PROFESSIONAL SUMMARY: An assiduous, competent Construction and Engineering Management Professional
with over 14 years of qualitative experience in accomplishing prestigious Coal Based Thermal Power Projects and
Solar Power Projects within defined time, cost and quality parameters and collaborating with project teams,
interfacing with clients, contractors, suppliers and deploying technology to build successful solutions, Cost
Controlling, Commissioning and Testing, Site Execution, Supervision, Site Monitoring, Project Management and
Contract Negotiation. Sound understanding of the construction process and the activities connected to it, with
expertise in Project Management, Operation, Relationship Management and Quality Assurance/ Quality control.
Knowledge of Project Planning, Monitoring, Site Supervision and Execution of projects without incidences of time,
cost and quality overruns. Strong knowledge of designing & executing construction activities & ensuring compliance
to quality standards and maintaining all related documents.
PROFESSIONAL SKILLS
•
• Site Management
• Construction Activities
• Project Engineering
• Vendor Management
• Contract Negotiation
• Project Management
• Troubleshooting
• Performance Reporting
• Scheduling Operations
• Design Analysis
• Commissioning & Testing
• Quality Assurance
• Feasibility Study
• Relationship Management
• Leadership Acumen
PROFESSIONAL EXPERIENCE
ACME CLEANTECH SOLUTION, HARYANA
SINCE JUL 2016
AGM – Construction Project Manager
Key Highlights –
• Successfully spearheaded the functions and operations of 12 professionals including Planning Engineer, Safety
Engineer, Quality Engineers and Field Engineers
• Implementing process modifications for optimizing resource utilization and maximizing productivity and
implementing automated systems for streamlining operations to enhance operational efficiency
• Planning and scheduling of Milestone activities and creating WBS for proper implementation of the same in
addition to managing the engineering operations and coordination
• Responsible for planning, scheduling, monitoring controlling and supervising assigned projects and assisting in
planning of equipment, labour, material, deployment and optimum utilization
• Conducting daily progress review meeting with Civil, AC & DC Vendors and contractors while providing timely
resolution of site execution issues, engineering issues, material supply and quality issues
• Building a cohesive team spirit throughout the company by designing a program that recognized competing
management objectives, created common goals, and provided measurement incentives
• Controlling and managing the scope to maintain commercial performance of project to ensure attainment of
established goals and exercising functional authority over project engineers spanning init iation, execution, cost,
budget and schedule control for project
• Key Accomplishments –
• Meticulously ensured COD is well ahead of schedule through control and monitoring of day to day
activities and ensuring timely availability of material, machinery and manpower by thorough focus and
follow-ups
• Attained Zero accident though Safe work practice and handling of material and equipment, zero
damage of Inverter, HT Panels, Transformers and other major equipment
• Planned and conceptualized to shift PV modules and installed according to engineering drawing and
avoidance of damages of modules as well as optimized cable usage and reduced the scrap
• Managed the project in bad climate condition by streamlining the resources side by side along with all
the departments, including, SCM, Engineering and other departments
• Made significant contribution in cost reduction by 20% man-hour well below the assigned contract term
5 to 10% also reduced the Wastage / damages by 5%
PROMINENT PROJECT –
• 30 MW Solar Project: Mahoba, UP
JK ORGANIZATION, NEW DELHI AUG
2012 – JUN 2016
Key Highlights –
AS SENIOR MANAGER – ENGINEERING MANAGEMENT & COORDINATION
• Spearheaded the operations of 10 professionals including, planning engineer, field engineer, Safety Engineer and
Quality supervisor also managed the operations of Bid Evaluation, Vendor Selection and Kick off meeting with
EPC vendor
• Attended engineering discussion and scope finalization also assisted in planning the finalization of engineering
and material delivery schedule also creating work break down structures for every milestone activities to have
proper planning of resources
• Effectively maintained and liaised with clients, consultants, subcontractors & external agencies for determining
technical specifications, approvals and obtaining statutory clearances
• Created Planning schedule on MS Project as per Milestone objectives as well as coordinated with EP C vendor for
timely delivery of engineering inputs and material delivery
• Key Accomplishments –
• Completion of Foundations for boiler and Air cooled condenser through proper planning and control on
resources within a record time against earlier estimated planning (Project was supposed to completed
in 2 days but was completed in 42 hours and saved over 25% time)
AS SENIOR MANAGER – PROJECT ENGINEERING MANAGER
• Worked with 5 employees in group and coordinated with environment assessment consultant to achieve
necessary project approvals in addition to was also engaged in preparation of bid documents
• Minimization of land by optimization of BTG and BOP package layout and optimization of storage space
requirement for coal and water
• Worked on Railway siding to minimize area requirement for the same
• Reviewed the operational practices, identify the areas of obstruction / quality failures and advise on system and
process changes for qualitative improvement in productivity
• Discussed with Domestic and Global Manufacturers to conclude the adoption of upgraded technology for the
project to achieve profitable, environment friendly and economic generation
• Worked on Environment Management plan like adoption of FGD for SOx control, High Concentration Slurry
Disposal for Fly ash to minimize water usage, Zero discharge water balance for plant.
AS CONSTRUCTION MANAGER
• Managed a group of 4 employees including, field engineers, quality and safety engineers to accomplish the
project milestones as well as coordinating with Civil, AC and DC vendors and provided daily review on progress
• Managed functions pertaining to planning, scheduling, monitoring, controlling and supervising assigned site &
assisted in planning of improvement and expansion projects
• Prepared project schedule in MS Project, WBS for accurate planning and control also planned the resource based
on schedule in addition to also recorded test certificates, protocols, inspection reports & approved engineering
drawings for proper closing & handover
AS FEASIBILITY STUDY
• Responsible for managing the site feasibility study for SOLAR PV Power Project, Simulation Modeling using
PVsyst V.6.39 for SOLAR PV Power Projects at different locations and creating a feasibility report as well as DPR
PROMINENT PROJECT –
• Waste Heat Recovery & 1x18MW CPP: Durg, Chhattisgarh as Sr. Manager – Engineering
Management & Coordination
• 2x660MW Thermal Power Project: Khandwa, MP as Sr. Manager – Project Engineering Manager
• 6.9 MW Solar Project: Bap, Rajasthan as Construction Manager
• 25 MW Solar Projects in Maharashtra as Feasibility Study
JINDAL INDIA THERMAL POWER, NEW DELHI NOV
2010 – JUL 2012
Senior Manager – Project Engineering Management
Key Highlights –
• Responsible for Contract management, Control and Management of Scope for the project to maintain
commercial performance of project Capex
• Ensured cash flow planning for scheduled delivery of Material as per planning as well as discussing with EPC
vendors and engineering consultant for resolution of engineering issues
• Proactively participated in meetings with internal departments and Clients, efficiently engaged in creating scope
changes, new requirements and dispute management
• Raised NCR on Engineering / construction issues according to scope and specifications as well as coordinated
and provided resolution of engineering interface issues arise due to BTG and BOP scope of work by different
vendors
• PROMINENT PROJECT –
• 2x600 MW Thermal Power Project: Angul, Odisha
PAST EXPERIENCE
RELIANCE ENERGY LIMITED (EPC DIVISION), NOIDA OCT
2008 – NOV 2010
Manager – Commissioning & Project Engineering Management
Projects – 2x600 MW Rajive Gandhi Thermal Power Project: Hisar, Haryana
• Preparation of Commissioning Procedures and schemes including Boiler, Turbine, Generator and Station
Auxiliaries
• Managed the operations of commissioning Furnace and duct Air Leak Test, Hydro test of Pressure parts, ID, FD
and PA Fans commissioning, Commissioning of ESP, ESP Air Leak Test, Boiler Safety valve floating and setting,
Commissioning of Mills, Fuel Oil System, APH, Boiler Light up, Coal Firing and full load trial
• Accountable for commissioning of Lube oil and Governing Oil System, Turbine Turning Gear, Rolling to Full
Speed No Load and Full Load trial also commissioning of MDBFP and TDBFP Lube Oil system, TDBFP Governing
Oil System, Governer Testing, HP/LP Heaters, Deaerator and Aux PRDS, HP/LP Dosing System, Interlock and
protection test for Boiler and Auxiliaries, TG and Auxiliaries, Pumps, TDBFPs
DOOSAN ENGINEERING SERVICES, GURGAON APR
2008 – SEP 2008
Senior Engineer – Project Engineering Management
Projects – 1x103 MW Thermal Power Project: CEBU, Philippinse
JSW ENERGY LIMITED, KARNATAKA OCT
2007 – MAR 2008
Deputy Manager – Mech Maintenance
Projects – 1x130 MW CPP: Bellary
BHARAT HEAVY ELECTRICALS LIMITED AUG
2002 – SEP 2007
4x500 MW NTPC Talcher: Angul, Odisha + 1x500 MW KPCL: Bellary, Karnataka as Engineer – Commissioning &
Testing
2x25 MW Gas Turbine, HPCL: Vizag, AP as Engineer – Construction
1x18 MW Turbine for CPP, EID Parry: Tamilnadu
• Preparation of Pre-commissioning check list of
• Boiler: Furnace and duct Air Leak Test, Hydro test of Pressure parts, Commissioning of ID, FD and PA
Fans, ESP, Safety valve floating and setting, Mill, Fuel Oil System, APH, Boiler Light up, Coal Firing & full
load trial, HP/LP Bypass System
• Turbine: Commissioning of Oil Lube oil and Governing Oil System, Turbine Turning Grear, Rolling to Full
Speed No Load, Full Load trial
• Generator: Commissioning of Lube Oil, Seal Oil, Gas System and Stator Water System
• Station Auxiliaries: Commissioning of MDBFP and TDBFP Lube Oil system, TDBFP Governing Oil System,
Governer Testing, Commissioning of HP/LP Heaters, Deaerator and Aux PRDS, HP/LP Dosing Sysytem
• No load trial of HT and LT Motors and Coupled trial of MDBFP, TDBFPs, ID, FD, PA Fans, APH and Mills
EDUCATION
• Master in Business Administration (Project Management), Sikkim Manipal University, Pursuing
• Bachelor of Technology (Mechanical Engineering), Indian Institute of Technology, 2002
• Excellent working knowledge of MS Project 2010, AutoCAD 2010, PowerPoint, MS Excel, MS Word
CERTIFICATIONS & TRAININGS
• PVsyst V 6.39 for simulation for Solar PV Power Projects
• Project Management Training at New Delhi (PMI-USA Affiliated)
• MS Project Certification and Executive training at NPTI Nagpur on “Familiarization of Power Plant”
• Management Training on Team Building in BHEL Hyderabad for 5 months
• Management Training for Project Execution in BHEL Bhopal
• Familiarization and design aspects of boiler pressure parts at BHEL Trichy
• Governing system familiarization and troubleshooting of 210 and 500MW steam turbine at BHEL Hardwar
• Vibration analysis and trouble shooting in rotating equipment BHEL Hyderabad
• DLN low NOX combustion of GAS turbine at BHEL Hyderabad
Date of Birth: 15th
December, 1978 | References: Available on request

Shailendra_Kumar_Resume_V01__1_

  • 1.
    SHAILENDRA KUMAR Address: C11,Nakshatra Apartment, Ward No 7, Mehrauli, Delhi – 110030, India Contact: +91 8527403279 Email: shailendra972002@rediffmail.com CONSTRUCTION AND PROJECT MANAGEMENT PROFESSIONAL PROFESSIONAL SUMMARY: An assiduous, competent Construction and Engineering Management Professional with over 14 years of qualitative experience in accomplishing prestigious Coal Based Thermal Power Projects and Solar Power Projects within defined time, cost and quality parameters and collaborating with project teams, interfacing with clients, contractors, suppliers and deploying technology to build successful solutions, Cost Controlling, Commissioning and Testing, Site Execution, Supervision, Site Monitoring, Project Management and Contract Negotiation. Sound understanding of the construction process and the activities connected to it, with expertise in Project Management, Operation, Relationship Management and Quality Assurance/ Quality control. Knowledge of Project Planning, Monitoring, Site Supervision and Execution of projects without incidences of time, cost and quality overruns. Strong knowledge of designing & executing construction activities & ensuring compliance to quality standards and maintaining all related documents. PROFESSIONAL SKILLS • • Site Management • Construction Activities • Project Engineering • Vendor Management • Contract Negotiation • Project Management • Troubleshooting • Performance Reporting • Scheduling Operations • Design Analysis • Commissioning & Testing • Quality Assurance • Feasibility Study • Relationship Management • Leadership Acumen PROFESSIONAL EXPERIENCE ACME CLEANTECH SOLUTION, HARYANA SINCE JUL 2016 AGM – Construction Project Manager Key Highlights – • Successfully spearheaded the functions and operations of 12 professionals including Planning Engineer, Safety Engineer, Quality Engineers and Field Engineers • Implementing process modifications for optimizing resource utilization and maximizing productivity and implementing automated systems for streamlining operations to enhance operational efficiency • Planning and scheduling of Milestone activities and creating WBS for proper implementation of the same in addition to managing the engineering operations and coordination
  • 2.
    • Responsible forplanning, scheduling, monitoring controlling and supervising assigned projects and assisting in planning of equipment, labour, material, deployment and optimum utilization • Conducting daily progress review meeting with Civil, AC & DC Vendors and contractors while providing timely resolution of site execution issues, engineering issues, material supply and quality issues • Building a cohesive team spirit throughout the company by designing a program that recognized competing management objectives, created common goals, and provided measurement incentives • Controlling and managing the scope to maintain commercial performance of project to ensure attainment of established goals and exercising functional authority over project engineers spanning init iation, execution, cost, budget and schedule control for project • Key Accomplishments – • Meticulously ensured COD is well ahead of schedule through control and monitoring of day to day activities and ensuring timely availability of material, machinery and manpower by thorough focus and follow-ups • Attained Zero accident though Safe work practice and handling of material and equipment, zero damage of Inverter, HT Panels, Transformers and other major equipment • Planned and conceptualized to shift PV modules and installed according to engineering drawing and avoidance of damages of modules as well as optimized cable usage and reduced the scrap • Managed the project in bad climate condition by streamlining the resources side by side along with all the departments, including, SCM, Engineering and other departments • Made significant contribution in cost reduction by 20% man-hour well below the assigned contract term 5 to 10% also reduced the Wastage / damages by 5% PROMINENT PROJECT – • 30 MW Solar Project: Mahoba, UP JK ORGANIZATION, NEW DELHI AUG 2012 – JUN 2016 Key Highlights – AS SENIOR MANAGER – ENGINEERING MANAGEMENT & COORDINATION • Spearheaded the operations of 10 professionals including, planning engineer, field engineer, Safety Engineer and Quality supervisor also managed the operations of Bid Evaluation, Vendor Selection and Kick off meeting with EPC vendor • Attended engineering discussion and scope finalization also assisted in planning the finalization of engineering and material delivery schedule also creating work break down structures for every milestone activities to have proper planning of resources • Effectively maintained and liaised with clients, consultants, subcontractors & external agencies for determining technical specifications, approvals and obtaining statutory clearances • Created Planning schedule on MS Project as per Milestone objectives as well as coordinated with EP C vendor for timely delivery of engineering inputs and material delivery • Key Accomplishments – • Completion of Foundations for boiler and Air cooled condenser through proper planning and control on resources within a record time against earlier estimated planning (Project was supposed to completed in 2 days but was completed in 42 hours and saved over 25% time) AS SENIOR MANAGER – PROJECT ENGINEERING MANAGER • Worked with 5 employees in group and coordinated with environment assessment consultant to achieve necessary project approvals in addition to was also engaged in preparation of bid documents • Minimization of land by optimization of BTG and BOP package layout and optimization of storage space requirement for coal and water • Worked on Railway siding to minimize area requirement for the same
  • 3.
    • Reviewed theoperational practices, identify the areas of obstruction / quality failures and advise on system and process changes for qualitative improvement in productivity • Discussed with Domestic and Global Manufacturers to conclude the adoption of upgraded technology for the project to achieve profitable, environment friendly and economic generation • Worked on Environment Management plan like adoption of FGD for SOx control, High Concentration Slurry Disposal for Fly ash to minimize water usage, Zero discharge water balance for plant. AS CONSTRUCTION MANAGER • Managed a group of 4 employees including, field engineers, quality and safety engineers to accomplish the project milestones as well as coordinating with Civil, AC and DC vendors and provided daily review on progress • Managed functions pertaining to planning, scheduling, monitoring, controlling and supervising assigned site & assisted in planning of improvement and expansion projects • Prepared project schedule in MS Project, WBS for accurate planning and control also planned the resource based on schedule in addition to also recorded test certificates, protocols, inspection reports & approved engineering drawings for proper closing & handover AS FEASIBILITY STUDY • Responsible for managing the site feasibility study for SOLAR PV Power Project, Simulation Modeling using PVsyst V.6.39 for SOLAR PV Power Projects at different locations and creating a feasibility report as well as DPR PROMINENT PROJECT – • Waste Heat Recovery & 1x18MW CPP: Durg, Chhattisgarh as Sr. Manager – Engineering Management & Coordination • 2x660MW Thermal Power Project: Khandwa, MP as Sr. Manager – Project Engineering Manager • 6.9 MW Solar Project: Bap, Rajasthan as Construction Manager • 25 MW Solar Projects in Maharashtra as Feasibility Study JINDAL INDIA THERMAL POWER, NEW DELHI NOV 2010 – JUL 2012 Senior Manager – Project Engineering Management Key Highlights – • Responsible for Contract management, Control and Management of Scope for the project to maintain commercial performance of project Capex • Ensured cash flow planning for scheduled delivery of Material as per planning as well as discussing with EPC vendors and engineering consultant for resolution of engineering issues • Proactively participated in meetings with internal departments and Clients, efficiently engaged in creating scope changes, new requirements and dispute management • Raised NCR on Engineering / construction issues according to scope and specifications as well as coordinated and provided resolution of engineering interface issues arise due to BTG and BOP scope of work by different vendors • PROMINENT PROJECT – • 2x600 MW Thermal Power Project: Angul, Odisha PAST EXPERIENCE RELIANCE ENERGY LIMITED (EPC DIVISION), NOIDA OCT 2008 – NOV 2010 Manager – Commissioning & Project Engineering Management Projects – 2x600 MW Rajive Gandhi Thermal Power Project: Hisar, Haryana • Preparation of Commissioning Procedures and schemes including Boiler, Turbine, Generator and Station Auxiliaries
  • 4.
    • Managed theoperations of commissioning Furnace and duct Air Leak Test, Hydro test of Pressure parts, ID, FD and PA Fans commissioning, Commissioning of ESP, ESP Air Leak Test, Boiler Safety valve floating and setting, Commissioning of Mills, Fuel Oil System, APH, Boiler Light up, Coal Firing and full load trial • Accountable for commissioning of Lube oil and Governing Oil System, Turbine Turning Gear, Rolling to Full Speed No Load and Full Load trial also commissioning of MDBFP and TDBFP Lube Oil system, TDBFP Governing Oil System, Governer Testing, HP/LP Heaters, Deaerator and Aux PRDS, HP/LP Dosing System, Interlock and protection test for Boiler and Auxiliaries, TG and Auxiliaries, Pumps, TDBFPs DOOSAN ENGINEERING SERVICES, GURGAON APR 2008 – SEP 2008 Senior Engineer – Project Engineering Management Projects – 1x103 MW Thermal Power Project: CEBU, Philippinse JSW ENERGY LIMITED, KARNATAKA OCT 2007 – MAR 2008 Deputy Manager – Mech Maintenance Projects – 1x130 MW CPP: Bellary BHARAT HEAVY ELECTRICALS LIMITED AUG 2002 – SEP 2007 4x500 MW NTPC Talcher: Angul, Odisha + 1x500 MW KPCL: Bellary, Karnataka as Engineer – Commissioning & Testing 2x25 MW Gas Turbine, HPCL: Vizag, AP as Engineer – Construction 1x18 MW Turbine for CPP, EID Parry: Tamilnadu • Preparation of Pre-commissioning check list of • Boiler: Furnace and duct Air Leak Test, Hydro test of Pressure parts, Commissioning of ID, FD and PA Fans, ESP, Safety valve floating and setting, Mill, Fuel Oil System, APH, Boiler Light up, Coal Firing & full load trial, HP/LP Bypass System • Turbine: Commissioning of Oil Lube oil and Governing Oil System, Turbine Turning Grear, Rolling to Full Speed No Load, Full Load trial • Generator: Commissioning of Lube Oil, Seal Oil, Gas System and Stator Water System • Station Auxiliaries: Commissioning of MDBFP and TDBFP Lube Oil system, TDBFP Governing Oil System, Governer Testing, Commissioning of HP/LP Heaters, Deaerator and Aux PRDS, HP/LP Dosing Sysytem • No load trial of HT and LT Motors and Coupled trial of MDBFP, TDBFPs, ID, FD, PA Fans, APH and Mills EDUCATION • Master in Business Administration (Project Management), Sikkim Manipal University, Pursuing • Bachelor of Technology (Mechanical Engineering), Indian Institute of Technology, 2002 • Excellent working knowledge of MS Project 2010, AutoCAD 2010, PowerPoint, MS Excel, MS Word CERTIFICATIONS & TRAININGS • PVsyst V 6.39 for simulation for Solar PV Power Projects • Project Management Training at New Delhi (PMI-USA Affiliated) • MS Project Certification and Executive training at NPTI Nagpur on “Familiarization of Power Plant” • Management Training on Team Building in BHEL Hyderabad for 5 months • Management Training for Project Execution in BHEL Bhopal • Familiarization and design aspects of boiler pressure parts at BHEL Trichy • Governing system familiarization and troubleshooting of 210 and 500MW steam turbine at BHEL Hardwar • Vibration analysis and trouble shooting in rotating equipment BHEL Hyderabad • DLN low NOX combustion of GAS turbine at BHEL Hyderabad
  • 5.