More Related Content Similar to 104 Project Plan (9) More from Dr Fereidoun Dejahang (20) 104 Project Plan21. Work on Site
Total cost £1, 900, 250.00
Preliminary
Works
£105.000.00
Sub-
structure
£270.00
Super-
Structure
£
Claddind &
Envelope
£
External
Work
£
Internal
Work
£
Site
Clearance
£
Piling
£
Foundation
s
£
Drainage
£
Floor slab
£
26. ACME Housing Corporation
1
House Building
Project
1.1
Concrete
1.1.1
Pour Foundation
1.1.1.1
Install Patio
1.1.1.2
Stairway
1.1.1.3
Framing
1.1.2
Frame Exterior
Walls
1.1.2.1
Frame Interior
Walls
1.1.2.2
Install Roofing
Trusses
1.1.2.3
Plumbing
1.1.3
Install Water
Lines
1.1.3.1
Install Gas Lines
1.1.3.2
Install B/K
Fixtures
1.1.3.3
Electrical
1.1.4
Install Wiring
1.1.4.1
Install Outlets/
Switches
1.1.4.2
Install Fixtures
1.1.4.3
Interior
1.1.5
Install Drywall
1.1.5.1
Install Carpets
1.1.5.2
Install Painting
1.1.5.3
Roofing
1.1.6
Install Felt
1.1.6.1
Install Shingles
1.1.6.2
Install Vents
1.1.6.3
27. Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14
A
B
C
D
E
F
G
Week Number
28. Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14
A
B
C
D
E
F
G
Week Number
29. Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14
A
B
C
D
E
F
G
Week Number
32. • Developing the project plan is an
iterative process that involves:
•Project manager
•Project team
•Project sponsor
•Customer
•Other stakeholders