Rehabilitation of ws system, lanchkhuti, georgia
1.
2. Supervision ofWater Supply Systems RehabilitationWorks in 17 (21)Towns of Georgia underWIMP
(Rehabilitation of LanchkhutiWater Supply System EIB/WIMP/W/ICB/07)
Extension of Distribution Network: 24,250m of PE100 Pipe (OD200, OD160, OD110, OD90, OD63 & OD32), 450m
of Steel Pipe (d159/4mm, d108/3mm & d76/3.5mm), associated 1,151nr House Connections & 10,300m of PE100
Pipe (OD20).
Sectoring of City Network with 10nrValves.
Installation of 1,950m of Transmission Main Steel Pipe (d109/4mm & d272/6mm), from Lashis Gele Reservoir to
the City Network.
Lashis Gele Outfall - Construction of new Reinforced Concrete Reservoir (500m3), with associated Valve Chamber
& installation of associated inlet & outlet pipes and valves, rehabilitation of Headwork Capitation Area (new
stone filter layers and perforated collection pipes), construction of new Chlorine Building & Gas Storage
Structure and installation of Chlorine Gas Dosing System at Reservoir Area, Installation of SCADA System
including Flow Measurement, Residual Chlorine Monitoring and Flow Control.
Oragvis Gele Outfall - Construction of new Reinforced Concrete Reservoir (1,900m3) , with associated Valve
Chamber & installation of associated inlet & outlet pipes and valves, rehabilitation at the existing Chlorination
Building and installation of Salt Based Disinfection System at the second Reservoir Area. Installation of SCADA
System including Flow Measurement, Residual Chlorine Monitoring and Flow Control.
Contract value 2,700,000GEL (€1,125,000) FIDIC Red Book MDB 2006
22. Lashis Gele
Transmission Main
Reservoir – City Network
Installation of 1,950m of Transmission
Main Steel Pipe (d109/4mm &
d272/6mm), from Lashis Gele
Reservoir to the City Network.
36. EXISTING RESERVOIR HAD TO BE DEMOLISHED DUE TO
MULTIPLE LEAKAGES, DETERIORATED CONCRETE
WALLS & BASE SLAB OF OLD RESERVOIR USED AS SHELL
FOR NEW RESERVOIR
37. NEW BASE SLAB, WALLS & COLUMNS NEW RESERVOIR ROOF SLAB REINFORCEMENT
39. BITUMEN PROTECTION
FINAL STATUS AFTER BACKFILLING (INSTALLED ULTRA SONIC
WATER LEVEL METER, AUTOMATIC VALVE ON INLET SHAFT,
VENTILATION PIPES, LAMP-POSTS AND ACCESS MANHOLES)
47. NEW 1,900M3 RESERVOIR INTERIOR
FINAL STATUS – AFTER BACKFILLING, INSTALLATION OF
UL.SONIC WATER LEVEL METER
48. OragvisGele Outfall
Chlorinating Building
Rehabilitation at the existing
Chlorination Building and
installation of Salt Based
Disinfection System at the
OragvisGele Reservoir Inlet
Area.
Installation of SCADA System
including Flow Measurement,
ResidualChlorine Monitoring
and Flow Control.