CHANGES IN CONSTRUCTION PROJECTS
Managerial
Technologic
al
Social
CHANGES IN CONSTRUCTION PROJECTS
1
• The re-work problem is often
caused by poor project
change management.
2
• During construction projects,
many decisions have to be
made under uncertain
conditions.
CHANGES IN CONSTRUCTION PROJECTS
3
• Designers, engineers and other
professionals have to make
assumptions based on existing
available information and their
experience.
4
• If any assumption is proven wrong,
some decisions have to be revised.
• changes are often inevitable.
CHANGES IN CONSTRUCTION PROJECTS
5
• The key-how to avoid or
reduce the negative impact of
changes.
6
• The need for effective change
management is essential for
productivity improvement.
CHANGES IN CONSTRUCTION PROJECTS
It can be caused by either internal or external
Factors (ARE THEY AVOIDABLE?).
Different changes may have different
effects or consequences.
A change refers to an alteration or a
modification to pre-existing
conditions, assumptions or
requirements.
CHANGES IN CONSTRUCTION PROJECTS
Plan preventive impacts & coordinate changes across
the entire project.
Identify changes that have already occurred.
The objective of change management is to forecast
possible changes.
TYPES OF CHANGE
A gradual change, also known as
incremental change, happens slowly
over a prolonged period and its intensity
is low.
A change that occurs can be a
“gradual change” or a “radical
change”.
CHANGES IN CONSTRUCTION PROJECTS
• A radical change is sudden, dramatic
and has a marked effect.
• Gradual Changes often occur during
the design development stage, where
many decisions are fine Tuned and
refined progressively.
CHANGES IN CONSTRUCTION PROJECTS
• Radical changes occur during construction
phases.
• Project changes can also be classified as
“anticipated changes” and “emergent changes”.
• Anticipated changes are planned in advance
and occur as intended.
• On the other hand, emergent changes arise
spontaneously and are not originally anticipated
or intended.
CHANGES IN CONSTRUCTION PROJECTS
• Another way to view project change is
through its necessity.
• In this way, project changes can be
classified as “elective changes” and
“required changes”.
• An elective change is where one may
choose whether or not to implement; and a
required change is where there is no option
but to make the change.
CAUSES OF CHANGE
External causes may be due to
technological change (AVOIDABLE?).
The causes of project change may
originate from either external or internal
pressures that are being applied to the
project (AVOIDABLE?).
CHANGES IN CONSTRUCTION PROJECTS
Changes in the economy and
finally demographic changes in
the society
Changes in the customer expectations
and tastes
changes in competitor’s
activities
changes in government
and policies
CHANGES IN CONSTRUCTION PROJECTS
Or changes in organisational objectives
and changes in the long-term survival
strategy of the organisations involved.
Internal causes may result from
changes in management policy
CHANGES
External causes:
■ Economic issues
■ Environmental issues
■ Technological issues
■ Regulatory issues
CHANGES
Internal causes:
■ Organisational level
• Organisational culture
• Ineffective decision-making
■ Project level
• Design Improvements
CHANGES
• Inadequate skills and knowledge
amongst the team
• Inclement weather
• Late change of client brief
• Designer change of mind
• Design errors
• Inadequate knowledge of the site
conditions
CHANGES IN CONSTRUCTION PROJECTS
• Revised design parameters
• Minor field-originated changes
• Contract disputes
• Ambiguity in project goal, scope, and
resources
CHANGES IN CONSTRUCTION PROJECTS
Direct effects
■ Addition of work
■ Deletion of work
■ Demolition of work already done
■ Rework
■ Specification change
■ Time lost in stopping and
CHANGES IN CONSTRUCTION PROJECTS
restarting current tasks in order to make the
variation
■ Revisions to project reports and documents
■ Reorganise schedule and work methods to
make up lost time
Indirect effects
■ Need for communicating change to all
project members
CHANGES IN CONSTRUCTION PROJECTS
■ Dispute and blaming amongst project
partners
■ Loss of productivity due to reprogramming;
loss of rhythm, unbalanced gangs and
acceleration
CHANGES IN CONSTRUCTION PROJECTS
■ Change in cash flow, financial costs,
loss of earnings
■ Increased risk of co-ordination failures
and errors
■ Lower morale of work force
■ Loss of float, therefore increased
sensitivity to further delays
Resources
Scope
Goals
Removeany Ambiguity
Leadership
Co-ordination
communication
Team work

More Related Content

What's hot

Project implimentation
Project implimentationProject implimentation
Project implimentationMazhar Poohlah
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013henry KKK
 
Management control of project
Management control of projectManagement control of project
Management control of projectSai Mahesh
 
Projrct Monitoring & Controling
Projrct   Monitoring  & ControlingProjrct   Monitoring  & Controling
Projrct Monitoring & ControlingDarshana Viduranga
 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & MonitoringJawad Ahmad
 
04.integration management updated
04.integration management updated04.integration management updated
04.integration management updatedShraddha PMP
 
Monitoring and evaluation of Projects
Monitoring and evaluation of ProjectsMonitoring and evaluation of Projects
Monitoring and evaluation of ProjectsLitunya Laurean
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Processeklaksh
 

What's hot (14)

How to close a project
How to close a projectHow to close a project
How to close a project
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Project implementation
Project implementationProject implementation
Project implementation
 
Develop project management plan
Develop project management planDevelop project management plan
Develop project management plan
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013
 
Project cycle
Project cycleProject cycle
Project cycle
 
Management control of project
Management control of projectManagement control of project
Management control of project
 
Projrct Monitoring & Controling
Projrct   Monitoring  & ControlingProjrct   Monitoring  & Controling
Projrct Monitoring & Controling
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & Monitoring
 
04.integration management updated
04.integration management updated04.integration management updated
04.integration management updated
 
Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 
Monitoring and evaluation of Projects
Monitoring and evaluation of ProjectsMonitoring and evaluation of Projects
Monitoring and evaluation of Projects
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
 

Similar to 013 changes in construction projects

1.1 skill pi introduction
1.1 skill pi introduction1.1 skill pi introduction
1.1 skill pi introductionNigestAbebaw1
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxkiranroy6777
 
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...SN Panigrahi, PMP
 
WHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxWHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxKashif-khan
 
Building An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMBuilding An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMAdaptive Corporation
 
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTBASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTNiruban Projoth
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project managementprakashnachnani
 
Building castles on sand - Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environmentBuilding castles on sand - Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environmentBohitesh Misra, PMP
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTSAJJAD KHUDHUR ABBAS
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project ManagementInam Khosa
 
Changes in construction projects
Changes in construction projectsChanges in construction projects
Changes in construction projectsMohamed Abdalla
 
lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery Mahendra Bhuva
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process modeldrdej19
 

Similar to 013 changes in construction projects (20)

1.1 skill pi introduction
1.1 skill pi introduction1.1 skill pi introduction
1.1 skill pi introduction
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptx
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
WHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxWHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptx
 
Building An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMBuilding An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLM
 
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTBASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENT
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project management
 
Building castles on sand - Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environmentBuilding castles on sand - Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environment
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Project Managemet Basics
Project Managemet BasicsProject Managemet Basics
Project Managemet Basics
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
Changes in construction
Changes in constructionChanges in construction
Changes in construction
 
Changes in construction projects
Changes in construction projectsChanges in construction projects
Changes in construction projects
 
lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
009 benefits realization
009 benefits realization009 benefits realization
009 benefits realization
 
008 benefits mnagement
008 benefits mnagement008 benefits mnagement
008 benefits mnagement
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 

Recently uploaded (20)

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 

013 changes in construction projects

  • 1.
  • 2. CHANGES IN CONSTRUCTION PROJECTS Managerial Technologic al Social
  • 3. CHANGES IN CONSTRUCTION PROJECTS 1 • The re-work problem is often caused by poor project change management. 2 • During construction projects, many decisions have to be made under uncertain conditions.
  • 4. CHANGES IN CONSTRUCTION PROJECTS 3 • Designers, engineers and other professionals have to make assumptions based on existing available information and their experience. 4 • If any assumption is proven wrong, some decisions have to be revised. • changes are often inevitable.
  • 5. CHANGES IN CONSTRUCTION PROJECTS 5 • The key-how to avoid or reduce the negative impact of changes. 6 • The need for effective change management is essential for productivity improvement.
  • 6. CHANGES IN CONSTRUCTION PROJECTS It can be caused by either internal or external Factors (ARE THEY AVOIDABLE?). Different changes may have different effects or consequences. A change refers to an alteration or a modification to pre-existing conditions, assumptions or requirements.
  • 7. CHANGES IN CONSTRUCTION PROJECTS Plan preventive impacts & coordinate changes across the entire project. Identify changes that have already occurred. The objective of change management is to forecast possible changes.
  • 8. TYPES OF CHANGE A gradual change, also known as incremental change, happens slowly over a prolonged period and its intensity is low. A change that occurs can be a “gradual change” or a “radical change”.
  • 9. CHANGES IN CONSTRUCTION PROJECTS • A radical change is sudden, dramatic and has a marked effect. • Gradual Changes often occur during the design development stage, where many decisions are fine Tuned and refined progressively.
  • 10. CHANGES IN CONSTRUCTION PROJECTS • Radical changes occur during construction phases. • Project changes can also be classified as “anticipated changes” and “emergent changes”. • Anticipated changes are planned in advance and occur as intended. • On the other hand, emergent changes arise spontaneously and are not originally anticipated or intended.
  • 11. CHANGES IN CONSTRUCTION PROJECTS • Another way to view project change is through its necessity. • In this way, project changes can be classified as “elective changes” and “required changes”. • An elective change is where one may choose whether or not to implement; and a required change is where there is no option but to make the change.
  • 12. CAUSES OF CHANGE External causes may be due to technological change (AVOIDABLE?). The causes of project change may originate from either external or internal pressures that are being applied to the project (AVOIDABLE?).
  • 13. CHANGES IN CONSTRUCTION PROJECTS Changes in the economy and finally demographic changes in the society Changes in the customer expectations and tastes changes in competitor’s activities changes in government and policies
  • 14. CHANGES IN CONSTRUCTION PROJECTS Or changes in organisational objectives and changes in the long-term survival strategy of the organisations involved. Internal causes may result from changes in management policy
  • 15. CHANGES External causes: ■ Economic issues ■ Environmental issues ■ Technological issues ■ Regulatory issues
  • 16. CHANGES Internal causes: ■ Organisational level • Organisational culture • Ineffective decision-making ■ Project level • Design Improvements
  • 17. CHANGES • Inadequate skills and knowledge amongst the team • Inclement weather • Late change of client brief • Designer change of mind • Design errors • Inadequate knowledge of the site conditions
  • 18. CHANGES IN CONSTRUCTION PROJECTS • Revised design parameters • Minor field-originated changes • Contract disputes • Ambiguity in project goal, scope, and resources
  • 19. CHANGES IN CONSTRUCTION PROJECTS Direct effects ■ Addition of work ■ Deletion of work ■ Demolition of work already done ■ Rework ■ Specification change ■ Time lost in stopping and
  • 20. CHANGES IN CONSTRUCTION PROJECTS restarting current tasks in order to make the variation ■ Revisions to project reports and documents ■ Reorganise schedule and work methods to make up lost time Indirect effects ■ Need for communicating change to all project members
  • 21. CHANGES IN CONSTRUCTION PROJECTS ■ Dispute and blaming amongst project partners ■ Loss of productivity due to reprogramming; loss of rhythm, unbalanced gangs and acceleration
  • 22. CHANGES IN CONSTRUCTION PROJECTS ■ Change in cash flow, financial costs, loss of earnings ■ Increased risk of co-ordination failures and errors ■ Lower morale of work force ■ Loss of float, therefore increased sensitivity to further delays