8. monitoring & control
1.
2. MONITORING &CONTROLLING
PROJECT COMPLETION DATE
BUDGETING CONSIDERATION
SPECIFICATIONS
WEATHER CONDITIONS
ECONOMY
MANAGEMENT
CONSTRUCTION METHOD
RESOURCE REQUIREMENT
CHANGES THAT CAN ALTER THE COURSE OF THE PROJECT
4. SOURCES OF INFORMATION INDICATIVE OF DELAY
• REVISED DRAWING
• AMENDED SPECIFICATION
• MINUTES OF THE MEETING
• CORRESPONDENCE
• INSPECTION REPORT
• OTHER
SPECIFICATION AND CORRESPONDENCE WILL BE UNDER MONITORING SYSTEM
5. MONITORING PREPARATION
DEVELOP PROCEDURES FOR COORDINATING &
INTEGRATING
ESTABLISH EFFECTIVE COMMUNICATION CHANNELS
ASSES THE IMPACT OF PROBLEMS & DELAYS
DETERMINE THE ADEQUACY OF RESOURCES
OBTAIN RELAIBLE INFORMATION
ASSESS ACCURATELY PROJECT COSTS
MEASURE PROJECT STATUS AND ACCOMPLISHMENT
COMPARE CURRENT PROGRESS TO PROJECTION AND
STANDARD
6. SCHEDULE MONITORING
ANY DIFFERENCE BETWEEN ESTIMATED START AND
FINISH DATE AND ACTUAL START AND FINISH DATES
THE PERCENTAGE OF COMPLETION FOR AN ACTIVITY
OR THE ENTIRE PROJECT
ANY UNEXPECTED DELAYS OR OTHER
ABNORMALITIES
ANY ACTIVITIES PERFORMED OUT OF NETWORK
SEQUENCE
ANY MILESTONE ACTIVITIES THAT APPEAR UN-
ACHIEVABLE
LOOK FOR:
7. RESOURCE MONITORING
• DETECT ANY DIFFERENCES EXISTING BETWEEN ESTIMATED
RESOURCE REQUIREMENTS AND ACTUAL REQUIREMENTS
• LIST ANY SIGNIFICANT DEVIATIONS
• DETERMINE WHETHER THE ORIGINAL RESOURCE ESTIMATES
FOR ANY PARTICULAR ACTIVITY MUST BE REVISED
• DETERMINE WHETHER THE ORIGINAL RESOURCE ESTIMATE
FOR THE ENTIRE PROJECT NEEDS REVISION
• DETERMINE IF A DELAY IN THE PROJECT WILL RESULT TO THE
RE-ESTIMATE OF RESOURCE.
DO THE FOLLOWING
8. COST MONITORING
• DETECT ANY DIFFERENCES BETWEEN ESTIMATED COST
AND ACTUAL COST FOR EACH ACTIVITY
• LIST ANY SIGNIFICANT DEVIATIONS
• DETERMINE THE CAUSE/S OF VARIANCE/S
• DECIDE WHETHER ORIGINAL COST ESTIMATES HAVE TO
BE REVISED
• LIST ACTIVITIES NEED A REVISION IN THEIR COST
ESTIMATES
• ASSES WHETHER THE REVISIONS WILL AFFECT THE COST
ESTIMATES FOR THE ENTIRE PROJECT
DO THE FOLLOWING