 Rehabilitation of the UrbanWater Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)
 Project Scope – due to frequent pipe bursting and significant water loss a replacement of existing asbestos cement and zinc
Pipelines has been defined through 7nr priority sectors / zones:
 Lot A1 - a part of the existing asbestos cement pressure transmission main, which conveys the water from the well field
“Korace” to the reservoir “Bijelo Brdo”, was to be replaced.
 Lot A2 - two sections of the asbestos cement gravity transmission main, which conveys water from the reservoir “Bijelo Brdo”
to the reservoir “Babino Brdo” was to be replaced.
 Lot A3 - The gravity asbestos cement transmission main, which conveys water from the reservoir Babino Brdo“ to the reservoir
„Gakovac”, shall be partly replaced. The other gravity asbestos cement transmission main, which delivers water from the
reservoir “Babino Brdo“ to the Water Supply Zone 1 in the city of “Derventa”, was also to be partly replaced.
 Lot A4 - the Reservoir “Gakovac”- City Network Feeder Line located in Stevana Nemanje Street was to be replaced.
 Lot A5 - a distribution asbestos cement pipes which are located in “Srpske Vojske”street was to be replaced, new house
connections installed
 Lot A6 – a distribution asbestos cement pipeline in “Stefana Nemanje Street” with belonging house connections were to be
replaced.
 Lot A7 – The distribution Zinc-pipes which are located in “Radnička street” together with belonging house connections were to
be replaced.
 Lot A8 – Provision and installation of SCADA System with associated software, equipments, ultrasonic flow meters, pressure
reducing valves on critical locations, integration into the SCADA System.
 Lot A9 – provision of Water Meters, PE Shafts and associated fittings for Water Utility “Komunalac”
 In total - 12,630.52m of DI & PE Pipelines have been installed under the Project, 309nr of house connections, 14nr of supporting
concrete manholes. From remaining budget – several pipelines were extended (Lot A3, A5, A6, A7).
 Project Budget – 2,000,000.00EUR
PROJECT’S SIGN BOARD WS PIPE MATERIAL – DUCTILE IRON “PAM” NATURAL PIPES
WS PIPE MATERIAL – DUCTILE IRON “PAM” NATURAL PIPES
, TYTON-SIT JOINTS
WS PIPE MATERIAL – HDPE100, SDR11-17, PN10, PN16
“PIPELIFE” PIPES
LOT A-1
(Transmission Main DI
DN300; L = 2.207,80m)
A part of the existing asbestos cement
pressure transmission main, which
conveys the water from the well field
“Korace” to the reservoir “Bijelo
Brdo”, was to be replaced.
Pipe material:
DI DN300, PN16 in 2,207.80m Length
with 1nr new Mud Outlet Valve Shaft.
Considering this previously war-
affected area has present mine fields,
it was required that demining of pipe
route corridor is conducted prior of
any construction works.
BHMAC DEMINING AREA SAFE DEMINED 20M WIDE PIPE-ROUTE CORRIDOR
DI DN300 PIPE MATERIAL DELIVERY WITHIN SAFETY
CORRIDOR
DI DN300 INSTALLATION
TITANIUM SITS JOINTS
PRESSURE TEST AS PER EN805, PIPE ANCHORING
MUD OUTLET VALVE MANHOLE
MUD OUTLET VALVE MANHOLE
LotA2
Transmission main
HDPE DN300
Two sections of the asbestos cement
gravity transmission main, which
conveys water from the reservoir
“Bijelo Brdo” to the reservoir “Babino
Brdo” was to be replaced.
Pipe material:
HDPE100, PN10, SDR17, OD315mm,
L=843.10m with 2nr House
Connections
PE PIPE WELDING PRESSURE TESTING – EN805
REPLACEMENT OF VALVES, FITTINGS AT EXISTING MUD
OUTLET VALVE MANHOLE
REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE
MANHOLE
REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE
MANHOLE
REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE
MANHOLE
LotA3
Transmission Main
The gravity asbestos cement
transmission main, which conveys
water from the reservoir Babino Brdo“
to the reservoir „Gakovac”, shall be
partly replaced.
The other gravity asbestos cement
transmission main, which delivers
water from the reservoir “Babino
Brdo“ to the Water Supply Zone 1 in
the city of “Derventa”, was also to be
partly replaced
Extension of City Network:
Pipe Material:
DI DN400, PN16 – L=253m;
DI DN300, PN16 – L=485m;
HDPE ID315, PN16 – 1,760m;
3nr new Shafts – 2 Mud Outlets, 1nr
Air Valves
PIPE ROUTE CORRIDOR DEMINED BY BHMAC
REGARDLESS, UNEXPLODED MINE ENCOUNTERED DURING
TRENCH EXCAVATION WORKS, WORKS ABORTED UNTIL
DEMINING COMPLETION
DI DN300 PIPE CONNECTION TO RESERVOIR “BABNO BRDO” DOWNSTREAM PIPE ROUTE
MUD OUTLET VALVE SHAFTS (DI DN300, DN400) MUD OUTLET VALVE SHAFTS (DI DN300, DN400)
DISCHARGE PIPES WITH “FROG FLAP VALVES”
AIR VALVE MANHOLE AT DI DN300 AIR VALVE MANHOLE AT DI DN300
TRANSITION TO HDPE OD315, PN16 EXTENSION OF TRANSMISSION MAIN HDPE OD315, PN16
LotA4
Feeder Line
The Reservoir “Gakovac”- City
Network Feeder Line located in
Stevana Nemanje Street was to be
replaced
Pipe material:
HDPE PN10, PN16:
OD315 – L=577m
1nr Air Valve Shaft
1nr Flow Meter Shaft (Lot A8)
HDPE OD315, PN16 PIPE CONNECTION TO “GAKOVAC”
WATER RESERVOIR
HDPE OD315, PN16 PIPE CONNECTION TO “GAKOVAC”
WATER RESERVOIR
GRAVITY FEEDER LINE AIR VALVE MANHOLE
GRAVITY FEEDER LINE AIR VALVE MANHOLE GRAVITY FEEDER LINE AIR VALVE
JOINT FLOW METER MANHOLE FLOW METERS / PART OF SCADA SYSTEM
LotA5
Distribution Pipeline
The distribution asbestos cement
pipes which are located in “Srpske
Vojske”street shall be replaced, new
house connections installed
Distribution Pipeline:
HDPE OD180, PN10 – 1,502m;
House Connections – 46nr
HDPE OD180, PN10 PIPE
LotA6
Distribution Pipeline
Distribution asbestos cement pipeline
in “Stefana Nemanje Street” with
belonging house connections to be
replaced:
Pipe material – HDPE PN16:
OD125 – 3,224m;
OD63-282m;
House Connections – 188nr;
2nr new shafts
HDPE OD125, PN16 PIPE
WATER METER PE SHAFTS R=1.0M, H=1.0M (PROVIDED
UNDER LOT A9)
INSTALLATION OF HOUSE CONNECTION’S WATER METERS
PE WATER METER SHAFT
TRANSITION FROM OD125 TO OD63MM PIPE
GATEVALVE MANHOLE
PRESSURE REDUCING VALVE SHAFT PRESSURE REDUCING VALVE
GREEN AREA HYDRANT COVER COMMISSIONING ON TAKE OVER INSPECTION
GREEN AREA GATE VALVES COVER, SURFACE CAPS
LotA7
Distribution Pipeline
The distribution Zinc-pipes which are
located in “Radnička street” together
with belonging house connections
were to be replaced.
Pipe Material -HDPE PN16:
OD125 – L=1,022m;
OD63 – L=474m;
House Connections – 73nr;
1nr Pressure Reducing Valve Shaft
PIPE TRENCH EXCAVATION HDPE OD125MM PN16 PIPE LAYING
PRESSURE REDUCING VALVE SHAFT-TO-BE PRESSURE REDUCING VALVE SHAFT-TO-BE
PRESSURE REDUCINGVALVE SHAFT PRESSURE REDUCING VALVE
LotA8
SCADA System
SCADA System:
Fm-01 PS “Korace”; (Flow Meter)
Fm-02 “Lupljanica”; (Flow Meter)
Fm-03 “Bilica Vrelo”; (Flow Meter)
Fm-04 “Bilica Vrelo”; (Flow Meter)
Fm-05 Reservoir “Babino Brdo”; (Flow
Meter)
Fm-06 Reservoir ”Babino Brdo”,
existing shaft; (Flow Meter)
Fm-07, 08 Reservoir ”Gakovac”; (Flow
Meter)
Pr-02 Reservoir “Vrhovi” (Pressure
Reducing Valve)
SCADA Control Center – PS “Korace”
1nr Buster Pump – PS “Bilica Vrelo”
8nr new shafts constructed
LotA8
SCADA System
Fm-01 PS “Korace”; (Flow Meter)
LotA8
SCADA System
Fm-02 PS “Lupljanica”; (Flow Meter)
LotA8
SCADA System
Fm-03 “Bilica Vrelo”; (Flow Meter)
LotA8
SCADA System
Fm-04 “Bilica Vrelo”; (Flow Meter)
LotA8
SCADA System
Fm-05 Reservoir “Babino Brdo” Inlet;
(Flow Meter)
LotA8
SCADA System
Fm-06 Reservoir ”Babino Brdo”
Outlet, existing shaft; (Flow Meter)
LotA8
SCADA System
Fm-07 Reservoir ”Gakovac”; (Flow
Meter)
LotA8
SCADA System
Fm-08, 09 Reservoir ”Gakovac” Inlet /
Outlet; (Flow Meter)
LotA8
SCADA System
Pr-02 Reservoir “Vrhovi” (Pressure
Reducing Valve)
LotA8
SCADA System
1nr Buster Pump – PS “Bilica Vrelo”
LotA9
“Delivery ofWS
material”
Lot A9 “Delivery of WS material”:
Water Meters (Qn = 1.5m³/h, dry type)
INSA (1/2“, 3/4", 1“, 5/4“, 6/4“, 2“)–
3,000nr
HDPE WM shafts 1.0x1.0m – 500nr
Shut-off valves (DN3/4“, 1“, 5/4“, 6/4“,
2“) – 6,000nr
Various fittings and valves.

More Related Content

What's hot

Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingVladimir Popovic
 
Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelinesGasforlife Polysource
 
Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011Shammy Puri
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Michael Hewitt, GISP
 
2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LININGTimothy Antos
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsSarah El Akkad
 
Karst Aquifer Well Rehabilitation Project
Karst Aquifer Well Rehabilitation ProjectKarst Aquifer Well Rehabilitation Project
Karst Aquifer Well Rehabilitation ProjectSteve Fisher
 
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Michael Hewitt, GISP
 
Integrating GIS data with pipeline design (Part 1)
Integrating GIS data with pipeline design (Part 1)Integrating GIS data with pipeline design (Part 1)
Integrating GIS data with pipeline design (Part 1)Usman Imtiaz, (EIT, PMP)
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...Michael Hewitt, GISP
 
Thiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boThiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boRobinking Boley
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply schemeAby Mundackal
 
Anchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldAnchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldJose V.Taboada
 
Optimal Design of a natural gas transmission system
Optimal Design of a natural gas transmission systemOptimal Design of a natural gas transmission system
Optimal Design of a natural gas transmission systemCini Gekpe
 

What's hot (18)

Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
 
Pipeline Design Project
Pipeline Design ProjectPipeline Design Project
Pipeline Design Project
 
Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelines
 
Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
 
2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultants
 
Karst Aquifer Well Rehabilitation Project
Karst Aquifer Well Rehabilitation ProjectKarst Aquifer Well Rehabilitation Project
Karst Aquifer Well Rehabilitation Project
 
Hydraulic Systems
Hydraulic SystemsHydraulic Systems
Hydraulic Systems
 
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
 
2016 OAWWA TANKS
2016 OAWWA TANKS2016 OAWWA TANKS
2016 OAWWA TANKS
 
Integrating GIS data with pipeline design (Part 1)
Integrating GIS data with pipeline design (Part 1)Integrating GIS data with pipeline design (Part 1)
Integrating GIS data with pipeline design (Part 1)
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
 
Thiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boThiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_bo
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
Anchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldAnchois 1- Oil&Gas Field
Anchois 1- Oil&Gas Field
 
Optimal Design of a natural gas transmission system
Optimal Design of a natural gas transmission systemOptimal Design of a natural gas transmission system
Optimal Design of a natural gas transmission system
 

Viewers also liked

full-line-grills
full-line-grillsfull-line-grills
full-line-grillsTara Troch
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
Kuching | Jan-15 | Micro Hydro Project For Rural Electrification
Kuching | Jan-15 |  Micro Hydro Project For Rural ElectrificationKuching | Jan-15 |  Micro Hydro Project For Rural Electrification
Kuching | Jan-15 | Micro Hydro Project For Rural ElectrificationSmart Villages
 
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATIONimtfiber
 
Water supply system
Water supply systemWater supply system
Water supply systemaishah
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyManish Pandey
 
Water resource management
Water resource management  Water resource management
Water resource management Rohan Mohite
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And MethodologiesIr. Abdul Aziz Abas
 
Collection and Conveyance of Water
Collection and Conveyance of WaterCollection and Conveyance of Water
Collection and Conveyance of WaterGAURAV. H .TANDON
 

Viewers also liked (11)

full-line-grills
full-line-grillsfull-line-grills
full-line-grills
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Kuching | Jan-15 | Micro Hydro Project For Rural Electrification
Kuching | Jan-15 |  Micro Hydro Project For Rural ElectrificationKuching | Jan-15 |  Micro Hydro Project For Rural Electrification
Kuching | Jan-15 | Micro Hydro Project For Rural Electrification
 
reuse of c&d waste
reuse  of c&d wastereuse  of c&d waste
reuse of c&d waste
 
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
 
Water supply system
Water supply systemWater supply system
Water supply system
 
P.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish PandeyP.P.T on water distribution system by Manish Pandey
P.P.T on water distribution system by Manish Pandey
 
Water resource management
Water resource management  Water resource management
Water resource management
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And Methodologies
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Collection and Conveyance of Water
Collection and Conveyance of WaterCollection and Conveyance of Water
Collection and Conveyance of Water
 

Similar to Derventa City Water Supply Project

Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww projectVladimir Popovic
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosniaVladimir Popovic
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010AlfredBirnhuber
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgiaVladimir Popovic
 
EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013AlfredBirnhuber
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipelineVladimir Popovic
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaVladimir Popovic
 
EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012AlfredBirnhuber
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasUbaldoJGarca
 
EADIPS FGR annual journal 2015
EADIPS FGR annual journal 2015EADIPS FGR annual journal 2015
EADIPS FGR annual journal 2015AlfredBirnhuber
 
EADIPS FGR annual journal 2014
EADIPS FGR annual journal 2014EADIPS FGR annual journal 2014
EADIPS FGR annual journal 2014AlfredBirnhuber
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b ProjectsAnandhan Annasamy
 
EADIPS FGR annual journal 2017
EADIPS FGR annual journal 2017EADIPS FGR annual journal 2017
EADIPS FGR annual journal 2017AlfredBirnhuber
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 
plumbing lecture_notes.pdf ffhggggjgjgjgj
plumbing lecture_notes.pdf ffhggggjgjgjgjplumbing lecture_notes.pdf ffhggggjgjgjgj
plumbing lecture_notes.pdf ffhggggjgjgjgjjaved838046
 

Similar to Derventa City Water Supply Project (20)

Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww project
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosnia
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipeline
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos Cloacas
 
EADIPS FGR annual journal 2015
EADIPS FGR annual journal 2015EADIPS FGR annual journal 2015
EADIPS FGR annual journal 2015
 
EADIPS FGR annual journal 2014
EADIPS FGR annual journal 2014EADIPS FGR annual journal 2014
EADIPS FGR annual journal 2014
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b Projects
 
EADIPS FGR annual journal 2017
EADIPS FGR annual journal 2017EADIPS FGR annual journal 2017
EADIPS FGR annual journal 2017
 
Vani Water Supply Project
Vani Water Supply ProjectVani Water Supply Project
Vani Water Supply Project
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
plumbing lecture_notes.pdf ffhggggjgjgjgj
plumbing lecture_notes.pdf ffhggggjgjgjgjplumbing lecture_notes.pdf ffhggggjgjgjgj
plumbing lecture_notes.pdf ffhggggjgjgjgj
 

More from Vladimir Popovic

Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Vladimir Popovic
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelinesVladimir Popovic
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction ScheduleVladimir Popovic
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesVladimir Popovic
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesVladimir Popovic
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESVladimir Popovic
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopVladimir Popovic
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionVladimir Popovic
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsVladimir Popovic
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Vladimir Popovic
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Vladimir Popovic
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresVladimir Popovic
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)Vladimir Popovic
 

More from Vladimir Popovic (15)

Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelines
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction Schedule
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing Examples
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod Holes
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-Stop
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elements
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor Structures
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)
 

Recently uploaded

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Recently uploaded (20)

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

Derventa City Water Supply Project

  • 1.
  • 2.  Rehabilitation of the UrbanWater Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)  Project Scope – due to frequent pipe bursting and significant water loss a replacement of existing asbestos cement and zinc Pipelines has been defined through 7nr priority sectors / zones:  Lot A1 - a part of the existing asbestos cement pressure transmission main, which conveys the water from the well field “Korace” to the reservoir “Bijelo Brdo”, was to be replaced.  Lot A2 - two sections of the asbestos cement gravity transmission main, which conveys water from the reservoir “Bijelo Brdo” to the reservoir “Babino Brdo” was to be replaced.  Lot A3 - The gravity asbestos cement transmission main, which conveys water from the reservoir Babino Brdo“ to the reservoir „Gakovac”, shall be partly replaced. The other gravity asbestos cement transmission main, which delivers water from the reservoir “Babino Brdo“ to the Water Supply Zone 1 in the city of “Derventa”, was also to be partly replaced.  Lot A4 - the Reservoir “Gakovac”- City Network Feeder Line located in Stevana Nemanje Street was to be replaced.  Lot A5 - a distribution asbestos cement pipes which are located in “Srpske Vojske”street was to be replaced, new house connections installed  Lot A6 – a distribution asbestos cement pipeline in “Stefana Nemanje Street” with belonging house connections were to be replaced.  Lot A7 – The distribution Zinc-pipes which are located in “Radnička street” together with belonging house connections were to be replaced.  Lot A8 – Provision and installation of SCADA System with associated software, equipments, ultrasonic flow meters, pressure reducing valves on critical locations, integration into the SCADA System.  Lot A9 – provision of Water Meters, PE Shafts and associated fittings for Water Utility “Komunalac”  In total - 12,630.52m of DI & PE Pipelines have been installed under the Project, 309nr of house connections, 14nr of supporting concrete manholes. From remaining budget – several pipelines were extended (Lot A3, A5, A6, A7).  Project Budget – 2,000,000.00EUR
  • 3. PROJECT’S SIGN BOARD WS PIPE MATERIAL – DUCTILE IRON “PAM” NATURAL PIPES
  • 4. WS PIPE MATERIAL – DUCTILE IRON “PAM” NATURAL PIPES , TYTON-SIT JOINTS WS PIPE MATERIAL – HDPE100, SDR11-17, PN10, PN16 “PIPELIFE” PIPES
  • 5. LOT A-1 (Transmission Main DI DN300; L = 2.207,80m) A part of the existing asbestos cement pressure transmission main, which conveys the water from the well field “Korace” to the reservoir “Bijelo Brdo”, was to be replaced. Pipe material: DI DN300, PN16 in 2,207.80m Length with 1nr new Mud Outlet Valve Shaft. Considering this previously war- affected area has present mine fields, it was required that demining of pipe route corridor is conducted prior of any construction works.
  • 6. BHMAC DEMINING AREA SAFE DEMINED 20M WIDE PIPE-ROUTE CORRIDOR
  • 7. DI DN300 PIPE MATERIAL DELIVERY WITHIN SAFETY CORRIDOR DI DN300 INSTALLATION
  • 9. PRESSURE TEST AS PER EN805, PIPE ANCHORING
  • 10. MUD OUTLET VALVE MANHOLE
  • 11. MUD OUTLET VALVE MANHOLE
  • 12. LotA2 Transmission main HDPE DN300 Two sections of the asbestos cement gravity transmission main, which conveys water from the reservoir “Bijelo Brdo” to the reservoir “Babino Brdo” was to be replaced. Pipe material: HDPE100, PN10, SDR17, OD315mm, L=843.10m with 2nr House Connections
  • 13.
  • 14. PE PIPE WELDING PRESSURE TESTING – EN805
  • 15. REPLACEMENT OF VALVES, FITTINGS AT EXISTING MUD OUTLET VALVE MANHOLE REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE MANHOLE
  • 16. REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE MANHOLE REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE MANHOLE
  • 17. LotA3 Transmission Main The gravity asbestos cement transmission main, which conveys water from the reservoir Babino Brdo“ to the reservoir „Gakovac”, shall be partly replaced. The other gravity asbestos cement transmission main, which delivers water from the reservoir “Babino Brdo“ to the Water Supply Zone 1 in the city of “Derventa”, was also to be partly replaced Extension of City Network: Pipe Material: DI DN400, PN16 – L=253m; DI DN300, PN16 – L=485m; HDPE ID315, PN16 – 1,760m; 3nr new Shafts – 2 Mud Outlets, 1nr Air Valves
  • 18. PIPE ROUTE CORRIDOR DEMINED BY BHMAC REGARDLESS, UNEXPLODED MINE ENCOUNTERED DURING TRENCH EXCAVATION WORKS, WORKS ABORTED UNTIL DEMINING COMPLETION
  • 19. DI DN300 PIPE CONNECTION TO RESERVOIR “BABNO BRDO” DOWNSTREAM PIPE ROUTE
  • 20.
  • 21. MUD OUTLET VALVE SHAFTS (DI DN300, DN400) MUD OUTLET VALVE SHAFTS (DI DN300, DN400)
  • 22.
  • 23. DISCHARGE PIPES WITH “FROG FLAP VALVES”
  • 24. AIR VALVE MANHOLE AT DI DN300 AIR VALVE MANHOLE AT DI DN300
  • 25.
  • 26. TRANSITION TO HDPE OD315, PN16 EXTENSION OF TRANSMISSION MAIN HDPE OD315, PN16
  • 27. LotA4 Feeder Line The Reservoir “Gakovac”- City Network Feeder Line located in Stevana Nemanje Street was to be replaced Pipe material: HDPE PN10, PN16: OD315 – L=577m 1nr Air Valve Shaft 1nr Flow Meter Shaft (Lot A8)
  • 28. HDPE OD315, PN16 PIPE CONNECTION TO “GAKOVAC” WATER RESERVOIR HDPE OD315, PN16 PIPE CONNECTION TO “GAKOVAC” WATER RESERVOIR
  • 29. GRAVITY FEEDER LINE AIR VALVE MANHOLE
  • 30. GRAVITY FEEDER LINE AIR VALVE MANHOLE GRAVITY FEEDER LINE AIR VALVE
  • 31. JOINT FLOW METER MANHOLE FLOW METERS / PART OF SCADA SYSTEM
  • 32. LotA5 Distribution Pipeline The distribution asbestos cement pipes which are located in “Srpske Vojske”street shall be replaced, new house connections installed Distribution Pipeline: HDPE OD180, PN10 – 1,502m; House Connections – 46nr
  • 34.
  • 35. LotA6 Distribution Pipeline Distribution asbestos cement pipeline in “Stefana Nemanje Street” with belonging house connections to be replaced: Pipe material – HDPE PN16: OD125 – 3,224m; OD63-282m; House Connections – 188nr; 2nr new shafts
  • 37. WATER METER PE SHAFTS R=1.0M, H=1.0M (PROVIDED UNDER LOT A9) INSTALLATION OF HOUSE CONNECTION’S WATER METERS
  • 38. PE WATER METER SHAFT
  • 39. TRANSITION FROM OD125 TO OD63MM PIPE
  • 41. PRESSURE REDUCING VALVE SHAFT PRESSURE REDUCING VALVE
  • 42.
  • 43. GREEN AREA HYDRANT COVER COMMISSIONING ON TAKE OVER INSPECTION
  • 44. GREEN AREA GATE VALVES COVER, SURFACE CAPS
  • 45. LotA7 Distribution Pipeline The distribution Zinc-pipes which are located in “Radnička street” together with belonging house connections were to be replaced. Pipe Material -HDPE PN16: OD125 – L=1,022m; OD63 – L=474m; House Connections – 73nr; 1nr Pressure Reducing Valve Shaft
  • 46. PIPE TRENCH EXCAVATION HDPE OD125MM PN16 PIPE LAYING
  • 47. PRESSURE REDUCING VALVE SHAFT-TO-BE PRESSURE REDUCING VALVE SHAFT-TO-BE
  • 48. PRESSURE REDUCINGVALVE SHAFT PRESSURE REDUCING VALVE
  • 49. LotA8 SCADA System SCADA System: Fm-01 PS “Korace”; (Flow Meter) Fm-02 “Lupljanica”; (Flow Meter) Fm-03 “Bilica Vrelo”; (Flow Meter) Fm-04 “Bilica Vrelo”; (Flow Meter) Fm-05 Reservoir “Babino Brdo”; (Flow Meter) Fm-06 Reservoir ”Babino Brdo”, existing shaft; (Flow Meter) Fm-07, 08 Reservoir ”Gakovac”; (Flow Meter) Pr-02 Reservoir “Vrhovi” (Pressure Reducing Valve) SCADA Control Center – PS “Korace” 1nr Buster Pump – PS “Bilica Vrelo” 8nr new shafts constructed
  • 50. LotA8 SCADA System Fm-01 PS “Korace”; (Flow Meter)
  • 51. LotA8 SCADA System Fm-02 PS “Lupljanica”; (Flow Meter)
  • 52. LotA8 SCADA System Fm-03 “Bilica Vrelo”; (Flow Meter)
  • 53. LotA8 SCADA System Fm-04 “Bilica Vrelo”; (Flow Meter)
  • 54. LotA8 SCADA System Fm-05 Reservoir “Babino Brdo” Inlet; (Flow Meter)
  • 55. LotA8 SCADA System Fm-06 Reservoir ”Babino Brdo” Outlet, existing shaft; (Flow Meter)
  • 56. LotA8 SCADA System Fm-07 Reservoir ”Gakovac”; (Flow Meter)
  • 57. LotA8 SCADA System Fm-08, 09 Reservoir ”Gakovac” Inlet / Outlet; (Flow Meter)
  • 58. LotA8 SCADA System Pr-02 Reservoir “Vrhovi” (Pressure Reducing Valve)
  • 59. LotA8 SCADA System 1nr Buster Pump – PS “Bilica Vrelo”
  • 60. LotA9 “Delivery ofWS material” Lot A9 “Delivery of WS material”: Water Meters (Qn = 1.5m³/h, dry type) INSA (1/2“, 3/4", 1“, 5/4“, 6/4“, 2“)– 3,000nr HDPE WM shafts 1.0x1.0m – 500nr Shut-off valves (DN3/4“, 1“, 5/4“, 6/4“, 2“) – 6,000nr Various fittings and valves.