Architecture
• Agreed design brief and schedule of accommodation.
• Report on existing facilities and engineering systems if applicable.
• Options studies report.
• Conceptual drawings including:
– overall site plan.
– floor plans.
– elevations.
– sketches.
– sections (indicative sufficient to illustrate overall concept.).
• Model.
• Preliminary cost estimate (prepared by quantity surveyor).
• Concept schedule of materials and finishes.
Inputs:
• Client brief, including budget and time schedule.
• Client advice in respect to structure of design process.
• Data Collection including:
– topographical survey.
– existing structures and services.
– certificate of title.
– other legal Information.
– geotechnical information.
– as-built measure of existing structures where additions
or alterations are involved.
– engineering reports on existing structures.
– district plan rules and objectives including any existing
resource consent, LIM and PIM.
– other design constraints.
1.
2.
3.
4.
5.
6.
7.
Confirm conditions of engagement at outset of
commission.
Note that the preparation of brief is not part of
architect’s standard service.
Agree roles and responsibilities for all participants in
building procurement process particularly
responsibility for obtaining resource consents.
Agree with client the requirements and programme
for client information and approvals.
Costing may be only on square metre rate basis –
quantity surveyor should provide concept cost plan
to accompany deliverables.
Concept and preliminary design phases may be
combined.
The approved design may be submitted for a PIM at
Design Documentation Guidelines
Concept Design PhaseDesign Process Deliverables Commentary
this stage to identify resource consent issues and to
Tasks:
• Attend regular design phase meetings with relevant parties. ❒ 8. Agree the scale of drawing deliverables for each
phase according to project type.
• Inspect site and prepare site analysis.
9. Dimensioning and co-ordination is often the
• Prepare schedule of accommodation. Agree with client.
Distribute.
10. Advise client on the advantages in maintaining
consultant advice at every stage, and the risks
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
Page 2
ArchitectureDesign Documentation Guidelines
Concept Design Phase continuedDesign Process Deliverables Commentary
• Discuss and agree with client the additional separate or
sub-consultants that are to be retained and by whom, i.e.,
geotechnical consultant, surveyor, planning consultant,
civil, structural, fire, services and acoustic engineers;
quantity surveyors, interior designer, landscape architect,
specialised project management services, health and
safety consultant, others.
• Select and recommend to client appointment of other
consultants or sub-consultants: confirm fees.
• Identify responsibility for dimensional control.
• Identify responsibility for design coordination.
• Identify responsibility for design management.
• Investigate district plan requirements, analyse, review
with client.
• Prepare formal/functional diagrams, develop viable
options, review with client.
massing models; evaluate relationships to site context.
arrangement and brief; review with client. Select model.
systems with structural engineer and building
services engineer.
• Analyse brief against design constraints. ❒
• Prepare concept design. ❒
• Study siting options and climatic influences; develop ❒
• Test massing options against preferred functional ❒
• Evaluate provisional concepts for accommodation of ❒
❒
❒
❒
❒
❒
❒
❒
11. If a partial service is commissioned, confirm whether
the deliverables for the commissioned phase are
affected.
12. Confirm with the client whether design
management services are included in the design
commission, or whether another party will manage
the design process.
13. It may be necessary to obtain from the services
engineer a schedule of notional requirements.
14. Refer to separate co-ordination checklist documents.
TM
Page 3
ArchitectureDesign Documentation Guidelines
Concept Design Phase continuedDesign Process Deliverables Commentary
• Evaluate provisional concepts for accommodation of
parking and traffic requirements.
• Prepare architecture concept drawings.
• Prepare feasibility report.
• Prepare concept schedule of internal and external materials
and finishes,confirm with client,distribute to quantity surveyor.
• Check disabled access requirements.
• Check concept against planning and survey requirements.
• Review concepts for significant health and safety risks
relevant to the design.
• Review scheme with territorial authority planners.
• Liaise with quantity surveyor to prepare concept design cost
estimate.
requirements.
floor-to-floor heights.
❒
❒
❒
❒
❒
❒
❒
❒
❒• Check concept design for conformity with fire and egress ❒
• Establish provisional beam depths, duct crossovers, and ❒
• Establish energy conservation design criteria. ❒
• Prepare energy study. ❒
• Determine if environmental studies are required if so, ❒
• Co-ordinate all design information between disciplines. ❒
TM
TM
ArchitectureDesign Documentation Guidelines
Preliminary Design Phase Deliverables
Drawings:
• Overall site plan.
• Floor plans.
• Elevations.
• Sections.
• Sketches/perspectives exterior.
• Sketches/perspectives interior.
• Model(s).
• Materials and finishes presentation.
• Other defined marketing material.
Commentary
1. Consultation with territorial authority is
recommended on key aspects of the design that may
be considered outside the ‘Acceptable Solution’
regime, and unusual/contentious issues.
2. Cost estimates at this stage generally cannot be on a
full elemental basis, as secondary elements are not
well defined, but ensure independent professional
cost advice is provided to the client.
3. Contribution to value management sessions may be
required.
4. Preliminary design may provide a level of
documentation appropriate for a resource consent
application for less complex projects.
5. It may be relevant to review structural engineer’s
Design Process
Inputs:
• Client approval of concept design.
• Approved concept cost plan.
• Confirmed site topographical, geotech and legal surveys.
• Confirmed district plan analysis and development rules.
• Concept civil and structural engineering constraints.
• Concept services engineering and infrastructural
constraints.
• Concept fire engineering.
• Concept environmental studies.
• Concept acoustic advice.
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
Specifications: preliminary report and effect on external façade
• Project time schedule.
• Preliminary schedule of internal and external materials and
weathering implications.
Tasks:
Reports:
parties.
• Updated design brief, schedule of accommodation and project
• Revise preliminary design brief from concept design ❒ time schedule.
including all up-to-date information; confirm with client.
Page 5
Architecture
• Outline of elements not covered in preliminary design.
• Define assumed construction methodology governing design.
• Highlight ‘significant’ or unusual buildability and health and
safety issues.
• Highlight ‘special’ project risks.
• Report on façade options and weathering issues.
Design Documentation Guidelines
Preliminary Design Phase continuedDesign Process Deliverables Commentary
❒
❒
❒
❒
❒
• Review preliminary design for significant or unusual
health and safety risks the design may present during
construction and maintenance.
• Prepare preliminary design work time schedule.
• Review town planning analysis and implications.
• Establish primary reference grids and dimensions
• Evaluate provisional concepts for accommodation ofstructural systems with structural engineer.
• Evaluate provisional concepts for accommodation of
services systems with building services engineer.
• Revise schedule of internal and external materials and finishes;
evaluate lifecycle durability and maintenance implications;
confirm with client and submit to quantity surveyor.
quantity surveyor.
floor requirements, plant room sizes/mechanical
requirements, and egress requirements.
❒
❒
❒
❒
❒
❒
❒
• Confirm compliance with fire and egress requirements. ❒
• Confirm compliance with disabled access requirements. ❒
• Confirm compliance with sanitary facilities code. ❒
• Confirm compliance with development rules. ❒
• Confirm revisions; request updated cost plan from ❒
• Establish provisional lift shaft sizes, air duct sizes, raised ❒
TM
Page 5
Architecture
• Outline of elements not covered in preliminary design.
• Define assumed construction methodology governing design.
• Highlight ‘significant’ or unusual buildability and health and
safety issues.
• Highlight ‘special’ project risks.
• Report on façade options and weathering issues.
Design Documentation Guidelines
Preliminary Design Phase continuedDesign Process Deliverables Commentary
❒
❒
❒
❒
❒
• Review preliminary design for significant or unusual
health and safety risks the design may present during
construction and maintenance.
• Prepare preliminary design work time schedule.
• Review town planning analysis and implications.
• Establish primary reference grids and dimensions
• Evaluate provisional concepts for accommodation ofstructural systems with structural engineer.
• Evaluate provisional concepts for accommodation of
services systems with building services engineer.
• Revise schedule of internal and external materials and finishes;
evaluate lifecycle durability and maintenance implications;
confirm with client and submit to quantity surveyor.
quantity surveyor.
floor requirements, plant room sizes/mechanical
requirements, and egress requirements.
❒
❒
❒
❒
❒
❒
❒
• Confirm compliance with fire and egress requirements. ❒
• Confirm compliance with disabled access requirements. ❒
• Confirm compliance with sanitary facilities code. ❒
• Confirm compliance with development rules. ❒
• Confirm revisions; request updated cost plan from ❒
• Establish provisional lift shaft sizes, air duct sizes, raised ❒
TM

More Related Content

What's hot

What's hot (19)

Resume_AG
Resume_AGResume_AG
Resume_AG
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
MY CV AB - Lng-2014
MY  CV AB - Lng-2014MY  CV AB - Lng-2014
MY CV AB - Lng-2014
 
SANPPT
SANPPTSANPPT
SANPPT
 
Construction Management Services
Construction Management ServicesConstruction Management Services
Construction Management Services
 
Resume Jaime Lopez 2016
Resume Jaime Lopez 2016Resume Jaime Lopez 2016
Resume Jaime Lopez 2016
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Process & power plants
Process & power plantsProcess & power plants
Process & power plants
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
Food service design
Food service designFood service design
Food service design
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
 
Offshore Vacancies at Fluor Phils
Offshore Vacancies at Fluor PhilsOffshore Vacancies at Fluor Phils
Offshore Vacancies at Fluor Phils
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
Optimum cm presentation 6-15-12
Optimum cm presentation  6-15-12Optimum cm presentation  6-15-12
Optimum cm presentation 6-15-12
 

Similar to Ddg architecture

Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...Galala University
 
Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Nghia Huynh Ngoc
 
Role of HVAC Engineer
Role of HVAC EngineerRole of HVAC Engineer
Role of HVAC EngineerAshutosh
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
Architectural Project Planning
Architectural Project PlanningArchitectural Project Planning
Architectural Project PlanningIndovance Inc
 
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Virtu Institute
 
building economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTbuilding economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTRiyaVerma238431
 
iosh-temporary-works.pdf
iosh-temporary-works.pdfiosh-temporary-works.pdf
iosh-temporary-works.pdfXiMdhk
 
working drawing basic
working drawing basic working drawing basic
working drawing basic download26
 
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUMEABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUMEAbdul Hakeem
 
Session 25 - Documentation
Session 25 - DocumentationSession 25 - Documentation
Session 25 - DocumentationVidyaIA
 
Youssef Altaweel- Resume -05-07-2016-
Youssef Altaweel- Resume -05-07-2016-Youssef Altaweel- Resume -05-07-2016-
Youssef Altaweel- Resume -05-07-2016-Youssef Altaweel
 
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Neha V
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionSeetha Ram P G
 

Similar to Ddg architecture (20)

Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...
 
Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Hydraulic services tables_8_2004
Hydraulic services tables_8_2004
 
Role of HVAC Engineer
Role of HVAC EngineerRole of HVAC Engineer
Role of HVAC Engineer
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
Architectural Project Planning
Architectural Project PlanningArchitectural Project Planning
Architectural Project Planning
 
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
Lecture 3 - Research & Design Process - Commercial-Institutional Interiors VD...
 
building economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTbuilding economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENT
 
iosh-temporary-works.pdf
iosh-temporary-works.pdfiosh-temporary-works.pdf
iosh-temporary-works.pdf
 
working drawing basic
working drawing basic working drawing basic
working drawing basic
 
1. cmpm
1. cmpm1. cmpm
1. cmpm
 
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUMEABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Session 25 - Documentation
Session 25 - DocumentationSession 25 - Documentation
Session 25 - Documentation
 
Total-Project-Cost.pptx
Total-Project-Cost.pptxTotal-Project-Cost.pptx
Total-Project-Cost.pptx
 
Youssef Altaweel- Resume -05-07-2016-
Youssef Altaweel- Resume -05-07-2016-Youssef Altaweel- Resume -05-07-2016-
Youssef Altaweel- Resume -05-07-2016-
 
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Documentation
DocumentationDocumentation
Documentation
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
 

More from Eelyn Cheong

Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Eelyn Cheong
 
Psy journal 02 complete print
Psy journal 02 complete printPsy journal 02 complete print
Psy journal 02 complete printEelyn Cheong
 
Psy ready to print
Psy ready to printPsy ready to print
Psy ready to printEelyn Cheong
 
Psy research proposal
Psy research proposalPsy research proposal
Psy research proposalEelyn Cheong
 
Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Eelyn Cheong
 
Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Eelyn Cheong
 
A comparative analysis of businesses
A comparative analysis of businessesA comparative analysis of businesses
A comparative analysis of businessesEelyn Cheong
 
Animated films done888888888
Animated films done888888888Animated films done888888888
Animated films done888888888Eelyn Cheong
 
The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888Eelyn Cheong
 
20 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation88888888888820 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation888888888888Eelyn Cheong
 
The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888Eelyn Cheong
 

More from Eelyn Cheong (20)

Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01
 
Psy final report
Psy final reportPsy final report
Psy final report
 
Psy journal 02 complete print
Psy journal 02 complete printPsy journal 02 complete print
Psy journal 02 complete print
 
Psy ready to print
Psy ready to printPsy ready to print
Psy ready to print
 
Psy research proposal
Psy research proposalPsy research proposal
Psy research proposal
 
Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02
 
Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02
 
A comparative analysis of businesses
A comparative analysis of businessesA comparative analysis of businesses
A comparative analysis of businesses
 
Animated films done888888888
Animated films done888888888Animated films done888888888
Animated films done888888888
 
The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888
 
20 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation88888888888820 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation888888888888
 
The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888
 
Cnc p2 meeting
Cnc p2 meetingCnc p2 meeting
Cnc p2 meeting
 
Ici
IciIci
Ici
 
Ecsy card
Ecsy cardEcsy card
Ecsy card
 
Ecsy envelope
Ecsy envelopeEcsy envelope
Ecsy envelope
 
Ecs ycomprofile
Ecs ycomprofileEcs ycomprofile
Ecs ycomprofile
 
Tj0111111
Tj0111111Tj0111111
Tj0111111
 
Tj0111111
Tj0111111Tj0111111
Tj0111111
 
Ecsy envelope
Ecsy envelopeEcsy envelope
Ecsy envelope
 

Recently uploaded

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 

Recently uploaded (20)

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 

Ddg architecture

  • 1. TM Architecture • Agreed design brief and schedule of accommodation. • Report on existing facilities and engineering systems if applicable. • Options studies report. • Conceptual drawings including: – overall site plan. – floor plans. – elevations. – sketches. – sections (indicative sufficient to illustrate overall concept.). • Model. • Preliminary cost estimate (prepared by quantity surveyor). • Concept schedule of materials and finishes. Inputs: • Client brief, including budget and time schedule. • Client advice in respect to structure of design process. • Data Collection including: – topographical survey. – existing structures and services. – certificate of title. – other legal Information. – geotechnical information. – as-built measure of existing structures where additions or alterations are involved. – engineering reports on existing structures. – district plan rules and objectives including any existing resource consent, LIM and PIM. – other design constraints. 1. 2. 3. 4. 5. 6. 7. Confirm conditions of engagement at outset of commission. Note that the preparation of brief is not part of architect’s standard service. Agree roles and responsibilities for all participants in building procurement process particularly responsibility for obtaining resource consents. Agree with client the requirements and programme for client information and approvals. Costing may be only on square metre rate basis – quantity surveyor should provide concept cost plan to accompany deliverables. Concept and preliminary design phases may be combined. The approved design may be submitted for a PIM at Design Documentation Guidelines Concept Design PhaseDesign Process Deliverables Commentary this stage to identify resource consent issues and to Tasks: • Attend regular design phase meetings with relevant parties. ❒ 8. Agree the scale of drawing deliverables for each phase according to project type. • Inspect site and prepare site analysis. 9. Dimensioning and co-ordination is often the • Prepare schedule of accommodation. Agree with client. Distribute. 10. Advise client on the advantages in maintaining consultant advice at every stage, and the risks ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒
  • 2. Page 2 ArchitectureDesign Documentation Guidelines Concept Design Phase continuedDesign Process Deliverables Commentary • Discuss and agree with client the additional separate or sub-consultants that are to be retained and by whom, i.e., geotechnical consultant, surveyor, planning consultant, civil, structural, fire, services and acoustic engineers; quantity surveyors, interior designer, landscape architect, specialised project management services, health and safety consultant, others. • Select and recommend to client appointment of other consultants or sub-consultants: confirm fees. • Identify responsibility for dimensional control. • Identify responsibility for design coordination. • Identify responsibility for design management. • Investigate district plan requirements, analyse, review with client. • Prepare formal/functional diagrams, develop viable options, review with client. massing models; evaluate relationships to site context. arrangement and brief; review with client. Select model. systems with structural engineer and building services engineer. • Analyse brief against design constraints. ❒ • Prepare concept design. ❒ • Study siting options and climatic influences; develop ❒ • Test massing options against preferred functional ❒ • Evaluate provisional concepts for accommodation of ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ 11. If a partial service is commissioned, confirm whether the deliverables for the commissioned phase are affected. 12. Confirm with the client whether design management services are included in the design commission, or whether another party will manage the design process. 13. It may be necessary to obtain from the services engineer a schedule of notional requirements. 14. Refer to separate co-ordination checklist documents. TM
  • 3. Page 3 ArchitectureDesign Documentation Guidelines Concept Design Phase continuedDesign Process Deliverables Commentary • Evaluate provisional concepts for accommodation of parking and traffic requirements. • Prepare architecture concept drawings. • Prepare feasibility report. • Prepare concept schedule of internal and external materials and finishes,confirm with client,distribute to quantity surveyor. • Check disabled access requirements. • Check concept against planning and survey requirements. • Review concepts for significant health and safety risks relevant to the design. • Review scheme with territorial authority planners. • Liaise with quantity surveyor to prepare concept design cost estimate. requirements. floor-to-floor heights. ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒• Check concept design for conformity with fire and egress ❒ • Establish provisional beam depths, duct crossovers, and ❒ • Establish energy conservation design criteria. ❒ • Prepare energy study. ❒ • Determine if environmental studies are required if so, ❒ • Co-ordinate all design information between disciplines. ❒ TM
  • 4. TM ArchitectureDesign Documentation Guidelines Preliminary Design Phase Deliverables Drawings: • Overall site plan. • Floor plans. • Elevations. • Sections. • Sketches/perspectives exterior. • Sketches/perspectives interior. • Model(s). • Materials and finishes presentation. • Other defined marketing material. Commentary 1. Consultation with territorial authority is recommended on key aspects of the design that may be considered outside the ‘Acceptable Solution’ regime, and unusual/contentious issues. 2. Cost estimates at this stage generally cannot be on a full elemental basis, as secondary elements are not well defined, but ensure independent professional cost advice is provided to the client. 3. Contribution to value management sessions may be required. 4. Preliminary design may provide a level of documentation appropriate for a resource consent application for less complex projects. 5. It may be relevant to review structural engineer’s Design Process Inputs: • Client approval of concept design. • Approved concept cost plan. • Confirmed site topographical, geotech and legal surveys. • Confirmed district plan analysis and development rules. • Concept civil and structural engineering constraints. • Concept services engineering and infrastructural constraints. • Concept fire engineering. • Concept environmental studies. • Concept acoustic advice. ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ ❒ Specifications: preliminary report and effect on external façade • Project time schedule. • Preliminary schedule of internal and external materials and weathering implications. Tasks: Reports: parties. • Updated design brief, schedule of accommodation and project • Revise preliminary design brief from concept design ❒ time schedule. including all up-to-date information; confirm with client.
  • 5. Page 5 Architecture • Outline of elements not covered in preliminary design. • Define assumed construction methodology governing design. • Highlight ‘significant’ or unusual buildability and health and safety issues. • Highlight ‘special’ project risks. • Report on façade options and weathering issues. Design Documentation Guidelines Preliminary Design Phase continuedDesign Process Deliverables Commentary ❒ ❒ ❒ ❒ ❒ • Review preliminary design for significant or unusual health and safety risks the design may present during construction and maintenance. • Prepare preliminary design work time schedule. • Review town planning analysis and implications. • Establish primary reference grids and dimensions • Evaluate provisional concepts for accommodation ofstructural systems with structural engineer. • Evaluate provisional concepts for accommodation of services systems with building services engineer. • Revise schedule of internal and external materials and finishes; evaluate lifecycle durability and maintenance implications; confirm with client and submit to quantity surveyor. quantity surveyor. floor requirements, plant room sizes/mechanical requirements, and egress requirements. ❒ ❒ ❒ ❒ ❒ ❒ ❒ • Confirm compliance with fire and egress requirements. ❒ • Confirm compliance with disabled access requirements. ❒ • Confirm compliance with sanitary facilities code. ❒ • Confirm compliance with development rules. ❒ • Confirm revisions; request updated cost plan from ❒ • Establish provisional lift shaft sizes, air duct sizes, raised ❒ TM
  • 6. Page 5 Architecture • Outline of elements not covered in preliminary design. • Define assumed construction methodology governing design. • Highlight ‘significant’ or unusual buildability and health and safety issues. • Highlight ‘special’ project risks. • Report on façade options and weathering issues. Design Documentation Guidelines Preliminary Design Phase continuedDesign Process Deliverables Commentary ❒ ❒ ❒ ❒ ❒ • Review preliminary design for significant or unusual health and safety risks the design may present during construction and maintenance. • Prepare preliminary design work time schedule. • Review town planning analysis and implications. • Establish primary reference grids and dimensions • Evaluate provisional concepts for accommodation ofstructural systems with structural engineer. • Evaluate provisional concepts for accommodation of services systems with building services engineer. • Revise schedule of internal and external materials and finishes; evaluate lifecycle durability and maintenance implications; confirm with client and submit to quantity surveyor. quantity surveyor. floor requirements, plant room sizes/mechanical requirements, and egress requirements. ❒ ❒ ❒ ❒ ❒ ❒ ❒ • Confirm compliance with fire and egress requirements. ❒ • Confirm compliance with disabled access requirements. ❒ • Confirm compliance with sanitary facilities code. ❒ • Confirm compliance with development rules. ❒ • Confirm revisions; request updated cost plan from ❒ • Establish provisional lift shaft sizes, air duct sizes, raised ❒ TM