2. PRELIMINARY SURVEY PLANS & SPECIFICATIONS
CONTRACT TERMS & CONDITIONS
SITE CONDITIONS
GOVERNMENT REGULATIONS
REQUIREMENTS OF OWNERS & DESIGNER
PROJECT ORGANIZATION
WORK EXECUTION PLAN
•SCOPE OF WORK
• CONSTRUCTION METHODS
• COORDINATION WITH OTHER WORKS
RESOURCES ALLOCATION PLAN
•SCHEDULE
•BUDGET
•MANPOWER
•MATERIAL
•EQUIPMENT
CONTROL PLAN
•COST
•SCHEDULE
•QUALITY
•SAFETY
IS THE WORK PLAN
APPROPRIATE?
NO DETAILED
PLAN
WORK EXECUTION
YES
3. PRELIMINARY
SURVEYRY
BASIC POLICY BASIC PLAN
SELECTION OF WORK
EXECUTION METHODS
ADJUSTMENT OF
DESIGN CONCEPT
DEVELOPMENT OF
TECHNIQUES
COLLECTION OF TECHNICAL INFORMATION
CONSTRUCTION
ASSESSMENT
& APPROVAL
CONTROL
PLANS
WORK
EXECUTION
PLAN
RESOURCE
ALLOCATION
PLAN
ORIGINAL
BUDGET
A
B C
D
E
F
4. ITEMS TO BE EXAMINED IN THE PREVIOUS PROCESS
A. PRELIMINARY SURVEY
o DESIGN SPECIFICATIONS AND DRAWINGS
o CONTRACT TERMS AND CONDITIONS
o SITE CONDITIONS
o NEEDS OF PROJECT OWNER AND DESIGNER
o COMPANY MANAGEMENT POLICIES
o PERMITS & LICENSES REQUIRED
o GOVERNMENT REGULATIONS
o PRIORITY POLICIES REGARDING QUALITY, COSTS, CONSTRUCTION
PERIOD AND SAFETY
B. WORK EXECUTION PLAN
oBASIC PLANS FOR MAIN WORK TYPES
oCONSTRUCTION METHODS PLAN
5. C. RESOURCE ALLOCATION PLAN
oSCHEDULE
oBUDGET
oMANPOWER
oMATERIAL
oEQUIPMENT
D. CONTROL PLAN
oCOST
oSCHEDULE
oQUALITY
oSAFETY