The Kingdom Tower in Jeddah, Saudi Arabia is planned to be the world's tallest building at over 1,000 meters tall. It will feature unique designs such as a sky terrace at the 157th floor and an evolving canopy design. The tower's Y-shaped design and reinforced concrete core structural system allow it to withstand high winds and seismic activity. Over 80,000 tons of steel and advanced concrete mixes will be used in its construction, which began in 2013 and is estimated to finish in 2020.
high rise building, cases tudy of hign rise building, history of high rise buildings, planning and services of high rise building, definition of high rise building, case studies of high rise building, kanchanjunga apartment, taipei 101.
A comprehensive presentation on capital gate building which has broken the record for the furthest leaning man made structure which was held by the leaning tower of pisa
high rise building, cases tudy of hign rise building, history of high rise buildings, planning and services of high rise building, definition of high rise building, case studies of high rise building, kanchanjunga apartment, taipei 101.
A comprehensive presentation on capital gate building which has broken the record for the furthest leaning man made structure which was held by the leaning tower of pisa
Burj Khalifa, known as Burj Dubai prior to its inauguration, is a skyscraper in Dubai, United Arab Emirates. It is the tallest artificial structure in the world, standing at 829.8 m.
The Burj Khalifa (Arabic: برج خليفة , Arabic for "Khalifa Tower"; pronounced English: / ˈ b ɜːr dʒ k ə ˈ l iː f ə /), known as the Burj Dubai prior to its inauguration in 2010, is a skyscraper in Dubai, United Arab Emirates.With a total height of 829.8 m (2,722 ft) and a roof height (excluding antenna) of 828 m (2,717 ft), the Burj Khalifa has been the tallest structure and ...
burj khalifa room prices
burj khalifa official website
burj khalifa room rates
burj khalifa website
burj khalifa facts
burj khalifa official site
booking burj khalifa
burj khalifa visit
interesting civil engineering topics
seminar topics pdf
civil engineering topics for presentation
civil seminar topics ppt
best seminar topics for civil engineering
seminar topics for mechanical engineers
civil engineering ppt
latest civil engineering seminar topics
A short and elaborate Case Study on High Rise Buildings for the course of Advanced Building Construction from students of 8th Semester Architecture at VNIT, Nagpur (January- April 2017)
Burj Khalifa, known as Burj Dubai prior to its inauguration, is a skyscraper in Dubai, United Arab Emirates. It is the tallest artificial structure in the world, standing at 829.8 m.
The Burj Khalifa (Arabic: برج خليفة , Arabic for "Khalifa Tower"; pronounced English: / ˈ b ɜːr dʒ k ə ˈ l iː f ə /), known as the Burj Dubai prior to its inauguration in 2010, is a skyscraper in Dubai, United Arab Emirates.With a total height of 829.8 m (2,722 ft) and a roof height (excluding antenna) of 828 m (2,717 ft), the Burj Khalifa has been the tallest structure and ...
burj khalifa room prices
burj khalifa official website
burj khalifa room rates
burj khalifa website
burj khalifa facts
burj khalifa official site
booking burj khalifa
burj khalifa visit
interesting civil engineering topics
seminar topics pdf
civil engineering topics for presentation
civil seminar topics ppt
best seminar topics for civil engineering
seminar topics for mechanical engineers
civil engineering ppt
latest civil engineering seminar topics
A short and elaborate Case Study on High Rise Buildings for the course of Advanced Building Construction from students of 8th Semester Architecture at VNIT, Nagpur (January- April 2017)
Architect: César Pelli
#Structure
#Architecture_Building
The Petronas Towers, also known as the Petronas Twin Towers, are twin skyscrapers in Kuala Lumpur, Malaysia. they were the tallest buildings in the world from 1998 to 2004 until they were surpassed by Taipei 101.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
2. INTRODUCTION
• Kingdom tower also known as Jeddah tower it is a skyscraper under
construction in Jeddah, Saudi Arabia.
• When completed Kingdom Tower will reach 1KM height, becoming the
tallest building in the world.
• Initially planned to be 1.6 kilometers high but the geology of the area
proved unsuitable for a tower of that height.
3. INTRODUCTION
Construction started : 1 April 2013 .
Expected Completion: 2020.
Height to Architectural Top: More than 1000 m.
Stories: 167 .
Total Area: Approx 258,000 sq m .
Owner: Jeddah Economic Company (JEC) .
Design Architect: Adrian Smith & Gordon Gill .
Structural Engineer: Thornton Tomasetti .
Contractor: Saudi Bin laden Group .
Estimated cost: 7965 cr
6. MATERIALS USED
HIGH STRENGTH CONCRETE REINFORCING
• Mainly two R.C.C materials will be used in construction
1. Concrete
2. Steel
• 1200 Psi concrete
• 60 to 75 ksi Rebar
• In addition to concrete and steel, other major materials will
be use are : Silicone, Aluminium & Glass.
• High performance concrete (HPC)
Low permeability.
High durability .
It includes fly ash, Portland cement .
7. • For reducing cracks due to high temperature
concreting is done only at night.
• Two largest concrete pumping machines in the
world are being used for this purpose.
• Tones of ices is used for the heat emitting
from the cement.
• Instead of Lap splices couplers are used to
reduce the load on the foundation.
• Approximately 80,000 tons of steel will be
used in construction
8. FOUNDATION
• PILE FOUNDATION
• After the geological investigation it was clear that piled
foundation would be appropriate for the tower.
• The pile depths range from 45 m at the wings to 105 m at the
center of the tower
15. REASON FOR THE SELECTION OF THE
SHAPE OF THE STRUCTURE
• A tapered Y shaped plan was chosen which
allowed the spreading of the base of the
tower.
• This allowed the structure to maintain a
reasonable 12:1 height to width ratio.
• In the “Y” shape every element is able to
participate in resisting both gravity and lateral
loads.
22. UNIQUE FEATURES OF THE DESIGN
• SKY TERRACE AT LEVEL 157
• CANOPY EVOLUTION
• ELEVATOR SYSTEM
23. SKY TERRACE AT LEVEL 157
• Another unique feature of the design is a sky terrace, roughly 30m (90
feets ) in a diameter, at level 157.
• Terrace will be of a steel structure.
A rendering showing the bottom of the
unique, glass-floored, circular sky terrace
that will overlook the Red Sea from over
610 meters (2,000 ft)
24. CANOPY EVOLUTION
• A canopy is an overhead roof or else a structure over which a
fabric or metal covering is attached, able to provide shade or
shelter from weather conditions such as sun, hail, snow and
rain.
• The final design shows three extended ,softly curved canopies
that cover the main lobbies and extend horizontally to protect
parking ramp entries .
25. ELEVATOR SYSTEM
• In future it will be fastest elevator
system in world.
• The kingdom tower will contains 59
elevators, including 564 single deck and
five double deck elevators, along with
12 escalators.
• Elevators will travel at a rate of 10
meters per second in both directions.
26. CONCLUSION
• The kingdom Tower will be one of the unique tallest
building in the world .
• For rising such a city in the sky several new techniques
have been used.
• The buttressed core structural system has made a great
change in the structural system of skyscrapers.
• The construction of the kingdom tower proves that
height doesn’t matter any civil engineering
construction.
• Projects of the Kingdom Tower will create jobs and
opportunities, and will become the central piece of a
new urban center .