΊ01’40” 88ΒΊ04’30” R 184.5 176.0 167.5 B L 202.0 176.0 149.5 89ΒΊ33’00” R 202.0 176.0 149.5 D 176.0 A L 194.5 176.0 157.0 134ΒΊ22’50 ” 89ΒΊ13’30” R 194.5 176.0 157.0 C L 184.5 176.0 167.5 88ΒΊ51’20” R 184.5 176.0 167.5
  • 9. 8 4.2 Average Field Data Station Height of instrument (m) Station sight Stadia Reading (m) Horizontal Vertical Top Middl e Botto m A 131.0 B 143.2 131.0 118.3 94ΒΊ18’00” 90ΒΊ28’40” D 149.5 131.0 112.0 90ΒΊ06’10” B 125.0 A 137.3 125.0 112.3 71ΒΊ55’50” 89ΒΊ30’50” C 151.0 125.0 99.0 89ΒΊ56’50” C 176.0 D 184.5 176.0 167.5 61ΒΊ01’40” 88ΒΊ04’30” B 202.0 176.0 149.5 89ΒΊ33’00” D 176.0 A 194.5 176.0 157.0 134ΒΊ22’50” 89ΒΊ13’30” C 184.5 176.0 167.5 88ΒΊ51’20” Station Field Angles A B C D 94Β° 18’ 00” 71Β° 55’ 50” 61Β° 01’ 40” 134Β° 22’ 50” Sum = 360Β° 96β€˜ 140β€œ 361Β° 38’ 20”
  • 10. 9 4.3 Angular Error and Angle Adjustment (4-2)(180Β°) = (2)(180Β°) = 360Β°, the sum of interior angle of the traverse must be 360Β°. Total angular error = 360Β° - 361Β° 38’ 20’ = -1Β° 38’ 20” Therefore, error per angle = -1Β° 38’ 20”/4 = -5900”/4 = -24’ 35” per angle Station Field Angles Correction Adjusted Angles A B C D 94Β° 18’ 00” 71Β° 55’ 50” 61Β° 01’ 40” 134Β° 22’ 50” - 24’ 35” - 24’ 35” - 24’ 35” - 24’ 35” 93Β° 53’ 25” 71Β° 31’ 15” 60Β° 37’ 05” 133Β° 58’ 15” Sum = 360Β° 96β€˜ 140β€œ 360Β° 0’ 0” 361Β° 38’ 20”
  • 11. 10 4.4 Course Bearings & Azimuths AB BC Azimuth N: 180Β° - 93Β°53’25” = 86Β°06’35” 180Β° + (90Β° - 03Β°53’25” - 71Β°31β€˜15β€œ) = 194Β°35’20” Bearing: N 86Β°06’35” E 90Β° - 03Β°53’25” - 71Β°31’15” = S 14Β°35’20” W CD DA Azimuth N: 270Β° + (90Β°- 46Β°01’45”) = 313Β°58’15” 360Β° Bearing: 60Β°37’05” - 14Β°35’20” = N 46Β°01’45” W 0Β°
  • 12. 11 4.5 Course Latitudes & Departures Cos Ξ² Sin Ξ² L cosΞ² L sinΞ² Station Bearing, Ξ² Length, L Cosine Sine Latitude Departure A B C D A N 86Β°06’35” E S 14Β°35’20” W N 46Β°01’45” W 0Β° 24.950 52.250 16.990 37.495 0.0678 0.9678 0.6943 1.000 0.9977 0.2519 0.7197 0.000 + 1.69161 - 50.56755 + 11.79620 + 37.49500 + 24.8926 - 13.1618 - 12.2277 0.0000 Sum = 131.685 + 0.41526 - 0.4969 Accuracy = 1: (P/Ec) For average land surveying, an accuracy is typically about 1:3000. Ec = [(Error in Latitude)2 + (Error in Departure)2 ] 1/2 = [(0.41526) 2 + (-0.4969) 2 ] 1/2 = 0.6476 P = 131.685 Accuracy = 1: (131.685 / 0.6478) = 1: 203.28 ∴ The traversing is not acceptable.
  • 13. 12 4.6 Adjusted Latitudes & Departures The Compass Rule Correction = – [βˆ‘βˆ†y] / P Γ— L or – [βˆ‘βˆ†x] / P Γ— L Where βˆ‘βˆ†y and βˆ‘βˆ†x = the error in latitude or in departure P = the total length or perimeter of the traverse L = the length of a particular course Compass rule correction to latitude and departure Unadjusted Correction Adjusted Latitude Departure Latitude Departure Latitude Departure A +1.8418 +24.9225 0.0214 0.02230 +1.8632 +24.9448 B -51.1381 -12.5647 0.0452 0.04697 -51.0929 -12.51773 C +11.5328 -12.4758 0.0146 0.01515 +11.5474 -12.46065 D +37.65 0 0.0323 0.03358 +37.6823 +0.03358 A -0.1135 -0.118 0.1135 0.118 0.0 0.0 Check Check
  • 14. 13 4.7 Table and Graph of Station Coordinate Compute station coordinates N2 = N1+ Lat1-2 E2 = E1+ Dep1-2 Where N2 and E2 = the Y and X coordinates of station 2 N1 and E1= the Y and X coordinates of station 1 Lat1-2 = the latitude of course 1-2 Dep 1-2 = the departure of course 1-2 Computation of station coordination N coordination *Latitude E coordinate *Departure N(Y) E(X) A 1037.6823 1000.00 +1.8632 +24.9448 B 1039.5455 1024.9448 -51.0929 -12.51773 C 988.4526 1012.42707 +11.5474 -12.46065 D 1000.00 999.96642 +37.6823 +0.03358 A 1037.0823 1000.00
  • 15. 14 Graph of Station Coordinate
  • 16. 15 FIELD DATA 2 5.1 Unadjusted Field Data Station Height of instrume nt (m) Station sight Stadia Reading (m) Horizontal Vertical Facing Top Middle Bottom A 176.0 B L 188.8 176.0 163.8 94ΒΊ12’30” 89ΒΊ30’20” R 188.8 176.0 163.8 D L 194.8 176.0 157.2 89ΒΊ27’20” R 194.7 176.0 157.0 B 176.0 A L 188.7 176.0 163.7 71ΒΊ57’20” 88ΒΊ34’50” R 188.8 176.0 163.8 C L 202.5 176.0 149.8 88ΒΊ32’20” R 202.5 176.0 149.8 C 176.0 D L 184.8 176.0 167.8 61ΒΊ02’10” 88ΒΊ04’20” R 184.8 176.0 167.8 B L 202.5 176.0 149.8 88ΒΊ06’10” R 202.5 176.0 149.8 D 176.0 A L 194.8 176.0 157.2 132ΒΊ44’00 ” 89ΒΊ09’00” R 194.8 176.0 157.2 C L 184.8 176.0 167.8 89ΒΊ09’00” R 184.8 176.0 167.8
  • 17. 16 5.2 Average Field Data Station Height of instrument (m) Station sight Stadia Reading (m) Horizontal Vertical Top Middl e Botto m A 176.0 B 188.8 176.0 163.8 94ΒΊ12’30” 89ΒΊ30’20” D 194.8 176.0 157.1 89ΒΊ27’20” B 176.0 A 188.8 176.0 163.8 71ΒΊ57’20” 88ΒΊ34’50” C 202.5 176.0 149.8 88ΒΊ32’20” C 176.0 D 184.8 176.0 167.8 61ΒΊ02’10” 88ΒΊ04’20” B 202.5 176.0 149.8 88ΒΊ06’10” D 176.0 A 194.8 176.0 157.2 132ΒΊ44’00” 89ΒΊ09’00” C 184.8 176.0 167.8 89ΒΊ09’00” Station Field Angles A B C D 94Β° 12’ 30” 71Β° 57’ 20” 61Β° 02’ 10” 132Β° 44’ 00” Sum = 358Β° 115β€˜ 60β€œ 359Β° 56’ 00”
  • 18. 17 5.3 Angular Error and Angle Adjustment (4-2)(180Β°) = (2)(180Β°) = 360Β°, the sum of interior angle of the traverse must be 360Β°. Total angular error = 360Β° - 359Β° 56’ 00’ = 0Β° 04’ 00” Therefore, error per angle = 0Β° 04’ 00”/4 = 0Β° 01’ 00” per angle Station Field Angles Correction Adjusted Angles A B C D 94Β° 12’ 30” 71Β° 57’ 20” 61Β° 02’ 10” 132Β° 44’ 00” + 01’ 00” + 01’ 00” + 01’ 00” + 01’ 00” 94Β° 13’ 30” 71Β° 58’ 20” 61Β° 03’ 10” 132Β° 45’ 00” Sum = 358Β° 115β€˜ 60β€œ 360Β° 0’ 0” 359Β° 56’ 00”
  • 19. 18 5.4 Course Bearings & Azimuths AB BC Azimuth N: 180Β° - 94Β°13’30” = 85Β°46’30” 180Β° + (90Β° - 04Β°13’30” - 71Β°58’20”) = 193Β°48’10” Bearing: N 85Β°46’30” E 90Β° - 03Β°53’25” - 71Β°58’20” = S 13Β°48’10” CD DA Azimuth N: 270Β° + (90Β°- 47Β°15’00”) = 312Β°45’00” 360Β° Bearing: 61Β°03’10” - 13Β°48’10” = N 47Β°15’00” W 0Β°
  • 20. 19 5.5 Course Latitudes & Departures Cos Ξ² Sin Ξ² L cosΞ² L sinΞ² Station Bearing, Ξ² Length, L Cosine Sine Latitude Departure A B C D A N 85Β°46’30” E S 13Β°48’10” W N 47Β°15’00” W 0Β° 24.990 52.660 16.990 37.650 0.0737 0.9711 0.6788 1.000 0.9973 0.2386 0.7343 0.000 + 1.8418 - 51.1381 + 11.5328 + 37.650 + 24.9225 - 12.5647 - 12.4758 0.0000 Sum = 132.290 - 0.1135 - 0.1180 Accuracy = 1: (P/Ec) For average land surveying, an accuracy is typically about 1:3000. Ec = [(Error in Latitude)2 + (Error in Departure)2 ] 1/2 = [(-0.1135) 2 + (-0.1180) 2 ] 1/2 = 0.1637 P = 132.290 Accuracy = 1: (132.290 / 0.1637) = 1: 808.12 ∴ The traversing is not acceptable.
  • 21. 20 5.6 Adjusted Latitudes & Departures The Compass Rule Correction = – [βˆ‘βˆ†y] / P Γ— L or – [βˆ‘βˆ†x] / P Γ— L Where βˆ‘βˆ†y and βˆ‘βˆ†x = the error in latitude or in departure P = the total length or perimeter of the traverse L = the length of a particular course Compass rule correction to latitude and departure Unadjusted Correction Adjusted Latitude Departure Latitude Departure Latitude Departure A +1.69161 +24.8926 -0.078678 0.09415 +1.612932 +24.98675 B -50.56755 -13.1618 -0.164767 0.19716 -50.732317 -12.96464 C +11.7962 -12.2277 -0.053577 0.06411 +11.74262 3 -12.16359 D +37.495 0 -0.118238 0.14148 +37.37676 2 +0.14148 A 0.41526 -0.4969 -0.41526 0.4969 0.0 0.0 Check Check
  • 22. 21 5.7 Table and Graph of Station Coordinate Compute station coordinates N2 = N1+ Lat1-2 E2 = E1+ Dep1-2 Where N2 and E2 = the Y and X coordinates of station 2 N1 and E1= the Y and X coordinates of station 1 Lat1-2 = the latitude of course 1-2 Dep 1-2 = the departure of course 1-2 Computation of station coordination N coordination *Latitude E coordinate *Departure N(Y) E(X) A 1037.376762 1000.00 +1.612932 +24.98675 B 1038.989694 1024.98675 -50.732317 -12.96464 C 988.257377 1012.02211 +11.742623 -12.16359 D 1000.00 999.85852 37.376762 +0.14148 A 1037.376762 1000.00
  • 23. 22 Graph of Station Coordinate
  • 24. 23 FIELD DATA 3 6.1 Unadjusted Field Data Station Height of instrument (m) Station sight Stadia Reading (m) Horizontal Vertical Facing Top Middle Bottom A 176.0 B L 188.0 176.0 163.1 94ΒΊ12’30” 89ΒΊ30’20” R 188.0 176.0 163.1 D L 194.8 176.0 157.2 89ΒΊ27’20” R 194.7 176.0 157.0 B 136.5 A L 149.0 136.5 123.5 71ΒΊ55’50” 89ΒΊ31’10” R 148.5 136.5 124.0 C L 162.5 136.5 110.0 89ΒΊ49’40” R 162.5 136.5 110.0 C 176.0 D L 184.0 176.0 167.2 61ΒΊ02’10” 88ΒΊ04’40” R 184.0 176.0 167.0 B L 202.5 176.0 149.8 88ΒΊ06’10” R 202.5 176.0 149.8 D 176.0 A L 194.8 176.0 157.2 132ΒΊ44’00” 89ΒΊ09’00” R 194.8 176.0 157.2 C L 184.0 176.0 167.2 89ΒΊ09’00” R 184.0 176.0 167.0
  • 25. 24 6.2 Average Field Data Station Height of instrument (m) Station sight Stadia Reading (m) Horizontal Vertical Top Middl e Botto m A 176.0 B 188.0 176.0 163.1 94ΒΊ12’30” 89ΒΊ30’40” D 194.8 176.0 157.1 89ΒΊ27’20” B 136.5 A 188.0 136.5 163.1 71ΒΊ55’50” 89ΒΊ31’10” C 162.5 136.5 110.0 89ΒΊ49’40” C 176.0 D 184.8 176.0 167.1 61ΒΊ02’10” 88ΒΊ04’40” B 202.5 176.0 149.8 88ΒΊ06’10” D 176.0 A 194.8 176.0 157.2 132ΒΊ44’00” 89ΒΊ09’00” C 184.0 176.0 167.1 89ΒΊ09’00” Station Field Angles A B C D 94Β° 12’ 30” 71Β° 55’ 50” 61Β° 02’ 10” 132Β° 44’ 00” Sum = 359Β° 54β€˜ 30β€œ
  • 26. 25 6.3 Angular Error and Angle Adjustment (4-2)(180Β°) = (2)(180Β°) = 360Β°, the sum of interior angle of the traverse must be 360Β°. Total angular error = 360Β° - 359Β° 54’ 30’ = 0Β° 05’ 30” Therefore, error per angle = 0Β° 05’ 30”/4 = 0Β° 01’ 22.5” per angle Station Field Angles Correction Adjusted Angles A B C D 94Β° 12’ 30” 71Β° 55’ 50” 61Β° 02’ 10” 132Β° 44’ 00” + 01’ 22.5” + 01’ 22.5” + 01’ 22.5” + 01’ 22.5” 94Β° 13’ 52.5” 71Β° 57’ 12.5” 61Β° 03’ 32.5” 132Β° 45’ 22.5” Sum = 359Β° 54β€˜ 30β€œ 360Β° 0’ 0”
  • 27. 26 6.4 Course Bearings & Azimuths AB BC Azimuth N: 180Β° - 94Β°13’52.5” = 85Β°46’7.5” 180Β°+(90Β°-04Β°13’52.5”-71Β°57β€˜12.5β€œ)= 193Β°48’55” Bearing: N 85Β°46’7.5” E 90Β° - 04Β°13’52.5” - 71Β°57’12.5”= S 13Β°48’55” CD DA Azimuth N: 270Β° + (90Β°- 47Β°39’44.5”)= 313Β°20’15.5” 360Β° Bearing: 61Β°03’32.5” - 13Β°48’55” = N 46Β°39’44.5” W 0Β°
  • 28. 27 6.5 Course Latitudes & Departures Cos Ξ² Sin Ξ² L cosΞ² L sinΞ² Station Bearing, Ξ² Length, L Cosine Sine Latitude Departure A B C D A N 85Β°46’7.5” E S 13Β°48’55” W N 46Β°39’44.5” W 0Β° 24.898 52.571 16.889 37.645 0.0738 0.9711 0.6863 1.000 0.9973 0.2388 0.7273 0.000 + 1.8371 - 51.0517 + 11.5909 + 37.6450 + 24.8301 - 12.5540 - 12.2834 0.0000 Sum = 132.003 0.0213 - 0.0073 Accuracy = 1: (P/Ec) For average land surveying, accuracy is typically about 1:3000. Ec = [(Error in Latitude) 2 + (Error in Departure) 2 ] 1/2 = [(0.0213) 2 + (- 0.0073) 2 ] 1/2 = 0.0225 P = 132.003 Accuracy = 1: (132.003 / 0.0225) = 1: 5866.80 ∴ The traversing is acceptable.
  • 29. 28 6.6 Adjusted Latitudes & Departures The Compass Rule Correction = – [βˆ‘βˆ†y] / P Γ— L or – [βˆ‘βˆ†x] / P Γ— L Where βˆ‘βˆ†y and βˆ‘βˆ†x = the error in latitude or in departure P = the total length or perimeter of the traverse L = the length of a particular course Correction to latitude and departure Unadjusted Correction Adjusted Latitude Departure Latitude Departure Latitude Departure A + 1.8371 + 24.8301 -0.00402 + 0.00138 + 1.83308 +24.83148 B -51.0517 -12.5540 - 0.00848 + 0.00291 -51.06018 -12.55109 C + 11.5909 -12.2834 - 0.00273 + 0.00093 +11.58817 -12.28247 D + 37.6450 0.0000 - 0.00607 + 0.00208 +37.63893 + 0.00208 A + 0.0213 - 0.0073 - 0.02130 + 0.00730 0.0000 0.0000 Checked Checked
  • 30. 29 6.7 Table and Graph of Station Coordinate Compute station coordinates N2 = N1+ Lat1-2 E2 = E1+ Dep1-2 Where N2and E2 = the Y and X coordinates of station 2 N1 and E1= the Y and X coordinates of station 1 Lat1-2 = the latitude of course 1-2 Dep 1-2 = the departure of course 1-2 Computation of station coordination N Coordinate *Latitude E Coordinate *Departure N (Y) E (X) A 1037.63893 1000.0000 + 1.83308 +24.83148 B 1039.47201 1024.83148 -51.06018 -12.55109 C 988.41183 1012.28039 +11.58817 -12.28247 D 1000.00000 999.99792 +37.63893 + 0.00208 A 1037.63893 1000.000
  • 31. 30 Graph of Station Coordinate
  • 32. 31 DISCUSSION Traversing is a closed loop traverse. The equipment that we utilized overall are the theodolite, tripod and plumb bob. The fieldwork was carried out at Taylor’s University Lakeside Campus staff’s car park, near Academic Block E. Each group was required to mark at least four points so that the traversing work can be done. Furthermore, we were required to measure the horizontal and vertical angles at the four points which are then labelled as point A, B, C and D. One of the apparent obstacles in doing the fieldwork was to balance the air bubble in the spirit level in order to get accurate results. We realised that the 5 person count in each group is the optimal head-count to get our job done quickly and smoothly, as each person was assigned to one specific task throughout the fieldwork. In addition, with guidance from our lecturer, Mr Chai, we were able to identify the important steps of the fieldwork and also the proper way to operate the theodolite. However, after repeating the fieldwork 2 times, we were still unable to obtain an accurate and acceptable result. We realised that even the slightest error in taking the readings can result in final readings that stray off too much from the acceptable error. We took our second set of readings which is more accurate than the first set, but still not closed to the acceptable error. Mr. Chai then asked us to do the 3rd time, however this time we used a different instrument. We manage to take all 4 points. Thankfully we managed to close it with our 3rd data after using a different instrument. In conclusion, practical experience in surveying is very important aside from everything we have learnt in the classroom. We also learn that 3 problems will arise when doing traversing such as human error, instrument error and random error such as heavy rain, strong wind and others.