SlideShare a Scribd company logo
1 of 26
 Presented by : Aazam Nirban
 Civil Engineering Department
 T. Y. Civil
 3105
Presentation on
BURJ KHALIFA
 The Burj Khalifa is the ever built tallest
man made structure.
 This tower rises in the sky to 828m
carrying 162 floors.
 The Burj khalifa took 6years for its
construction
and was completed in the year 2010.
 For erecting this city in the sky several
new technologies had to be used.
INTRODUCTION
 The soil stratum of Dubai is very week
so they had to excavate up to 50m
deep to get a hard rock structure
 But the rock that they found was
fragile and saturated with ground
water
 So that any hole made
will be cured immediately
EXCAVATION
 The engineers filled this with a viscous polymer
slurry
 This pushes the rock and the ground water to the
edges of the boreholes to keep it open
 This slurry is denser than water and liter than
concrete, so that when concrete is pumped the
concrete displaces the fluid and forms the
foundation.
 194 piles were constructed
for avoiding the sinking of
this structure.
EXCAVATION Cont.
 The casting of the whole structure is mainly done by two
materials
1. Concrete
2. Steel
 Over 30,000 tons of steel were used
 About 250,000 m2 concrete was also used
 The reinforced concrete acts as the backbone of the whole
structure
CASTING OF THE STRUCTURE
 The Burj can accommodate about 35,000 people
at a time
 Consist of 57 elevators and 8 escalators
 The biggest elevator carries about 46 people at
a time
 These elevators travel at a speed of 35km/hr
 The Burj has a service/firemans elevator which
have a capacity to hold about 5,500kg
 And this is the worlds tallest service elevator.
ELEVATORS AND ESCALATORS
 The Burj is cladded with high-tech glass which
forms as a curtain wall
 If the whole cladding has to be done with high-
tech glass which will cost about 100 million
dollars
CLADDING OF THE TOWER
 The cladding should withstand the heavy sand
storms that with in include water and dust
 Prototypes were selected and with the help of
propellers artificially created storm was
allowed to hit the glass panels at a greater
speed
 The glass panels withstands the storm up to
75km/hr
TEST FOR THE CLADDING AGAINST
STORM
 As the building has to be built more than half a
km, it had to challenge many factors that
haven't faced by any other building
 Has to be completed with in the short period
limit
 So the time was money
 For erecting such a structure in the sky steel
and glass panels have to be raised
 This was done by cranes
SPEED OF CONSTRUCTION
 The cranes consist of two plates on the two
sides
 It could jump from one floor to the another
 So that they were called the kangaroo cranes
 So as to speed up the construction the RCC
walls was done in a simple and clever
engineering way.
Cranes
 For simplicity and speed the engineers made no. of steel cages
 These cages were inserted to the formworks that can be moved easily
 After installation of cages concrete was filled in these formworks
 Only took 12hrs for the setting of concrete
 After setting the concrete the formworks would move to the next
level with in 2hrs
CASTING OF RCC WALLS
 High performance concrete(HPC)
 Low permeability
 High durability
 C80-C60 cube strength concrete was used
 It includes fly ash, Portland cement
 Two largest concrete pumping machines in the world were used for
this purpose
 For reducing cracks due to high temperature concreting was done only
at night
 So that air is cooler and humidity is higher with ice added to the mix
CONCRETE USED
 The pump needs 630HP to pump about 25000 tons of concrete
 It had took about 14 mints for reaching the concrete to the 150th
floor
 They completed every new floor in 3 day
CONCRETE USED Cont.
 Every year the storm attacks Dubai
 As the building grows much higher to the sky the top will be badly
affected by the wind
 This causes a sway at the top floors of the building
 So that they studied many other skyscrapers
 The buildings must be in a definite shape
WIND
 They made a study on the Sears tower at
Chicago
 The Sears tower had a layer of steel, and
an another layer of steel which forms an
exoskeleton to the building
 9 such blocks were used in this Sears
tower in definite shape
 So that the building was made rock solid
SHAPE
 Giving the Burj a exoskeleton was not a easy
task
 So they designed the Burj in a triangular shape
 So that this was suitable to deflect the wind to
different ways
SHAPE Cont.
 The three wings allow for greater building
height by buttressing one another by a central
core hence it is called buttressed core structural
system
 This buttressed core is a six sided central piece
 So that it is called a Hexagonal Hub
BUTTRESSED CORE
 This hub is surrounded by the three wings
 These three wings afford the torsional
resistance and the twisting of the tower
 This hub encloses the elevators
BUTTRESSED CORE Cont.
 The earthquake was one of the most important factor that had to be
challenged by the Burj Khalifa
 Any unknown concept would collapse the whole structure
 They took the Taipie101 tower for their study
EARTHQUAKE
 A year twice China is affected with earthquakes
 The Taipei 101 was raised up with 36 steel tubes
 They were filled with concrete for their rigidity
TAIPEI 101
 These columns were holding together
with outrigger trusses
 So that these elastic bands would
recover the whole movement occurred
to the building
TAIPEI 101 Cont.
 Providing such bands was not so practical for Burj
 According to Uniform Building Code(UBC) ,Dubai was classified
under a zone 2a
 Moderate seismic activity
 The Burj would resist up to 6 in the Richter scale
 Because of the massive reinforced concrete skeleton
EARTHQUAKE Cont.
 The attack against the world trade centre at sept2001 shows the
importance of evacuation in skyscrapers
 How tall the skyscrapers grow makes the evacuation much harder
 The Burj is different and have a perfect evacuation system
EVACUATION
 The Burj is naturally fire resistant as the concrete backbone is already
fire resistant
 More than that the Burj consist of refuge rooms
 These refuge rooms are made of RCC and fire proof sheets that resist
the heat up to 2hrs
 These refuge rooms has a special supply of air which pumps through
fire resistant pipes
 There are 9 refuge rooms, one in every 30 floors
EVACUATION Cont.
 The Burj Khalifa is one of the unique tallest building that was built by
man
 For rising such a city in the sky several new techniques have been
used
 The buttressed core structural system has made a great change in the
structural system of skyscrapers
 A strong buttressed core will initiate the height of the skyscrapers
 The construction of the Burj Khalifa proves that height doesn't matter
any civil engineering construction.
CONCLUSION
THANK YOU

More Related Content

What's hot

What's hot (20)

Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
TALL BUILDINGS
TALL BUILDINGSTALL BUILDINGS
TALL BUILDINGS
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high rise
 
Retrofitting case study of RCC structure
Retrofitting case study of RCC structureRetrofitting case study of RCC structure
Retrofitting case study of RCC structure
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
High rise
High rise High rise
High rise
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise Presentation
 
Burje-khalifa
Burje-khalifaBurje-khalifa
Burje-khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Report on High Rise buildings.
Report  on High Rise buildings.  Report  on High Rise buildings.
Report on High Rise buildings.
 
Services in high rise
Services in high riseServices in high rise
Services in high rise
 

Viewers also liked (8)

Art and stuff
Art and stuffArt and stuff
Art and stuff
 
Burj Khalifa Dubai
Burj Khalifa DubaiBurj Khalifa Dubai
Burj Khalifa Dubai
 
Jinmao tower (11) siti yaumilia salsa
Jinmao tower (11) siti yaumilia salsaJinmao tower (11) siti yaumilia salsa
Jinmao tower (11) siti yaumilia salsa
 
The Basics of Chi
The Basics of ChiThe Basics of Chi
The Basics of Chi
 
Shanghai World Financial Center
Shanghai World Financial CenterShanghai World Financial Center
Shanghai World Financial Center
 
Shanghai office tower (salsa)
Shanghai office tower (salsa)Shanghai office tower (salsa)
Shanghai office tower (salsa)
 
Burj khalifa presentation ppt
Burj khalifa presentation pptBurj khalifa presentation ppt
Burj khalifa presentation ppt
 
Sears tower
Sears towerSears tower
Sears tower
 

Similar to Seminar presentation Burj Khalifa

Structure
StructureStructure
Structure
snarse
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
Ar. Md Shahroz Alam
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
Yap Xin
 

Similar to Seminar presentation Burj Khalifa (20)

burjjjj new
burjjjj newburjjjj new
burjjjj new
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Aadil final presentation
Aadil final presentationAadil final presentation
Aadil final presentation
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptx
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
 
Making of burj khalifa
Making of burj khalifaMaking of burj khalifa
Making of burj khalifa
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural System
 
Structure
StructureStructure
Structure
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Birth of skyscrapers
Birth of skyscrapersBirth of skyscrapers
Birth of skyscrapers
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towers
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
PPT by Team Kasim burj khalifa.pptx by m
PPT by Team Kasim burj khalifa.pptx by mPPT by Team Kasim burj khalifa.pptx by m
PPT by Team Kasim burj khalifa.pptx by m
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
burjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdfburjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdf
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 

Seminar presentation Burj Khalifa

  • 1.  Presented by : Aazam Nirban  Civil Engineering Department  T. Y. Civil  3105 Presentation on BURJ KHALIFA
  • 2.  The Burj Khalifa is the ever built tallest man made structure.  This tower rises in the sky to 828m carrying 162 floors.  The Burj khalifa took 6years for its construction and was completed in the year 2010.  For erecting this city in the sky several new technologies had to be used. INTRODUCTION
  • 3.  The soil stratum of Dubai is very week so they had to excavate up to 50m deep to get a hard rock structure  But the rock that they found was fragile and saturated with ground water  So that any hole made will be cured immediately EXCAVATION
  • 4.  The engineers filled this with a viscous polymer slurry  This pushes the rock and the ground water to the edges of the boreholes to keep it open  This slurry is denser than water and liter than concrete, so that when concrete is pumped the concrete displaces the fluid and forms the foundation.  194 piles were constructed for avoiding the sinking of this structure. EXCAVATION Cont.
  • 5.  The casting of the whole structure is mainly done by two materials 1. Concrete 2. Steel  Over 30,000 tons of steel were used  About 250,000 m2 concrete was also used  The reinforced concrete acts as the backbone of the whole structure CASTING OF THE STRUCTURE
  • 6.  The Burj can accommodate about 35,000 people at a time  Consist of 57 elevators and 8 escalators  The biggest elevator carries about 46 people at a time  These elevators travel at a speed of 35km/hr  The Burj has a service/firemans elevator which have a capacity to hold about 5,500kg  And this is the worlds tallest service elevator. ELEVATORS AND ESCALATORS
  • 7.  The Burj is cladded with high-tech glass which forms as a curtain wall  If the whole cladding has to be done with high- tech glass which will cost about 100 million dollars CLADDING OF THE TOWER
  • 8.  The cladding should withstand the heavy sand storms that with in include water and dust  Prototypes were selected and with the help of propellers artificially created storm was allowed to hit the glass panels at a greater speed  The glass panels withstands the storm up to 75km/hr TEST FOR THE CLADDING AGAINST STORM
  • 9.  As the building has to be built more than half a km, it had to challenge many factors that haven't faced by any other building  Has to be completed with in the short period limit  So the time was money  For erecting such a structure in the sky steel and glass panels have to be raised  This was done by cranes SPEED OF CONSTRUCTION
  • 10.  The cranes consist of two plates on the two sides  It could jump from one floor to the another  So that they were called the kangaroo cranes  So as to speed up the construction the RCC walls was done in a simple and clever engineering way. Cranes
  • 11.  For simplicity and speed the engineers made no. of steel cages  These cages were inserted to the formworks that can be moved easily  After installation of cages concrete was filled in these formworks  Only took 12hrs for the setting of concrete  After setting the concrete the formworks would move to the next level with in 2hrs CASTING OF RCC WALLS
  • 12.  High performance concrete(HPC)  Low permeability  High durability  C80-C60 cube strength concrete was used  It includes fly ash, Portland cement  Two largest concrete pumping machines in the world were used for this purpose  For reducing cracks due to high temperature concreting was done only at night  So that air is cooler and humidity is higher with ice added to the mix CONCRETE USED
  • 13.  The pump needs 630HP to pump about 25000 tons of concrete  It had took about 14 mints for reaching the concrete to the 150th floor  They completed every new floor in 3 day CONCRETE USED Cont.
  • 14.  Every year the storm attacks Dubai  As the building grows much higher to the sky the top will be badly affected by the wind  This causes a sway at the top floors of the building  So that they studied many other skyscrapers  The buildings must be in a definite shape WIND
  • 15.  They made a study on the Sears tower at Chicago  The Sears tower had a layer of steel, and an another layer of steel which forms an exoskeleton to the building  9 such blocks were used in this Sears tower in definite shape  So that the building was made rock solid SHAPE
  • 16.  Giving the Burj a exoskeleton was not a easy task  So they designed the Burj in a triangular shape  So that this was suitable to deflect the wind to different ways SHAPE Cont.
  • 17.  The three wings allow for greater building height by buttressing one another by a central core hence it is called buttressed core structural system  This buttressed core is a six sided central piece  So that it is called a Hexagonal Hub BUTTRESSED CORE
  • 18.  This hub is surrounded by the three wings  These three wings afford the torsional resistance and the twisting of the tower  This hub encloses the elevators BUTTRESSED CORE Cont.
  • 19.  The earthquake was one of the most important factor that had to be challenged by the Burj Khalifa  Any unknown concept would collapse the whole structure  They took the Taipie101 tower for their study EARTHQUAKE
  • 20.  A year twice China is affected with earthquakes  The Taipei 101 was raised up with 36 steel tubes  They were filled with concrete for their rigidity TAIPEI 101
  • 21.  These columns were holding together with outrigger trusses  So that these elastic bands would recover the whole movement occurred to the building TAIPEI 101 Cont.
  • 22.  Providing such bands was not so practical for Burj  According to Uniform Building Code(UBC) ,Dubai was classified under a zone 2a  Moderate seismic activity  The Burj would resist up to 6 in the Richter scale  Because of the massive reinforced concrete skeleton EARTHQUAKE Cont.
  • 23.  The attack against the world trade centre at sept2001 shows the importance of evacuation in skyscrapers  How tall the skyscrapers grow makes the evacuation much harder  The Burj is different and have a perfect evacuation system EVACUATION
  • 24.  The Burj is naturally fire resistant as the concrete backbone is already fire resistant  More than that the Burj consist of refuge rooms  These refuge rooms are made of RCC and fire proof sheets that resist the heat up to 2hrs  These refuge rooms has a special supply of air which pumps through fire resistant pipes  There are 9 refuge rooms, one in every 30 floors EVACUATION Cont.
  • 25.  The Burj Khalifa is one of the unique tallest building that was built by man  For rising such a city in the sky several new techniques have been used  The buttressed core structural system has made a great change in the structural system of skyscrapers  A strong buttressed core will initiate the height of the skyscrapers  The construction of the Burj Khalifa proves that height doesn't matter any civil engineering construction. CONCLUSION