Acknowledgement…..
This presentation has been summarized from various
books, papers, websites and presentations on VLSI
Design and its various topics all over the world. I
couldn’t item-wise mention from where these large
pull of hints and work come. However, I’d like to
thank all professors and scientists who created such
a good work on this emerging field. Without those
efforts in this very emerging technology, these notes
and slides can’t be finished.
2
Dr
Usha
Mehta
04-08-2021
3
Dr
Usha
Mehta
04-08-2021
4
Dr
Usha
Mehta
04-08-2021
5
Dr
Usha
Mehta
04-08-2021
System Design Flow
6
Dr
Usha
Mehta
04-08-2021
Design Flow
7
Dr
Usha
Mehta
04-08-2021
VLSI Design Flow
8
Dr
Usha
Mehta
04-08-2021
Source of Errors
• Errors in Specification
• Unspecified Functionality
• Conflicting requirements
• Unrealized features
• No model for checking as it is at top of
abstraction hierarchy
• Errors in Implementation
• human error in interpreting design functionality
9
Dr
Usha
Mehta
04-08-2021
How to reduce human
introduced errors in
interpretation?
• Automation
• Poka-Yoke
10
Dr
Usha
Mehta
04-08-2021
• Automation
• The obvious way to reduce human
introduced error
• It is not always possible specially when the
processes are not well defined and requires a
human ingenuity and creativity.
• Poka-Yoke
• A Japanese term that means "mistake-
proofing" or “inadvertent error prevention”
• Towards the fool automation but not
complete automation
• Human intervention is needed only to decide
on the particular sequence or steps required
to obtain the desired results.
• Verification now a days remains an art.
11
Dr
Usha
Mehta
04-08-2021
Redundancy
• Most costly but highly efficient approach
• Most widely used for ASICs
12
Dr
Usha
Mehta
04-08-2021
Reconvergence Model
It consists the following steps:
1. Creating the design at a higher level of abstraction
2. Verifying the design at that level of abstraction
3. Translating the design to a lower level of abstraction
4. Verifying the consistency between steps 1 and 3
5. Steps 2, 3, and 4 are repeated until tapeout
The transformation can be any process like
:
• RTL coding from specification
• Insertion of a scan chain
• Synthesizing a RTL code into gate level netlist
• Synthesizing a gate level netlist in to lay out …..
13
Dr
Usha
Mehta
04-08-2021
Do you recall?
14
Dr
Usha
Mehta
04-08-2021
Verification Methods
• Functional Verification
• Formal Verification
• Equivalence Checking
• Model Checking
• Semiformal Verification
• Assertion Based Methods
15
Dr
Usha
Mehta
04-08-2021
Verification Techniques
• Simulation (functional and timing)
• Behavioral
• RTL
• Gate-level (pre-layout and post-layout)
• Switch-level
• Transistor-level
• Formal Verification (functional)
• Binary Decision Diagrams
• Equivalence Checking
• Model Checking
• Static Timing Analysis (timing)
16
Dr
Usha
Mehta
04-08-2021
Thanks……

More Related Content

What's hot

Static_Timing_Analysis_in_detail.pdf
Static_Timing_Analysis_in_detail.pdfStatic_Timing_Analysis_in_detail.pdf
Static_Timing_Analysis_in_detail.pdfUsha Mehta
 
2019 5 testing and verification of vlsi design_fault_modeling
2019 5 testing and verification of vlsi design_fault_modeling2019 5 testing and verification of vlsi design_fault_modeling
2019 5 testing and verification of vlsi design_fault_modelingUsha Mehta
 
Automatic Test Pattern Generation (Testing of VLSI Design)
Automatic Test Pattern Generation (Testing of VLSI Design)Automatic Test Pattern Generation (Testing of VLSI Design)
Automatic Test Pattern Generation (Testing of VLSI Design)Usha Mehta
 
SOC Verification using SystemVerilog
SOC Verification using SystemVerilog SOC Verification using SystemVerilog
SOC Verification using SystemVerilog Ramdas Mozhikunnath
 
Deterministic Test Pattern Generation ( D-Algorithm of ATPG) (Testing of VLSI...
Deterministic Test Pattern Generation ( D-Algorithm of ATPG) (Testing of VLSI...Deterministic Test Pattern Generation ( D-Algorithm of ATPG) (Testing of VLSI...
Deterministic Test Pattern Generation ( D-Algorithm of ATPG) (Testing of VLSI...Usha Mehta
 
ASIC DESIGN FLOW
ASIC DESIGN FLOWASIC DESIGN FLOW
ASIC DESIGN FLOWPurvi Medawala
 
Formal Verification - Formality.pdf
Formal Verification - Formality.pdfFormal Verification - Formality.pdf
Formal Verification - Formality.pdfAhmed Abdelazeem
 
Multi mode multi corner (mmmc)
Multi mode multi corner (mmmc)Multi mode multi corner (mmmc)
Multi mode multi corner (mmmc)shaik sharief
 
Synchronous and asynchronous clock
Synchronous and asynchronous clockSynchronous and asynchronous clock
Synchronous and asynchronous clockNallapati Anindra
 
ASIC design verification
ASIC design verificationASIC design verification
ASIC design verificationGireesh Kallihal
 
Testing and Verification of Electronics Circuits : Introduction
Testing and Verification of Electronics Circuits : IntroductionTesting and Verification of Electronics Circuits : Introduction
Testing and Verification of Electronics Circuits : IntroductionUsha Mehta
 
Timing Analysis
Timing AnalysisTiming Analysis
Timing Analysisrchovatiya
 
Functional verification techniques EW16 session
Functional verification techniques  EW16 sessionFunctional verification techniques  EW16 session
Functional verification techniques EW16 sessionSameh El-Ashry
 
The Verification Methodology Landscape
The Verification Methodology LandscapeThe Verification Methodology Landscape
The Verification Methodology LandscapeDVClub
 
04~chapter 02 dft.ppt
04~chapter 02 dft.ppt04~chapter 02 dft.ppt
04~chapter 02 dft.pptSandipSolanki10
 
Introduction to EDA Tools
Introduction to EDA ToolsIntroduction to EDA Tools
Introduction to EDA Toolsvenkatasuman1983
 
Physical Verification Design.pdf
Physical Verification Design.pdfPhysical Verification Design.pdf
Physical Verification Design.pdfAhmed Abdelazeem
 

What's hot (20)

Static_Timing_Analysis_in_detail.pdf
Static_Timing_Analysis_in_detail.pdfStatic_Timing_Analysis_in_detail.pdf
Static_Timing_Analysis_in_detail.pdf
 
2019 5 testing and verification of vlsi design_fault_modeling
2019 5 testing and verification of vlsi design_fault_modeling2019 5 testing and verification of vlsi design_fault_modeling
2019 5 testing and verification of vlsi design_fault_modeling
 
Automatic Test Pattern Generation (Testing of VLSI Design)
Automatic Test Pattern Generation (Testing of VLSI Design)Automatic Test Pattern Generation (Testing of VLSI Design)
Automatic Test Pattern Generation (Testing of VLSI Design)
 
STA.pdf
STA.pdfSTA.pdf
STA.pdf
 
SOC Verification using SystemVerilog
SOC Verification using SystemVerilog SOC Verification using SystemVerilog
SOC Verification using SystemVerilog
 
Deterministic Test Pattern Generation ( D-Algorithm of ATPG) (Testing of VLSI...
Deterministic Test Pattern Generation ( D-Algorithm of ATPG) (Testing of VLSI...Deterministic Test Pattern Generation ( D-Algorithm of ATPG) (Testing of VLSI...
Deterministic Test Pattern Generation ( D-Algorithm of ATPG) (Testing of VLSI...
 
ASIC DESIGN FLOW
ASIC DESIGN FLOWASIC DESIGN FLOW
ASIC DESIGN FLOW
 
Formal Verification - Formality.pdf
Formal Verification - Formality.pdfFormal Verification - Formality.pdf
Formal Verification - Formality.pdf
 
Multi mode multi corner (mmmc)
Multi mode multi corner (mmmc)Multi mode multi corner (mmmc)
Multi mode multi corner (mmmc)
 
Scan insertion
Scan insertionScan insertion
Scan insertion
 
Synchronous and asynchronous clock
Synchronous and asynchronous clockSynchronous and asynchronous clock
Synchronous and asynchronous clock
 
ASIC design verification
ASIC design verificationASIC design verification
ASIC design verification
 
Testing and Verification of Electronics Circuits : Introduction
Testing and Verification of Electronics Circuits : IntroductionTesting and Verification of Electronics Circuits : Introduction
Testing and Verification of Electronics Circuits : Introduction
 
Timing Analysis
Timing AnalysisTiming Analysis
Timing Analysis
 
Study of vlsi design methodologies and limitations using cad tools for cmos t...
Study of vlsi design methodologies and limitations using cad tools for cmos t...Study of vlsi design methodologies and limitations using cad tools for cmos t...
Study of vlsi design methodologies and limitations using cad tools for cmos t...
 
Functional verification techniques EW16 session
Functional verification techniques  EW16 sessionFunctional verification techniques  EW16 session
Functional verification techniques EW16 session
 
The Verification Methodology Landscape
The Verification Methodology LandscapeThe Verification Methodology Landscape
The Verification Methodology Landscape
 
04~chapter 02 dft.ppt
04~chapter 02 dft.ppt04~chapter 02 dft.ppt
04~chapter 02 dft.ppt
 
Introduction to EDA Tools
Introduction to EDA ToolsIntroduction to EDA Tools
Introduction to EDA Tools
 
Physical Verification Design.pdf
Physical Verification Design.pdfPhysical Verification Design.pdf
Physical Verification Design.pdf
 

Similar to Verification flow and_planning_vlsi_design

1 why to_test
1 why to_test1 why to_test
1 why to_testUsha Mehta
 
What are Model-Based Reviews
What are Model-Based ReviewsWhat are Model-Based Reviews
What are Model-Based ReviewsSarahCraig7
 
Use Case: Airbus and Process Mining Technology
Use Case: Airbus and Process Mining TechnologyUse Case: Airbus and Process Mining Technology
Use Case: Airbus and Process Mining TechnologyCelonis
 
System development
System developmentSystem development
System developmentPraveen Minz
 
S/4HANA Migration Challenges and Use Cases Workshop
S/4HANA Migration Challenges and Use Cases WorkshopS/4HANA Migration Challenges and Use Cases Workshop
S/4HANA Migration Challenges and Use Cases WorkshopCelonis
 
Generic Software Process Models
Generic Software Process ModelsGeneric Software Process Models
Generic Software Process ModelsEducation Front
 
Introduction to DevOps
Introduction to DevOpsIntroduction to DevOps
Introduction to DevOpsCprime
 
Lecture 3 software_engineering
Lecture 3 software_engineeringLecture 3 software_engineering
Lecture 3 software_engineeringmoduledesign
 
Nature vs. Nurture: Building Great Test Teams
Nature vs. Nurture: Building Great Test TeamsNature vs. Nurture: Building Great Test Teams
Nature vs. Nurture: Building Great Test TeamsJosiah Renaudin
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system developmentcymark09
 
Lecture 3 software_engineering
Lecture 3 software_engineeringLecture 3 software_engineering
Lecture 3 software_engineeringmoduledesign
 
New Model Testing: A New Test Process and Tool
New Model Testing:  A New Test Process and ToolNew Model Testing:  A New Test Process and Tool
New Model Testing: A New Test Process and ToolTEST Huddle
 
Context Driven Automation Gtac 2008
Context Driven Automation Gtac 2008Context Driven Automation Gtac 2008
Context Driven Automation Gtac 2008Pete Schneider
 
DACHNUG50 CNX4 Analytics in HCL Connections.pdf
DACHNUG50 CNX4 Analytics in HCL Connections.pdfDACHNUG50 CNX4 Analytics in HCL Connections.pdf
DACHNUG50 CNX4 Analytics in HCL Connections.pdfDNUG e.V.
 
Role of Pipelines in Continuous Delivery
Role of Pipelines in Continuous DeliveryRole of Pipelines in Continuous Delivery
Role of Pipelines in Continuous DeliveryMandi Walls
 
(ATS6-APP05) Deploying Contur ELN to large organizations
(ATS6-APP05) Deploying Contur ELN to large organizations(ATS6-APP05) Deploying Contur ELN to large organizations
(ATS6-APP05) Deploying Contur ELN to large organizationsBIOVIA
 
What's New with Worksoft Certify
What's New with Worksoft CertifyWhat's New with Worksoft Certify
What's New with Worksoft CertifyWorksoft
 
Pawan111
Pawan111Pawan111
Pawan111ranjeetdon
 
What is Scaled Agile Framework | Edureka
What is Scaled Agile Framework | EdurekaWhat is Scaled Agile Framework | Edureka
What is Scaled Agile Framework | EdurekaEdureka!
 

Similar to Verification flow and_planning_vlsi_design (20)

1 why to_test
1 why to_test1 why to_test
1 why to_test
 
What are Model-Based Reviews
What are Model-Based ReviewsWhat are Model-Based Reviews
What are Model-Based Reviews
 
Use Case: Airbus and Process Mining Technology
Use Case: Airbus and Process Mining TechnologyUse Case: Airbus and Process Mining Technology
Use Case: Airbus and Process Mining Technology
 
System development
System developmentSystem development
System development
 
S/4HANA Migration Challenges and Use Cases Workshop
S/4HANA Migration Challenges and Use Cases WorkshopS/4HANA Migration Challenges and Use Cases Workshop
S/4HANA Migration Challenges and Use Cases Workshop
 
Generic Software Process Models
Generic Software Process ModelsGeneric Software Process Models
Generic Software Process Models
 
Introduction to DevOps
Introduction to DevOpsIntroduction to DevOps
Introduction to DevOps
 
Lecture 3 software_engineering
Lecture 3 software_engineeringLecture 3 software_engineering
Lecture 3 software_engineering
 
Nature vs. Nurture: Building Great Test Teams
Nature vs. Nurture: Building Great Test TeamsNature vs. Nurture: Building Great Test Teams
Nature vs. Nurture: Building Great Test Teams
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system development
 
Best Practices for Enterprise Continuous Delivery of Oracle Fusion Middlewa...
Best Practices for Enterprise Continuous Delivery of Oracle Fusion Middlewa...Best Practices for Enterprise Continuous Delivery of Oracle Fusion Middlewa...
Best Practices for Enterprise Continuous Delivery of Oracle Fusion Middlewa...
 
Lecture 3 software_engineering
Lecture 3 software_engineeringLecture 3 software_engineering
Lecture 3 software_engineering
 
New Model Testing: A New Test Process and Tool
New Model Testing:  A New Test Process and ToolNew Model Testing:  A New Test Process and Tool
New Model Testing: A New Test Process and Tool
 
Context Driven Automation Gtac 2008
Context Driven Automation Gtac 2008Context Driven Automation Gtac 2008
Context Driven Automation Gtac 2008
 
DACHNUG50 CNX4 Analytics in HCL Connections.pdf
DACHNUG50 CNX4 Analytics in HCL Connections.pdfDACHNUG50 CNX4 Analytics in HCL Connections.pdf
DACHNUG50 CNX4 Analytics in HCL Connections.pdf
 
Role of Pipelines in Continuous Delivery
Role of Pipelines in Continuous DeliveryRole of Pipelines in Continuous Delivery
Role of Pipelines in Continuous Delivery
 
(ATS6-APP05) Deploying Contur ELN to large organizations
(ATS6-APP05) Deploying Contur ELN to large organizations(ATS6-APP05) Deploying Contur ELN to large organizations
(ATS6-APP05) Deploying Contur ELN to large organizations
 
What's New with Worksoft Certify
What's New with Worksoft CertifyWhat's New with Worksoft Certify
What's New with Worksoft Certify
 
Pawan111
Pawan111Pawan111
Pawan111
 
What is Scaled Agile Framework | Edureka
What is Scaled Agile Framework | EdurekaWhat is Scaled Agile Framework | Edureka
What is Scaled Agile Framework | Edureka
 

More from Usha Mehta

Basic Design Flow for Field Programmable Gate Arrays
Basic Design Flow for Field Programmable Gate ArraysBasic Design Flow for Field Programmable Gate Arrays
Basic Design Flow for Field Programmable Gate ArraysUsha Mehta
 
Field Programmable Gate Arrays : Architecture
Field Programmable Gate Arrays : ArchitectureField Programmable Gate Arrays : Architecture
Field Programmable Gate Arrays : ArchitectureUsha Mehta
 
Programmable Logic Devices : SPLD and CPLD
Programmable Logic Devices : SPLD and CPLDProgrammable Logic Devices : SPLD and CPLD
Programmable Logic Devices : SPLD and CPLDUsha Mehta
 
Programmable Switches for Programmable Logic Devices
Programmable Switches for Programmable Logic DevicesProgrammable Switches for Programmable Logic Devices
Programmable Switches for Programmable Logic DevicesUsha Mehta
 
2_DVD_ASIC_Design_FLow.pdf
2_DVD_ASIC_Design_FLow.pdf2_DVD_ASIC_Design_FLow.pdf
2_DVD_ASIC_Design_FLow.pdfUsha Mehta
 
3_DVD_IC_Fabrication_Flow_designer_perspective.pdf
3_DVD_IC_Fabrication_Flow_designer_perspective.pdf3_DVD_IC_Fabrication_Flow_designer_perspective.pdf
3_DVD_IC_Fabrication_Flow_designer_perspective.pdfUsha Mehta
 
7_DVD_Combinational_MOS_Logic_Circuits.pdf
7_DVD_Combinational_MOS_Logic_Circuits.pdf7_DVD_Combinational_MOS_Logic_Circuits.pdf
7_DVD_Combinational_MOS_Logic_Circuits.pdfUsha Mehta
 
5_DVD_VLSI Technology Trends.pdf
5_DVD_VLSI Technology Trends.pdf5_DVD_VLSI Technology Trends.pdf
5_DVD_VLSI Technology Trends.pdfUsha Mehta
 
8_DVD_Sequential_MOS_logic_circuits.pdf
8_DVD_Sequential_MOS_logic_circuits.pdf8_DVD_Sequential_MOS_logic_circuits.pdf
8_DVD_Sequential_MOS_logic_circuits.pdfUsha Mehta
 
9_DVD_Dynamic_logic_circuits.pdf
9_DVD_Dynamic_logic_circuits.pdf9_DVD_Dynamic_logic_circuits.pdf
9_DVD_Dynamic_logic_circuits.pdfUsha Mehta
 
13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdf13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdfUsha Mehta
 
14 static timing_analysis_5_clock_domain_crossing
14 static timing_analysis_5_clock_domain_crossing14 static timing_analysis_5_clock_domain_crossing
14 static timing_analysis_5_clock_domain_crossingUsha Mehta
 
9 semiconductor memory
9 semiconductor memory9 semiconductor memory
9 semiconductor memoryUsha Mehta
 
13 static timing_analysis_4_set_up_and_hold_time_violation_remedy
13 static timing_analysis_4_set_up_and_hold_time_violation_remedy13 static timing_analysis_4_set_up_and_hold_time_violation_remedy
13 static timing_analysis_4_set_up_and_hold_time_violation_remedyUsha Mehta
 
12 static timing_analysis_3_clocked_design
12 static timing_analysis_3_clocked_design12 static timing_analysis_3_clocked_design
12 static timing_analysis_3_clocked_designUsha Mehta
 
11 static timing_analysis_2_combinational_design
11 static timing_analysis_2_combinational_design11 static timing_analysis_2_combinational_design
11 static timing_analysis_2_combinational_designUsha Mehta
 
10 static timing_analysis_1_concept_of_timing_analysis
10 static timing_analysis_1_concept_of_timing_analysis10 static timing_analysis_1_concept_of_timing_analysis
10 static timing_analysis_1_concept_of_timing_analysisUsha Mehta
 
3 test economic_test_equipments_yield
3 test economic_test_equipments_yield3 test economic_test_equipments_yield
3 test economic_test_equipments_yieldUsha Mehta
 
2 when to_test_role_of_testing
2 when to_test_role_of_testing2 when to_test_role_of_testing
2 when to_test_role_of_testingUsha Mehta
 
1 why to_test
1 why to_test1 why to_test
1 why to_testUsha Mehta
 

More from Usha Mehta (20)

Basic Design Flow for Field Programmable Gate Arrays
Basic Design Flow for Field Programmable Gate ArraysBasic Design Flow for Field Programmable Gate Arrays
Basic Design Flow for Field Programmable Gate Arrays
 
Field Programmable Gate Arrays : Architecture
Field Programmable Gate Arrays : ArchitectureField Programmable Gate Arrays : Architecture
Field Programmable Gate Arrays : Architecture
 
Programmable Logic Devices : SPLD and CPLD
Programmable Logic Devices : SPLD and CPLDProgrammable Logic Devices : SPLD and CPLD
Programmable Logic Devices : SPLD and CPLD
 
Programmable Switches for Programmable Logic Devices
Programmable Switches for Programmable Logic DevicesProgrammable Switches for Programmable Logic Devices
Programmable Switches for Programmable Logic Devices
 
2_DVD_ASIC_Design_FLow.pdf
2_DVD_ASIC_Design_FLow.pdf2_DVD_ASIC_Design_FLow.pdf
2_DVD_ASIC_Design_FLow.pdf
 
3_DVD_IC_Fabrication_Flow_designer_perspective.pdf
3_DVD_IC_Fabrication_Flow_designer_perspective.pdf3_DVD_IC_Fabrication_Flow_designer_perspective.pdf
3_DVD_IC_Fabrication_Flow_designer_perspective.pdf
 
7_DVD_Combinational_MOS_Logic_Circuits.pdf
7_DVD_Combinational_MOS_Logic_Circuits.pdf7_DVD_Combinational_MOS_Logic_Circuits.pdf
7_DVD_Combinational_MOS_Logic_Circuits.pdf
 
5_DVD_VLSI Technology Trends.pdf
5_DVD_VLSI Technology Trends.pdf5_DVD_VLSI Technology Trends.pdf
5_DVD_VLSI Technology Trends.pdf
 
8_DVD_Sequential_MOS_logic_circuits.pdf
8_DVD_Sequential_MOS_logic_circuits.pdf8_DVD_Sequential_MOS_logic_circuits.pdf
8_DVD_Sequential_MOS_logic_circuits.pdf
 
9_DVD_Dynamic_logic_circuits.pdf
9_DVD_Dynamic_logic_circuits.pdf9_DVD_Dynamic_logic_circuits.pdf
9_DVD_Dynamic_logic_circuits.pdf
 
13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdf13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdf
 
14 static timing_analysis_5_clock_domain_crossing
14 static timing_analysis_5_clock_domain_crossing14 static timing_analysis_5_clock_domain_crossing
14 static timing_analysis_5_clock_domain_crossing
 
9 semiconductor memory
9 semiconductor memory9 semiconductor memory
9 semiconductor memory
 
13 static timing_analysis_4_set_up_and_hold_time_violation_remedy
13 static timing_analysis_4_set_up_and_hold_time_violation_remedy13 static timing_analysis_4_set_up_and_hold_time_violation_remedy
13 static timing_analysis_4_set_up_and_hold_time_violation_remedy
 
12 static timing_analysis_3_clocked_design
12 static timing_analysis_3_clocked_design12 static timing_analysis_3_clocked_design
12 static timing_analysis_3_clocked_design
 
11 static timing_analysis_2_combinational_design
11 static timing_analysis_2_combinational_design11 static timing_analysis_2_combinational_design
11 static timing_analysis_2_combinational_design
 
10 static timing_analysis_1_concept_of_timing_analysis
10 static timing_analysis_1_concept_of_timing_analysis10 static timing_analysis_1_concept_of_timing_analysis
10 static timing_analysis_1_concept_of_timing_analysis
 
3 test economic_test_equipments_yield
3 test economic_test_equipments_yield3 test economic_test_equipments_yield
3 test economic_test_equipments_yield
 
2 when to_test_role_of_testing
2 when to_test_role_of_testing2 when to_test_role_of_testing
2 when to_test_role_of_testing
 
1 why to_test
1 why to_test1 why to_test
1 why to_test
 

Recently uploaded

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 

Recently uploaded (20)

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Verification flow and_planning_vlsi_design

  • 1. Introduction to Verification of VLSI Design and Functional Verification 1 Dr Usha Mehta 04-08-2021 Usha Mehta, Ph.D. in Testing and Verification of VLSI Design usha.mehta@ieee.org usha.mehta@nirmauni.ac.in
  • 2. Acknowledgement….. This presentation has been summarized from various books, papers, websites and presentations on VLSI Design and its various topics all over the world. I couldn’t item-wise mention from where these large pull of hints and work come. However, I’d like to thank all professors and scientists who created such a good work on this emerging field. Without those efforts in this very emerging technology, these notes and slides can’t be finished. 2 Dr Usha Mehta 04-08-2021
  • 9. Source of Errors • Errors in Specification • Unspecified Functionality • Conflicting requirements • Unrealized features • No model for checking as it is at top of abstraction hierarchy • Errors in Implementation • human error in interpreting design functionality 9 Dr Usha Mehta 04-08-2021
  • 10. How to reduce human introduced errors in interpretation? • Automation • Poka-Yoke 10 Dr Usha Mehta 04-08-2021
  • 11. • Automation • The obvious way to reduce human introduced error • It is not always possible specially when the processes are not well defined and requires a human ingenuity and creativity. • Poka-Yoke • A Japanese term that means "mistake- proofing" or “inadvertent error prevention” • Towards the fool automation but not complete automation • Human intervention is needed only to decide on the particular sequence or steps required to obtain the desired results. • Verification now a days remains an art. 11 Dr Usha Mehta 04-08-2021
  • 12. Redundancy • Most costly but highly efficient approach • Most widely used for ASICs 12 Dr Usha Mehta 04-08-2021
  • 13. Reconvergence Model It consists the following steps: 1. Creating the design at a higher level of abstraction 2. Verifying the design at that level of abstraction 3. Translating the design to a lower level of abstraction 4. Verifying the consistency between steps 1 and 3 5. Steps 2, 3, and 4 are repeated until tapeout The transformation can be any process like : • RTL coding from specification • Insertion of a scan chain • Synthesizing a RTL code into gate level netlist • Synthesizing a gate level netlist in to lay out ….. 13 Dr Usha Mehta 04-08-2021
  • 15. Verification Methods • Functional Verification • Formal Verification • Equivalence Checking • Model Checking • Semiformal Verification • Assertion Based Methods 15 Dr Usha Mehta 04-08-2021
  • 16. Verification Techniques • Simulation (functional and timing) • Behavioral • RTL • Gate-level (pre-layout and post-layout) • Switch-level • Transistor-level • Formal Verification (functional) • Binary Decision Diagrams • Equivalence Checking • Model Checking • Static Timing Analysis (timing) 16 Dr Usha Mehta 04-08-2021