Chapter 6 – Theodolites
The main function of theodolite is to measure angles in the horizontal and vertical planes. It
is deemed as the scientifically most precise and versatile surveying instrument used for angle
measurements.
The digital theodolite nowadays enables the surveyor to measure angles to an accuracy of up
to 1” (1” = 1/3600°).
Applications of Theodolite in surveying:
• Laying of horizontal angles
• Locating points on line
• Prolonging survey lines
• Establishing grades
• Determining difference in elevation
• Setting out curves
• Aligning tunnels
A theodolite consists of a small moveable telescope that is linked with the mechanisms to
rotate vertically or horizontally. The theodolite telescope is fixed within perpendicular axes,
namely the vertical axis and the horizontal axis. The theodolite is also fixed on a base that can
be rotated on a tripod by a leveling system. Similar to the auto level, the theodolite needs to
be leveled before it is ready for taking measurements. This can be done by adjusting the foot
screw to bring the bubbles to the centre of the circular level and plate level. Also, the
theodolite needs to be aligned at the centre point of the desired station (normally marked by
the nail on a wooden peg). This can be done by moving the base of the theodolite while
observing the location of the wooden peg through the optical plummet. During measurement,
the vertical and horizontal angles will be shown on the digital readout panel. In summary, a
good setup of a theodolite must be both precisely leveled and centred.
Tacheometry
Tacheometry or tachemetry or telemetry is a branch of angular surveying in which the
horizontal and vertical distances of points are obtained by optical means, as opposed to the
ordinary slower process of measurements by tape or chain.
The method is very rapid and convenient but produces less accurate results.
It is best adopted in checking of already measured distance and preparation of topographic
maps which require both elevations and horizontal distances.
The tacheometry survey is carried out by suing the stadia diaphragm mounted in the telescope
of theodolite. The stadia diaphragm consists of one stadia hair above and the other an equal
distance below the middle horizontal cross hair.
The tacheometry survey can be divided into 3 methods:
1. Stadia method (or Fixed hair method)
2. Subtense method
3. Tangential method
The principal common to all the systems is to calculate the horizontal distance between two
points A and B and their distances in elevation.
Stadia method
A theodolite is set up at a survey point A, and a staff is held vertically at another survey point
B.
The readings on the staff corresponding to the all the three stadia (top, middle, bottom) are
taken. The difference of the readings corresponding to the top and bottom stadia wires will
therefore depend on the distance of the staff from the theodolite. For instance, the difference
in stadia readings (top stadia – bottom stadia) at the survey point B which is located nearer to
the theodolite should be smaller than that at survey point C, as shown in Figure below. Based
on this proportion, we can estimate the horizontal and vertical distance of any survey point
from the location of theodolite.
To apply the tacheometry survey, the data we need from the field survey includes:
i. vertical angle of the theodolite (θ)
ii. three stadia readings (top, middle, and bottom) of the leveling staff at the survey point
iii. height of the theodolite (h).
Subsequently, the horizontal and vertical distances between the survey points and the
theodolite can be calculated using the equations as follows:
D = K × s × cos2
(θ) + C × cos(θ)
V = (1/2) × K × s × sin(2θ) + C × sin(θ)
Where, D = horizontal distance between survey point and instrument
V = vertical distance between middle stadia and instrument
S = difference between top stadia and bottom stadia
θ = vertical angle of telescope from the horizontal line when capturing the
stadia readings
K = multiplying constant given by the manufacturer of the theodolite,
(normally = 100)
C = additive factor given by the manufacturer of the theodolite, (normally = 0)
Upon obtaining the vertical distance (V), the reduced level can be calculated at the survey
point, provided the reduced level at the point where theodolite is set up is known, as shown in
the Figure below.
RLB = RLX + h + V – r
Where RLB = reduced level at the survey point
RLA = reduced level at the station where theodolite is set up
h = height of theodolite
r = middle stadia reading
Example
A theodolite with a multiplying constant of 100 and 0 additive constant was set up over a
benchmark X and sighted on a leveling staff held vertically on a survey point Y. Given that
the reduced level at the benchmark X is 178.360 m, the height of the theodolite is 1.123 m,
and the three stadia readings at point Y captured through a telescope inclined slightly
downward at 2° are 2.323 m, 2.186 m, and 2.049 m, calculate
1. the horizontal distance of XY
2. the reduced level of point Y
Solution
Reduced level at Y = 176.34m
Example
A theodolite with a multiplying constant of 100 and 0 additive constant was set up over
benchmark A and sighted on a level staff held vertically on point B, and then on point C. The
reduced level at A is 101.238 m and the height of the theodolite from the ground is 1.298 m.
The surveying results are shown in the table below.
Calculate the difference in height between points B and C.
Solution
Example
A theodolite has a tacheometric constant of 100 and an additive constant of zero. The center
reading on a vertical staff held on a point B was 2.292 m when sighted from A. If the vertical
angle was + 25° and the horizontal distance AB 190.326 m, calculate the other staff readings
and thus show that the two intercept intervals are not equal. Using these values calculate the
level of B if A was 37.95 m and the height of the instrument 1.35 m.
From basic equation
CD = K × s × cos2
(θ) + C × cos(θ)
CD = 100 S cos2
θ + 0
190.326 = 100 S cos2
25°
∴ S = 2.316 m
From the figure below, HJ = S cos 25° = 2.1 m
Inclined distance CE = CD / cos 25° = 210 m
tan2α = HJ / CE: 2α = 2.1/210 rad = 0° 34’ 23”
α = 0° 17’ 11”
DG = CD tan (25 - α) = 87.594
DE = CD tan 25° = 88.749
DF = CD tan (25 + α) = 89.910
Hence, the stadia intervals are
GE = S1 = 1.155
EF = S2 = 1.161 (S = 1.155 + 1.161 = 2.316 m , check)
From which it is obvious that the
Upper reading = 2.292 + 1.161 = 3.453
Lower reading = 2.292 – 1.155 = 1.137
Vertical height DE = ∆H = CD tan 25° = 88.749
Level of B = 37.95 + 1.35 + 88.749 – 2.292 = 125.757 m
Trigonometrical levelling
Trigonomerical leveling is used where difficult terrain, such as mountainous areas, precludes
the use of conventional differential leveling.
The modern approach is to measure the slope distance and vertical angle to the point in
question. Slope distance is measured using electromagnetic distance measures and the
vertical (or zenith) angle using a theodolite.
When these two instruments are integrated into a single instrument it is called a ‘total station’.
Total stations contain hard-wired algorithms which calculate and display the horizontal
distance and vertical height.
Short lines
From figure 1 it can be seen that when measuring the vertical angle
∆h = S sin α
when using the zenith angle z
∆h = S cos z
If the horizontal distance is used
∆h = D tan α = D cot z
The difference in elevation (∆H) between ground points A and B is therefore
∆H = hi + ∆h - ht
= ∆h + hi - ht
where hi = vertical height of the measuring centre of the instrument above A
ht = vertical height of the center of the target above B
This is the basic concept of trigonometrical leveling. The vertical angles are positive for
angles of elevation and negative for angles of depression. The zenith angles are always
positive, but naturally when greater than 90° they will produce a negative result.

More Related Content

What's hot

Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volume
kmasz kamal
 
Chapter 4 earth work and quantities new
Chapter 4 earth work and quantities newChapter 4 earth work and quantities new
Chapter 4 earth work and quantities new
BashaFayissa1
 

What's hot (20)

Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 
Levelling
LevellingLevelling
Levelling
 
EDM ( Electronic distance meter)
EDM ( Electronic distance meter)EDM ( Electronic distance meter)
EDM ( Electronic distance meter)
 
Curves
CurvesCurves
Curves
 
Traversing
TraversingTraversing
Traversing
 
Topic 4 - Curve
Topic 4 - CurveTopic 4 - Curve
Topic 4 - Curve
 
tacheometry surveying
tacheometry surveyingtacheometry surveying
tacheometry surveying
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
 
Chain survey
Chain surveyChain survey
Chain survey
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volume
 
Chapter 4 earth work and quantities new
Chapter 4 earth work and quantities newChapter 4 earth work and quantities new
Chapter 4 earth work and quantities new
 
5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU5. AREAS AND VOLUMES (SUR) 3140601 GTU
5. AREAS AND VOLUMES (SUR) 3140601 GTU
 
Lecture 1 precise levelling
Lecture 1 precise levellingLecture 1 precise levelling
Lecture 1 precise levelling
 
Lecture9 traverse
Lecture9 traverseLecture9 traverse
Lecture9 traverse
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
 
Traversing
TraversingTraversing
Traversing
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 

Similar to S2 6 theodolites

Tachymetry survey POLITEKNIK MELAKA
Tachymetry survey POLITEKNIK MELAKATachymetry survey POLITEKNIK MELAKA
Tachymetry survey POLITEKNIK MELAKA
Riezat Zainal
 

Similar to S2 6 theodolites (20)

Tacheometry 1
Tacheometry 1Tacheometry 1
Tacheometry 1
 
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
 
tacheometric-surveying.pdf
tacheometric-surveying.pdftacheometric-surveying.pdf
tacheometric-surveying.pdf
 
Tacheometric-Surveying.ppt
Tacheometric-Surveying.pptTacheometric-Surveying.ppt
Tacheometric-Surveying.ppt
 
Laboratory manual surveying_ii
Laboratory manual surveying_iiLaboratory manual surveying_ii
Laboratory manual surveying_ii
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 
UNIT 1.pptx
UNIT 1.pptxUNIT 1.pptx
UNIT 1.pptx
 
Tachymetry survey POLITEKNIK MELAKA
Tachymetry survey POLITEKNIK MELAKATachymetry survey POLITEKNIK MELAKA
Tachymetry survey POLITEKNIK MELAKA
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Trigonometric Levelling theory
Trigonometric Levelling theoryTrigonometric Levelling theory
Trigonometric Levelling theory
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abierta
 
Trigonometric levelling
Trigonometric  levellingTrigonometric  levelling
Trigonometric levelling
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
3140601_surveying_module-6-tacheometric-surveying.pdf
3140601_surveying_module-6-tacheometric-surveying.pdf3140601_surveying_module-6-tacheometric-surveying.pdf
3140601_surveying_module-6-tacheometric-surveying.pdf
 
Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)
 
Surveying_en.pdf
Surveying_en.pdfSurveying_en.pdf
Surveying_en.pdf
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
Est
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
Est
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
Est
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
Est
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
Est
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
Est
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
Est
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
Est
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
Est
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
Est
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
Est
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
Est
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
Est
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 

Recently uploaded

一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
wsppdmt
 
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
eehzz
 
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdfJohn Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
Excavator
 
出售伯明翰大学毕业证研究生文凭证书原版质量
出售伯明翰大学毕业证研究生文凭证书原版质量出售伯明翰大学毕业证研究生文凭证书原版质量
出售伯明翰大学毕业证研究生文凭证书原版质量
kthcah
 
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Cara Menggugurkan Kandungan 087776558899
 
mechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbxmechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbx
joshuaclack73
 
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
zovambe
 
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
avy6anjnd
 
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
avy6anjnd
 
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
fhjlokjhi
 
如何办理(NCL毕业证书)纽卡斯尔大学毕业证毕业证成绩单原版一比一
如何办理(NCL毕业证书)纽卡斯尔大学毕业证毕业证成绩单原版一比一如何办理(NCL毕业证书)纽卡斯尔大学毕业证毕业证成绩单原版一比一
如何办理(NCL毕业证书)纽卡斯尔大学毕业证毕业证成绩单原版一比一
avy6anjnd
 

Recently uploaded (20)

一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
 
Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be WrongIs Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
 
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
 
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdfJohn Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
 
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
 
出售伯明翰大学毕业证研究生文凭证书原版质量
出售伯明翰大学毕业证研究生文凭证书原版质量出售伯明翰大学毕业证研究生文凭证书原版质量
出售伯明翰大学毕业证研究生文凭证书原版质量
 
SEM 922 MOTOR GRADER PARTS LIST, ALL WHEEL DRIVE
SEM 922 MOTOR GRADER PARTS LIST, ALL WHEEL DRIVESEM 922 MOTOR GRADER PARTS LIST, ALL WHEEL DRIVE
SEM 922 MOTOR GRADER PARTS LIST, ALL WHEEL DRIVE
 
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
 
mechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbxmechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbx
 
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's WhyIs Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
 
Preparing for Transportation Electrification: The Electric Coop Perspective
Preparing for Transportation Electrification: The Electric Coop PerspectivePreparing for Transportation Electrification: The Electric Coop Perspective
Preparing for Transportation Electrification: The Electric Coop Perspective
 
What Does It Mean When Mercedes Says 'ESP Inoperative See Owner's Manual'
What Does It Mean When Mercedes Says 'ESP Inoperative See Owner's Manual'What Does It Mean When Mercedes Says 'ESP Inoperative See Owner's Manual'
What Does It Mean When Mercedes Says 'ESP Inoperative See Owner's Manual'
 
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
 
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
 
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
 
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
 
Exploring the Heart of Alberta: A Journey from Calgary to Edmonton
Exploring the Heart of Alberta: A Journey from Calgary to EdmontonExploring the Heart of Alberta: A Journey from Calgary to Edmonton
Exploring the Heart of Alberta: A Journey from Calgary to Edmonton
 
John deere 7200r 7230R 7260R Problems Repair Manual
John deere 7200r 7230R 7260R Problems Repair ManualJohn deere 7200r 7230R 7260R Problems Repair Manual
John deere 7200r 7230R 7260R Problems Repair Manual
 
Seamless Driving Experience Premier Mini Cooper Clutch Solutions
Seamless Driving Experience Premier Mini Cooper Clutch SolutionsSeamless Driving Experience Premier Mini Cooper Clutch Solutions
Seamless Driving Experience Premier Mini Cooper Clutch Solutions
 
如何办理(NCL毕业证书)纽卡斯尔大学毕业证毕业证成绩单原版一比一
如何办理(NCL毕业证书)纽卡斯尔大学毕业证毕业证成绩单原版一比一如何办理(NCL毕业证书)纽卡斯尔大学毕业证毕业证成绩单原版一比一
如何办理(NCL毕业证书)纽卡斯尔大学毕业证毕业证成绩单原版一比一
 

S2 6 theodolites

  • 1. Chapter 6 – Theodolites The main function of theodolite is to measure angles in the horizontal and vertical planes. It is deemed as the scientifically most precise and versatile surveying instrument used for angle measurements. The digital theodolite nowadays enables the surveyor to measure angles to an accuracy of up to 1” (1” = 1/3600°). Applications of Theodolite in surveying: • Laying of horizontal angles • Locating points on line • Prolonging survey lines
  • 2. • Establishing grades • Determining difference in elevation • Setting out curves • Aligning tunnels A theodolite consists of a small moveable telescope that is linked with the mechanisms to rotate vertically or horizontally. The theodolite telescope is fixed within perpendicular axes, namely the vertical axis and the horizontal axis. The theodolite is also fixed on a base that can be rotated on a tripod by a leveling system. Similar to the auto level, the theodolite needs to be leveled before it is ready for taking measurements. This can be done by adjusting the foot screw to bring the bubbles to the centre of the circular level and plate level. Also, the theodolite needs to be aligned at the centre point of the desired station (normally marked by the nail on a wooden peg). This can be done by moving the base of the theodolite while observing the location of the wooden peg through the optical plummet. During measurement, the vertical and horizontal angles will be shown on the digital readout panel. In summary, a good setup of a theodolite must be both precisely leveled and centred. Tacheometry Tacheometry or tachemetry or telemetry is a branch of angular surveying in which the horizontal and vertical distances of points are obtained by optical means, as opposed to the ordinary slower process of measurements by tape or chain. The method is very rapid and convenient but produces less accurate results. It is best adopted in checking of already measured distance and preparation of topographic maps which require both elevations and horizontal distances. The tacheometry survey is carried out by suing the stadia diaphragm mounted in the telescope of theodolite. The stadia diaphragm consists of one stadia hair above and the other an equal distance below the middle horizontal cross hair.
  • 3. The tacheometry survey can be divided into 3 methods: 1. Stadia method (or Fixed hair method) 2. Subtense method 3. Tangential method The principal common to all the systems is to calculate the horizontal distance between two points A and B and their distances in elevation. Stadia method A theodolite is set up at a survey point A, and a staff is held vertically at another survey point B. The readings on the staff corresponding to the all the three stadia (top, middle, bottom) are taken. The difference of the readings corresponding to the top and bottom stadia wires will therefore depend on the distance of the staff from the theodolite. For instance, the difference in stadia readings (top stadia – bottom stadia) at the survey point B which is located nearer to the theodolite should be smaller than that at survey point C, as shown in Figure below. Based on this proportion, we can estimate the horizontal and vertical distance of any survey point from the location of theodolite. To apply the tacheometry survey, the data we need from the field survey includes: i. vertical angle of the theodolite (θ) ii. three stadia readings (top, middle, and bottom) of the leveling staff at the survey point iii. height of the theodolite (h). Subsequently, the horizontal and vertical distances between the survey points and the theodolite can be calculated using the equations as follows:
  • 4. D = K × s × cos2 (θ) + C × cos(θ) V = (1/2) × K × s × sin(2θ) + C × sin(θ) Where, D = horizontal distance between survey point and instrument V = vertical distance between middle stadia and instrument S = difference between top stadia and bottom stadia θ = vertical angle of telescope from the horizontal line when capturing the stadia readings K = multiplying constant given by the manufacturer of the theodolite, (normally = 100) C = additive factor given by the manufacturer of the theodolite, (normally = 0) Upon obtaining the vertical distance (V), the reduced level can be calculated at the survey point, provided the reduced level at the point where theodolite is set up is known, as shown in the Figure below. RLB = RLX + h + V – r Where RLB = reduced level at the survey point RLA = reduced level at the station where theodolite is set up h = height of theodolite r = middle stadia reading
  • 5. Example A theodolite with a multiplying constant of 100 and 0 additive constant was set up over a benchmark X and sighted on a leveling staff held vertically on a survey point Y. Given that the reduced level at the benchmark X is 178.360 m, the height of the theodolite is 1.123 m, and the three stadia readings at point Y captured through a telescope inclined slightly downward at 2° are 2.323 m, 2.186 m, and 2.049 m, calculate 1. the horizontal distance of XY 2. the reduced level of point Y Solution Reduced level at Y = 176.34m
  • 6. Example A theodolite with a multiplying constant of 100 and 0 additive constant was set up over benchmark A and sighted on a level staff held vertically on point B, and then on point C. The reduced level at A is 101.238 m and the height of the theodolite from the ground is 1.298 m. The surveying results are shown in the table below. Calculate the difference in height between points B and C. Solution
  • 7. Example A theodolite has a tacheometric constant of 100 and an additive constant of zero. The center reading on a vertical staff held on a point B was 2.292 m when sighted from A. If the vertical angle was + 25° and the horizontal distance AB 190.326 m, calculate the other staff readings and thus show that the two intercept intervals are not equal. Using these values calculate the level of B if A was 37.95 m and the height of the instrument 1.35 m. From basic equation CD = K × s × cos2 (θ) + C × cos(θ) CD = 100 S cos2 θ + 0 190.326 = 100 S cos2 25° ∴ S = 2.316 m From the figure below, HJ = S cos 25° = 2.1 m Inclined distance CE = CD / cos 25° = 210 m tan2α = HJ / CE: 2α = 2.1/210 rad = 0° 34’ 23” α = 0° 17’ 11” DG = CD tan (25 - α) = 87.594 DE = CD tan 25° = 88.749 DF = CD tan (25 + α) = 89.910 Hence, the stadia intervals are GE = S1 = 1.155 EF = S2 = 1.161 (S = 1.155 + 1.161 = 2.316 m , check) From which it is obvious that the
  • 8. Upper reading = 2.292 + 1.161 = 3.453 Lower reading = 2.292 – 1.155 = 1.137 Vertical height DE = ∆H = CD tan 25° = 88.749 Level of B = 37.95 + 1.35 + 88.749 – 2.292 = 125.757 m Trigonometrical levelling Trigonomerical leveling is used where difficult terrain, such as mountainous areas, precludes the use of conventional differential leveling. The modern approach is to measure the slope distance and vertical angle to the point in question. Slope distance is measured using electromagnetic distance measures and the vertical (or zenith) angle using a theodolite. When these two instruments are integrated into a single instrument it is called a ‘total station’. Total stations contain hard-wired algorithms which calculate and display the horizontal distance and vertical height. Short lines From figure 1 it can be seen that when measuring the vertical angle ∆h = S sin α when using the zenith angle z ∆h = S cos z If the horizontal distance is used ∆h = D tan α = D cot z The difference in elevation (∆H) between ground points A and B is therefore ∆H = hi + ∆h - ht = ∆h + hi - ht where hi = vertical height of the measuring centre of the instrument above A ht = vertical height of the center of the target above B
  • 9. This is the basic concept of trigonometrical leveling. The vertical angles are positive for angles of elevation and negative for angles of depression. The zenith angles are always positive, but naturally when greater than 90° they will produce a negative result.