   2008 - Council approved Professional Services
    Contract with Killis Almond Architects to begin
    Master Plan of City Hall rehabilitation
   2009 - Contract amended to include Phase I for the
    rehabilitation of the City Hall and Library Building
   2010 – Contract amended to include Phase II for
    the central plant with ice storage
   2011 – Contract amended to include voter
    approved rehabilitation of the City Auditorium
   Rehabilitation of City Hall
   Rehabilitation of old Public Library, including
    expansion
   Central Plant serving:
       City Hall
       old Library
       Utility Building
       Auditorium, including annex
   CDBG                                      $ 761,000
   ARRA                                         216,616
   Fund 504                                   1,776,698
   Fund 508                                   5,000,000
   Fund 508                                   2,500,000
   504,508 Contingencies                        177,030
   EECBG                                        865,000
   Fire Station Savings                         200,000
   WIC                                          600,000
   Water/Wastewater Admin Space                 131,000
   Utility Billing Building HVAC                135,065
   Auditorium Half-Cent Approval              3,750,000
                             Total Revenue   $16,112,409
   Design Contract (KAA)                         $ 1,218,474
   Construction Management                            165,000
   Construction Contract (Stoddard)                 8,740,748*
   Relocation                                         293,000
   Demolition                                         141,317
   Asbestos Abatement                                 103,337
   Security System                                    119,084
   HVAC Equipment                                     499,217
   Central Plant (per CO#1)                        1,765,085
   Revised Auditorium                              2,614,186
                        Total Expenses            $15,659,448
      *figure did not represent contract amount
Original Contract Amount            $9,083,000*

   Included $500,000 contingency
     $500,000 spent
   Revenue         $16,112,409
   Expenses        $15,659,448
                 $452,961

   Remaining funds will be used for:
       Furniture
       Landscaping and
        site amenities
       Movers
   Budgeted funds remaining                  $296,750.60
   Add CDBG eligible costs                   $131,354.24
     Chair Lifts            $120,060.00
     Demo Supervision       $11,294.24
   Add FUMC purchase                         $125,000.00

                      Total funds available   $553,664.84
Total funds available                          $553,664.84
 Still needed:
   Furniture                                    229,698.55
     OfficeWise,
     Bart Turner & Assoc., and
     West Office Furniture**
   Equipment (refrigerators, etc.)        4,000.00
   Moving                                        80,000.00
   Hardscaping                                  232,463.00
     Stoddard Construction** (City crews will demo)
     Reese Albert
   Landscaping                                    7,503.29

                                                       **recommended bid
   Funds remaining                          $7,503.29
   Inadequate to develop site
   Such funds never included in any
    prior contract, and only recently
    designed (a contribution by Schertz)
   Staff requests an additional $150,000 to implement a
   Landscaping plan that features drought-tolerant plant
    materials using xeriscape principals
   If it is the Council’s desire, an interpretive system could
    be included as a public demonstration site
   Originally built as the City’s “Public Library”
   Most recently served as home to Health Department, included
    Health Admin, Nursing, WIC, Pharmacy, etc.
   Will soon serve as home to Departments of Neighborhood &
    Family Services and Community & Economic Development
   Staff recommends that the building be referred to as the
    Community Development Building while preserving the original
    name on the historic structure
   Modifications to custodial services in “new”
    buildings
       Change in needs
       Desire to increase building maintenance level
 Operation of Central Plant
 Staffing/Expertise
1. Approval of budget of remaining funds
   a. Consideration of additional funds for landscaping
   and other site amenities
   b. Approval of hardscape bid by Stoddard
   Construction
2. Approval of furniture purchase from West Office
   Supply
3. Consideration of renaming the old “Public Library” to
   the Community Development Building
4. Consideration of operational issues related to
   occupancy of rehabbed buildings
Or is it really the beginning…?
   Per Change Order #1                              $1,765,085
   Trane Equipment                             499,217
   Total Central Plant Cost                $2,264,302

   City Hall             32%                 724,577
        < Utilized 5 days per week
   Old Library                     13%                 294,359
        < Utilized 5 days per week
    Water Billing         6%                  135,858
        < Utilized 5 days per week 100%
   Auditorium                      33%                 747,220
        < off peak, select # days / year
   Auditorium Annex                16%                 362,288
        < off peak, select # days / year
   Total                           100%            $2,264,302
   In Spring election, voters approve $3,750,000
    for Auditorium enhancements

   Design Fees (includes Sound & Lighting Consultants)       $
    334,500
   Construction Mgmt
    32,950
   HVAC Equipment and Installation                   1,109,508
   Foundation, Plumbing, Fire Protection               180,856

   Remaining funds for lighting, sound,
    rigging, seating, lobby, windows, curtains, etc.   $2,092,186
City Council March 20, 2012 City Hall Complex 2012

More Related Content

Similar to City Council March 20, 2012 City Hall Complex 2012

Save St. Pauls Presentation
Save St. Pauls PresentationSave St. Pauls Presentation
Save St. Pauls PresentationJamie Cohen
 
8.3.2012.board.presentation
8.3.2012.board.presentation8.3.2012.board.presentation
8.3.2012.board.presentationclacourse-blum
 
City Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity of San Angelo Texas
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
City Council July 19, 2011 Finance Presentation
City Council July 19, 2011 Finance PresentationCity Council July 19, 2011 Finance Presentation
City Council July 19, 2011 Finance PresentationCity of San Angelo Texas
 
Michigan Energy Forum - March 7, 2013
Michigan Energy Forum - March 7, 2013Michigan Energy Forum - March 7, 2013
Michigan Energy Forum - March 7, 2013AnnArborSPARK
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone PresentationJosue Campos
 
2012 ISCN Symposium - Energy Optimization at Central Michigan University 2012
2012 ISCN Symposium - Energy Optimization at Central Michigan University 20122012 ISCN Symposium - Energy Optimization at Central Michigan University 2012
2012 ISCN Symposium - Energy Optimization at Central Michigan University 2012ISCN_Secretariat
 
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit FeesAlamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit Feesahcitycouncil
 
Tim dettlaff presentation fmli nov 13 2014
Tim dettlaff presentation   fmli nov 13 2014Tim dettlaff presentation   fmli nov 13 2014
Tim dettlaff presentation fmli nov 13 2014MikeWorsfold
 
Business plan on fly ash bricks
Business plan on fly ash bricksBusiness plan on fly ash bricks
Business plan on fly ash bricksAtikant Kashyap
 
Final presentation with excel 2
Final presentation with excel 2Final presentation with excel 2
Final presentation with excel 2Aura Investments
 
cost appraisal
cost appraisalcost appraisal
cost appraisalahmong4
 
Dri expansion cost breakdown pdf-1
Dri expansion cost breakdown   pdf-1Dri expansion cost breakdown   pdf-1
Dri expansion cost breakdown pdf-1Tumehfamily
 
Final slideshow presentation (1)
Final slideshow presentation (1)Final slideshow presentation (1)
Final slideshow presentation (1)Aura Investments
 

Similar to City Council March 20, 2012 City Hall Complex 2012 (20)

FY12 Budget Amendment No. 1
FY12 Budget Amendment No. 1FY12 Budget Amendment No. 1
FY12 Budget Amendment No. 1
 
Save St. Pauls Presentation
Save St. Pauls PresentationSave St. Pauls Presentation
Save St. Pauls Presentation
 
8.3.2012.board.presentation
8.3.2012.board.presentation8.3.2012.board.presentation
8.3.2012.board.presentation
 
City Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget Presentation
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
City Council July 19, 2011 Finance Presentation
City Council July 19, 2011 Finance PresentationCity Council July 19, 2011 Finance Presentation
City Council July 19, 2011 Finance Presentation
 
Michigan Energy Forum - March 7, 2013
Michigan Energy Forum - March 7, 2013Michigan Energy Forum - March 7, 2013
Michigan Energy Forum - March 7, 2013
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone Presentation
 
2012 ISCN Symposium - Energy Optimization at Central Michigan University 2012
2012 ISCN Symposium - Energy Optimization at Central Michigan University 20122012 ISCN Symposium - Energy Optimization at Central Michigan University 2012
2012 ISCN Symposium - Energy Optimization at Central Michigan University 2012
 
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit FeesAlamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
 
Tim dettlaff presentation fmli nov 13 2014
Tim dettlaff presentation   fmli nov 13 2014Tim dettlaff presentation   fmli nov 13 2014
Tim dettlaff presentation fmli nov 13 2014
 
UFI Operations Award 2010 - Direct Energy Center
UFI Operations Award 2010 - Direct Energy CenterUFI Operations Award 2010 - Direct Energy Center
UFI Operations Award 2010 - Direct Energy Center
 
Business plan on fly ash bricks
Business plan on fly ash bricksBusiness plan on fly ash bricks
Business plan on fly ash bricks
 
Final presentation with excel 2
Final presentation with excel 2Final presentation with excel 2
Final presentation with excel 2
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
104 Project Plan
104 Project Plan104 Project Plan
104 Project Plan
 
Dri expansion cost breakdown pdf-1
Dri expansion cost breakdown   pdf-1Dri expansion cost breakdown   pdf-1
Dri expansion cost breakdown pdf-1
 
Final slideshow presentation (1)
Final slideshow presentation (1)Final slideshow presentation (1)
Final slideshow presentation (1)
 
2011 Budget
2011 Budget2011 Budget
2011 Budget
 

More from City of San Angelo Texas

City council january 7, 2014 sidewalk agreement
City council january 7, 2014   sidewalk agreementCity council january 7, 2014   sidewalk agreement
City council january 7, 2014 sidewalk agreementCity of San Angelo Texas
 
City council january 7, 2014 bandits presentation
City council january 7, 2014   bandits presentationCity council january 7, 2014   bandits presentation
City council january 7, 2014 bandits presentationCity of San Angelo Texas
 
City council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity of San Angelo Texas
 
City council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity of San Angelo Texas
 
City council nov. 19, 2013 san angelo public housing authority
City council nov. 19, 2013   san angelo public housing  authorityCity council nov. 19, 2013   san angelo public housing  authority
City council nov. 19, 2013 san angelo public housing authorityCity of San Angelo Texas
 
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City council nov. 19, 2013    cosadc budget presentation 11-19-13City council nov. 19, 2013    cosadc budget presentation 11-19-13
City council nov. 19, 2013 cosadc budget presentation 11-19-13City of San Angelo Texas
 
City council nov. 19, 2013 cosadc ballot language presentation
City council nov. 19, 2013    cosadc ballot language presentationCity council nov. 19, 2013    cosadc ballot language presentation
City council nov. 19, 2013 cosadc ballot language presentationCity of San Angelo Texas
 
San angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipSan angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipCity of San Angelo Texas
 
San angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotSan angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotCity of San Angelo Texas
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...City of San Angelo Texas
 
San angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationSan angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationCity of San Angelo Texas
 
San angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetSan angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetCity of San Angelo Texas
 

More from City of San Angelo Texas (20)

February 4, 2014 Agenda Packet
February 4, 2014 Agenda PacketFebruary 4, 2014 Agenda Packet
February 4, 2014 Agenda Packet
 
January 21, 2014 Agenda packet
January 21, 2014 Agenda packetJanuary 21, 2014 Agenda packet
January 21, 2014 Agenda packet
 
City council january 7, 2014 sidewalk agreement
City council january 7, 2014   sidewalk agreementCity council january 7, 2014   sidewalk agreement
City council january 7, 2014 sidewalk agreement
 
City council january 7, 2014 bandits presentation
City council january 7, 2014   bandits presentationCity council january 7, 2014   bandits presentation
City council january 7, 2014 bandits presentation
 
City council january 7, 2014 river fest
City council january 7, 2014   river festCity council january 7, 2014   river fest
City council january 7, 2014 river fest
 
January 7, 2014 Agenda Packet
January 7, 2014 Agenda PacketJanuary 7, 2014 Agenda Packet
January 7, 2014 Agenda Packet
 
City council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity council 12 17-13 downtown development plan
City council 12 17-13 downtown development plan
 
City council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity council 12 17-13 planning presentation
City council 12 17-13 planning presentation
 
December 17, 2013 Agenda Packet
December 17, 2013 Agenda PacketDecember 17, 2013 Agenda Packet
December 17, 2013 Agenda Packet
 
December 3, 2013 Agenda packet
December 3, 2013 Agenda packetDecember 3, 2013 Agenda packet
December 3, 2013 Agenda packet
 
City council nov. 19, 2013 san angelo public housing authority
City council nov. 19, 2013   san angelo public housing  authorityCity council nov. 19, 2013   san angelo public housing  authority
City council nov. 19, 2013 san angelo public housing authority
 
City council nov. 19, 2013 planning
City council nov. 19, 2013   planningCity council nov. 19, 2013   planning
City council nov. 19, 2013 planning
 
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City council nov. 19, 2013    cosadc budget presentation 11-19-13City council nov. 19, 2013    cosadc budget presentation 11-19-13
City council nov. 19, 2013 cosadc budget presentation 11-19-13
 
City council nov. 19, 2013 cosadc ballot language presentation
City council nov. 19, 2013    cosadc ballot language presentationCity council nov. 19, 2013    cosadc ballot language presentation
City council nov. 19, 2013 cosadc ballot language presentation
 
November 19, 2013 Agenda Packet
November 19, 2013 Agenda PacketNovember 19, 2013 Agenda Packet
November 19, 2013 Agenda Packet
 
San angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipSan angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnership
 
San angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotSan angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilot
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...
 
San angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationSan angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentation
 
San angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetSan angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budget
 

Recently uploaded

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 

City Council March 20, 2012 City Hall Complex 2012

  • 1.
  • 2. 2008 - Council approved Professional Services Contract with Killis Almond Architects to begin Master Plan of City Hall rehabilitation  2009 - Contract amended to include Phase I for the rehabilitation of the City Hall and Library Building  2010 – Contract amended to include Phase II for the central plant with ice storage  2011 – Contract amended to include voter approved rehabilitation of the City Auditorium
  • 3. Rehabilitation of City Hall  Rehabilitation of old Public Library, including expansion  Central Plant serving:  City Hall  old Library  Utility Building  Auditorium, including annex
  • 4. CDBG $ 761,000  ARRA 216,616  Fund 504 1,776,698  Fund 508 5,000,000  Fund 508 2,500,000  504,508 Contingencies 177,030  EECBG 865,000  Fire Station Savings 200,000  WIC 600,000  Water/Wastewater Admin Space 131,000  Utility Billing Building HVAC 135,065  Auditorium Half-Cent Approval 3,750,000 Total Revenue $16,112,409
  • 5. Design Contract (KAA) $ 1,218,474  Construction Management 165,000  Construction Contract (Stoddard) 8,740,748*  Relocation 293,000  Demolition 141,317  Asbestos Abatement 103,337  Security System 119,084  HVAC Equipment 499,217  Central Plant (per CO#1) 1,765,085  Revised Auditorium 2,614,186 Total Expenses $15,659,448 *figure did not represent contract amount
  • 6. Original Contract Amount $9,083,000*  Included $500,000 contingency  $500,000 spent
  • 7. Revenue $16,112,409  Expenses $15,659,448 $452,961  Remaining funds will be used for:  Furniture  Landscaping and site amenities  Movers
  • 8. Budgeted funds remaining $296,750.60  Add CDBG eligible costs $131,354.24  Chair Lifts $120,060.00  Demo Supervision $11,294.24  Add FUMC purchase $125,000.00 Total funds available $553,664.84
  • 9. Total funds available $553,664.84  Still needed:  Furniture 229,698.55  OfficeWise,  Bart Turner & Assoc., and  West Office Furniture**  Equipment (refrigerators, etc.) 4,000.00  Moving 80,000.00  Hardscaping 232,463.00  Stoddard Construction** (City crews will demo)  Reese Albert  Landscaping 7,503.29 **recommended bid
  • 10. Funds remaining $7,503.29  Inadequate to develop site  Such funds never included in any prior contract, and only recently designed (a contribution by Schertz)  Staff requests an additional $150,000 to implement a  Landscaping plan that features drought-tolerant plant materials using xeriscape principals  If it is the Council’s desire, an interpretive system could be included as a public demonstration site
  • 11. Originally built as the City’s “Public Library”  Most recently served as home to Health Department, included Health Admin, Nursing, WIC, Pharmacy, etc.  Will soon serve as home to Departments of Neighborhood & Family Services and Community & Economic Development  Staff recommends that the building be referred to as the Community Development Building while preserving the original name on the historic structure
  • 12. Modifications to custodial services in “new” buildings  Change in needs  Desire to increase building maintenance level  Operation of Central Plant  Staffing/Expertise
  • 13. 1. Approval of budget of remaining funds a. Consideration of additional funds for landscaping and other site amenities b. Approval of hardscape bid by Stoddard Construction 2. Approval of furniture purchase from West Office Supply 3. Consideration of renaming the old “Public Library” to the Community Development Building 4. Consideration of operational issues related to occupancy of rehabbed buildings
  • 14. Or is it really the beginning…?
  • 15. Per Change Order #1 $1,765,085  Trane Equipment 499,217  Total Central Plant Cost $2,264,302  City Hall 32% 724,577  < Utilized 5 days per week  Old Library 13% 294,359  < Utilized 5 days per week Water Billing   6% 135,858  < Utilized 5 days per week 100%  Auditorium 33% 747,220  < off peak, select # days / year  Auditorium Annex 16% 362,288  < off peak, select # days / year  Total 100% $2,264,302
  • 16. In Spring election, voters approve $3,750,000 for Auditorium enhancements  Design Fees (includes Sound & Lighting Consultants) $ 334,500  Construction Mgmt 32,950  HVAC Equipment and Installation 1,109,508  Foundation, Plumbing, Fire Protection 180,856  Remaining funds for lighting, sound, rigging, seating, lobby, windows, curtains, etc. $2,092,186

Editor's Notes

  1. Dave, I think you have this info
  2. Less Killis $37,700 No time penalty as per change order $45,922.45
  3. Basement east looking west
  4. East side of City Hall, street closed between city hall and old library…
  5. Dave
  6. The entire budget is presented because it is cheaper to do the remaining plumbing and fire suppresiion work before the City Hall phase is completed, therefore we will be asking you to approve this work as part of change Order #1… the first Change Order that is outside the budget and scope of the original project. The funding however has been approved and is available… The remaining expenses related to the auditorium will be presented to you at a later time.