OSP FIBER PROJECT
IMPLEMENTATION
IT IS ALL ABOUT
COMPLING WITH
PROCESS
..it has start and end
WHAT HAPPENS
IN -BETWEEN
IS THE
MANAGEMENT
STAGE I
PROPOSED ROUTE SURVEY
 After studying the SOW from the client .
It is important to survey the project route and t...
It begins with
SURVEY of the
PROPOSED ROUTE
STAGE II
DRAFTING AND DRAWING OF
THE SURVEY
IN AUTO-CAD FORMAT
MH 1 MH 2 IN
MH 3
IN
MH 5 OUT
MH 4 OUT
MH 6 MH 7
STAGE III
TRENCHING
YOU CAN CALL IT
DIGGING, REMOVAL OF
THE TERRAIN SUFARCE
TO A GIVEN DEPTH
ASPHALT CUTTING, CONCRETE
BREAKING, THRUST BORING, PAVE
STONES, SWAMP AREAS, BRIGDE
CROSSING are some of the terrain to
wo...
STAGE IV : CONCRETE WORK
casting of MANHOLE and ROUTE MARKER
Manhole are the concrete junction box site at given interval ...
STAGE V
DUCTING & COUPLING
Laying of
(PVC Polyvinyl chloride) (HDPE: High density polyethene) & GI Pipe
WHAT IS COUPLING
JOINING OF DUCTS TOGETHER FOR CONTINUITY
PVC COUPLING
PVC (Polyvinyl chloride)COUPLING INVOLVE SETTING
THE FEMALE SIDE OF THE PIPE AGAINST THE MALE SIDE
SUB-DUCT COUPLING
THE SUB-DUCT KNOWN AS HDPE (High Density
Polyethylene) VARY IN SIZES 33/40mm. It is uniform
in size. Unl...
STAGE VI
BACKFILLING
&
REINSTATEMENT
This term refers to the returns of the excavated soil to the trench. Warning tape is
...
STAGE VII
FIBER WORK
FIBER PULLING : HAND PULLING OR BLOWING
It involve inserting of the fiber
optics cable into the sub-duct
from manhole to manhole to the
end of the cable drum or
c...
Equipment such as the calibration rope, stager,
hand and blowing machine can be deployed
to achieve this stage
STAGE VIII
FIBER CABLE
TERMINATION
Connectorization and splicing
STAGE IX : TESTING
INSERTION LOSS TEST AND OTDR TEST
VISUAL FAULT LOCATOR
OLTS
OTDR
STAGE X
DOCUMENTATION OF THE TEST RESULT, AS- BUILT DRAWING
Upcoming SlideShare
Loading in …5
×

10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION

18,149 views

Published on

HOW TO CARRY OUT SUCCESSFUL FIBER OPTIC PROJECT STAGE BY STAGE. THE OUTSIDE PLANT PROJECT OF FIBER OPTICS CABLING TECHNIQUES WHICH INCLUDE PROJECT PLANNING TO PROJECT EXECUTION

Published in: Technology
  • I think you need a perfect and 100% unique academic essays papers have a look once this site i hope you will get valuable papers, ⇒ www.WritePaper.info ⇐
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • DOWNLOAD THE BOOK INTO AVAILABLE FORMAT (New Update) ......................................................................................................................... ......................................................................................................................... Download Full PDF EBOOK here { https://urlzs.com/UABbn } ......................................................................................................................... Download Full EPUB Ebook here { https://urlzs.com/UABbn } ......................................................................................................................... Download Full doc Ebook here { https://urlzs.com/UABbn } ......................................................................................................................... Download PDF EBOOK here { https://urlzs.com/UABbn } ......................................................................................................................... Download EPUB Ebook here { https://urlzs.com/UABbn } ......................................................................................................................... Download doc Ebook here { https://urlzs.com/UABbn } ......................................................................................................................... ......................................................................................................................... ................................................................................................................................... eBook is an electronic version of a traditional print book THE can be read by using a personal computer or by using an eBook reader. (An eBook reader can be a software application for use on a computer such as Microsoft's free Reader application, or a book-sized computer THE is used solely as a reading device such as Nuvomedia's Rocket eBook.) Users can purchase an eBook on diskette or CD, but the most popular method of getting an eBook is to purchase a downloadable file of the eBook (or other reading material) from a Web site (such as Barnes and Noble) to be read from the user's computer or reading device. Generally, an eBook can be downloaded in five minutes or less ......................................................................................................................... .............. Browse by Genre Available eBOOK .............................................................................................................................. Art, Biography, Business, Chick Lit, Children's, Christian, Classics, Comics, Contemporary, CookBOOK, Manga, Memoir, Music, Mystery, Non Fiction, Paranormal, Philosophy, Poetry, Psychology, Religion, Romance, Science, Science Fiction, Self Help, Suspense, Spirituality, Sports, Thriller, Travel, Young Adult, Crime, EBOOK, Fantasy, Fiction, Graphic Novels, Historical Fiction, History, Horror, Humor And Comedy, ......................................................................................................................... ......................................................................................................................... .....BEST SELLER FOR EBOOK RECOMMEND............................................................. ......................................................................................................................... Blowout: Corrupted Democracy, Rogue State Russia, and the Richest, Most Destructive Industry on Earth,-- The Ride of a Lifetime: Lessons Learned from 15 Years as CEO of the Walt Disney Company,-- Call Sign Chaos: Learning to Lead,-- StrengthsFinder 2.0,-- Stillness Is the Key,-- She Said: Breaking the Sexual Harassment Story THE Helped Ignite a Movement,-- Atomic Habits: An Easy & Proven Way to Build Good Habits & Break Bad Ones,-- Everything Is Figureoutable,-- What It Takes: Lessons in the Pursuit of Excellence,-- Rich Dad Poor Dad: What the Rich Teach Their Kids About Money THE the Poor and Middle Class Do Not!,-- The Total Money Makeover: Classic Edition: A Proven Plan for Financial Fitness,-- Shut Up and Listen!: Hard Business Truths THE Will Help You Succeed, ......................................................................................................................... .........................................................................................................................
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • The professtional essay writer are having more knowledege about the writing papers. The professional essay writer are providing the best essay writing services papers to the students. The writeersity writing company had to providing the more writing papers for the professtionalist. The papers should be very quality and possible to acedemic success. HelpWriting.net Good luck!
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Grab 5 Free Shed Plans Now! Download 5 Full-Blown Shed Plans with Step-By-Step Instructions & Easy To Follow Blueprints! ✄✄✄ https://t.cn/A62YdYfe
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Without requiring much effort from your part, The Gout Diet guides you step-by-step on how to remove gout quickly and efficiently. For more details: check out the following free video presentation: ■■■ https://t.cn/A6AZCbfA
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here

10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION

  1. 1. OSP FIBER PROJECT IMPLEMENTATION
  2. 2. IT IS ALL ABOUT COMPLING WITH PROCESS ..it has start and end
  3. 3. WHAT HAPPENS IN -BETWEEN IS THE MANAGEMENT
  4. 4. STAGE I PROPOSED ROUTE SURVEY  After studying the SOW from the client . It is important to survey the project route and take note of the terrain.  The use of GPS and knowledge of it with other mapping software is an hedge in this stage
  5. 5. It begins with SURVEY of the PROPOSED ROUTE
  6. 6. STAGE II DRAFTING AND DRAWING OF THE SURVEY IN AUTO-CAD FORMAT MH 1 MH 2 IN MH 3 IN MH 5 OUT MH 4 OUT MH 6 MH 7
  7. 7. STAGE III TRENCHING
  8. 8. YOU CAN CALL IT DIGGING, REMOVAL OF THE TERRAIN SUFARCE TO A GIVEN DEPTH
  9. 9. ASPHALT CUTTING, CONCRETE BREAKING, THRUST BORING, PAVE STONES, SWAMP AREAS, BRIGDE CROSSING are some of the terrain to work with during TRENCHING
  10. 10. STAGE IV : CONCRETE WORK casting of MANHOLE and ROUTE MARKER Manhole are the concrete junction box site at given interval on the project route THIS CAN BE CONSTRUCTED ON SITE (IN-SITU) OR CAST IN THE PROJECT EQUIPMENT LOCATED (PRE-CAST) Route marker are the short pillars erected along the fiber route to indicate the presence of underground telecom facilities
  11. 11. STAGE V DUCTING & COUPLING Laying of (PVC Polyvinyl chloride) (HDPE: High density polyethene) & GI Pipe
  12. 12. WHAT IS COUPLING JOINING OF DUCTS TOGETHER FOR CONTINUITY
  13. 13. PVC COUPLING PVC (Polyvinyl chloride)COUPLING INVOLVE SETTING THE FEMALE SIDE OF THE PIPE AGAINST THE MALE SIDE
  14. 14. SUB-DUCT COUPLING THE SUB-DUCT KNOWN AS HDPE (High Density Polyethylene) VARY IN SIZES 33/40mm. It is uniform in size. Unlike PVC, it does not have male and female sides. joining requires a special coupler and techniques
  15. 15. STAGE VI BACKFILLING & REINSTATEMENT This term refers to the returns of the excavated soil to the trench. Warning tape is required here before total backfilling. Reinstatement only takes place where major terrain such as asphalt cutting and concrete breaking take place
  16. 16. STAGE VII FIBER WORK FIBER PULLING : HAND PULLING OR BLOWING
  17. 17. It involve inserting of the fiber optics cable into the sub-duct from manhole to manhole to the end of the cable drum or cassette.
  18. 18. Equipment such as the calibration rope, stager, hand and blowing machine can be deployed to achieve this stage
  19. 19. STAGE VIII FIBER CABLE TERMINATION Connectorization and splicing
  20. 20. STAGE IX : TESTING INSERTION LOSS TEST AND OTDR TEST VISUAL FAULT LOCATOR OLTS OTDR
  21. 21. STAGE X DOCUMENTATION OF THE TEST RESULT, AS- BUILT DRAWING

×