Contract for Material 
Material provided under separate Contract and delivered to Bihac Water Utility. 
WU has received material in total value of 741.000EUR: 
- Service Line Pipe material (PE80, PN10, OD25-50) – 14.100m; 
- City Network Pipe material (PE100, PN16, OD63-250) -13.212m; 
-Transmission Main DI DN300, PN16 Pipe material – 1.222m 
- In addition all Pipe fittings, 830nr Service valves, 330nr Gate valves, 30 Hydrants, 3.000nr Water Meters, 100nr Bulk Water Meters were provided by the Project
STEEL FLANGED “TEES” 
WATER METERS 3.000NR
VARIOUS MATERIAL 
DI DN300 PAM UNIVERSAL PIPES (PN16) – 1.222M
SERVICE LINES PE80, PN10 PIPE MATERIAL (OD25-50, L=14.100M) 
PIPE MAIN PE100, PN16 PIPE MATERIAL (OD63-250, L= 13.212M)
Project’s Sign Board
Project Scope of Works: 
o Project Zone 1: Replacement of existing pipes by construction of new PE-HD pipes, OD 63 with total length 1151m, OD 90 with a total length 195m, OD 180 with a total length 721m, OD 250 with total length 97m. Construction of approx. 470 new house connections along and to the already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old lines and house connections. 
o Project Zone 4: Replacement of existing pipes by construction of new PE-HD pipes, OD 63 with total length 707m, OD 90 with total length 476m, OD 125 with total length 364m, OD 180 with total length 1814m. Construction of approx. 270 new house connections along and to the already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old lines and house connections. 
o Project Zone 5: Replacement of existing pipes by construction of new PE-HD pipes, OD 63 with total length 532m, OD 125 with total length 970m, OD 250 with total length 3.774m. Construction of approx. 231 new house connections along and to the already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old lines and house connections. 
o Project Zone 10: Replacement of existing pipes by construction of new PE-HD pipes, OD 63 with total length 140m, OD 125 with a total length 931m, Construction of approx. 150 new house connections along and to the already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old lines and house connections.
Zones 1, 4, 5 & 10 City Network 
In Total installed: 
City Network Pipelines (PE100, PN16): 
OD63 – 2.371m; 
OD90 – 1.229m; 
OD125 – 1.069m; 
OD180 – 2.331m; 
OD225 – 437m; 
OD250 – 1.241m 
Totally installed 8.678m of main pipelines with 670 associated House Connections
PIPE WELDING
HOUSE CONNECTIONS – DIAMETERS OD25-50, 670NR IN ~10.000M LENGTH
PIPE SADDLE – HOUSE CONNECTIONS 
BRANCH GATE VALVE
PRESSURE TESTING (EN805) 
HYDRANT INSTALLATION (IN TOTAL 20 UNDERGROUND HYDRANTS INSTALLED)
HOUSE CONNECTION (SERVICE LINE) WITH PIPE SADDLE AND VALVE 
ABOVE-GROUND HYDRANTS (3NR INSTALLED)
UNDERGROUND HYDRANTS 
UNDERGROUND HYDRANTS
PIPE TRENCH BACKFILLING COMPACTION (PLATE LOAD TEST PER DIN18134) 
PIPE MARKING TAPE
HOUSE CONNECTIONS TO WATER METER LOCATION (3.000NR WATER METERS AND ASSOCIATED FITTINGS PROVIDED FOR WATER UTILITY) 
HOUSE CONNECTIONS TO WATER METER LOCATION
TRENCH COMPACTION 
PLATE LOAD TEST ON TRENCH AREAS 
(AS PER DIN 18134 / ŐNORM B4417)
Zone 8 New WS RC Tank “Debeljaca” (700m3) 
The new RC water reservoir constructed app. 100 m north of the old reservoir. The maximum operating water level is at a height of 293,00masl, the minimum water level is at a height of 288,50masl. 
In the first stage only one chamber of the reservoir with a volume of 700m³ will be constructed. The walls and the piping built in a manner that an extension in the future with further 700m³ is possible without any changing.
ELECTRO MAGNETIC FLOW METER PROMAG 50W
ELECTRIC ACTUATOR
SCADA CONTROL CABINET 
AUTOMATIC AIR VALVE
Zone 8 Feeder Line DI DN300, L=332m 
Gravity feed Feeder Line DI DN300 from new RC Tank “Debeljaca” to Flow Control Chamber
CONNECTION TO RC TANK “DEBELJACA” 
CONNECTION TO FLOW METER CHAMBER
Zone 8 Flow Control Shaft 
The flow control shaft constructed 250m north of the New “Debeljaca” Reservoir at the feeder line to the distribution network.
BASE SLAB REINFORCING WORKS 
DI PIPE PENETRATION THROUGH THE WALL
WALL REINFORCEMENT WORKS 
ROOF SLAB REINFORCEMENT WORKS
HYDRO-INSULATION 
FLOW EL.CONTROL VALVE “BERMARD” MODEL 718-03
Zone 9 Transmission Main Ductile Iron Pipeline 
The Project Zone 9 is presenting the transmission main from “Privlica” Pumping Station to the New “Debeljaca” Reservoir. 
The connection realized with a pressure DI pipe with a diameter of DN300mm. In parallel a data cable connection from “Privlica” Pumping Station to “Debeljaca” Reservoir shall be laid. 
DI DN300; PN16, L=826m
PIPE MATERIAL: 
PAM UNIVERSAL DI DN300, PN16 
TITANIUM SIT - JOINTS
CONNECTION OF DI PIPES 
TITANIUM SIT - JOINTS
PRESSURE TESTING – ANCHORING THE PIPE-ENDS 
ANALOG & DIGITAL PRESSURE GAUGES, TESTING AS PER EN805 STANDARD
Zone 9 Transmission Main Drain Valve
SUPPLY AND INSTALL AN OIL-IMMERSED TRANSFORMER 
10 KV/ 0.4 KV, RATED 1,000 KVA, INCLUDING ALL AUXILIARIES AND PROTECTION EQUIPMENT. 
TYPE: KBTS-1-VP 10(20)/0,4KV, 1X1000KVA (EN61330)
EL. MAG. FLOW METER “ENDRESS+HAUSER” PROMAG 50 W 
DN350, PN16
ELECTRO MAGNETIC FLOW METER “ENDRESS+HAUSER” PROMAG 50 W, DN250, PN16
Remaining Budget 
Out of the remaining Budget the following items have been provided for WU: 
- Vehicle VW Van 2,5 TDI; 
- Leak Detection Equipment: 
Woltex Water Meters (3nr – DN100, 200, 300) 
Geofon Guterman (2nr) 
Measuring Wheel M10 (2nr) 
SEWAD 30-s digital pressure logger (2nr) 
Kit for SEWAD 30-s (1nr) 
GPS/GIS Magellan Mobile Mapper 6 (1nr) 
FUJI Metal Locator F-90M (2nr) 
In total: 
Contract for Material – 741.085,28€ 
Contract for Works – 1,258,872.74€ 
Total Value: 1,999,958.02€ 
Total Project Budget: 2,000,000.00€

More Related Content

What's hot

2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LININGTimothy Antos
 
Mechanical & pumping1
Mechanical & pumping1Mechanical & pumping1
Mechanical & pumping1jmcelli
 
HydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax Inc. Limited
 
PPRC piping presentation
PPRC piping presentationPPRC piping presentation
PPRC piping presentationVinayak Abhale
 
Il materiale - CIPP, Timo Münstermann
Il materiale - CIPP, Timo MünstermannIl materiale - CIPP, Timo Münstermann
Il materiale - CIPP, Timo MünstermannServizi a rete
 
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsJay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsMorris Group International
 
materials of sewer
materials of sewermaterials of sewer
materials of sewerManish Goyal
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESCarlo Avanzini
 
Handbook of laying pipe sp57
Handbook of laying pipe sp57Handbook of laying pipe sp57
Handbook of laying pipe sp57Yogesh Nema
 
Fundamentals of Volumetric Filling using Electromagnetic Flowmeters
Fundamentals of Volumetric Filling using Electromagnetic FlowmetersFundamentals of Volumetric Filling using Electromagnetic Flowmeters
Fundamentals of Volumetric Filling using Electromagnetic FlowmetersInstrument Specialties, Inc.
 
SANITARY AND WATER SUPPLY
SANITARY AND WATER SUPPLYSANITARY AND WATER SUPPLY
SANITARY AND WATER SUPPLYRIDDHESH VARIK
 
Building services and its components.
Building services and its components.Building services and its components.
Building services and its components.Mehedi Hassan
 
PRESENTATION FOR ESTIMATION 18.11.2013
PRESENTATION FOR ESTIMATION 18.11.2013PRESENTATION FOR ESTIMATION 18.11.2013
PRESENTATION FOR ESTIMATION 18.11.2013ABDUL SALAM
 

What's hot (20)

Pipeline construction management
Pipeline construction managementPipeline construction management
Pipeline construction management
 
Fastflow Siphonic Systems
Fastflow Siphonic SystemsFastflow Siphonic Systems
Fastflow Siphonic Systems
 
2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING
 
High rise plumbing design by aspe
High rise plumbing design by aspeHigh rise plumbing design by aspe
High rise plumbing design by aspe
 
Traps and sewers
Traps and sewersTraps and sewers
Traps and sewers
 
Mechanical & pumping1
Mechanical & pumping1Mechanical & pumping1
Mechanical & pumping1
 
HydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof Drainage
 
PPRC piping presentation
PPRC piping presentationPPRC piping presentation
PPRC piping presentation
 
Il materiale - CIPP, Timo Münstermann
Il materiale - CIPP, Timo MünstermannIl materiale - CIPP, Timo Münstermann
Il materiale - CIPP, Timo Münstermann
 
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsJay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
 
materials of sewer
materials of sewermaterials of sewer
materials of sewer
 
Lecture notes
Lecture notesLecture notes
Lecture notes
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
 
AME OUTLINES
AME OUTLINESAME OUTLINES
AME OUTLINES
 
Hydraulic Systems
Hydraulic SystemsHydraulic Systems
Hydraulic Systems
 
Handbook of laying pipe sp57
Handbook of laying pipe sp57Handbook of laying pipe sp57
Handbook of laying pipe sp57
 
Fundamentals of Volumetric Filling using Electromagnetic Flowmeters
Fundamentals of Volumetric Filling using Electromagnetic FlowmetersFundamentals of Volumetric Filling using Electromagnetic Flowmeters
Fundamentals of Volumetric Filling using Electromagnetic Flowmeters
 
SANITARY AND WATER SUPPLY
SANITARY AND WATER SUPPLYSANITARY AND WATER SUPPLY
SANITARY AND WATER SUPPLY
 
Building services and its components.
Building services and its components.Building services and its components.
Building services and its components.
 
PRESENTATION FOR ESTIMATION 18.11.2013
PRESENTATION FOR ESTIMATION 18.11.2013PRESENTATION FOR ESTIMATION 18.11.2013
PRESENTATION FOR ESTIMATION 18.11.2013
 

Similar to Bihac WS Project

Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww projectVladimir Popovic
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaVladimir Popovic
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewVladimir Popovic
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgiaVladimir Popovic
 
Derventa, Water Supply Project
Derventa, Water Supply ProjectDerventa, Water Supply Project
Derventa, Water Supply ProjectVladimir Popovic
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxAgohaChinonso
 
Thiết kế đường ống trên bờ
Thiết kế đường ống trên bờThiết kế đường ống trên bờ
Thiết kế đường ống trên bờVcoi Vit
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02Bolin Loong
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010AlfredBirnhuber
 
GBF 2015, April 17th, Presentation of Mr. Pawel Markowicz
GBF 2015, April 17th, Presentation of Mr. Pawel MarkowiczGBF 2015, April 17th, Presentation of Mr. Pawel Markowicz
GBF 2015, April 17th, Presentation of Mr. Pawel MarkowiczGreen Bridge Forum
 
Cathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookCathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookSimone Tremolada
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 
Water Mist Systems - Akshay Jangam.
Water Mist Systems - Akshay Jangam. Water Mist Systems - Akshay Jangam.
Water Mist Systems - Akshay Jangam. Akshay Jangam
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosniaVladimir Popovic
 
Case Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBCase Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBStefanie Straubert
 

Similar to Bihac WS Project (20)

Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww project
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
Derventa, Water Supply Project
Derventa, Water Supply ProjectDerventa, Water Supply Project
Derventa, Water Supply Project
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptx
 
Thiết kế đường ống trên bờ
Thiết kế đường ống trên bờThiết kế đường ống trên bờ
Thiết kế đường ống trên bờ
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010
 
Service report
Service reportService report
Service report
 
GBF 2015, April 17th, Presentation of Mr. Pawel Markowicz
GBF 2015, April 17th, Presentation of Mr. Pawel MarkowiczGBF 2015, April 17th, Presentation of Mr. Pawel Markowicz
GBF 2015, April 17th, Presentation of Mr. Pawel Markowicz
 
Cathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookCathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlook
 
Pipeline b
Pipeline bPipeline b
Pipeline b
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Water Mist Systems - Akshay Jangam.
Water Mist Systems - Akshay Jangam. Water Mist Systems - Akshay Jangam.
Water Mist Systems - Akshay Jangam.
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosnia
 
Case Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBCase Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GB
 
AMAN PPT 4985 Assignment-1.pptx
AMAN PPT 4985 Assignment-1.pptxAMAN PPT 4985 Assignment-1.pptx
AMAN PPT 4985 Assignment-1.pptx
 

More from Vladimir Popovic

Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...Vladimir Popovic
 
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirSeismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirVladimir Popovic
 
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Vladimir Popovic
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelinesVladimir Popovic
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction ScheduleVladimir Popovic
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesVladimir Popovic
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesVladimir Popovic
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESVladimir Popovic
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopVladimir Popovic
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionVladimir Popovic
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsVladimir Popovic
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Vladimir Popovic
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Vladimir Popovic
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresVladimir Popovic
 

More from Vladimir Popovic (17)

Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
Rehabilitation of Municipal Water Supply and Wastewater Infrastructure in Bat...
 
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoirSeismic concrete Bore Piles at Makhinjauri water supply reservoir
Seismic concrete Bore Piles at Makhinjauri water supply reservoir
 
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelines
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction Schedule
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing Examples
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod Holes
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-Stop
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elements
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor Structures
 
Vani Water Supply Project
Vani Water Supply ProjectVani Water Supply Project
Vani Water Supply Project
 

Bihac WS Project

  • 1.
  • 2. Contract for Material Material provided under separate Contract and delivered to Bihac Water Utility. WU has received material in total value of 741.000EUR: - Service Line Pipe material (PE80, PN10, OD25-50) – 14.100m; - City Network Pipe material (PE100, PN16, OD63-250) -13.212m; -Transmission Main DI DN300, PN16 Pipe material – 1.222m - In addition all Pipe fittings, 830nr Service valves, 330nr Gate valves, 30 Hydrants, 3.000nr Water Meters, 100nr Bulk Water Meters were provided by the Project
  • 3. STEEL FLANGED “TEES” WATER METERS 3.000NR
  • 4. VARIOUS MATERIAL DI DN300 PAM UNIVERSAL PIPES (PN16) – 1.222M
  • 5. SERVICE LINES PE80, PN10 PIPE MATERIAL (OD25-50, L=14.100M) PIPE MAIN PE100, PN16 PIPE MATERIAL (OD63-250, L= 13.212M)
  • 7. Project Scope of Works: o Project Zone 1: Replacement of existing pipes by construction of new PE-HD pipes, OD 63 with total length 1151m, OD 90 with a total length 195m, OD 180 with a total length 721m, OD 250 with total length 97m. Construction of approx. 470 new house connections along and to the already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old lines and house connections. o Project Zone 4: Replacement of existing pipes by construction of new PE-HD pipes, OD 63 with total length 707m, OD 90 with total length 476m, OD 125 with total length 364m, OD 180 with total length 1814m. Construction of approx. 270 new house connections along and to the already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old lines and house connections. o Project Zone 5: Replacement of existing pipes by construction of new PE-HD pipes, OD 63 with total length 532m, OD 125 with total length 970m, OD 250 with total length 3.774m. Construction of approx. 231 new house connections along and to the already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old lines and house connections. o Project Zone 10: Replacement of existing pipes by construction of new PE-HD pipes, OD 63 with total length 140m, OD 125 with a total length 931m, Construction of approx. 150 new house connections along and to the already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old lines and house connections.
  • 8.
  • 9. Zones 1, 4, 5 & 10 City Network In Total installed: City Network Pipelines (PE100, PN16): OD63 – 2.371m; OD90 – 1.229m; OD125 – 1.069m; OD180 – 2.331m; OD225 – 437m; OD250 – 1.241m Totally installed 8.678m of main pipelines with 670 associated House Connections
  • 11. HOUSE CONNECTIONS – DIAMETERS OD25-50, 670NR IN ~10.000M LENGTH
  • 12. PIPE SADDLE – HOUSE CONNECTIONS BRANCH GATE VALVE
  • 13. PRESSURE TESTING (EN805) HYDRANT INSTALLATION (IN TOTAL 20 UNDERGROUND HYDRANTS INSTALLED)
  • 14. HOUSE CONNECTION (SERVICE LINE) WITH PIPE SADDLE AND VALVE ABOVE-GROUND HYDRANTS (3NR INSTALLED)
  • 16. PIPE TRENCH BACKFILLING COMPACTION (PLATE LOAD TEST PER DIN18134) PIPE MARKING TAPE
  • 17. HOUSE CONNECTIONS TO WATER METER LOCATION (3.000NR WATER METERS AND ASSOCIATED FITTINGS PROVIDED FOR WATER UTILITY) HOUSE CONNECTIONS TO WATER METER LOCATION
  • 18. TRENCH COMPACTION PLATE LOAD TEST ON TRENCH AREAS (AS PER DIN 18134 / ŐNORM B4417)
  • 19.
  • 20. Zone 8 New WS RC Tank “Debeljaca” (700m3) The new RC water reservoir constructed app. 100 m north of the old reservoir. The maximum operating water level is at a height of 293,00masl, the minimum water level is at a height of 288,50masl. In the first stage only one chamber of the reservoir with a volume of 700m³ will be constructed. The walls and the piping built in a manner that an extension in the future with further 700m³ is possible without any changing.
  • 21.
  • 22. ELECTRO MAGNETIC FLOW METER PROMAG 50W
  • 24. SCADA CONTROL CABINET AUTOMATIC AIR VALVE
  • 25. Zone 8 Feeder Line DI DN300, L=332m Gravity feed Feeder Line DI DN300 from new RC Tank “Debeljaca” to Flow Control Chamber
  • 26. CONNECTION TO RC TANK “DEBELJACA” CONNECTION TO FLOW METER CHAMBER
  • 27. Zone 8 Flow Control Shaft The flow control shaft constructed 250m north of the New “Debeljaca” Reservoir at the feeder line to the distribution network.
  • 28. BASE SLAB REINFORCING WORKS DI PIPE PENETRATION THROUGH THE WALL
  • 29. WALL REINFORCEMENT WORKS ROOF SLAB REINFORCEMENT WORKS
  • 30. HYDRO-INSULATION FLOW EL.CONTROL VALVE “BERMARD” MODEL 718-03
  • 31. Zone 9 Transmission Main Ductile Iron Pipeline The Project Zone 9 is presenting the transmission main from “Privlica” Pumping Station to the New “Debeljaca” Reservoir. The connection realized with a pressure DI pipe with a diameter of DN300mm. In parallel a data cable connection from “Privlica” Pumping Station to “Debeljaca” Reservoir shall be laid. DI DN300; PN16, L=826m
  • 32.
  • 33. PIPE MATERIAL: PAM UNIVERSAL DI DN300, PN16 TITANIUM SIT - JOINTS
  • 34. CONNECTION OF DI PIPES TITANIUM SIT - JOINTS
  • 35. PRESSURE TESTING – ANCHORING THE PIPE-ENDS ANALOG & DIGITAL PRESSURE GAUGES, TESTING AS PER EN805 STANDARD
  • 36.
  • 37. Zone 9 Transmission Main Drain Valve
  • 38.
  • 39. SUPPLY AND INSTALL AN OIL-IMMERSED TRANSFORMER 10 KV/ 0.4 KV, RATED 1,000 KVA, INCLUDING ALL AUXILIARIES AND PROTECTION EQUIPMENT. TYPE: KBTS-1-VP 10(20)/0,4KV, 1X1000KVA (EN61330)
  • 40.
  • 41. EL. MAG. FLOW METER “ENDRESS+HAUSER” PROMAG 50 W DN350, PN16
  • 42. ELECTRO MAGNETIC FLOW METER “ENDRESS+HAUSER” PROMAG 50 W, DN250, PN16
  • 43. Remaining Budget Out of the remaining Budget the following items have been provided for WU: - Vehicle VW Van 2,5 TDI; - Leak Detection Equipment: Woltex Water Meters (3nr – DN100, 200, 300) Geofon Guterman (2nr) Measuring Wheel M10 (2nr) SEWAD 30-s digital pressure logger (2nr) Kit for SEWAD 30-s (1nr) GPS/GIS Magellan Mobile Mapper 6 (1nr) FUJI Metal Locator F-90M (2nr) In total: Contract for Material – 741.085,28€ Contract for Works – 1,258,872.74€ Total Value: 1,999,958.02€ Total Project Budget: 2,000,000.00€