Contents Pages 
Objective 1 
Introduction to auto level 2 
Field Data 3 
Adjusted Data 4-7 
Summary 8
Objectives 
 To allow us to have a better understanding or knowledge about the process 
of using the instrument (Theodolite) rather than learning from a video in class. 
 To enable us to have the experience in using theodolite such as setting up, 
collaborating, calculating and recording data. 
 To enable us to know the methods to measure horizontal angles between 
lines. 
 To allow us to learn more about the life being a quantity surveyor. 
 To allow us to experience and expose to the actual working environment in 
site such as working under the hot weather. 
 To allow us to have the teamwork while carrying out the fieldwork. 
 To enable us to learn how to analyze the data collected. 
 To allow us to understand how to distribute different types of error from the 
data collected on field. 
 To enable us to have the knowledge in reading the positions on ranging rods. 
 To enable us to have a basic knowledge on how to set up the points. 
 To allow us to have the ability to undertake the site measurements and 
calculations. 
 To enable us to know the precautions should be taken while using Theodolite.
Introduction to theodolite 
A theodolite is a precision instrument for measuring angles in the horizontal and 
vertical planes. Theodolites are used mainly for surveying applications, and have 
been adapted for specialized purposes in fields like meteorology and rocket 
launch technology. A modern theodolite consists of a movable telescope mounted 
within two perpendicular axes, the horizontal or trunnion axis, and the vertical axis. 
When the telescope is pointed at a target object, the angle of each of these axes can 
be measured with great precision, typically to seconds of arc. 
Theodolites may be either transit or non-transit. Transit theodolites are those in 
which the telescope can be inverted in the vertical plane, whereas the rotation in the 
same plane is restricted to a semi-circle for non-transit theodolites. Some types of 
transit theodolites do not allow the measurement of vertical angles. 
The builder's level is sometimes mistaken for a transit theodolite, but it measures 
neither horizontal nor vertical angles. It uses a spirit level to set a telescope level to 
define a line of sight along a horizontal plane. 
Electronic Theodolite
Field Data 
D 
89° 30’ 46” 
A 
51.73 m 
90° 12’ 50” 
C 
89° 57’ 55” 
51.64 m 
B 
90° 11’ 45” 
13.67 m 
13.23 m 
Station Field Angles 
A 90°12’ 50” 
B 90° 11’ 45” 
C 89° 57’ 55” 
D 89° 30’ 46” 
Sum = 359° 53’ 16”
Adjusted Data 
As known the sum of the interior angles in any loop transverse is equal to (n - 2) 
(180°) for geometric consistency, therefore 
(4 – 2) (180°) = 2 (180°) = 360° 
The total angular error = 360° 00’ 00” - 359° 53’ 16” = 0° 6’ 44” 
Therefore, error per angle = 0° 6’ 44”/4 = 0° 1’ 41” per angle 
Station Field Angles Correction Adjusted Angles 
A 90°12’ 50” +0° 1’ 41” 90° 14’ 31” 
B 90° 11’ 45” +0° 1’ 41” 90° 13’ 26” 
C 89° 57’ 55” +0° 1’ 41” 89° 59’ 36” 
D 89° 30’ 46” +0° 1’ 41” 89° 32’ 27” 
Sum = 359° 53’ 16” 360° 0’ 0” 
Computation for course azimuths 
Station Adjusted Angles Course Azimuths 
A-B 90° 14’ 31” 90° 14’ 31” 
B-C 90° 13’ 26” 90° 14’ 31” + 90° 13’ 26” - 180° = 0° 27’ 57” 
C-D 89° 59’ 36” 0° 27’ 57” + 89° 59’ 36” + 180° = 270° 27’ 33” 
D-A 89° 32’ 27” 270° 27’ 33” + 89° 32’ 27” - 180° = 180° 0’ 0”
Computations for Latitude and Departure 
Cos ∂ Sin ∂ L cos ∂ L sin ∂ 
Station Azimuth, ∂ Length, L Cosine Sine Latitude Departure 
A 
90° 14’ 31” 13.23 -0.0042 1.0000 -0.056 +13.230 
B 
0° 27’ 57” 51.64 1.0000 0.0081 +51.640 +0.418 
C 
270° 27’ 33” 13.67 0.0080 -1.0000 +0.109 -13.670 
D 
180° 0’ 0” 51.73 -1.0000 0.0000 -51.730 0 
A 
Perimeter(P) = 130.27 m Sum of latitudes = ΣΔy = -0.037 m 
Sum of departures = ΣΔx = -0.022 m 
Error in departure ΣΔx = -0.022 m 
A 
Error in latitude 
ΣΔy = -0.037 m 
Ec, Total Error 
0.043 m 
A’ 
Accuracy = 1: (P/Ec) 
Therefore, the accuracy = 1: (130.27/ 0.043) 
= 1: 3029.5 
= 1: 3030 
For average land surveying, an accuracy of about 1: 3000 is typical. 
Thus, the accuracy of field is acceptable.
Adjust Course Latitudes and Departures 
Unadjusted Corrections Adjusted 
Station Latitude Departure Latitude Departure Latitude Departure 
A 
-0.056 +13.230 0.003 0.002 -0.053 +13.232 
B 
+51.640 +0.418 0.015 0.009 +51.655 +0.427 
C 
+0.109 -13.670 0.004 0.002 +0.113 -13.668 
D 
-51.730 0 0.015 0.009 -51.715 +0.009 
A 
Sum = -0.037 -0.022 0.037 0.022 0.0 0.0 
Computation of Station Coordinates 
Assume that the coordinates of A is (100.000, 100.000) 
Station N Coordinate* Latitude E Coordinates* Departure 
A 100.000 100.000 
-0.053 +13.232 
B 99.947 113.232 
+51.655 +0.427 
C 151.602 113.659 
+0.113 -13.668 
D 151.715 99.991 
-51.715 +0.009 
A 100.00 100.000
The adjusted loop traverse plotted by coordinates: 
Y axis (north) 
C 
D 
A B 
N 100.000 
E 100.000 
N 151.602 
E 113.659 
N 99.947 
E 113.232 
N 151.715 
E 99.991 
200 
150 
100 
50 
0 
0 50 100 150 
X axis 
(East)
Summary 
A theodolite is a precision instrument for measuring angles in the horizontal and 
vertical planes. Theodolites are used mainly for surveying applications, and have 
been adapted for specialized purposes in fields like meteorology and rocket launch 
technology. We were assigned to use this instrument for angle calculation. In this 
experienced fieldwork, we needed more than 2 hours to complete the angle 
calculation. The first thing we did was setting up the instrument. We leveled the 
theodolite before we took the measurement. We took extra time to do that because 
to stabilize the instrument was a bit hard. 
Firstly, the theodolite is placed at station A and need to adjust the theodolite until it is 
in horizontal level. Then, the station A, B, C, D must be stated on the site to form a 
loop traverse by using the small stones. We use theodolite to measure the angles of 
four stations as our field data. During measurement, the vertical and horizontal 
angles will be shown on the digital readout panel. Everything went well but the 
readings were imperfect so we had to do some distribution error. 
Our total angular for the loop traverse is 359° 53’ 16” and the total angular error is 
about 0° 6’ 44”, therefore for each angle, it has 0° 1’ 41” error in angle. Before adjust 
the readings we get, the accuracy (1:3000) is important to be calculated to ensure 
the error of closure and accuracy are acceptable. Fortunately, the accuracy is about 
1: 3030 that is a typical accuracy for average land surveying. 
The field data is adjusted and the coordinates of four stations are stated at the graph 
with assuming the coordinates of station A is (100.000, 100.000).

More Related Content

What's hot

Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
 
Tranverse report
Tranverse report Tranverse report
Tranverse report Wen Crystal
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSheng Zhe
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2Shane Ah
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling seenyee
 
Theodolite surveying part1
Theodolite surveying part1Theodolite surveying part1
Theodolite surveying part1Naufil Sayyad
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - TraverseKai Yun Pang
 
Ss report 1
Ss report 1Ss report 1
Ss report 1Shen Sin
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Haziq1511
 
Advanced surveying equipment ppt
Advanced surveying equipment pptAdvanced surveying equipment ppt
Advanced surveying equipment pptNaufil Sayyad
 
To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station Agriculture Journal IJOEAR
 
Total station setup and operation
Total station setup and operationTotal station setup and operation
Total station setup and operationMuhammad Adi K
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital TheodoliteEhab AL-Timimi
 

What's hot (19)

Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Tranverse report
Tranverse report Tranverse report
Tranverse report
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
 
Theodolite surveying part1
Theodolite surveying part1Theodolite surveying part1
Theodolite surveying part1
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Traversing
TraversingTraversing
Traversing
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
 
Advanced surveying equipment ppt
Advanced surveying equipment pptAdvanced surveying equipment ppt
Advanced surveying equipment ppt
 
To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station
 
Total station setup and operation
Total station setup and operationTotal station setup and operation
Total station setup and operation
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 

Viewers also liked

Building services i report
Building services i   reportBuilding services i   report
Building services i report마 이환
 
Building Services 1 Report
Building Services 1 ReportBuilding Services 1 Report
Building Services 1 ReportMelvin Lim
 
Building Services Report 2016
Building Services Report 2016Building Services Report 2016
Building Services Report 2016KhangWei Chin
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Building Services Project 1
Building Services Project 1Building Services Project 1
Building Services Project 1Gertrude Lee
 
Cooling load calculations and principles
Cooling load calculations and principlesCooling load calculations and principles
Cooling load calculations and principlesDheiy Myth
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systemsbecoolseo
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning SystemSumit Ranjan
 
Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234KRISHAN KUMAR
 
Hvac formulas
Hvac formulasHvac formulas
Hvac formulashvactrg1
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac PresentationChoong KW
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginersguestf11b52
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load CalculationOrange Slides
 

Viewers also liked (18)

Building services i report
Building services i   reportBuilding services i   report
Building services i report
 
Building Services 1 Report
Building Services 1 ReportBuilding Services 1 Report
Building Services 1 Report
 
Building Services Report 2016
Building Services Report 2016Building Services Report 2016
Building Services Report 2016
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Module (1.2) psychometrics-air parameters-hvac_by ss-eng. juma
Module (1.2) psychometrics-air parameters-hvac_by ss-eng. jumaModule (1.2) psychometrics-air parameters-hvac_by ss-eng. juma
Module (1.2) psychometrics-air parameters-hvac_by ss-eng. juma
 
Psychometric chart how to use
Psychometric chart how to usePsychometric chart how to use
Psychometric chart how to use
 
Building Services Project 1
Building Services Project 1Building Services Project 1
Building Services Project 1
 
Cooling load calculations and principles
Cooling load calculations and principlesCooling load calculations and principles
Cooling load calculations and principles
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systems
 
Air Conditioning System
Air Conditioning SystemAir Conditioning System
Air Conditioning System
 
Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234Complete hvac ppt by kk 354647.pptx 1234
Complete hvac ppt by kk 354647.pptx 1234
 
HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 
HVAC Basic Concepts of Air Conditioning
HVAC Basic Concepts of Air ConditioningHVAC Basic Concepts of Air Conditioning
HVAC Basic Concepts of Air Conditioning
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Hvac formulas
Hvac formulasHvac formulas
Hvac formulas
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginers
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load Calculation
 

Similar to Fieldwork 2

Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii마 이환
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversingashleyyeap
 
Ss report 2 report
Ss report 2 reportSs report 2 report
Ss report 2 reportMELVIN tan
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Tee Joanne
 
Tacheometry survey of detailing
Tacheometry survey of detailingTacheometry survey of detailing
Tacheometry survey of detailingEr. Suman Jyoti
 
S2 6 theodolites
S2 6 theodolitesS2 6 theodolites
S2 6 theodolitesEst
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abiertaJeanCordova7
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1Est
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Est
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveysstudent
 

Similar to Fieldwork 2 (20)

Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
2 nd report
2 nd report2 nd report
2 nd report
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Ss report 2 report
Ss report 2 reportSs report 2 report
Ss report 2 report
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Tacheometry survey of detailing
Tacheometry survey of detailingTacheometry survey of detailing
Tacheometry survey of detailing
 
Total station corrections
Total station correctionsTotal station corrections
Total station corrections
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
S2 6 theodolites
S2 6 theodolitesS2 6 theodolites
S2 6 theodolites
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abierta
 
Group 1.pptx
Group 1.pptxGroup 1.pptx
Group 1.pptx
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
 
2520633.ppt
2520633.ppt2520633.ppt
2520633.ppt
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveys
 
Azimuth angles - Report
Azimuth angles - ReportAzimuth angles - Report
Azimuth angles - Report
 

More from Melvin Lim

PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment ReportMelvin Lim
 
Sydney Opera House
Sydney Opera HouseSydney Opera House
Sydney Opera HouseMelvin Lim
 
VM Final Report
VM Final ReportVM Final Report
VM Final ReportMelvin Lim
 
VM Final Presentation Slide
VM Final Presentation SlideVM Final Presentation Slide
VM Final Presentation SlideMelvin Lim
 
CL Final Report
CL Final ReportCL Final Report
CL Final ReportMelvin Lim
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Melvin Lim
 
DE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesDE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesMelvin Lim
 
Community Service Individual Report
Community Service Individual ReportCommunity Service Individual Report
Community Service Individual ReportMelvin Lim
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006Melvin Lim
 
Financial Analysis Report for Sycal Ventures Berhad
Financial Analysis Report for Sycal Ventures BerhadFinancial Analysis Report for Sycal Ventures Berhad
Financial Analysis Report for Sycal Ventures BerhadMelvin Lim
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation SlidesMelvin Lim
 
Financial Management Group Presentation Slides
Financial Management Group Presentation SlidesFinancial Management Group Presentation Slides
Financial Management Group Presentation SlidesMelvin Lim
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 AssignmentMelvin Lim
 
Lack of understanding and awareness
Lack of understanding and awarenessLack of understanding and awareness
Lack of understanding and awarenessMelvin Lim
 
Building Services - Efficient Energy Ventilation System
Building Services - Efficient Energy Ventilation SystemBuilding Services - Efficient Energy Ventilation System
Building Services - Efficient Energy Ventilation SystemMelvin Lim
 
Construction Technology Assignment
Construction Technology AssignmentConstruction Technology Assignment
Construction Technology AssignmentMelvin Lim
 
Building Material (Library Site report)
Building Material (Library Site report)Building Material (Library Site report)
Building Material (Library Site report)Melvin Lim
 
Building Material (Concrete)
Building Material (Concrete) Building Material (Concrete)
Building Material (Concrete) Melvin Lim
 

More from Melvin Lim (20)

PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
 
Sydney Opera House
Sydney Opera HouseSydney Opera House
Sydney Opera House
 
VM Final Report
VM Final ReportVM Final Report
VM Final Report
 
VM Final Presentation Slide
VM Final Presentation SlideVM Final Presentation Slide
VM Final Presentation Slide
 
CL Final Report
CL Final ReportCL Final Report
CL Final Report
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
 
DE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesDE/BE Workshop Presentation Slides
DE/BE Workshop Presentation Slides
 
Community Service Individual Report
Community Service Individual ReportCommunity Service Individual Report
Community Service Individual Report
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Financial Analysis Report for Sycal Ventures Berhad
Financial Analysis Report for Sycal Ventures BerhadFinancial Analysis Report for Sycal Ventures Berhad
Financial Analysis Report for Sycal Ventures Berhad
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation Slides
 
Financial Management Group Presentation Slides
Financial Management Group Presentation SlidesFinancial Management Group Presentation Slides
Financial Management Group Presentation Slides
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 Assignment
 
Lack of understanding and awareness
Lack of understanding and awarenessLack of understanding and awareness
Lack of understanding and awareness
 
Fieldwork 1
Fieldwork 1Fieldwork 1
Fieldwork 1
 
Building Services - Efficient Energy Ventilation System
Building Services - Efficient Energy Ventilation SystemBuilding Services - Efficient Energy Ventilation System
Building Services - Efficient Energy Ventilation System
 
Site report
Site reportSite report
Site report
 
Construction Technology Assignment
Construction Technology AssignmentConstruction Technology Assignment
Construction Technology Assignment
 
Building Material (Library Site report)
Building Material (Library Site report)Building Material (Library Site report)
Building Material (Library Site report)
 
Building Material (Concrete)
Building Material (Concrete) Building Material (Concrete)
Building Material (Concrete)
 

Recently uploaded

Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17Celine George
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesSHIVANANDaRV
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningMarc Dusseiller Dusjagr
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptNishitharanjan Rout
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxakanksha16arora
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of PlayPooky Knightsmith
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 

Recently uploaded (20)

Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptx
 
Our Environment Class 10 Science Notes pdf
Our Environment Class 10 Science Notes pdfOur Environment Class 10 Science Notes pdf
Our Environment Class 10 Science Notes pdf
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of Play
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 

Fieldwork 2

  • 1. SCHOOL OF ARCHITECTURAL, BUILDING & DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) AUGUST 2014 [QSB 60203] SITE SURVEYING Fieldwork 2 Group Member: Eley Chong Shu Hui 0319458 Melvin Lim 0315772 Moy Chin Hoong 0314014 Muhammad Hakim 0310371 Lecturer : CHAI VOON CHIET
  • 2. Contents Contents Pages Objective 1 Introduction to auto level 2 Field Data 3 Adjusted Data 4-7 Summary 8
  • 3. Objectives  To allow us to have a better understanding or knowledge about the process of using the instrument (Theodolite) rather than learning from a video in class.  To enable us to have the experience in using theodolite such as setting up, collaborating, calculating and recording data.  To enable us to know the methods to measure horizontal angles between lines.  To allow us to learn more about the life being a quantity surveyor.  To allow us to experience and expose to the actual working environment in site such as working under the hot weather.  To allow us to have the teamwork while carrying out the fieldwork.  To enable us to learn how to analyze the data collected.  To allow us to understand how to distribute different types of error from the data collected on field.  To enable us to have the knowledge in reading the positions on ranging rods.  To enable us to have a basic knowledge on how to set up the points.  To allow us to have the ability to undertake the site measurements and calculations.  To enable us to know the precautions should be taken while using Theodolite.
  • 4. Introduction to theodolite A theodolite is a precision instrument for measuring angles in the horizontal and vertical planes. Theodolites are used mainly for surveying applications, and have been adapted for specialized purposes in fields like meteorology and rocket launch technology. A modern theodolite consists of a movable telescope mounted within two perpendicular axes, the horizontal or trunnion axis, and the vertical axis. When the telescope is pointed at a target object, the angle of each of these axes can be measured with great precision, typically to seconds of arc. Theodolites may be either transit or non-transit. Transit theodolites are those in which the telescope can be inverted in the vertical plane, whereas the rotation in the same plane is restricted to a semi-circle for non-transit theodolites. Some types of transit theodolites do not allow the measurement of vertical angles. The builder's level is sometimes mistaken for a transit theodolite, but it measures neither horizontal nor vertical angles. It uses a spirit level to set a telescope level to define a line of sight along a horizontal plane. Electronic Theodolite
  • 5. Field Data D 89° 30’ 46” A 51.73 m 90° 12’ 50” C 89° 57’ 55” 51.64 m B 90° 11’ 45” 13.67 m 13.23 m Station Field Angles A 90°12’ 50” B 90° 11’ 45” C 89° 57’ 55” D 89° 30’ 46” Sum = 359° 53’ 16”
  • 6. Adjusted Data As known the sum of the interior angles in any loop transverse is equal to (n - 2) (180°) for geometric consistency, therefore (4 – 2) (180°) = 2 (180°) = 360° The total angular error = 360° 00’ 00” - 359° 53’ 16” = 0° 6’ 44” Therefore, error per angle = 0° 6’ 44”/4 = 0° 1’ 41” per angle Station Field Angles Correction Adjusted Angles A 90°12’ 50” +0° 1’ 41” 90° 14’ 31” B 90° 11’ 45” +0° 1’ 41” 90° 13’ 26” C 89° 57’ 55” +0° 1’ 41” 89° 59’ 36” D 89° 30’ 46” +0° 1’ 41” 89° 32’ 27” Sum = 359° 53’ 16” 360° 0’ 0” Computation for course azimuths Station Adjusted Angles Course Azimuths A-B 90° 14’ 31” 90° 14’ 31” B-C 90° 13’ 26” 90° 14’ 31” + 90° 13’ 26” - 180° = 0° 27’ 57” C-D 89° 59’ 36” 0° 27’ 57” + 89° 59’ 36” + 180° = 270° 27’ 33” D-A 89° 32’ 27” 270° 27’ 33” + 89° 32’ 27” - 180° = 180° 0’ 0”
  • 7. Computations for Latitude and Departure Cos ∂ Sin ∂ L cos ∂ L sin ∂ Station Azimuth, ∂ Length, L Cosine Sine Latitude Departure A 90° 14’ 31” 13.23 -0.0042 1.0000 -0.056 +13.230 B 0° 27’ 57” 51.64 1.0000 0.0081 +51.640 +0.418 C 270° 27’ 33” 13.67 0.0080 -1.0000 +0.109 -13.670 D 180° 0’ 0” 51.73 -1.0000 0.0000 -51.730 0 A Perimeter(P) = 130.27 m Sum of latitudes = ΣΔy = -0.037 m Sum of departures = ΣΔx = -0.022 m Error in departure ΣΔx = -0.022 m A Error in latitude ΣΔy = -0.037 m Ec, Total Error 0.043 m A’ Accuracy = 1: (P/Ec) Therefore, the accuracy = 1: (130.27/ 0.043) = 1: 3029.5 = 1: 3030 For average land surveying, an accuracy of about 1: 3000 is typical. Thus, the accuracy of field is acceptable.
  • 8. Adjust Course Latitudes and Departures Unadjusted Corrections Adjusted Station Latitude Departure Latitude Departure Latitude Departure A -0.056 +13.230 0.003 0.002 -0.053 +13.232 B +51.640 +0.418 0.015 0.009 +51.655 +0.427 C +0.109 -13.670 0.004 0.002 +0.113 -13.668 D -51.730 0 0.015 0.009 -51.715 +0.009 A Sum = -0.037 -0.022 0.037 0.022 0.0 0.0 Computation of Station Coordinates Assume that the coordinates of A is (100.000, 100.000) Station N Coordinate* Latitude E Coordinates* Departure A 100.000 100.000 -0.053 +13.232 B 99.947 113.232 +51.655 +0.427 C 151.602 113.659 +0.113 -13.668 D 151.715 99.991 -51.715 +0.009 A 100.00 100.000
  • 9. The adjusted loop traverse plotted by coordinates: Y axis (north) C D A B N 100.000 E 100.000 N 151.602 E 113.659 N 99.947 E 113.232 N 151.715 E 99.991 200 150 100 50 0 0 50 100 150 X axis (East)
  • 10. Summary A theodolite is a precision instrument for measuring angles in the horizontal and vertical planes. Theodolites are used mainly for surveying applications, and have been adapted for specialized purposes in fields like meteorology and rocket launch technology. We were assigned to use this instrument for angle calculation. In this experienced fieldwork, we needed more than 2 hours to complete the angle calculation. The first thing we did was setting up the instrument. We leveled the theodolite before we took the measurement. We took extra time to do that because to stabilize the instrument was a bit hard. Firstly, the theodolite is placed at station A and need to adjust the theodolite until it is in horizontal level. Then, the station A, B, C, D must be stated on the site to form a loop traverse by using the small stones. We use theodolite to measure the angles of four stations as our field data. During measurement, the vertical and horizontal angles will be shown on the digital readout panel. Everything went well but the readings were imperfect so we had to do some distribution error. Our total angular for the loop traverse is 359° 53’ 16” and the total angular error is about 0° 6’ 44”, therefore for each angle, it has 0° 1’ 41” error in angle. Before adjust the readings we get, the accuracy (1:3000) is important to be calculated to ensure the error of closure and accuracy are acceptable. Fortunately, the accuracy is about 1: 3030 that is a typical accuracy for average land surveying. The field data is adjusted and the coordinates of four stations are stated at the graph with assuming the coordinates of station A is (100.000, 100.000).