1.0 Introduction to traversing
Traversing is that type of survey in which a number of connected survey lines form the
framework and the directions and lengths of the survey lines are measured with the help of
an angle measuring instrument and a tape or chain respectively.
1.1 Types of Traverse
➔ Closed traverse: When the lines form a circuit which ends at the starting point, it is
known as closed traverse.
➔ Open traverse : When the lines form a circuit ends elsewhere except starting point, it
is said to be an open traverse.
1.11 Open Traverse
An open traverse is one which does not close on the point of the beginning. It begins at a
point of known position and ends at a station whose point is unknown. This traverse type is
not recommended because there is no geometric verification possible with respect to the
actual positioning of the traverse stations.It is commonly used for the line center survey for
highway,railroad and etc.
OPEN TRAVERSE
Image source:www.artillerysurveyors131.com.au
3
1.12 Closed Traverse
A closed traverse is one enclosing a defined area and having a common point for its
beginning and end point or at a point whose relative position is known. It is commonly used
for locating the boundaries of lakes,property and etc.
There are two types of closed traverse:-
1. Loop Traverse - The starting point and the ending point of the loop are located at the
same point, a closed geometric figure called a polygon will be formed. The ending
point will be the same with the beginning point if you were to move along the sides of
the closed traverse. Loop traverse are best surveyed in a counterclockwise
direction,with interior angles ‘turned’ to the right.
Image source:files.carlsonsw.com
2. Connecting Traverse - It looks like an open traverse ,except that it begins and ends
at points (or lines) of known position (and direction) at each end of the traverse.
Deflection angles must be identified as being turned either clockwise,that is,to the
right (R) ,or counterclockwise to the (L).
Image source:jerrymahun.com
4
1.2 Azimuths
The azimuth of a line defined as the clockwise horizontal angle from reference line. The
reference direction normally is from north .The range of the angle should be from 0º to 360º.
The example of the azimuth is 120º or 140º.
1.3 Bearing
A bearing of a line defined as the acute angle(<90º) from the north (N) or the south (S) end
of meridian. It has the addition designation of east (E) or west (W), whichever applies . The
angle of the bearing should never greater than 90º. The example of bearing is S60ºE or
N70ºW.
Image source:www.e-education.psu.edu
1.4 Selection of Traverse Stations
● The chosen control traverse stations need to be as close as possible to the features
or objects
● The chosen control traverse stations need to form a suitable shape.
● Cost and time of the survey will increase if too many points are established
● Sufficient control may not be provided for the survey if too few points are established.
● The ground of the survey area should be accessible where the traverse legs are
tapped.
● The length of the traverse legs are needed to be almost the same.
5
1.5 Acceptable Misclosure
In common, for land surveying an accuracy of about 1:3000 is typical. The acceptable
misclosure can be calculated by using the formulae below:-
Accuracy= 1 : (P/Ec)
P= Perimeter
E= Error of closure (computed from the error in departure and error in latitude ,using the
Pythagorean theorem)
Classification First Order Second Order
(Class I)
Second Order
(Class II)
Third Order
(Class I)
Third Order
(Class II)
Recommended
spacing of
principal
stations
Network
stations 10-
15km ; other
surveys
seldom less
than 3km
Principal
stations
seldom less
than 4km,
except in
metropolitan
area surveys
,where the
limitation is
0.3 km
Principal
stations
seldom less
than 2km,
except in
metropolitan
area surveys
,where the
limitation is
0.2 km
Seldom less
than 0.1 km
in tertiary
surveys in
metropolitan
area surveys
; as required
for other
surveys
Seldom less
than 0.1 km in
tertiary
surveys in
metropolitan
area surveys ;
as required
for other
surveys
Position
closure after
azimuth
adjustment
0.04m √K or
1:100,000
0.08m √K or
1:50,000
0.2m √K or
1:20,000
0.4m √K or
1:10,000
0.8m √K or
1:5000
Table: Traverse Specifications - United States
Source: From Federal Control Committee,United States,1974.
6
1.6 Traverse Computations
Traverse computations is the process of taking field measurement through a series of
mathematical calculations to determine final traverse size and configuration. These
calculations include error compensation as well as reformation to determine quantities not
directly measured.
Traditional traverse computation steps are:
1. Balance (adjust) angles
2. Determine line directions
3. Compute latitudes and departures
4. Adjust the traverse misclosure
5. Determine adjusted line lengths and directions
6. Compute coordinates
7. Compute area
The order of some steps can be changed. For example, steps 1 and 2 would be reversed for
closed link traverses with directions at both ends. Balancing angles would normally not be
done If a least squares adjustment is used at step 4.
The complete series of computations can only be performed on closed traverses. That's
because some of the steps require adjustment of errors and, as discussed before, errors
can't be identified in an open traverse.
7
1.7 Outline Apparatus
Theodolites are used mainly for surveying applications. It is a
precision instrument for measuring angles in the horizontal
and vertical angles, distance, depth and etc. It is used to
identify the ground level and the ways to construct ‘super-
structure or
sub-structure. A modern theodolite consists of a movable
telescope and it is able to rotate 360 degree on a tripod stand
by the leveling system. When the telescope is pointed at a
target object, the angle of each of these axes can be
measured with great precision. The calculation of the angles is
based on the used in triangulation network and geo-location work.
Tripod stand consists of a portable three-legged frame. It is
used to provide stability by supporting the weight and
maintaining the balance of the instrument on top of it. The
three legs are moved away from the vertical centre and the leg
lengths are adjusted to bring the tripod head to a convenient
height and make it roughly level. After that screw the
instrument on it and make sure both of them are precisely
positioned.
Plumb bob is an instrument to make sure the object is
placed perpendicularly. It is a weight with a pointed
bottom that is suspended from a string to determine a
vertical line. It’s usually used to mark a point directly
under the theodolite.
8
Spirit level is designed to indicate whether the surface is
horizontal or vertical. A slightly curved glass tube which
incompletely filled with either alcohol or spirit, leaving a
bubble in the tube. On a flat surface, the bubble naturally
rest in the center, the highest point.
Optical ‘plumnet is a detachable base for theodolites
to indicate the center of it over a ground station. It is
used in place of plumb bob to center theodolites and
transits over a given point due to its steadiness in
strong winds during surveying process. It can speed
up the set-up procedure and protect the theodolite
from any accident because there’s a lock below it to
screw itself towards the device using during the
fieldwork.
Ranging poles are used to mark areas and to set out
straight lines on the field. They are also used to mark
points that must be seen from a distance, in which
case a flag may be attached to improve the visibility.
Ranging poles are straight round stalks, 3 to 4 cm
9
thick and about 2m long. They are usually painted with alternate red-white or black-white bands.
2.0 Objectives
● To learn the principles of running a closed field traverse.
● To enhance the student knowledge in the traversing procedure
● To be familiar with the setting up of the theodolite
● To determine the error of misclosure in order to compute the accuracy of the work
● To determine the adjusted independent coordinates of the traverse station so that they
can be plotted on the drawing sheet
10
3.0 Field Data
Station
A 82º 44’ 30’’
B 94º 39’ 50’’
C 87º 46’ 30’’
D 94º 46’ 50’’
Sum 359º 57’ 40’’
11
3.1 Compute the angular error and adjust the angles.
The sum of the interior angles in any loop must be equal (n - 2) (180º) for geometric
consistency;
Sum of interior angle= (n - 2) (180º)
= (4 - 2) (180º)
= 360º
Total angular error = 360º 00’ 00’’ - 359º 57’ 40’’
= 0º 02’ 20’’
Error per angle = 0º 02’ 20’’ / 4
= 0º 0’ 35’’ per angle
Station Angles Correction Adjusted Angles
A 82º 44’ 30’’ + 0º 0’ 35” 82º 45’ 05’’
B 94º 39’ 50’’ + 0º 0’ 35” 94º 40’ 25’’
C 87º 46’ 30’’ + 0º 0’ 35” 87º 47’ 05”
D 94º 46’ 50’’ + 0º 0’ 35” 94º 47’ 25”
Sum 359º 57’ 40’’ 360º 00’ 00”
12
3.2 Calculate the Horizontal and Vertical Distance Between the Survey Points and the
Theodolite
Survey Points and the Theodolite
The horizontal and vertical distances between the survey points and the theodolite can be
calculated using the equations as follows:
Equation
;
D = k x S x cos2 (θ) + C x cos
Where,
D = Horizontal distance between survey point and instrument
S = Difference between top stadia and bottom stadia
θ = Vertical angle of telescope from the horizontal line when capturing the stadia readings
K = Multiplying constant given by the manufacturer of the theodolite,
(normally = 0 )
C = Addictive factor given b y the manufacturer of the theodolite
(normally = 0 )
13
Distance A-B
Top Stadia: 1.730
Medium Stadia: 1.465
Bottom Stadia: 1.250
Top Stadia: 1.670
Medium Stadia: 1.475
Bottom Stadia: 1.280
Distance A-B = [ (K x s x Cos2 θ) + ( C x Cos θ )
= [ 100 x ( 1.730 - 1.250 ) Cos2 θ ] + ( 0 x Cos θ )
= 53.7742 m
Distance A-B = [ (K x s x Cos2 θ) + ( C x Cos θ )
= [ 100 x ( 1.670 - 1.280 ) Cos2 θ ] + ( 0 x Cos θ )
= 45.5760 m
Average distance = ( 53.7742 m + 45.5760 m ) / 2
= 49.6751 m
Distance B-C
Top Stadia: 1.520
Medium Stadia: 1.453
Bottom Stadia: 1.263
Top Stadia: 1.326
Medium Stadia: 1.260
Bottom Stadia: 1.080
Distance B-C = [ (K x s x Cos2 θ) + ( C x Cos θ )
= [ 100 x ( 1.520 - 1.263 ) Cos2 θ ] + ( 0 x Cos θ )
= 33.7420 m
Distance B-C = [ (K x s x Cos2 θ) + ( C x Cos θ )
= [ 100 x ( 1.326 - 1.080 ) Cos2 θ ] + ( 0 x Cos θ )
= 24.7060 m
Average distance = ( 33.7420 m + 24.7060 m ) / 2
= 29.2240 m
14
Distance C-D
Top Stadia: 1.490
Medium Stadia: 1.272
Bottom Stadia: 1.030
Top Stadia: 1.620
Medium Stadia: 1.550
Bottom Stadia: 1.130
Distance C-D = [ (K x s x Cos2 θ) + ( C x Cos θ )
= [ 100 x ( 1.490 - 1.030 ) Cos2 θ ] + ( 0 x Cos θ )
= 49.7726 m
Distance C-D = [ (K x s x Cos2 θ) + ( C x Cos θ )
= [ 100 x ( 1.620 - 1.130 ) Cos2 θ ] + ( 0 x Cos θ )
= 46.4762 m
Average distance = ( 49.7726 m + 46.4762 m ) / 2
= 48.1244 m
Distance D-A
Top Stadia: 1.463
Medium Stadia: 1.350
Bottom Stadia: 1.189
Top Stadia: 1.826
Medium Stadia: 1.680
Bottom Stadia: 1.530
Distance D-A = [ (K x s x Cos2 θ) + ( C x Cos θ )
= [ 100 x ( 1.463 - 1.189 ) Cos2 θ ] + ( 0 x Cos θ )
= 30.9954 m
Distance C-D = [ (K x s x Cos2 θ) + ( C x Cos θ )
= [ 100 x ( 1.826 - 1.530 ) Cos2 θ ] + ( 0 x Cos θ )
= 31.9806 m
Average distance = ( 30.9954 m + 31.9806 m ) / 2
= 31.4880 m
15
3.3 Compute course bearing and azimuth
Azimuth Bearing
A-B 00° 00’ 00” N 00° 00’ 00”
B-C 180° 00’ 00”
+ 94° 40’ 25”
_____________
274° 40’ 25”
_____________
N 85° 19’ 35” W
16
C-D 87° 47’05”
+ 94° 40’ 25”
____________
182° 27’ 30”
____________
182° 27’ 30”
- 180° 00’ 00”
____________
2° 27’ 30”
____________
S 2° 27’ 30” W
D-A 94° 47’ 25”
+ 2° 27’ 30”
____________
97° 14’ 55”
____________
180° 00’ 00”
- 97° 14’ 55”
____________
82° 45’ 05”
____________
S 82° 45’ 05” E
17
3.4 Compute Latitude and Departure
Image source:www.cfr.washington.edu
Cos β Sin β L cos β L sin β
Station Bearing, β Length, L Cosine Sine Latitude Departure
A
N 00° 00’ 00” 49.6751 1.0000 0.0000 + 49.6751 0.0000
B
N 85° 19’ 35” W 29.2240 0.0818 0.9967 + 2.3905 - 29.1276
C
S 2° 27’ 30” W 48.1244 0.9991 0.0429 - 48.0811 - 2.0645
D
S 82° 45’ 05” E 31.4880 0.1262 0.9920 - 3.9738 + 31.2361
A
Total Perimeter (P) = 158.5115
Sum of
Latitude:
ΣΔy = 0.0107
Sum of
Departure:
ΣΔx = 0.0440
18
3.5 Determine The Error of Closure
Accuracy = 1 : (P/Ec)
For average land surveying an accuracy of about 1 : 3000 is typical
Ec = [ (sum of latitude)2
+ (sum of departure)2
]1/2
= [ ( 0.0107 )2
+ ( 0.0440 )2
]1/2
= 0.0453 m
P = 158.5115 m
Accuracy = 1 : ( 158.5115 / 0.0453 )
= 1 : 3499
Therefore, the traversing is acceptable.
19
3.6 Adjust Course Latitude and Departure
The Compass Rule
Correction = - [ ΣΔy ] / P x L or - [ ΣΔx ] P / L
Where,
ΣΔy and ΣΔx = The error in latitude and departure
P = Total length of perimeter of the traverse
L = Length of a particular course
Station Unadjusted Corrections Adjusted
Latitude Departure Latitude Departure Latitude Departure
A
+ 49.6751 0.0000 - 0.0034 - 0.0138 + 49.6717 - 0.0138
B
+ 2.3905 - 29.1276 - 0.0020 - 0.0081 + 2.3885 - 29.1357
C
- 48.0811 - 2.0645 - 0.0032 - 0.0134 - 48.0843 - 2.0779
D
- 3.9738 + 31.2361 - 0.0021 - 0.0087 - 3.9759 + 31.2274
A
Σ= + 0.0107 + 0.0440 - 0.0107 - 0.0440 0.00 0.00
Check Check
20
Latitude correction
● The correction to the latitude of course A-B is
[ - 0.0107 / 158.5115 ] x 49.6751 = - 0.0034
● The correction to the latitude of course B-C is
[ - 0.0107 / 158.5115 ] x 29.2240 = - 0.0020
● The correction to the latitude of course C-D is
[ - 0.0107 / 158.5115 ] x 48.1244 = - 0.0032
● The correction to the latitude of course D-A is
[ - 0.0107 / 158.5115 ] x 31.4880 = - 0.0021
Departure correction
● The correction to the departure of course A-B is
[ -0.0440 / 158.5115 ] x 49.6751 = - 0.0138
● The correction to the departure of course B-C is
[ -0.0440 / 158.5115 ] x 29.2240 = - 0.0081
● The correction to the departure of course C-D is
[ -0.0440 / 158.5115 ] x 48.1244 = - 0.0134
● The correction to the departure of course D-A is
[ -0.0440 / 158.5115 ] x 31.4880 = - 0.0087
3.7 Compute station coordinates
21
N2 = N1 + Lat1-2
E2 = E1 + Dep1-2
Where,
N2 and E2 = The Y and X coordinates of station 2
N1 and E1 = The Y and X coordinates of station 1
Lat1-2 = The latitude of course 1-2
Dep1-2 = The departure of course 1-2
Station N Coordinate* Latitude E Coordinate* Departure
A 100.0000 ( Assumed )
+ 49.6717
129.1495
-0.0138 Start/ return here for lat. check
Start/ return here for dep. Check
(Course lat. and dep.)
B 149.6717
+2.3885
129.1357
-29.1357
C 152.0602
-48.0843
100.0000
-2.0779
D 103.9759
-3.9759
97.9221
+31.2274
A 100.0000 129.1495
* Compass - Adjusted Coordinates
Table 0f Computation of Station Coordinate
22
3.8 Loop Traverse Plotted Using Coordinate ( Graph)
The adjusted loop traverse plotted by coordinates.
23
4.0 Discussion
In this field work, we are required to investigate the survey method which is the closed loop
traverse. A traverse is a series of consecutive lines whose ends have been marked on the
field, and whose lengths and directions (angle, bearing, or azimuth) have been determined
from measurements. There are two types of traverse which is the closed traverse and open
traverse. We found that the close traverse gives a higher accuracy because open traverse
offers no means of checking for errors or mistakes.
First, we are exposed to the method of using the apparatus which is the electronic distance
measurement (EDM). A detailed explanation has been given by our lecturer before the work
is conducted. Four points are roughly set and was noted as station A, B, C and D. These
four points are set to form a quadrilateral shape as we are conducting the simplest closed
loop traverse.
Then, we used the theodolite to measure the angle of the station A, B, C and D and the data
is recorded for further calculations. We first start with the angle measurement at station A.
The apparatus is set up at station A, the data is collected by reading through the theodolite
on station B and D. This step is repeated by setting the apparatus on the following stations
to obtain the angle on that particular station. Both vertical and horizontal angles which are
showed on the digital panel of the theodolite have been recorded.
The stadias (top, middle and bottom) readings are recorded for calculation of the horizontal
24
and vertical distances between the stations. This is known as the stadia method. The
calculation is given by the equation:
D = k x S x cos2 (θ) + C x cos
When calculating the error, we have obtained 359º 57’ 40’’ for our total interior angle, which
is 2’ 20’’ less than the optimum total interior angle of a quadrilateral (360º). The optimum
total interior angle is calculated by
𝛴 = (𝒏− 𝟐) ∗ 𝟏𝟖𝟎º
The error at each angle has been calculated and each angle is adjusted by adding 0º 0’ 35”.
Latitude and departure error is calculated then, which are 0.0107 and 0.0440 respectively.
The total error is 0.0453 which is given by equation
Ec = [ (sum of latitude)2
+ (sum of departure)2
]1/2
And so, the accuracy is calculated with equation
Accuracy = 1 : (P/Ec)
The value obtained is 1:3499 which meets the optimum accuracy for average land surveying
1:3000 and hence, our traverse survey is acceptable.
Latitude and departure are then being adjusted by using the compass rule:
Correction = - [ ΣΔy ] / P x L or - [ ΣΔx ] P / L
Lastly, a graph is plotted with the coordinates achieved for all the four stations.
There are few precautions have to be taken in consideration when using the apparatus when
measurement is conducting.
25
1. Special care should be taken to avoid any situation that might result in the theodolite
being dropped or otherwise subjected to a severe jar.
2. Inspect the theodolite for loose parts and screws. Remove dust from the objective
lens and eyepiece with a lens brush and lens tissue using procedures consistent with
delicate optics. Keep the lens covered with the theodolite is not in use. Use a
sunshade to protect the lens from the direct rays of the sun.
3. The graduated circles and venires are coated with a lacquer to retard oxidation.
Avoid touching these parts. A thin film of oil applied with a lintless cloth will aid in
keeping the surfaces clean.
4. Store the theodolite in its case or other dry dust free location when not in use.
5. If the theodolite is to be taken from a cool environment to a warm one (especially in
humid conditions) allow the theodolite to warm up inside its case where it will not be
subject to condensation.
As any surveyor should understand, all measurements are in error. We may only try to
minimize error and calculate reasonable tolerances, but not eliminating the errors.
In conclusion, we have gained some useful knowledge on how a survey is done as it’s a
hand-on work that we have to conduct ourselves to obtain the data needed. It links up all the
theories we learned in class, giving us a deeper understanding as we worked practically on
field. It can be useful in the future as we know how a distance is measured in order to
construct a level building, or how a boundary of certain area is determined by this surveying
method.
It is pleased to have team members which are able to work together as a team in completing
the task given. The objectives set primarily are achieved easily since everyone in the team
gives fully support and cooperation throughout the survey work and report writing. Each
team members is willing to share their thoughts and ideas when discussion is conducted and
it’s a good attitude as we are able to learn from each other and broaden our mindset. Credits
are to be given to our lecturer as well for teaching and guiding us on how the survey work is
done and how the apparatus is used. It will be our pleasure if we are able to work together in
the next work soon.

More Related Content

What's hot

Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levellingYASMINE HASLAN
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreportKiplimoCalvin
 
Full report of survey camp at Linggi, Malacca
Full report of survey camp at Linggi, Malacca Full report of survey camp at Linggi, Malacca
Full report of survey camp at Linggi, Malacca Aini Habir
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - ReportSarchia Khursheed
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: TransversingFarah Sham
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - LevellingKai Yun Pang
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Enoch Wong
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic engamira688
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingDolat Ram
 
Ukur aras-levelling
Ukur aras-levellingUkur aras-levelling
Ukur aras-levellingUTHM
 
Ukur terabas teodolit
Ukur terabas teodolitUkur terabas teodolit
Ukur terabas teodolitNik M Farid
 
SURVEY ALIP SETTING OUT (1).docx
SURVEY ALIP SETTING OUT (1).docxSURVEY ALIP SETTING OUT (1).docx
SURVEY ALIP SETTING OUT (1).docxAliffHaiqal32
 
Theory &amp; practical theodolite traverse
Theory &amp; practical theodolite traverseTheory &amp; practical theodolite traverse
Theory &amp; practical theodolite traverseMohd Firdaus Ismail
 

What's hot (20)

Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreport
 
Full report of survey camp at Linggi, Malacca
Full report of survey camp at Linggi, Malacca Full report of survey camp at Linggi, Malacca
Full report of survey camp at Linggi, Malacca
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: Transversing
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Levelling report
Levelling reportLevelling report
Levelling report
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic eng
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Ukur aras-levelling
Ukur aras-levellingUkur aras-levelling
Ukur aras-levelling
 
Ukur terabas teodolit
Ukur terabas teodolitUkur terabas teodolit
Ukur terabas teodolit
 
SURVEY ALIP SETTING OUT (1).docx
SURVEY ALIP SETTING OUT (1).docxSURVEY ALIP SETTING OUT (1).docx
SURVEY ALIP SETTING OUT (1).docx
 
Lecture 1 precise levelling
Lecture 1 precise levellingLecture 1 precise levelling
Lecture 1 precise levelling
 
Fw2
Fw2Fw2
Fw2
 
Theory &amp; practical theodolite traverse
Theory &amp; practical theodolite traverseTheory &amp; practical theodolite traverse
Theory &amp; practical theodolite traverse
 

Viewers also liked

Site surveying-Leveling
Site surveying-LevelingSite surveying-Leveling
Site surveying-LevelingShane Ah
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii마 이환
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELINGFarah Sham
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Haziq1511
 

Viewers also liked (6)

Site surveying-Leveling
Site surveying-LevelingSite surveying-Leveling
Site surveying-Leveling
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 

Similar to Sem 2 Site surveying report 2

Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversingashleyyeap
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptNITINSURESH30
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignmentSze Ting Kuek
 
Ss report 2
Ss report 2Ss report 2
Ss report 2Shen Sin
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveyingPhurba Tamang
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traversesEst
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) PartBishnuBhandari12
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.pptAsadKhan606012
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docxalexandermwaura
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric surveyStudent
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offsetMir Zafarullah
 

Similar to Sem 2 Site surveying report 2 (20)

Traversing
TraversingTraversing
Traversing
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .ppt
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) Part
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docx
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
triangulation.pptx
triangulation.pptxtriangulation.pptx
triangulation.pptx
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
ch7-traverse calcs.pdf
ch7-traverse calcs.pdfch7-traverse calcs.pdf
ch7-traverse calcs.pdf
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offset
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmEst
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM PartneringEst
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in constructionEst
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscmEst
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangementEst
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systemsEst
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmEst
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignmentEst
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MSEst
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrmEst
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergEst
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationEst
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communicationEst
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 

Recently uploaded

FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | DelhiFULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | DelhiMalviyaNagarCallGirl
 
Call Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceCall Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceAyesha Khan
 
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...dajasot375
 
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Availabledollysharma2066
 
Kishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
Kishangarh Call Girls : ☎ 8527673949, Low rate Call GirlsKishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
Kishangarh Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiMalviyaNagarCallGirl
 
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call GirlsJagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
SHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
SHIVNA SAHITYIKI APRIL JUNE 2024 MagazineSHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
SHIVNA SAHITYIKI APRIL JUNE 2024 MagazineShivna Prakashan
 
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | DelhiFULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | DelhiMalviyaNagarCallGirl
 
MinSheng Gaofeng Estate commercial storyboard
MinSheng Gaofeng Estate commercial storyboardMinSheng Gaofeng Estate commercial storyboard
MinSheng Gaofeng Estate commercial storyboardjessica288382
 
Govindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
Govindpuri Call Girls : ☎ 8527673949, Low rate Call GirlsGovindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
Govindpuri Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
San Jon Motel, Motel/Residence, San Jon NM
San Jon Motel, Motel/Residence, San Jon NMSan Jon Motel, Motel/Residence, San Jon NM
San Jon Motel, Motel/Residence, San Jon NMroute66connected
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtowndajasot375
 
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiMalviyaNagarCallGirl
 
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts ServiceRussian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Servicedoor45step
 
Khanpur Call Girls : ☎ 8527673949, Low rate Call Girls
Khanpur Call Girls : ☎ 8527673949, Low rate Call GirlsKhanpur Call Girls : ☎ 8527673949, Low rate Call Girls
Khanpur Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Roadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMRoadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMroute66connected
 
Karachi Escorts | +923070433345 | Escort Service in Karachi
Karachi Escorts | +923070433345 | Escort Service in KarachiKarachi Escorts | +923070433345 | Escort Service in Karachi
Karachi Escorts | +923070433345 | Escort Service in KarachiAyesha Khan
 
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiMalviyaNagarCallGirl
 

Recently uploaded (20)

FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | DelhiFULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
FULL ENJOY - 9953040155 Call Girls in Dwarka Mor | Delhi
 
Call Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl ServiceCall Girls in Islamabad | 03274100048 | Call Girl Service
Call Girls in Islamabad | 03274100048 | Call Girl Service
 
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
Call Girl in Bur Dubai O5286O4116 Indian Call Girls in Bur Dubai By VIP Bur D...
 
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
 
Kishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
Kishangarh Call Girls : ☎ 8527673949, Low rate Call GirlsKishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
Kishangarh Call Girls : ☎ 8527673949, Low rate Call Girls
 
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
 
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call GirlsJagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
 
SHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
SHIVNA SAHITYIKI APRIL JUNE 2024 MagazineSHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
SHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
 
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | DelhiFULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Mahipalpur | Delhi
 
MinSheng Gaofeng Estate commercial storyboard
MinSheng Gaofeng Estate commercial storyboardMinSheng Gaofeng Estate commercial storyboard
MinSheng Gaofeng Estate commercial storyboard
 
Govindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
Govindpuri Call Girls : ☎ 8527673949, Low rate Call GirlsGovindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
Govindpuri Call Girls : ☎ 8527673949, Low rate Call Girls
 
San Jon Motel, Motel/Residence, San Jon NM
San Jon Motel, Motel/Residence, San Jon NMSan Jon Motel, Motel/Residence, San Jon NM
San Jon Motel, Motel/Residence, San Jon NM
 
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in DowntownDowntown Call Girls O5O91O128O Pakistani Call Girls in Downtown
Downtown Call Girls O5O91O128O Pakistani Call Girls in Downtown
 
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Paschim Vihar | Delhi
 
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts ServiceRussian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
 
Khanpur Call Girls : ☎ 8527673949, Low rate Call Girls
Khanpur Call Girls : ☎ 8527673949, Low rate Call GirlsKhanpur Call Girls : ☎ 8527673949, Low rate Call Girls
Khanpur Call Girls : ☎ 8527673949, Low rate Call Girls
 
Roadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NMRoadrunner Lodge, Motel/Residence, Tucumcari NM
Roadrunner Lodge, Motel/Residence, Tucumcari NM
 
Karachi Escorts | +923070433345 | Escort Service in Karachi
Karachi Escorts | +923070433345 | Escort Service in KarachiKarachi Escorts | +923070433345 | Escort Service in Karachi
Karachi Escorts | +923070433345 | Escort Service in Karachi
 
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
 
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Uttam Nagar | Delhi
 

Sem 2 Site surveying report 2

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB60103103946-M Site Surveying Fieldwork Report 2 TRAVERSE GROUP MEMBERS STUDENT ID Liew Li Wen 0324297 Lim Kar Yan 0325602 Tan Hwee Min 0326057 Esther Chuah Ning Sie 0321422
  • 2. 1 TABLE OF CONTENT Content Pages Cover Page 1 Table of Content 2 Introduction 3 - 8 Objectives 9 Data and Results 10 - 22 Discussion 23 - 25
  • 3. 2 1.0 Introduction to traversing Traversing is that type of survey in which a number of connected survey lines form the framework and the directions and lengths of the survey lines are measured with the help of an angle measuring instrument and a tape or chain respectively. 1.1 Types of Traverse ➔ Closed traverse: When the lines form a circuit which ends at the starting point, it is known as closed traverse. ➔ Open traverse : When the lines form a circuit ends elsewhere except starting point, it is said to be an open traverse. 1.11 Open Traverse An open traverse is one which does not close on the point of the beginning. It begins at a point of known position and ends at a station whose point is unknown. This traverse type is not recommended because there is no geometric verification possible with respect to the actual positioning of the traverse stations.It is commonly used for the line center survey for highway,railroad and etc. OPEN TRAVERSE Image source:www.artillerysurveyors131.com.au
  • 4. 3 1.12 Closed Traverse A closed traverse is one enclosing a defined area and having a common point for its beginning and end point or at a point whose relative position is known. It is commonly used for locating the boundaries of lakes,property and etc. There are two types of closed traverse:- 1. Loop Traverse - The starting point and the ending point of the loop are located at the same point, a closed geometric figure called a polygon will be formed. The ending point will be the same with the beginning point if you were to move along the sides of the closed traverse. Loop traverse are best surveyed in a counterclockwise direction,with interior angles ‘turned’ to the right. Image source:files.carlsonsw.com 2. Connecting Traverse - It looks like an open traverse ,except that it begins and ends at points (or lines) of known position (and direction) at each end of the traverse. Deflection angles must be identified as being turned either clockwise,that is,to the right (R) ,or counterclockwise to the (L). Image source:jerrymahun.com
  • 5. 4 1.2 Azimuths The azimuth of a line defined as the clockwise horizontal angle from reference line. The reference direction normally is from north .The range of the angle should be from 0º to 360º. The example of the azimuth is 120º or 140º. 1.3 Bearing A bearing of a line defined as the acute angle(<90º) from the north (N) or the south (S) end of meridian. It has the addition designation of east (E) or west (W), whichever applies . The angle of the bearing should never greater than 90º. The example of bearing is S60ºE or N70ºW. Image source:www.e-education.psu.edu 1.4 Selection of Traverse Stations ● The chosen control traverse stations need to be as close as possible to the features or objects ● The chosen control traverse stations need to form a suitable shape. ● Cost and time of the survey will increase if too many points are established ● Sufficient control may not be provided for the survey if too few points are established. ● The ground of the survey area should be accessible where the traverse legs are tapped. ● The length of the traverse legs are needed to be almost the same.
  • 6. 5 1.5 Acceptable Misclosure In common, for land surveying an accuracy of about 1:3000 is typical. The acceptable misclosure can be calculated by using the formulae below:- Accuracy= 1 : (P/Ec) P= Perimeter E= Error of closure (computed from the error in departure and error in latitude ,using the Pythagorean theorem) Classification First Order Second Order (Class I) Second Order (Class II) Third Order (Class I) Third Order (Class II) Recommended spacing of principal stations Network stations 10- 15km ; other surveys seldom less than 3km Principal stations seldom less than 4km, except in metropolitan area surveys ,where the limitation is 0.3 km Principal stations seldom less than 2km, except in metropolitan area surveys ,where the limitation is 0.2 km Seldom less than 0.1 km in tertiary surveys in metropolitan area surveys ; as required for other surveys Seldom less than 0.1 km in tertiary surveys in metropolitan area surveys ; as required for other surveys Position closure after azimuth adjustment 0.04m √K or 1:100,000 0.08m √K or 1:50,000 0.2m √K or 1:20,000 0.4m √K or 1:10,000 0.8m √K or 1:5000 Table: Traverse Specifications - United States Source: From Federal Control Committee,United States,1974.
  • 7. 6 1.6 Traverse Computations Traverse computations is the process of taking field measurement through a series of mathematical calculations to determine final traverse size and configuration. These calculations include error compensation as well as reformation to determine quantities not directly measured. Traditional traverse computation steps are: 1. Balance (adjust) angles 2. Determine line directions 3. Compute latitudes and departures 4. Adjust the traverse misclosure 5. Determine adjusted line lengths and directions 6. Compute coordinates 7. Compute area The order of some steps can be changed. For example, steps 1 and 2 would be reversed for closed link traverses with directions at both ends. Balancing angles would normally not be done If a least squares adjustment is used at step 4. The complete series of computations can only be performed on closed traverses. That's because some of the steps require adjustment of errors and, as discussed before, errors can't be identified in an open traverse.
  • 8. 7 1.7 Outline Apparatus Theodolites are used mainly for surveying applications. It is a precision instrument for measuring angles in the horizontal and vertical angles, distance, depth and etc. It is used to identify the ground level and the ways to construct ‘super- structure or sub-structure. A modern theodolite consists of a movable telescope and it is able to rotate 360 degree on a tripod stand by the leveling system. When the telescope is pointed at a target object, the angle of each of these axes can be measured with great precision. The calculation of the angles is based on the used in triangulation network and geo-location work. Tripod stand consists of a portable three-legged frame. It is used to provide stability by supporting the weight and maintaining the balance of the instrument on top of it. The three legs are moved away from the vertical centre and the leg lengths are adjusted to bring the tripod head to a convenient height and make it roughly level. After that screw the instrument on it and make sure both of them are precisely positioned. Plumb bob is an instrument to make sure the object is placed perpendicularly. It is a weight with a pointed bottom that is suspended from a string to determine a vertical line. It’s usually used to mark a point directly under the theodolite.
  • 9. 8 Spirit level is designed to indicate whether the surface is horizontal or vertical. A slightly curved glass tube which incompletely filled with either alcohol or spirit, leaving a bubble in the tube. On a flat surface, the bubble naturally rest in the center, the highest point. Optical ‘plumnet is a detachable base for theodolites to indicate the center of it over a ground station. It is used in place of plumb bob to center theodolites and transits over a given point due to its steadiness in strong winds during surveying process. It can speed up the set-up procedure and protect the theodolite from any accident because there’s a lock below it to screw itself towards the device using during the fieldwork. Ranging poles are used to mark areas and to set out straight lines on the field. They are also used to mark points that must be seen from a distance, in which case a flag may be attached to improve the visibility. Ranging poles are straight round stalks, 3 to 4 cm
  • 10. 9 thick and about 2m long. They are usually painted with alternate red-white or black-white bands. 2.0 Objectives ● To learn the principles of running a closed field traverse. ● To enhance the student knowledge in the traversing procedure ● To be familiar with the setting up of the theodolite ● To determine the error of misclosure in order to compute the accuracy of the work ● To determine the adjusted independent coordinates of the traverse station so that they can be plotted on the drawing sheet
  • 11. 10 3.0 Field Data Station A 82º 44’ 30’’ B 94º 39’ 50’’ C 87º 46’ 30’’ D 94º 46’ 50’’ Sum 359º 57’ 40’’
  • 12. 11 3.1 Compute the angular error and adjust the angles. The sum of the interior angles in any loop must be equal (n - 2) (180º) for geometric consistency; Sum of interior angle= (n - 2) (180º) = (4 - 2) (180º) = 360º Total angular error = 360º 00’ 00’’ - 359º 57’ 40’’ = 0º 02’ 20’’ Error per angle = 0º 02’ 20’’ / 4 = 0º 0’ 35’’ per angle Station Angles Correction Adjusted Angles A 82º 44’ 30’’ + 0º 0’ 35” 82º 45’ 05’’ B 94º 39’ 50’’ + 0º 0’ 35” 94º 40’ 25’’ C 87º 46’ 30’’ + 0º 0’ 35” 87º 47’ 05” D 94º 46’ 50’’ + 0º 0’ 35” 94º 47’ 25” Sum 359º 57’ 40’’ 360º 00’ 00”
  • 13. 12 3.2 Calculate the Horizontal and Vertical Distance Between the Survey Points and the Theodolite Survey Points and the Theodolite The horizontal and vertical distances between the survey points and the theodolite can be calculated using the equations as follows: Equation ; D = k x S x cos2 (θ) + C x cos Where, D = Horizontal distance between survey point and instrument S = Difference between top stadia and bottom stadia θ = Vertical angle of telescope from the horizontal line when capturing the stadia readings K = Multiplying constant given by the manufacturer of the theodolite, (normally = 0 ) C = Addictive factor given b y the manufacturer of the theodolite (normally = 0 )
  • 14. 13 Distance A-B Top Stadia: 1.730 Medium Stadia: 1.465 Bottom Stadia: 1.250 Top Stadia: 1.670 Medium Stadia: 1.475 Bottom Stadia: 1.280 Distance A-B = [ (K x s x Cos2 θ) + ( C x Cos θ ) = [ 100 x ( 1.730 - 1.250 ) Cos2 θ ] + ( 0 x Cos θ ) = 53.7742 m Distance A-B = [ (K x s x Cos2 θ) + ( C x Cos θ ) = [ 100 x ( 1.670 - 1.280 ) Cos2 θ ] + ( 0 x Cos θ ) = 45.5760 m Average distance = ( 53.7742 m + 45.5760 m ) / 2 = 49.6751 m Distance B-C Top Stadia: 1.520 Medium Stadia: 1.453 Bottom Stadia: 1.263 Top Stadia: 1.326 Medium Stadia: 1.260 Bottom Stadia: 1.080 Distance B-C = [ (K x s x Cos2 θ) + ( C x Cos θ ) = [ 100 x ( 1.520 - 1.263 ) Cos2 θ ] + ( 0 x Cos θ ) = 33.7420 m Distance B-C = [ (K x s x Cos2 θ) + ( C x Cos θ ) = [ 100 x ( 1.326 - 1.080 ) Cos2 θ ] + ( 0 x Cos θ ) = 24.7060 m Average distance = ( 33.7420 m + 24.7060 m ) / 2 = 29.2240 m
  • 15. 14 Distance C-D Top Stadia: 1.490 Medium Stadia: 1.272 Bottom Stadia: 1.030 Top Stadia: 1.620 Medium Stadia: 1.550 Bottom Stadia: 1.130 Distance C-D = [ (K x s x Cos2 θ) + ( C x Cos θ ) = [ 100 x ( 1.490 - 1.030 ) Cos2 θ ] + ( 0 x Cos θ ) = 49.7726 m Distance C-D = [ (K x s x Cos2 θ) + ( C x Cos θ ) = [ 100 x ( 1.620 - 1.130 ) Cos2 θ ] + ( 0 x Cos θ ) = 46.4762 m Average distance = ( 49.7726 m + 46.4762 m ) / 2 = 48.1244 m Distance D-A Top Stadia: 1.463 Medium Stadia: 1.350 Bottom Stadia: 1.189 Top Stadia: 1.826 Medium Stadia: 1.680 Bottom Stadia: 1.530 Distance D-A = [ (K x s x Cos2 θ) + ( C x Cos θ ) = [ 100 x ( 1.463 - 1.189 ) Cos2 θ ] + ( 0 x Cos θ ) = 30.9954 m Distance C-D = [ (K x s x Cos2 θ) + ( C x Cos θ ) = [ 100 x ( 1.826 - 1.530 ) Cos2 θ ] + ( 0 x Cos θ ) = 31.9806 m Average distance = ( 30.9954 m + 31.9806 m ) / 2 = 31.4880 m
  • 16. 15 3.3 Compute course bearing and azimuth Azimuth Bearing A-B 00° 00’ 00” N 00° 00’ 00” B-C 180° 00’ 00” + 94° 40’ 25” _____________ 274° 40’ 25” _____________ N 85° 19’ 35” W
  • 17. 16 C-D 87° 47’05” + 94° 40’ 25” ____________ 182° 27’ 30” ____________ 182° 27’ 30” - 180° 00’ 00” ____________ 2° 27’ 30” ____________ S 2° 27’ 30” W D-A 94° 47’ 25” + 2° 27’ 30” ____________ 97° 14’ 55” ____________ 180° 00’ 00” - 97° 14’ 55” ____________ 82° 45’ 05” ____________ S 82° 45’ 05” E
  • 18. 17 3.4 Compute Latitude and Departure Image source:www.cfr.washington.edu Cos β Sin β L cos β L sin β Station Bearing, β Length, L Cosine Sine Latitude Departure A N 00° 00’ 00” 49.6751 1.0000 0.0000 + 49.6751 0.0000 B N 85° 19’ 35” W 29.2240 0.0818 0.9967 + 2.3905 - 29.1276 C S 2° 27’ 30” W 48.1244 0.9991 0.0429 - 48.0811 - 2.0645 D S 82° 45’ 05” E 31.4880 0.1262 0.9920 - 3.9738 + 31.2361 A Total Perimeter (P) = 158.5115 Sum of Latitude: ΣΔy = 0.0107 Sum of Departure: ΣΔx = 0.0440
  • 19. 18 3.5 Determine The Error of Closure Accuracy = 1 : (P/Ec) For average land surveying an accuracy of about 1 : 3000 is typical Ec = [ (sum of latitude)2 + (sum of departure)2 ]1/2 = [ ( 0.0107 )2 + ( 0.0440 )2 ]1/2 = 0.0453 m P = 158.5115 m Accuracy = 1 : ( 158.5115 / 0.0453 ) = 1 : 3499 Therefore, the traversing is acceptable.
  • 20. 19 3.6 Adjust Course Latitude and Departure The Compass Rule Correction = - [ ΣΔy ] / P x L or - [ ΣΔx ] P / L Where, ΣΔy and ΣΔx = The error in latitude and departure P = Total length of perimeter of the traverse L = Length of a particular course Station Unadjusted Corrections Adjusted Latitude Departure Latitude Departure Latitude Departure A + 49.6751 0.0000 - 0.0034 - 0.0138 + 49.6717 - 0.0138 B + 2.3905 - 29.1276 - 0.0020 - 0.0081 + 2.3885 - 29.1357 C - 48.0811 - 2.0645 - 0.0032 - 0.0134 - 48.0843 - 2.0779 D - 3.9738 + 31.2361 - 0.0021 - 0.0087 - 3.9759 + 31.2274 A Σ= + 0.0107 + 0.0440 - 0.0107 - 0.0440 0.00 0.00 Check Check
  • 21. 20 Latitude correction ● The correction to the latitude of course A-B is [ - 0.0107 / 158.5115 ] x 49.6751 = - 0.0034 ● The correction to the latitude of course B-C is [ - 0.0107 / 158.5115 ] x 29.2240 = - 0.0020 ● The correction to the latitude of course C-D is [ - 0.0107 / 158.5115 ] x 48.1244 = - 0.0032 ● The correction to the latitude of course D-A is [ - 0.0107 / 158.5115 ] x 31.4880 = - 0.0021 Departure correction ● The correction to the departure of course A-B is [ -0.0440 / 158.5115 ] x 49.6751 = - 0.0138 ● The correction to the departure of course B-C is [ -0.0440 / 158.5115 ] x 29.2240 = - 0.0081 ● The correction to the departure of course C-D is [ -0.0440 / 158.5115 ] x 48.1244 = - 0.0134 ● The correction to the departure of course D-A is [ -0.0440 / 158.5115 ] x 31.4880 = - 0.0087 3.7 Compute station coordinates
  • 22. 21 N2 = N1 + Lat1-2 E2 = E1 + Dep1-2 Where, N2 and E2 = The Y and X coordinates of station 2 N1 and E1 = The Y and X coordinates of station 1 Lat1-2 = The latitude of course 1-2 Dep1-2 = The departure of course 1-2 Station N Coordinate* Latitude E Coordinate* Departure A 100.0000 ( Assumed ) + 49.6717 129.1495 -0.0138 Start/ return here for lat. check Start/ return here for dep. Check (Course lat. and dep.) B 149.6717 +2.3885 129.1357 -29.1357 C 152.0602 -48.0843 100.0000 -2.0779 D 103.9759 -3.9759 97.9221 +31.2274 A 100.0000 129.1495 * Compass - Adjusted Coordinates Table 0f Computation of Station Coordinate
  • 23. 22 3.8 Loop Traverse Plotted Using Coordinate ( Graph) The adjusted loop traverse plotted by coordinates.
  • 24. 23 4.0 Discussion In this field work, we are required to investigate the survey method which is the closed loop traverse. A traverse is a series of consecutive lines whose ends have been marked on the field, and whose lengths and directions (angle, bearing, or azimuth) have been determined from measurements. There are two types of traverse which is the closed traverse and open traverse. We found that the close traverse gives a higher accuracy because open traverse offers no means of checking for errors or mistakes. First, we are exposed to the method of using the apparatus which is the electronic distance measurement (EDM). A detailed explanation has been given by our lecturer before the work is conducted. Four points are roughly set and was noted as station A, B, C and D. These four points are set to form a quadrilateral shape as we are conducting the simplest closed loop traverse. Then, we used the theodolite to measure the angle of the station A, B, C and D and the data is recorded for further calculations. We first start with the angle measurement at station A. The apparatus is set up at station A, the data is collected by reading through the theodolite on station B and D. This step is repeated by setting the apparatus on the following stations to obtain the angle on that particular station. Both vertical and horizontal angles which are showed on the digital panel of the theodolite have been recorded. The stadias (top, middle and bottom) readings are recorded for calculation of the horizontal
  • 25. 24 and vertical distances between the stations. This is known as the stadia method. The calculation is given by the equation: D = k x S x cos2 (θ) + C x cos When calculating the error, we have obtained 359º 57’ 40’’ for our total interior angle, which is 2’ 20’’ less than the optimum total interior angle of a quadrilateral (360º). The optimum total interior angle is calculated by 𝛴 = (𝒏− 𝟐) ∗ 𝟏𝟖𝟎º The error at each angle has been calculated and each angle is adjusted by adding 0º 0’ 35”. Latitude and departure error is calculated then, which are 0.0107 and 0.0440 respectively. The total error is 0.0453 which is given by equation Ec = [ (sum of latitude)2 + (sum of departure)2 ]1/2 And so, the accuracy is calculated with equation Accuracy = 1 : (P/Ec) The value obtained is 1:3499 which meets the optimum accuracy for average land surveying 1:3000 and hence, our traverse survey is acceptable. Latitude and departure are then being adjusted by using the compass rule: Correction = - [ ΣΔy ] / P x L or - [ ΣΔx ] P / L Lastly, a graph is plotted with the coordinates achieved for all the four stations. There are few precautions have to be taken in consideration when using the apparatus when measurement is conducting.
  • 26. 25 1. Special care should be taken to avoid any situation that might result in the theodolite being dropped or otherwise subjected to a severe jar. 2. Inspect the theodolite for loose parts and screws. Remove dust from the objective lens and eyepiece with a lens brush and lens tissue using procedures consistent with delicate optics. Keep the lens covered with the theodolite is not in use. Use a sunshade to protect the lens from the direct rays of the sun. 3. The graduated circles and venires are coated with a lacquer to retard oxidation. Avoid touching these parts. A thin film of oil applied with a lintless cloth will aid in keeping the surfaces clean. 4. Store the theodolite in its case or other dry dust free location when not in use. 5. If the theodolite is to be taken from a cool environment to a warm one (especially in humid conditions) allow the theodolite to warm up inside its case where it will not be subject to condensation. As any surveyor should understand, all measurements are in error. We may only try to minimize error and calculate reasonable tolerances, but not eliminating the errors. In conclusion, we have gained some useful knowledge on how a survey is done as it’s a hand-on work that we have to conduct ourselves to obtain the data needed. It links up all the theories we learned in class, giving us a deeper understanding as we worked practically on field. It can be useful in the future as we know how a distance is measured in order to construct a level building, or how a boundary of certain area is determined by this surveying method. It is pleased to have team members which are able to work together as a team in completing the task given. The objectives set primarily are achieved easily since everyone in the team gives fully support and cooperation throughout the survey work and report writing. Each team members is willing to share their thoughts and ideas when discussion is conducted and it’s a good attitude as we are able to learn from each other and broaden our mindset. Credits are to be given to our lecturer as well for teaching and guiding us on how the survey work is done and how the apparatus is used. It will be our pleasure if we are able to work together in the next work soon.