GROUP MEMBERS:
MELVIN LIM
VOON SZE LUN
JAKE SIA
ERVING TIONG
SHEILA ANN
Building Economics
Group Presentation
Land Parcel @ Cecil Telok Ayer Street
 20-storey office floors, 3 commercial floors and 1
underground basement floors.
 Total GFA of overall project 77,162 m2
 100 m2 F&B Kiosk located at Open Space area.
 Pedestrian walkway is constructed to connect plot A1
with A2
Project Brief
1.
Project Brief
2.
Site Plan
Perspective
3.
Side ElevationFront Elevation
Cost Plan
4.
Description Percentage (%) Contract Sum (RM)
Preliminaries 10.0% 35,485,540.00
Architecture & Finishes Works 30.0% 106,456,620.00
Structural Cost 28.0% 99,359,512.00
M & E Works 24.0% 85,165,296.00
External Work 3.0% 10,645,662.00
Green certification 5.0% 17,742,770.00
TOTAL 100.0% 354,855,400.00
Benchmark Project
5.
Project : Kuala Lumpur Petronas Twin Towers
Location : Kuala Lumpur City Centre
Total Gross Development Cost : RM7.05billion
Gross Floor Area : 1,672,254.72 m2
Unit Cost per m2 : RM4,215.86 /m2
Green Re Rating : Gold
Benchmark Project
6.
Green Features
i. Storm water design
KLCC has retention tank basin with water treatment system which able to
clean the debris from the rainwater and allow them flow back into the
ground.
ii. Light Pollution Reduction
KLCC has reduced exterior lighting to prevent the light sent up into the sky.
This is better for the nocturnal animal and also better stars view in the sky.
Benchmark Project
7.
iii. Lighting System Design and Controllability
The light in KLCC is controlled by occupancy sensors and daylight sensors.
When the surrounding is filled with sunlight, the light will turn off
automatically.
iv. Low Impact Cleaning & Maintenance Equipment
KLCC cleaning department only use environmentally –friendly cleaning
equipments to keep the air clean and fresh.
Green Features
Parameters
8.
Source
9.
10.
Parameters
Cost Appraisal
11.
Proposed Materials
Internal Doors
INTERNAL DOORS
GLAZING
GLASS IN OPENINGS
Clear float glass as specified
6mm Thick to metal rebates with glazing compound
0.50m2 – 1.0m2
RM 65 per m2
12.
Proposed Materials
Glass Wall
INTERNAL WALLS & PARTITIONS
GLAZING
GLASS IN OPENINGS
Clear float glass as specified
6mm Thick to metal rebates with glazing compound
Over 1.00m2
RM 67 per m2
13.
Carpet
INTERNAL FLOOR FINISHES
FLOOR, WALL AND CEILING FINISHINGS
FLOOR
Fitted Carpeting
Approved carpet tile synthetic fibre heavy duty 500mm x 500mm multi level texture loop pile
780gm/m2 including adhesive to PVC fibre glass reinforcement backing and all joint thermo welded
to form a seemless flooring all in accordance with manufacturer's instruction to floor
RM 80 per m2
Proposed Materials
Floor Finishes
14.
Semi-glazed ceramic tiles = RM
95.80/m2
Proposed Materials
Floor Finishes
15.
Roller Shutter = RM 3606.10/No.
Proposed Materials
Roller Shutter
16.
Proposed Materials
Park Furniture
Floral Patio Garden Park Bench
RM 439.00
Basic Outdoor Patio Park Bench
RM 439.00
17.
RM 536.00 RM 4591.30
Proposed Materials
Park Furniture
18.
Softscape (Plant)
TURFING AND SOFT LANDSCAPING
FENCING, TURFING AND PLANTING
PLANTING
Supply, plant and maintain as specified, the following
landscaping work as shown in the drawing
Tree
Bauhinia Purpurea; 75mm diameter x 2.00m height.
RM 258.31 per number of tree
Proposed Materials
Softscapes
19.
Softscape (Turve)
TURFING AND SOFT LANDSCAPING
FENCING, TURFING AND PLANTING
SEEDING AND TURFING
Close Turfing
225mm x 225mm approved cow grass turves as specified
obtained from Contractor's own source; trimming, levelling and
grading surfaces; 50mm thick top soil as specified, watering and
tendering until well established; replacing badly grow turves to
slopes and embankments
RM6 per m2
Proposed Materials
Softscapes
20.
Proposed Materials
Water Features
7.3JF 3 Phase Lake and
Pond Aerating Fountai0n
RM 36,543.74
• Multiple patterns in one unit
• Efficient/low power use
• Clog resistant
• Rugged motor: environmentally friendly design with a hard-
face internal mechanical seal and external lip seal for protection
against leaks; seals are silicone carbide for long life; long-life
top and bottom ball bearings; flood oil lubricated for excellent
heat dissipation
• Corrosion resistant: superior all external metal motor, float,
and hardware components are of stainless steel composition
and protected by a sacrificial zinc anode
• Low maintenance: clean the motor housing once or twice per
year and replacing the sacrificial zinc anode when visibly
corroded
21.
22.
Cost Appraisal
Concrete G30 = RM 42/m
Tempered Glass = RM 178.50/m2
Proposed Materials
Pedestrian Network
23.
Proposed Materials
Night Lighting
Solar Space LED Streetlight
RM 1,190.90
LED Tile 20x10cm Outdoor Ground Light
RM 1186.75
24.
25.
Cost Appraisal
26.
Cost Appraisal
THE END
Thank
YouQ: Why did the Banana go to the Doctor? A: It wasn’t peeling well..

Building Economics Group Presentation Slides

  • 1.
    GROUP MEMBERS: MELVIN LIM VOONSZE LUN JAKE SIA ERVING TIONG SHEILA ANN Building Economics Group Presentation Land Parcel @ Cecil Telok Ayer Street
  • 2.
     20-storey officefloors, 3 commercial floors and 1 underground basement floors.  Total GFA of overall project 77,162 m2  100 m2 F&B Kiosk located at Open Space area.  Pedestrian walkway is constructed to connect plot A1 with A2 Project Brief 1.
  • 3.
  • 4.
  • 5.
    Cost Plan 4. Description Percentage(%) Contract Sum (RM) Preliminaries 10.0% 35,485,540.00 Architecture & Finishes Works 30.0% 106,456,620.00 Structural Cost 28.0% 99,359,512.00 M & E Works 24.0% 85,165,296.00 External Work 3.0% 10,645,662.00 Green certification 5.0% 17,742,770.00 TOTAL 100.0% 354,855,400.00
  • 6.
    Benchmark Project 5. Project :Kuala Lumpur Petronas Twin Towers Location : Kuala Lumpur City Centre Total Gross Development Cost : RM7.05billion Gross Floor Area : 1,672,254.72 m2 Unit Cost per m2 : RM4,215.86 /m2 Green Re Rating : Gold
  • 7.
    Benchmark Project 6. Green Features i.Storm water design KLCC has retention tank basin with water treatment system which able to clean the debris from the rainwater and allow them flow back into the ground. ii. Light Pollution Reduction KLCC has reduced exterior lighting to prevent the light sent up into the sky. This is better for the nocturnal animal and also better stars view in the sky.
  • 8.
    Benchmark Project 7. iii. LightingSystem Design and Controllability The light in KLCC is controlled by occupancy sensors and daylight sensors. When the surrounding is filled with sunlight, the light will turn off automatically. iv. Low Impact Cleaning & Maintenance Equipment KLCC cleaning department only use environmentally –friendly cleaning equipments to keep the air clean and fresh. Green Features
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
    Proposed Materials Internal Doors INTERNALDOORS GLAZING GLASS IN OPENINGS Clear float glass as specified 6mm Thick to metal rebates with glazing compound 0.50m2 – 1.0m2 RM 65 per m2 12.
  • 14.
    Proposed Materials Glass Wall INTERNALWALLS & PARTITIONS GLAZING GLASS IN OPENINGS Clear float glass as specified 6mm Thick to metal rebates with glazing compound Over 1.00m2 RM 67 per m2 13.
  • 15.
    Carpet INTERNAL FLOOR FINISHES FLOOR,WALL AND CEILING FINISHINGS FLOOR Fitted Carpeting Approved carpet tile synthetic fibre heavy duty 500mm x 500mm multi level texture loop pile 780gm/m2 including adhesive to PVC fibre glass reinforcement backing and all joint thermo welded to form a seemless flooring all in accordance with manufacturer's instruction to floor RM 80 per m2 Proposed Materials Floor Finishes 14.
  • 16.
    Semi-glazed ceramic tiles= RM 95.80/m2 Proposed Materials Floor Finishes 15.
  • 17.
    Roller Shutter =RM 3606.10/No. Proposed Materials Roller Shutter 16.
  • 18.
    Proposed Materials Park Furniture FloralPatio Garden Park Bench RM 439.00 Basic Outdoor Patio Park Bench RM 439.00 17.
  • 19.
    RM 536.00 RM4591.30 Proposed Materials Park Furniture 18.
  • 20.
    Softscape (Plant) TURFING ANDSOFT LANDSCAPING FENCING, TURFING AND PLANTING PLANTING Supply, plant and maintain as specified, the following landscaping work as shown in the drawing Tree Bauhinia Purpurea; 75mm diameter x 2.00m height. RM 258.31 per number of tree Proposed Materials Softscapes 19.
  • 21.
    Softscape (Turve) TURFING ANDSOFT LANDSCAPING FENCING, TURFING AND PLANTING SEEDING AND TURFING Close Turfing 225mm x 225mm approved cow grass turves as specified obtained from Contractor's own source; trimming, levelling and grading surfaces; 50mm thick top soil as specified, watering and tendering until well established; replacing badly grow turves to slopes and embankments RM6 per m2 Proposed Materials Softscapes 20.
  • 22.
    Proposed Materials Water Features 7.3JF3 Phase Lake and Pond Aerating Fountai0n RM 36,543.74 • Multiple patterns in one unit • Efficient/low power use • Clog resistant • Rugged motor: environmentally friendly design with a hard- face internal mechanical seal and external lip seal for protection against leaks; seals are silicone carbide for long life; long-life top and bottom ball bearings; flood oil lubricated for excellent heat dissipation • Corrosion resistant: superior all external metal motor, float, and hardware components are of stainless steel composition and protected by a sacrificial zinc anode • Low maintenance: clean the motor housing once or twice per year and replacing the sacrificial zinc anode when visibly corroded 21.
  • 23.
  • 24.
    Concrete G30 =RM 42/m Tempered Glass = RM 178.50/m2 Proposed Materials Pedestrian Network 23.
  • 25.
    Proposed Materials Night Lighting SolarSpace LED Streetlight RM 1,190.90 LED Tile 20x10cm Outdoor Ground Light RM 1186.75 24.
  • 26.
  • 27.
  • 28.