SlideShare a Scribd company logo
1 of 17
DIRECTOR
Admin
Incharge
Office
assistance
Accountant
Execution Incharge
(Project Manager)
DPM
Site EngineerSite EngineerSite Engineer
Deputy Project
Manager
Billing
Planning &
Incharge
DPM
Quantity
Surveyor
Asst Billing
Engineer
• Company : GURU INFRATECH (Currently Working as Sankalp Associates)
• Position : Sankalp Associates (BOQ Preparation+ Budget+ Rate Analysis +
Final Bill Checking+EXECUTION+DAY TO DAY MONITORING)PMC WORKS
• Projects : 4 NO OF FARMHOUSES Project in DELHI (DELHI).
• Project Description : 4 NO OF FARMHOUSES Approx 20 Cr. (Four NO of
FARM HOUSES)
• Company : BGK INFRA STRUCTURE (Currently Working as Sankalp
Associates)
• Position: Sankalp Associates (BOQ Preparation+ Budget+ Rate Analysis +
Final Bill Checking)
• Projects : Ware House Project in Akola (Maharashtra).
• Project Description : Ware House Approx 25 Cr. (Four working shed with
Admin block and External Development)
• Company : BGK INFRA STRUCTURE (Currently Working as Sankalp
Associates)
• Position : Sankalp Associates (BOQ Preparation+ Budget+ Rate
Analysis + Final Bill Checking)
• Projects : Ware House Project in Washim (Maharashtra).
• Project Description : Ware House Approx 20 Cr. (Four working shed
with Admin block and External Development)
• Company : BGK INFRA STRUCTURE (Currently Working as Sankalp
Associates)
• Position : Sankalp Associates (BOQPreparation+ Budget+ Rate
Analysis + Final Bill Checking)
• Projects : Ware House Project in Yavatmal (Maharashtra).
• Project Description : Ware House Approx 25 Cr. (Four working shed
with Admin block and External Development
• Company : BGK INFRA STRUCTURE (Currently Working as Sankalp
Associates)
• Position : Sankalp Associates (BOQ Preparation+ Budget+
Rate Analysis + Final Bill Checking)
• Projects : Ware House Project in Araria (Bihar).
• Project Description : Ware House Approx 25 Cr. (Four working shed
with Admin block and External Development
• Company : GURU INFRATECH PVT LTD (Currently Working as Sankalp
Associates)
• Position : Sankalp Associates (We deal in Project BOQ)
• Projects : Villa A, B & C at Guru Infratech, Green Meadows, Satbari.
• Project Description : 500 SQYDS VILLA
• Company : Ahluwalia Contracts (India) Ltd. (Currently Working as
Sankalp Associates)
• Position : Sankalp Associates (Project Billing)
• Projects : Times Residency, Damdama Resort (Gurgaon)
• Project Description : HIGH RISE RESIDENCIAL TOWER (A, B, C, D, E, F, G, H
• Company : HERO MOTO
• Position : Project Planning with MS project+ Project Billing+ Project
Execution
• Projects : Haridwar Plant Paint shop Building.
• Project Description : PAINT SHOP BUILDING 7.8 CR PROJECT
• Company : HERO MOTO
• Position : Project Billing+ Auditing
• Projects : Neemrana Main Plant Building + Utility Building +GPC Building + Mani Plant
Building
• Project Description : Main Plant Building 300 CR Project
PRE
CONSTRUCTIO
N
• PLANNING THE PROJECT IN
• SET THE MILESTONES
• BUDGET PLANNING WITH MILESTONE
CONSTRUCTIO
NS STAGE
•MOBLIZATION OF CONTACTOR
•MONITERING OF PROJECT WITH REFERNCE TO MILE STONE)
• EXECUTION PLANNING WITH ALL THE FORMATS
•BILLING, MATERIAL RECONCILATION
•FINAL HANDOVER WITH IN TIME
POST
CONSTRUCTIO
N STAGES
•PREPARE THE DAVIATION SHEET
•PREPARE THE SNAG LIST
•CLEAR THE QUALITY ISSUE DURING THE CONSTRUCTION
•FINAL BILL CHECKING WITH MATERIAL RECONCILATION
Pre-Construction Stage
Project Strategy and Benchmarking
• To develop and obtain approval from client on the project
strategy including financial and contracting strategy w. r. t.
time schedule and cost estimates for the project.
• Establish the project requirements, project phases,
functionaries, project brief, design brief etc.
• Establish communication system for systematic project
control in cost, quality and timely completion.
Design Brief Preparation
• Coordinate and manage the architect team, consultants and vendors,
advisors and others involved in the project
• Provide inputs for the design and specification of materials with special
emphasis to value engineering, proposed by the architect team and
consultants for the project based on the project brief and in coordination
with the cost and time schedule for the project with the prior approval
of client.
• Review the designs suggested by the architect team and consultants in
terms of build-ability / constructability, technical efficiency, life cycle
costing, overall construction and maintenance friendly details and
prepare comprehensive reports of same including cost saving for client’s
approval.
Tendering / Packaging
• Prepare detailed strategy and management of work packages as well as supply
and composite contracts.
• Finalize parameters for pre-qualifying and qualifying vendors based on guidelines
approved by clients
• Evaluate detailed design and specification including make/ specified item of
material and BOQ and DPR with the architect team and consultants.
• Prepare/vetting cost estimates of all packages including supply and composite
items and provide to client
• Reviews, all contract documents (general and specific) provided by the architect
team and consultants including BOQ, Technical Specifications, GCC, and SCC
approved make of material etc.
• Assist in preparing and floating tenders to short-listed agencies
• Techno commercially evaluate, recommend to client and assist in awarding of
orders.
• The cost of the packages/contracts will be prepared for calling of tenders/bids
with the prior approval of clients/his CA
Mobilization of Work and Material at Site through On-
Site Coordination
• Strategize and put forward the mobilization strategy being adopted by the selected
contracting agencies, with respect to men and material.
• The amount of mobilization for starting the project at site to be decided by the client after
considering the amount of contract.
• Strategize and coordinate the site layout/ works with the architect team and consultants.
• Ensure submission of shop drawings by various contractors as and when required
• Check and report to Client about the quality of material brought into for the project in
consideration to the approved specifications including inspection of material locally or at
outstations.
• Establish and monitor safety parameters for construction activities for the project in
consultation with the architect team, the consultants, contractors and others.
• Conduct a comprehensive safety audit with the Running bills/payments to the contractor
and report the same to client.
• Evaluate, examine and ensure the adequacy of mobilization and delivery of all necessary
resources i.e. men, material and equipment at site by the contracting agencies.
Construction Stage
• Prepare monthly execution strategies for work at project site
• Ensure that the construction and installation are as per the design intent
• Conduct kick-off and weekly on-site review meetings to be attended by all
concerned, consultants / architect and client to achieve quality, cost and
adherence to time schedule
• Establish procedures for checking compliance with design and specification,
monitor standard of workmanship, construction method and right sequence in
accordance with the procedure laid-down and adequacy of materials
• Ensure to set up a laboratory at site by the contractor to conduct field tests and
review all test results and compare with prescribed specification. If deviations
are observed, suggest and initiate remedial actions
• Review payment requests / bills / invoices and reconciliation of material supplied
by owner or as specified in tender documents, coordinate certification and other
conditions for payment and submit to Client.
• Coordinate quality and specification of all works for the project and site.
• Coordinate for checking approvals of finishes, material used, mock-ups and
details executed at site by the architect team, consultants, client and other
entities, as required
• Track the project schedule and report probable slippages, in advance, to client along with a
recommended strategy with corrective action to mitigate the impact of any slippage
• Check and validate contractors / suppliers claim for change / variation orders by rate
analysis and evaluation before taking the approval from the client
• Monitor and report progress to Client on daily / weekly / monthly basis
• Conduct Quality and Safety Audits and submit report to Client
• Provide detailed cash flow management and report. Prepare and furnish the monthly fund
requirement in advance
• Ensure the approved execution strategy for the contractors to be followed at works
• Review the Good for Construction drawings being issued for construction and proposed
changes and their implications to Client
• Establish and provide a comprehensive program to monitor, examine and reporting of the
Safety Parameters to be adhered to at site
• Manage and attend all construction review meetings and report the critical issues to Client
• Establish and provide a comprehensive program to ensure and evaluate all the necessary
checks and performance criteria for electrical, HVAC and fire fighting, and report the same
to Client.
• Ensure compliances of requirements by the respective contractors for matters related to
welfare and medical facilities to workmen.
Post Construction Stage
• Ensure preparation of a master document for Client underlining the variation in design and
specification if any during the course of construction as against the design and specification
originally agreed.
• Prepare defect / snag list and ensure removal of defects by the contractor, before giving
recommendation of issuing completion certificate by the client.
• Ascertain a handing over strategy, underlining the list of documents, drawings, test
certificates, performance guarantee, warrantee / guarantee cards, etc. for specified items
and handover these to client.
• Coordinate to identify, list out and hand over the residual stock for materials.
• Ensure that the As-built drawings, list of contacts and “Operation and Maintenance
Manuals” etc. are handed over to Client at the time of project closing out.
• Ensure the receipt of all necessary statutory approvals, such as the occupation /
completion certificate.
• Coordinate procedural commissioning of various equipments & integrated testing of all the
services including handing over the same to the maintenance agency.
• Coordinate to establish a Project Completion Date in order to specify the Start and End of
the Defects Liability Period.
• Ensure handing over the flats, building units to Client nominated representative..
Project Manager Experience and Construction Project Details

More Related Content

What's hot (18)

Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
CV
CVCV
CV
 
Bilal updated cv
Bilal updated cvBilal updated cv
Bilal updated cv
 
CJM Construction Consulting Presentation
CJM Construction Consulting PresentationCJM Construction Consulting Presentation
CJM Construction Consulting Presentation
 
Engr. Bode CV corrted-Road
Engr. Bode CV corrted-RoadEngr. Bode CV corrted-Road
Engr. Bode CV corrted-Road
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
Updated CV
Updated CVUpdated CV
Updated CV
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
Balamurugan CV Jan16
Balamurugan CV Jan16Balamurugan CV Jan16
Balamurugan CV Jan16
 
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
 
Resume
ResumeResume
Resume
 
Precon Phase Services
Precon Phase ServicesPrecon Phase Services
Precon Phase Services
 
C.V
C.VC.V
C.V
 
Resume
ResumeResume
Resume
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 

Viewers also liked

Почему проекты не выстреливают?
Почему проекты не выстреливают?Почему проекты не выстреливают?
Почему проекты не выстреливают?SEMANTICA
 
CONTABILIZZATORIE INDIRETTI parte III
CONTABILIZZATORIE INDIRETTI parte IIICONTABILIZZATORIE INDIRETTI parte III
CONTABILIZZATORIE INDIRETTI parte IIIroberto gelpi
 
parasitic helminthis
parasitic helminthisparasitic helminthis
parasitic helminthisNOMI KhanS
 
Nuevo presentación de microsoft power point
Nuevo presentación de microsoft power pointNuevo presentación de microsoft power point
Nuevo presentación de microsoft power pointYessenia Correa
 
Проміжний звіт ENEMO щодо місцевих виборів в Україні 25 жовтня
Проміжний звіт ENEMO щодо місцевих виборів в Україні 25 жовтняПроміжний звіт ENEMO щодо місцевих виборів в Україні 25 жовтня
Проміжний звіт ENEMO щодо місцевих виборів в Україні 25 жовтняtsnua
 

Viewers also liked (9)

Cosmofono
CosmofonoCosmofono
Cosmofono
 
Почему проекты не выстреливают?
Почему проекты не выстреливают?Почему проекты не выстреливают?
Почему проекты не выстреливают?
 
CONTABILIZZATORIE INDIRETTI parte III
CONTABILIZZATORIE INDIRETTI parte IIICONTABILIZZATORIE INDIRETTI parte III
CONTABILIZZATORIE INDIRETTI parte III
 
parasitic helminthis
parasitic helminthisparasitic helminthis
parasitic helminthis
 
Goldschmidt 2012
Goldschmidt 2012Goldschmidt 2012
Goldschmidt 2012
 
CSR w Danone
CSR w DanoneCSR w Danone
CSR w Danone
 
FINAL SD (1)
FINAL SD (1)FINAL SD (1)
FINAL SD (1)
 
Nuevo presentación de microsoft power point
Nuevo presentación de microsoft power pointNuevo presentación de microsoft power point
Nuevo presentación de microsoft power point
 
Проміжний звіт ENEMO щодо місцевих виборів в Україні 25 жовтня
Проміжний звіт ENEMO щодо місцевих виборів в Україні 25 жовтняПроміжний звіт ENEMO щодо місцевих виборів в Україні 25 жовтня
Проміжний звіт ENEMO щодо місцевих виборів в Україні 25 жовтня
 

Similar to Project Manager Experience and Construction Project Details

Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Elsahen
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cvMadhu Civil
 
Role of HVAC Engineer
Role of HVAC EngineerRole of HVAC Engineer
Role of HVAC EngineerAshutosh
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_originalwaji waji
 
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Neha V
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerSidharth Sunny
 

Similar to Project Manager Experience and Construction Project Details (20)

resume-.PDF (2)
resume-.PDF (2)resume-.PDF (2)
resume-.PDF (2)
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
Role of HVAC Engineer
Role of HVAC EngineerRole of HVAC Engineer
Role of HVAC Engineer
 
Sunil Final Resume
Sunil Final ResumeSunil Final Resume
Sunil Final Resume
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
Waji Ul Hassan_original
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
 
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
Cjmconstructionconsultingpresentation 13086519950433-phpapp02-110621053129-ph...
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Richie Resume
Richie Resume Richie Resume
Richie Resume
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Civil Engineer 2
Civil Engineer 2Civil Engineer 2
Civil Engineer 2
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
Ateeq cv d
Ateeq cv dAteeq cv d
Ateeq cv d
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Amir QC
Amir QCAmir QC
Amir QC
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 

Project Manager Experience and Construction Project Details

  • 1.
  • 2. DIRECTOR Admin Incharge Office assistance Accountant Execution Incharge (Project Manager) DPM Site EngineerSite EngineerSite Engineer Deputy Project Manager Billing Planning & Incharge DPM Quantity Surveyor Asst Billing Engineer
  • 3.
  • 4. • Company : GURU INFRATECH (Currently Working as Sankalp Associates) • Position : Sankalp Associates (BOQ Preparation+ Budget+ Rate Analysis + Final Bill Checking+EXECUTION+DAY TO DAY MONITORING)PMC WORKS • Projects : 4 NO OF FARMHOUSES Project in DELHI (DELHI). • Project Description : 4 NO OF FARMHOUSES Approx 20 Cr. (Four NO of FARM HOUSES) • Company : BGK INFRA STRUCTURE (Currently Working as Sankalp Associates) • Position: Sankalp Associates (BOQ Preparation+ Budget+ Rate Analysis + Final Bill Checking) • Projects : Ware House Project in Akola (Maharashtra). • Project Description : Ware House Approx 25 Cr. (Four working shed with Admin block and External Development)
  • 5. • Company : BGK INFRA STRUCTURE (Currently Working as Sankalp Associates) • Position : Sankalp Associates (BOQ Preparation+ Budget+ Rate Analysis + Final Bill Checking) • Projects : Ware House Project in Washim (Maharashtra). • Project Description : Ware House Approx 20 Cr. (Four working shed with Admin block and External Development) • Company : BGK INFRA STRUCTURE (Currently Working as Sankalp Associates) • Position : Sankalp Associates (BOQPreparation+ Budget+ Rate Analysis + Final Bill Checking) • Projects : Ware House Project in Yavatmal (Maharashtra). • Project Description : Ware House Approx 25 Cr. (Four working shed with Admin block and External Development
  • 6. • Company : BGK INFRA STRUCTURE (Currently Working as Sankalp Associates) • Position : Sankalp Associates (BOQ Preparation+ Budget+ Rate Analysis + Final Bill Checking) • Projects : Ware House Project in Araria (Bihar). • Project Description : Ware House Approx 25 Cr. (Four working shed with Admin block and External Development • Company : GURU INFRATECH PVT LTD (Currently Working as Sankalp Associates) • Position : Sankalp Associates (We deal in Project BOQ) • Projects : Villa A, B & C at Guru Infratech, Green Meadows, Satbari. • Project Description : 500 SQYDS VILLA
  • 7. • Company : Ahluwalia Contracts (India) Ltd. (Currently Working as Sankalp Associates) • Position : Sankalp Associates (Project Billing) • Projects : Times Residency, Damdama Resort (Gurgaon) • Project Description : HIGH RISE RESIDENCIAL TOWER (A, B, C, D, E, F, G, H • Company : HERO MOTO • Position : Project Planning with MS project+ Project Billing+ Project Execution • Projects : Haridwar Plant Paint shop Building. • Project Description : PAINT SHOP BUILDING 7.8 CR PROJECT
  • 8. • Company : HERO MOTO • Position : Project Billing+ Auditing • Projects : Neemrana Main Plant Building + Utility Building +GPC Building + Mani Plant Building • Project Description : Main Plant Building 300 CR Project
  • 9. PRE CONSTRUCTIO N • PLANNING THE PROJECT IN • SET THE MILESTONES • BUDGET PLANNING WITH MILESTONE CONSTRUCTIO NS STAGE •MOBLIZATION OF CONTACTOR •MONITERING OF PROJECT WITH REFERNCE TO MILE STONE) • EXECUTION PLANNING WITH ALL THE FORMATS •BILLING, MATERIAL RECONCILATION •FINAL HANDOVER WITH IN TIME POST CONSTRUCTIO N STAGES •PREPARE THE DAVIATION SHEET •PREPARE THE SNAG LIST •CLEAR THE QUALITY ISSUE DURING THE CONSTRUCTION •FINAL BILL CHECKING WITH MATERIAL RECONCILATION
  • 10. Pre-Construction Stage Project Strategy and Benchmarking • To develop and obtain approval from client on the project strategy including financial and contracting strategy w. r. t. time schedule and cost estimates for the project. • Establish the project requirements, project phases, functionaries, project brief, design brief etc. • Establish communication system for systematic project control in cost, quality and timely completion.
  • 11. Design Brief Preparation • Coordinate and manage the architect team, consultants and vendors, advisors and others involved in the project • Provide inputs for the design and specification of materials with special emphasis to value engineering, proposed by the architect team and consultants for the project based on the project brief and in coordination with the cost and time schedule for the project with the prior approval of client. • Review the designs suggested by the architect team and consultants in terms of build-ability / constructability, technical efficiency, life cycle costing, overall construction and maintenance friendly details and prepare comprehensive reports of same including cost saving for client’s approval.
  • 12. Tendering / Packaging • Prepare detailed strategy and management of work packages as well as supply and composite contracts. • Finalize parameters for pre-qualifying and qualifying vendors based on guidelines approved by clients • Evaluate detailed design and specification including make/ specified item of material and BOQ and DPR with the architect team and consultants. • Prepare/vetting cost estimates of all packages including supply and composite items and provide to client • Reviews, all contract documents (general and specific) provided by the architect team and consultants including BOQ, Technical Specifications, GCC, and SCC approved make of material etc. • Assist in preparing and floating tenders to short-listed agencies • Techno commercially evaluate, recommend to client and assist in awarding of orders. • The cost of the packages/contracts will be prepared for calling of tenders/bids with the prior approval of clients/his CA
  • 13. Mobilization of Work and Material at Site through On- Site Coordination • Strategize and put forward the mobilization strategy being adopted by the selected contracting agencies, with respect to men and material. • The amount of mobilization for starting the project at site to be decided by the client after considering the amount of contract. • Strategize and coordinate the site layout/ works with the architect team and consultants. • Ensure submission of shop drawings by various contractors as and when required • Check and report to Client about the quality of material brought into for the project in consideration to the approved specifications including inspection of material locally or at outstations. • Establish and monitor safety parameters for construction activities for the project in consultation with the architect team, the consultants, contractors and others. • Conduct a comprehensive safety audit with the Running bills/payments to the contractor and report the same to client. • Evaluate, examine and ensure the adequacy of mobilization and delivery of all necessary resources i.e. men, material and equipment at site by the contracting agencies.
  • 14. Construction Stage • Prepare monthly execution strategies for work at project site • Ensure that the construction and installation are as per the design intent • Conduct kick-off and weekly on-site review meetings to be attended by all concerned, consultants / architect and client to achieve quality, cost and adherence to time schedule • Establish procedures for checking compliance with design and specification, monitor standard of workmanship, construction method and right sequence in accordance with the procedure laid-down and adequacy of materials • Ensure to set up a laboratory at site by the contractor to conduct field tests and review all test results and compare with prescribed specification. If deviations are observed, suggest and initiate remedial actions • Review payment requests / bills / invoices and reconciliation of material supplied by owner or as specified in tender documents, coordinate certification and other conditions for payment and submit to Client. • Coordinate quality and specification of all works for the project and site. • Coordinate for checking approvals of finishes, material used, mock-ups and details executed at site by the architect team, consultants, client and other entities, as required
  • 15. • Track the project schedule and report probable slippages, in advance, to client along with a recommended strategy with corrective action to mitigate the impact of any slippage • Check and validate contractors / suppliers claim for change / variation orders by rate analysis and evaluation before taking the approval from the client • Monitor and report progress to Client on daily / weekly / monthly basis • Conduct Quality and Safety Audits and submit report to Client • Provide detailed cash flow management and report. Prepare and furnish the monthly fund requirement in advance • Ensure the approved execution strategy for the contractors to be followed at works • Review the Good for Construction drawings being issued for construction and proposed changes and their implications to Client • Establish and provide a comprehensive program to monitor, examine and reporting of the Safety Parameters to be adhered to at site • Manage and attend all construction review meetings and report the critical issues to Client • Establish and provide a comprehensive program to ensure and evaluate all the necessary checks and performance criteria for electrical, HVAC and fire fighting, and report the same to Client. • Ensure compliances of requirements by the respective contractors for matters related to welfare and medical facilities to workmen.
  • 16. Post Construction Stage • Ensure preparation of a master document for Client underlining the variation in design and specification if any during the course of construction as against the design and specification originally agreed. • Prepare defect / snag list and ensure removal of defects by the contractor, before giving recommendation of issuing completion certificate by the client. • Ascertain a handing over strategy, underlining the list of documents, drawings, test certificates, performance guarantee, warrantee / guarantee cards, etc. for specified items and handover these to client. • Coordinate to identify, list out and hand over the residual stock for materials. • Ensure that the As-built drawings, list of contacts and “Operation and Maintenance Manuals” etc. are handed over to Client at the time of project closing out. • Ensure the receipt of all necessary statutory approvals, such as the occupation / completion certificate. • Coordinate procedural commissioning of various equipments & integrated testing of all the services including handing over the same to the maintenance agency. • Coordinate to establish a Project Completion Date in order to specify the Start and End of the Defects Liability Period. • Ensure handing over the flats, building units to Client nominated representative..