R REZA SHAH ABADI
104 – 4723 DAWSON STREET – BURNABY – BC – V5C 0A7, CELL: (604)655-2132, REZA10SHAH @YAHOO.COM
1/2
List of Noticeable Projects/ Maintenance Workshop Activities
i. List of High voltage substations EPC projects:
 Kerman Province Miduk copper complex
It was a project to provide around 150MW active power for Nicico expansion projects from
400KV nation power grid to 132KV Nicico’s network and 132KV regional power grid. It was
an AIS green field project with One and a half breaker in 2*400KV bays switchyard and H
type in 11*132KV feeders with 2*200MVA transformers. All utilities in Scada, Conventional
Control, Protection, communication, AC/DC, Diesel generator, civil and construction,
fencing, bus and cable work have been included in an EPC project.
 Azerbaijan Province Sungun copper complex
It was a project to provide around 30MW active power for Nicico expansion project from
230KV nation power grid to 20KV Nicico’s network. It was an AIS brown field project to add
a new 40 MVA transformer in a RING 230KV switchyard to provide a new 20KV feeder. All
utilities in Scada, DCS Control, Protection, communication, AC/DC, MV switchgear, bus
and cable work have been included in an EPC project.
 Sistan & Baluchistan Province Chehlkooreh copper complex
It was a project to provide around 9MW active power for Nicico new project from 63KV
regional power grid to 6.9KV Nicico’s new network. It was an AIS green field project with
two incomings 63KV and 2*15MVA transformers. All utilities in Scada, Conventional
Control, Protection, communication, AC/DC, civil and construction, fencing, bus and cable
work, duct banks, MV switchgear have been included in an EPC project.
 Kerman Province Sarcheshmeh Copper Complex:
In order to provide required power for expansion projects in this location, we have finalized
the required Basic/Detail design and finding best location for three new substations:
 230KV AIS Switching substations, One and a half breaker with 8 incoming and
outgoings
 230KV GIS Double-Busbar, 2*80MVA transformers
 132KV GIS H type, 2*80MVA transformers
ii. List of EPC ( Engineering, Procurement and Construction) Medium and Low voltage
projects and its code in Sarcheshmeh Copper complex:
 E3: Switchgear and MCC: Replacing ten old LV Power center switchgears by new metal
clad and well equipped ones and refurbishment the 20 air bus ducts and 130 ACBs.
Replacing old MCC by new safer, divided compartment and well equipped ones.
 E7: Protection Relay and Automation: Replacing all old protection relays by numerical
intelligent types, providing SAS for all substations (including remote mines and sites spread
in 70 Sq. Km), SCADA, FDS ( Fundamental Design Specifications SAS/SCADA), Power
Management System (PMS), Intelligent Load Shedding (ILS) for the factory’s power plant,
Network Protocols DNP 3 and IEC61850, Providing a media of fiber optic, Radio system
and Communication network, Human Machine Interface (HMI) software applications, LAN
technologies, field/backbone switches, IP list, Signal List, SAS Architecture Diagrams,
Hardware/Software Technical specification, Data Base configuration, Time Synchronization
R REZA SHAH ABADI
104 – 4723 DAWSON STREET – BURNABY – BC – V5C 0A7, CELL: (604)655-2132, REZA10SHAH @YAHOO.COM
2/2
 E8: Switchgear GIS and Breakers: Replacing all different types minimum oil circuit
breakers and SF6 circuit breaker on trucks with Vacuum CB, replacing an MV Air Insulation
Switchgear by a metal clad semi GIS with a complete SAS/numerical relays/power quality
meters systems, Installation the tuned MV filter banks, Installation PASS systems, design
for installation of an IS-Limiter, replacement two in-box- Disconnector Switches with their
enclosures with new ones, replacing two air bus ducts with the fully insulated ones …..
 E9: Transformers and Ring Main Units: Replacing the 42 distribution Askarel (PCB) oil
immerse transformers by cast resin dry types and exporting the oil and contaminated
equipment to disposal plant in France. In this project we replaced 16 Oil Immersed LBSs by
metal enclosed GIS RMUs
Note: Energy Globe (An International Foundation in Austria) awarded National Award in
2013 for this project and the project was a candidate for Energy Globe International Award
in 2013 as well.
 E13: Partial Discharge: Installation online and offline partial discharge measurement and
monitoring system for MV machines (45 units including Generators 11 & 6.9KV and
Electromotors 6.9KV) based on North American method in the production lines.
Furthermore, providing a portable measurement PD system for switchgears, electromotors,
cables and terminators based on European method.
 E17: Skid Mounted Substations: Replacing 3 old and conventional mining substations
5MVA, 20/6.9KV and 12 mining 6.9KV switchboxes by new mobile and skid mounted ones.
They are equipped by numerical relay, Power Quality Meters and Broadband Power Line
carrier data systems on MV cables.
 E20: Transformers and Cable Duct Banks: Expanding electrical distribution network
(including 11 transformer substations, 12KV metal enclosed switchgear with 22 feeders,
encapsulated resin bus ducts, 20 Km triplex 20/12KV cables, 1200 meter duct bank, 16
manholes, 35 distribution industrial transformers 20/6.9KV & 20/0.4KV, 45 units metal clad
semi GIS, plug in terminators, etc.) for the new consumer to feed 40MW new plants.
iii. List of High voltage Transmission line PC projects:
 400, 132 KV in Kerman Province 70km
 63KV in Azerbaijan Province 15km
 230, 63 KV in Sistan & Baluchistan Province 120km
iv. Noticeable Workshop Maintenance Activities:
 Rewinding MV Electromotor Stator: Complete rewinding a Stator of 4500hp, 30poles,
200RMP, 6900 Volt, Synchronous Mill Electromotors GE Canada in workshop with all
required tests
 Overhauls of Stators Gas Turbine Generators and checking all parts of insulation
windings 11Kv, 25MW Alstom Frame 5
 Predict the insulation life lasting by doing all required tests on a Waste Heat Steam
Generator Stator 6900 Volts, 10MW GE to
 Rewinding Transformer: 2MVA, 20KV/6.9KV
 Inspection on rewinding/maintenance of a variety range of MV electromotors in off-site
workshop

More Related Content

What's hot

TDU - Unit 02 - HVDC, FACTS and sub-stations
TDU - Unit  02 - HVDC, FACTS and sub-stations TDU - Unit  02 - HVDC, FACTS and sub-stations
TDU - Unit 02 - HVDC, FACTS and sub-stations PremanandDesai
 
Instruction manual
Instruction manualInstruction manual
Instruction manualrohit singh
 
Osama Fouad (Update)
Osama Fouad (Update)Osama Fouad (Update)
Osama Fouad (Update)Usama Fouad
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Sarthak Panigrahi
 
EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions LLP
 
Catalog busbar ls 06. busduct presentation e series rev 2
Catalog busbar ls 06. busduct presentation e series rev 2Catalog busbar ls 06. busduct presentation e series rev 2
Catalog busbar ls 06. busduct presentation e series rev 2Dien Ha The
 
Comparison of the performance of hvdc and hvac overhead transmission lines fo...
Comparison of the performance of hvdc and hvac overhead transmission lines fo...Comparison of the performance of hvdc and hvac overhead transmission lines fo...
Comparison of the performance of hvdc and hvac overhead transmission lines fo...Mahdi Bahaghighat
 
Comnet C2US Data Sheet
Comnet C2US Data SheetComnet C2US Data Sheet
Comnet C2US Data SheetJMAC Supply
 
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...Yole Developpement
 
Single phase grid connected motor drive system with dc-link shunt compensator...
Single phase grid connected motor drive system with dc-link shunt compensator...Single phase grid connected motor drive system with dc-link shunt compensator...
Single phase grid connected motor drive system with dc-link shunt compensator...LeMeniz Infotech
 
Prefabricated compact transformer
Prefabricated compact transformerPrefabricated compact transformer
Prefabricated compact transformerJoeChueng
 

What's hot (18)

TDU - Unit 02 - HVDC, FACTS and sub-stations
TDU - Unit  02 - HVDC, FACTS and sub-stations TDU - Unit  02 - HVDC, FACTS and sub-stations
TDU - Unit 02 - HVDC, FACTS and sub-stations
 
Instruction manual
Instruction manualInstruction manual
Instruction manual
 
Osama Fouad (Update)
Osama Fouad (Update)Osama Fouad (Update)
Osama Fouad (Update)
 
HVDC vs HVAC ppt
HVDC vs HVAC pptHVDC vs HVAC ppt
HVDC vs HVAC ppt
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
 
Busduct
BusductBusduct
Busduct
 
EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions - All About Substation
EPC Solutions - All About Substation
 
Catalog busbar ls 06. busduct presentation e series rev 2
Catalog busbar ls 06. busduct presentation e series rev 2Catalog busbar ls 06. busduct presentation e series rev 2
Catalog busbar ls 06. busduct presentation e series rev 2
 
Comparison of the performance of hvdc and hvac overhead transmission lines fo...
Comparison of the performance of hvdc and hvac overhead transmission lines fo...Comparison of the performance of hvdc and hvac overhead transmission lines fo...
Comparison of the performance of hvdc and hvac overhead transmission lines fo...
 
Comnet C2US Data Sheet
Comnet C2US Data SheetComnet C2US Data Sheet
Comnet C2US Data Sheet
 
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
 
Single phase grid connected motor drive system with dc-link shunt compensator...
Single phase grid connected motor drive system with dc-link shunt compensator...Single phase grid connected motor drive system with dc-link shunt compensator...
Single phase grid connected motor drive system with dc-link shunt compensator...
 
ABB Low Voltage LV Capacitors, ABB CLMD
ABB Low Voltage LV Capacitors, ABB CLMDABB Low Voltage LV Capacitors, ABB CLMD
ABB Low Voltage LV Capacitors, ABB CLMD
 
Electric09
Electric09Electric09
Electric09
 
Prefabricated compact transformer
Prefabricated compact transformerPrefabricated compact transformer
Prefabricated compact transformer
 
Bs bab 1
Bs bab 1Bs bab 1
Bs bab 1
 
Mohd_Anwarulla
Mohd_AnwarullaMohd_Anwarulla
Mohd_Anwarulla
 
CWB Contactors
CWB ContactorsCWB Contactors
CWB Contactors
 

Similar to Project List 1.3-May21,16- Substation Electrical Enginner

International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
High Voltage DC Transmission
High Voltage DC TransmissionHigh Voltage DC Transmission
High Voltage DC Transmissionkrishna koundinya
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdfHIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdfEMERSON EDUARDO RODRIGUES
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report imkanhaiyalal
 
Final report of 220kv gss working model
Final report of 220kv gss working modelFinal report of 220kv gss working model
Final report of 220kv gss working modelgiriraj bairwa
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
HVDC TRANSMISSION LINE PPT
HVDC TRANSMISSION LINE  PPTHVDC TRANSMISSION LINE  PPT
HVDC TRANSMISSION LINE PPTAshutosh kumar
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)Saher Jehad
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationSteve Sadler
 
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj InfoAC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj InfoDario Gnoato
 
Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...Naveed Shahzad
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 

Similar to Project List 1.3-May21,16- Substation Electrical Enginner (20)

International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
High Voltage DC Transmission
High Voltage DC TransmissionHigh Voltage DC Transmission
High Voltage DC Transmission
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdfHIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
 
metro naveen
metro naveenmetro naveen
metro naveen
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
Final report of 220kv gss working model
Final report of 220kv gss working modelFinal report of 220kv gss working model
Final report of 220kv gss working model
 
Status of hvdc links
Status of hvdc linksStatus of hvdc links
Status of hvdc links
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
HVDC TRANSMISSION LINE PPT
HVDC TRANSMISSION LINE  PPTHVDC TRANSMISSION LINE  PPT
HVDC TRANSMISSION LINE PPT
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
 
HVDC presentation
HVDC presentationHVDC presentation
HVDC presentation
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj InfoAC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info
 
CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
 
Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...Conventional and emerging converter technologies in hvdc power transmission s...
Conventional and emerging converter technologies in hvdc power transmission s...
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 

Project List 1.3-May21,16- Substation Electrical Enginner

  • 1. R REZA SHAH ABADI 104 – 4723 DAWSON STREET – BURNABY – BC – V5C 0A7, CELL: (604)655-2132, REZA10SHAH @YAHOO.COM 1/2 List of Noticeable Projects/ Maintenance Workshop Activities i. List of High voltage substations EPC projects:  Kerman Province Miduk copper complex It was a project to provide around 150MW active power for Nicico expansion projects from 400KV nation power grid to 132KV Nicico’s network and 132KV regional power grid. It was an AIS green field project with One and a half breaker in 2*400KV bays switchyard and H type in 11*132KV feeders with 2*200MVA transformers. All utilities in Scada, Conventional Control, Protection, communication, AC/DC, Diesel generator, civil and construction, fencing, bus and cable work have been included in an EPC project.  Azerbaijan Province Sungun copper complex It was a project to provide around 30MW active power for Nicico expansion project from 230KV nation power grid to 20KV Nicico’s network. It was an AIS brown field project to add a new 40 MVA transformer in a RING 230KV switchyard to provide a new 20KV feeder. All utilities in Scada, DCS Control, Protection, communication, AC/DC, MV switchgear, bus and cable work have been included in an EPC project.  Sistan & Baluchistan Province Chehlkooreh copper complex It was a project to provide around 9MW active power for Nicico new project from 63KV regional power grid to 6.9KV Nicico’s new network. It was an AIS green field project with two incomings 63KV and 2*15MVA transformers. All utilities in Scada, Conventional Control, Protection, communication, AC/DC, civil and construction, fencing, bus and cable work, duct banks, MV switchgear have been included in an EPC project.  Kerman Province Sarcheshmeh Copper Complex: In order to provide required power for expansion projects in this location, we have finalized the required Basic/Detail design and finding best location for three new substations:  230KV AIS Switching substations, One and a half breaker with 8 incoming and outgoings  230KV GIS Double-Busbar, 2*80MVA transformers  132KV GIS H type, 2*80MVA transformers ii. List of EPC ( Engineering, Procurement and Construction) Medium and Low voltage projects and its code in Sarcheshmeh Copper complex:  E3: Switchgear and MCC: Replacing ten old LV Power center switchgears by new metal clad and well equipped ones and refurbishment the 20 air bus ducts and 130 ACBs. Replacing old MCC by new safer, divided compartment and well equipped ones.  E7: Protection Relay and Automation: Replacing all old protection relays by numerical intelligent types, providing SAS for all substations (including remote mines and sites spread in 70 Sq. Km), SCADA, FDS ( Fundamental Design Specifications SAS/SCADA), Power Management System (PMS), Intelligent Load Shedding (ILS) for the factory’s power plant, Network Protocols DNP 3 and IEC61850, Providing a media of fiber optic, Radio system and Communication network, Human Machine Interface (HMI) software applications, LAN technologies, field/backbone switches, IP list, Signal List, SAS Architecture Diagrams, Hardware/Software Technical specification, Data Base configuration, Time Synchronization
  • 2. R REZA SHAH ABADI 104 – 4723 DAWSON STREET – BURNABY – BC – V5C 0A7, CELL: (604)655-2132, REZA10SHAH @YAHOO.COM 2/2  E8: Switchgear GIS and Breakers: Replacing all different types minimum oil circuit breakers and SF6 circuit breaker on trucks with Vacuum CB, replacing an MV Air Insulation Switchgear by a metal clad semi GIS with a complete SAS/numerical relays/power quality meters systems, Installation the tuned MV filter banks, Installation PASS systems, design for installation of an IS-Limiter, replacement two in-box- Disconnector Switches with their enclosures with new ones, replacing two air bus ducts with the fully insulated ones …..  E9: Transformers and Ring Main Units: Replacing the 42 distribution Askarel (PCB) oil immerse transformers by cast resin dry types and exporting the oil and contaminated equipment to disposal plant in France. In this project we replaced 16 Oil Immersed LBSs by metal enclosed GIS RMUs Note: Energy Globe (An International Foundation in Austria) awarded National Award in 2013 for this project and the project was a candidate for Energy Globe International Award in 2013 as well.  E13: Partial Discharge: Installation online and offline partial discharge measurement and monitoring system for MV machines (45 units including Generators 11 & 6.9KV and Electromotors 6.9KV) based on North American method in the production lines. Furthermore, providing a portable measurement PD system for switchgears, electromotors, cables and terminators based on European method.  E17: Skid Mounted Substations: Replacing 3 old and conventional mining substations 5MVA, 20/6.9KV and 12 mining 6.9KV switchboxes by new mobile and skid mounted ones. They are equipped by numerical relay, Power Quality Meters and Broadband Power Line carrier data systems on MV cables.  E20: Transformers and Cable Duct Banks: Expanding electrical distribution network (including 11 transformer substations, 12KV metal enclosed switchgear with 22 feeders, encapsulated resin bus ducts, 20 Km triplex 20/12KV cables, 1200 meter duct bank, 16 manholes, 35 distribution industrial transformers 20/6.9KV & 20/0.4KV, 45 units metal clad semi GIS, plug in terminators, etc.) for the new consumer to feed 40MW new plants. iii. List of High voltage Transmission line PC projects:  400, 132 KV in Kerman Province 70km  63KV in Azerbaijan Province 15km  230, 63 KV in Sistan & Baluchistan Province 120km iv. Noticeable Workshop Maintenance Activities:  Rewinding MV Electromotor Stator: Complete rewinding a Stator of 4500hp, 30poles, 200RMP, 6900 Volt, Synchronous Mill Electromotors GE Canada in workshop with all required tests  Overhauls of Stators Gas Turbine Generators and checking all parts of insulation windings 11Kv, 25MW Alstom Frame 5  Predict the insulation life lasting by doing all required tests on a Waste Heat Steam Generator Stator 6900 Volts, 10MW GE to  Rewinding Transformer: 2MVA, 20KV/6.9KV  Inspection on rewinding/maintenance of a variety range of MV electromotors in off-site workshop