Extending Tank Life
Water Storage Tank
Construction & Rehab
2016 OAWWA
Cincinnati
Tank Design – New Construction
 Site Location
– Elevation & Access
– Drainage (overflow & foundation)
– Foundation (4,000 -6,000 psf)
– Visibility
 Water Modeling
– Height; capacity; turnover; pumping; water mains
 Style – Coatings – Logo
 Appurtenances
 AWWA standards D101-107
Tank Styles
Multi-Leg Hydropillar Standpipe
Tank Styles
Spheroid Bolted CET Steel CET
Construction Costs & Bidding
 1.0 MG Tank
– Steel Spheroid = $2,500,000
– CET Steel Bowl = $2,300,000
– CET Bolted Bowl = $2,200,000
 Schedule
– Contract duration 16-18 months
– Construction 7-9 months
 Bid Alternate Styles
– Few contractors; tight competition!
Many Years Later...
Now What?
Inspection
 AWWA M42
–3 year interval
–Drain and wash out
 Inspector
–Trained climber
–Structural background
–Coatings/Corrosion certification (SSPC/NACE)
Inspection Guidelines
 Observations
– Surfaces (coatings/adhesion/corrosion)
– Lead paint (CPSC 600 ppm)
– Structural
– Sanitary
– Safety & Security
– Appurtenances
 Report
– Findings/Rehab/Estimates
– Photo log
Coating Adhesion Testing
 ASTM 3359 Tape Test
– % flaking/detachment
– Cross Cut
– “X” Cut
– Overcoat determination
Re-Paint?
Overcoat?
Clean?
Pressure Wash Cleaning
 Is tank simply “dirty”?
 “Mildew/Mold” = Fungus (microbe)
 Cleaning
1) Disable fungus
2) Heated pressure wash
3) Microbe inhibitor
 $5,000 - $8,000
Overcoat Existing System
 Advantages
– 30%-40% cost savings
– Fast! No exterior blasting & containment
 Disadvantages
– Less useful life
– Total DFTs too “heavy”
 Surface Preparation
– Low Pressure (<5,000 psi) Water Clean (SSPC LP WC)
– Hand/Power Tool Cleaning (SSPC-SP2 or SP3)
 Primer - Epoxy (low viscosity; penetrating)
Surface Preparation
&
Coatings
Standards & Regulatory
 AWWA D102 Coating Steel Water Storage Tanks
– Outside coating systems (6)
– Inside coating systems (5)
– Minimum guidelines
 SSPC - Society of Protective Coatings
 NACE - National Association Corrosion Engineers
 OAC 3745-17-08
– Restriction of Emission of Fugitive Dust
– Lists affected Counties
Surface Preparation
SURFACE
PREPARATION
GRADE
DESCRIPTION
MIL
PROFILE
NOTES
Wet Interior SSPC-SP5/NACE 1 White Metal 2.0-2.5
Highest blast grade.
No staining allowed.
Dry Interior SSPC-SP10/NACE 2 Near White Metal 2.0-2.5
2nd highest blast grade.
5% staining allowed.
Dry Interior - Alternate SSPC-SP6/NACE 3 Commercial 2.0-2.5 33% staining allowed.
Exterior SSPC-SP10/NACE 2 Near White Metal 2.0-2.5
2nd highest blast grade.
5% staining allowed.
Exterior - Alternate SSPC-SP6/NACE 3 Commercial 2.0-2.5 33% staining allowed.
Exterior - Overcoat SSPC-LP/HP WC Low/High Pressure Water Clean N/A 1,000 - 10,000 psi
Dry Interior/Exterior SSPC-SP3; 11; 15
Power Tool Cleaning
(Reg; Commercial; Bare Metal)
1.0 Spot corrosion/Edges
Surface Preparation Notes
 2.0-2.5 mil profile typical
 Too much or too little profile = BAD!
 Do not blast/grind flat welds
 Protect electrical/control cabinets; receptacles
Surface Preparation Inspection
 Inspection:
– Visual
– Profile tape/thickness gauge or digital
Containment – TEPE Type
 Totally Enclosed Painting Environment
Containment – Rigging
Center Pulley Assembly Outriggers
Remote Robot Wet Blast Unit
Coatings
SURFACE TYPE LAYER MIL DFT NOTES
Wet Interior Zinc or Epoxy Primer 3 Mositure cure; fast and low temp. cure
*spray gun application Epoxy Stripe Coat 3 Brush apply at welds
Epoxy Intermediate 4
Epoxy Finish 5 Caulk welds/lap seams
* Metallizing (alternate) Total 12 * 100% Vol. Solids 20-30 mils (alternate)
Dry Interior Epoxy Primer 3
*spray gun application Epoxy Finish 6 Apply in two coats
Total 9
Exterior Zinc or Epoxy Primer 3
*phenolic core non-shedding roller Epoxy Intermediate 3
Fluoropolymer (alternate) Polyurethane Finish 3 Better gloss/color retention
Total 9
Fluoropolymer (alternate) Polyurethane Logo 3 UV resistant; Best gloss/color retention
Coating Inspection
 Dry Film Thickness (DFT)
 Temperature – air & surface
 Dew Point & Relative Humidity - Psychrometer
 Runs/drips/pinholes/holidays/striping/ghosting
Wet Interior Inspection
 Prior to filling & disinfection
– Solvent Rub Test (ASTM 5402-6)
– Spark/Holiday test (low voltage)
Logo – Sizing
Logo – Contractor Submittal
Painting Costs & Bidding
 All Surfaces & Full Containment & Repairs
– 1.0 MG = $600K
– .75 MG = $500K
– .50 MG = $400K
 Bidding
– Break out large items
– Contingency Allowance
– Local landscaper for site restoration
 Planning
– 90 days duration
– Tank out of service! Modeling & field trials!
Repair & Maintenance
Typical Repair Items
 Hatch gaskets
 Fall protection
 Safety lugs
 Light bulbs & globes
 Roof vent
 Riser debris guard
 Overflow trough
 Bowl drain valve
 Foundation patching
Aviation Light
 FAA Advisory Circular
– Obstruction Marking and Lighting
– AC 70/7460-1K
 LED (+100,000 hrs)
Cathodic Protection
 Replacement & Rehab
– Rectifier
– Mounting hooks & cables
– Anodes & wiring
– Pressure entrance fitting
– Ice break
– Inactive for 1st year!
Close old hand holes!
Pitting
 Wet interior
– Fluctuation zone
– Debris and ice
– Corrosion hides severity
 Concerns
– Decreases thickness
– No uniform film build
 Fill pits prior to painting
– Epoxy solids
– $3,000 to $40,000
Ladders & Safety Rail
 Safety
– OSHA
– Fall Protection
 Ladder
$75-$125 per ft
 Safety Rail
$10,000
Access Hatches
 Full replacement
$4K-$6K
 Replace hinges/hasps
Riser Pipe Insulation
 Replacement
– Rigid fiberglass insulation
– Metal jacket
 Flexible aluminum
 $10K-$20K
Overflow Pipe
 Failed weld joints
 Replacement $15K - $20K
Erosion Protection
 Overflow Outlet
– Flange pest screen
– Counter weighted
– Duck bill valve
– Swing Box
 Splash Block
– Protect foundations
– Direct water off site
Cellular Equipment
 Cellular Agreements
– OSHA standards
– Third party PE submittals
– Allow maintenance/shutdowns
 Coordinate work in advance
 PPE for workers
City of Huron, Ohio & LESI
Questions?Tim Antos, PE
Burgess & Niple, Inc.
440-354-9700
tim.antos@burgessniple.com

More Related Content

What's hot

Buried Flexible Pipelines AS2566
Buried Flexible Pipelines AS2566Buried Flexible Pipelines AS2566
Buried Flexible Pipelines AS2566blenrayaust
 
178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-designTiago Farinhas
 
Piping handbook
Piping handbookPiping handbook
Piping handbookpdmsguy
 
PASS/START-PROF What's new in 4.84 version
PASS/START-PROF What's new in 4.84 versionPASS/START-PROF What's new in 4.84 version
PASS/START-PROF What's new in 4.84 versionAlex Matveev
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping designMusa Sabri
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1BHARAT BELLAD
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...Britt Bettell
 
PASS/START-PROF capabilities for oil &amp; gas gathering, upstream and midstr...
PASS/START-PROF capabilities for oil &amp; gas gathering, upstream and midstr...PASS/START-PROF capabilities for oil &amp; gas gathering, upstream and midstr...
PASS/START-PROF capabilities for oil &amp; gas gathering, upstream and midstr...Alex Matveev
 
piping design engineering by hamed motlagh
piping design engineering by hamed motlaghpiping design engineering by hamed motlagh
piping design engineering by hamed motlaghHamed Motlagh
 
Mechanical_design_of_process_system_volume-2.
Mechanical_design_of_process_system_volume-2.Mechanical_design_of_process_system_volume-2.
Mechanical_design_of_process_system_volume-2.MIGUEL SALDIVAR HERNANDEZ
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guideram111eg
 

What's hot (19)

Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
Buried Flexible Pipelines AS2566
Buried Flexible Pipelines AS2566Buried Flexible Pipelines AS2566
Buried Flexible Pipelines AS2566
 
Design, Application & Installation of Pipe Clamps Webinar
Design, Application & Installation of Pipe Clamps WebinarDesign, Application & Installation of Pipe Clamps Webinar
Design, Application & Installation of Pipe Clamps Webinar
 
178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-design
 
Piping handbook
Piping handbookPiping handbook
Piping handbook
 
PASS/START-PROF What's new in 4.84 version
PASS/START-PROF What's new in 4.84 versionPASS/START-PROF What's new in 4.84 version
PASS/START-PROF What's new in 4.84 version
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 
Piping Introduction
Piping IntroductionPiping Introduction
Piping Introduction
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping design
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
 
General Presentation Featuring Pipe Clamps - March
General Presentation Featuring Pipe Clamps - MarchGeneral Presentation Featuring Pipe Clamps - March
General Presentation Featuring Pipe Clamps - March
 
PIPERACK
PIPERACKPIPERACK
PIPERACK
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
 
Basic piping
Basic pipingBasic piping
Basic piping
 
PASS/START-PROF capabilities for oil &amp; gas gathering, upstream and midstr...
PASS/START-PROF capabilities for oil &amp; gas gathering, upstream and midstr...PASS/START-PROF capabilities for oil &amp; gas gathering, upstream and midstr...
PASS/START-PROF capabilities for oil &amp; gas gathering, upstream and midstr...
 
piping design engineering by hamed motlagh
piping design engineering by hamed motlaghpiping design engineering by hamed motlagh
piping design engineering by hamed motlagh
 
Mechanical_design_of_process_system_volume-2.
Mechanical_design_of_process_system_volume-2.Mechanical_design_of_process_system_volume-2.
Mechanical_design_of_process_system_volume-2.
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
 
Pipeline repair techniques
Pipeline repair techniquesPipeline repair techniques
Pipeline repair techniques
 

Similar to 2016 OAWWA TANKS

PRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - CopyPRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - Copyanil prashanth
 
Condition Assessment and Environmental Ranking of Weathered T&D Structures an...
Condition Assessment and Environmental Ranking of Weathered T&D Structures an...Condition Assessment and Environmental Ranking of Weathered T&D Structures an...
Condition Assessment and Environmental Ranking of Weathered T&D Structures an...Intermark Group
 
Sealmatic-API-682-4th-Edition-Catalogue.pdf
Sealmatic-API-682-4th-Edition-Catalogue.pdfSealmatic-API-682-4th-Edition-Catalogue.pdf
Sealmatic-API-682-4th-Edition-Catalogue.pdfANDRESCASTRO448320
 
PRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.CPRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.Canil prashanth
 
Induron coatings services
Induron coatings servicesInduron coatings services
Induron coatings servicesKendall Smith
 
Advancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAdvancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAudubon Engineering Company
 
API 6A Wellhead Selection.ppt
API 6A Wellhead Selection.pptAPI 6A Wellhead Selection.ppt
API 6A Wellhead Selection.pptssuser73bb74
 
Induron Coatings for Transmission and Distribution
Induron Coatings for Transmission and DistributionInduron Coatings for Transmission and Distribution
Induron Coatings for Transmission and DistributionIntermark Group
 
Maintenance &amp; repair of steel bridges
Maintenance &amp; repair of steel bridgesMaintenance &amp; repair of steel bridges
Maintenance &amp; repair of steel bridgesnaveen kumar
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATSMary Calkins
 
Coil Coating
Coil CoatingCoil Coating
Coil Coatingdurolast
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Audubon Engineering Company
 
1_paint coating.ppt
1_paint coating.ppt1_paint coating.ppt
1_paint coating.pptIkhsanLy
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc DRP Joint
 

Similar to 2016 OAWWA TANKS (20)

Juan 2015
Juan 2015Juan 2015
Juan 2015
 
PRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - CopyPRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - Copy
 
Condition Assessment and Environmental Ranking of Weathered T&D Structures an...
Condition Assessment and Environmental Ranking of Weathered T&D Structures an...Condition Assessment and Environmental Ranking of Weathered T&D Structures an...
Condition Assessment and Environmental Ranking of Weathered T&D Structures an...
 
Kumar KV
Kumar KVKumar KV
Kumar KV
 
Sealmatic-API-682-4th-Edition-Catalogue.pdf
Sealmatic-API-682-4th-Edition-Catalogue.pdfSealmatic-API-682-4th-Edition-Catalogue.pdf
Sealmatic-API-682-4th-Edition-Catalogue.pdf
 
PRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.CPRESTIGE ENGINEERING L.L.C
PRESTIGE ENGINEERING L.L.C
 
Induron coatings services
Induron coatings servicesInduron coatings services
Induron coatings services
 
Advancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAdvancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanks
 
abc
abcabc
abc
 
Coating presentation tp bangkok 23 jan 2014
Coating presentation tp bangkok   23 jan 2014Coating presentation tp bangkok   23 jan 2014
Coating presentation tp bangkok 23 jan 2014
 
API 6A Wellhead Selection.ppt
API 6A Wellhead Selection.pptAPI 6A Wellhead Selection.ppt
API 6A Wellhead Selection.ppt
 
Induron Coatings for Transmission and Distribution
Induron Coatings for Transmission and DistributionInduron Coatings for Transmission and Distribution
Induron Coatings for Transmission and Distribution
 
COATING PRESENTATION
COATING PRESENTATIONCOATING PRESENTATION
COATING PRESENTATION
 
Maintenance &amp; repair of steel bridges
Maintenance &amp; repair of steel bridgesMaintenance &amp; repair of steel bridges
Maintenance &amp; repair of steel bridges
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
Coil Coating
Coil CoatingCoil Coating
Coil Coating
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
 
Ace Energy MEP
Ace Energy MEPAce Energy MEP
Ace Energy MEP
 
1_paint coating.ppt
1_paint coating.ppt1_paint coating.ppt
1_paint coating.ppt
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc
 

2016 OAWWA TANKS

  • 1. Extending Tank Life Water Storage Tank Construction & Rehab 2016 OAWWA Cincinnati
  • 2. Tank Design – New Construction  Site Location – Elevation & Access – Drainage (overflow & foundation) – Foundation (4,000 -6,000 psf) – Visibility  Water Modeling – Height; capacity; turnover; pumping; water mains  Style – Coatings – Logo  Appurtenances  AWWA standards D101-107
  • 5. Construction Costs & Bidding  1.0 MG Tank – Steel Spheroid = $2,500,000 – CET Steel Bowl = $2,300,000 – CET Bolted Bowl = $2,200,000  Schedule – Contract duration 16-18 months – Construction 7-9 months  Bid Alternate Styles – Few contractors; tight competition!
  • 8. Inspection  AWWA M42 –3 year interval –Drain and wash out  Inspector –Trained climber –Structural background –Coatings/Corrosion certification (SSPC/NACE)
  • 9. Inspection Guidelines  Observations – Surfaces (coatings/adhesion/corrosion) – Lead paint (CPSC 600 ppm) – Structural – Sanitary – Safety & Security – Appurtenances  Report – Findings/Rehab/Estimates – Photo log
  • 10. Coating Adhesion Testing  ASTM 3359 Tape Test – % flaking/detachment – Cross Cut – “X” Cut – Overcoat determination
  • 12. Pressure Wash Cleaning  Is tank simply “dirty”?  “Mildew/Mold” = Fungus (microbe)  Cleaning 1) Disable fungus 2) Heated pressure wash 3) Microbe inhibitor  $5,000 - $8,000
  • 13. Overcoat Existing System  Advantages – 30%-40% cost savings – Fast! No exterior blasting & containment  Disadvantages – Less useful life – Total DFTs too “heavy”  Surface Preparation – Low Pressure (<5,000 psi) Water Clean (SSPC LP WC) – Hand/Power Tool Cleaning (SSPC-SP2 or SP3)  Primer - Epoxy (low viscosity; penetrating)
  • 15. Standards & Regulatory  AWWA D102 Coating Steel Water Storage Tanks – Outside coating systems (6) – Inside coating systems (5) – Minimum guidelines  SSPC - Society of Protective Coatings  NACE - National Association Corrosion Engineers  OAC 3745-17-08 – Restriction of Emission of Fugitive Dust – Lists affected Counties
  • 16. Surface Preparation SURFACE PREPARATION GRADE DESCRIPTION MIL PROFILE NOTES Wet Interior SSPC-SP5/NACE 1 White Metal 2.0-2.5 Highest blast grade. No staining allowed. Dry Interior SSPC-SP10/NACE 2 Near White Metal 2.0-2.5 2nd highest blast grade. 5% staining allowed. Dry Interior - Alternate SSPC-SP6/NACE 3 Commercial 2.0-2.5 33% staining allowed. Exterior SSPC-SP10/NACE 2 Near White Metal 2.0-2.5 2nd highest blast grade. 5% staining allowed. Exterior - Alternate SSPC-SP6/NACE 3 Commercial 2.0-2.5 33% staining allowed. Exterior - Overcoat SSPC-LP/HP WC Low/High Pressure Water Clean N/A 1,000 - 10,000 psi Dry Interior/Exterior SSPC-SP3; 11; 15 Power Tool Cleaning (Reg; Commercial; Bare Metal) 1.0 Spot corrosion/Edges
  • 17. Surface Preparation Notes  2.0-2.5 mil profile typical  Too much or too little profile = BAD!  Do not blast/grind flat welds  Protect electrical/control cabinets; receptacles
  • 18. Surface Preparation Inspection  Inspection: – Visual – Profile tape/thickness gauge or digital
  • 19. Containment – TEPE Type  Totally Enclosed Painting Environment
  • 20. Containment – Rigging Center Pulley Assembly Outriggers
  • 21. Remote Robot Wet Blast Unit
  • 22. Coatings SURFACE TYPE LAYER MIL DFT NOTES Wet Interior Zinc or Epoxy Primer 3 Mositure cure; fast and low temp. cure *spray gun application Epoxy Stripe Coat 3 Brush apply at welds Epoxy Intermediate 4 Epoxy Finish 5 Caulk welds/lap seams * Metallizing (alternate) Total 12 * 100% Vol. Solids 20-30 mils (alternate) Dry Interior Epoxy Primer 3 *spray gun application Epoxy Finish 6 Apply in two coats Total 9 Exterior Zinc or Epoxy Primer 3 *phenolic core non-shedding roller Epoxy Intermediate 3 Fluoropolymer (alternate) Polyurethane Finish 3 Better gloss/color retention Total 9 Fluoropolymer (alternate) Polyurethane Logo 3 UV resistant; Best gloss/color retention
  • 23. Coating Inspection  Dry Film Thickness (DFT)  Temperature – air & surface  Dew Point & Relative Humidity - Psychrometer  Runs/drips/pinholes/holidays/striping/ghosting
  • 24. Wet Interior Inspection  Prior to filling & disinfection – Solvent Rub Test (ASTM 5402-6) – Spark/Holiday test (low voltage)
  • 26. Logo – Contractor Submittal
  • 27. Painting Costs & Bidding  All Surfaces & Full Containment & Repairs – 1.0 MG = $600K – .75 MG = $500K – .50 MG = $400K  Bidding – Break out large items – Contingency Allowance – Local landscaper for site restoration  Planning – 90 days duration – Tank out of service! Modeling & field trials!
  • 29. Typical Repair Items  Hatch gaskets  Fall protection  Safety lugs  Light bulbs & globes  Roof vent  Riser debris guard  Overflow trough  Bowl drain valve  Foundation patching
  • 30. Aviation Light  FAA Advisory Circular – Obstruction Marking and Lighting – AC 70/7460-1K  LED (+100,000 hrs)
  • 31. Cathodic Protection  Replacement & Rehab – Rectifier – Mounting hooks & cables – Anodes & wiring – Pressure entrance fitting – Ice break – Inactive for 1st year! Close old hand holes!
  • 32. Pitting  Wet interior – Fluctuation zone – Debris and ice – Corrosion hides severity  Concerns – Decreases thickness – No uniform film build  Fill pits prior to painting – Epoxy solids – $3,000 to $40,000
  • 33. Ladders & Safety Rail  Safety – OSHA – Fall Protection  Ladder $75-$125 per ft  Safety Rail $10,000
  • 34. Access Hatches  Full replacement $4K-$6K  Replace hinges/hasps
  • 35. Riser Pipe Insulation  Replacement – Rigid fiberglass insulation – Metal jacket  Flexible aluminum  $10K-$20K
  • 36. Overflow Pipe  Failed weld joints  Replacement $15K - $20K
  • 37. Erosion Protection  Overflow Outlet – Flange pest screen – Counter weighted – Duck bill valve – Swing Box  Splash Block – Protect foundations – Direct water off site
  • 38. Cellular Equipment  Cellular Agreements – OSHA standards – Third party PE submittals – Allow maintenance/shutdowns  Coordinate work in advance  PPE for workers
  • 39. City of Huron, Ohio & LESI
  • 40. Questions?Tim Antos, PE Burgess & Niple, Inc. 440-354-9700 tim.antos@burgessniple.com

Editor's Notes

  1. Like picking out a car! What model? HP? Options?
  2. CB&I; Caldwell; Landmark (CETs only); Phoenix Fabricators. For tanks around .75 MG, spheroids become less expensive than CETs; The rental cost for the concrete formwork and hoisting equipment is similar for all composite sizes. As the tank gets larger these prices get diluted. Also, field construction labor gets diluted as capacity increases.
  3. Like picking out a car! What model? HP? Options?
  4. Consumer Products Safety Commission
  5. Specialized cutting tool and tape, or use regular
  6. Fungus attachments and reproduction keeps paint surface wet; breaks down paint
  7. Adhesion testing results are favorable. For LP WC use Oscillating tip; Biodegradable alkaline detergent
  8. SSPC Steel Structures Painting Council
  9. For SSPC 5-10-6, the surface shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products. Difference is % staining/shadowing/discoloration that remains.
  10. Flexible reflective metal jacket