 Rehabilitation of the UrbanWater Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)
 Water Supply Scope:
 Existing gravity feed Transmission main between Source Mraovo Polje and the City is approx. 25 years old and in a poor
condition resulting in approx. 5 numbers of significant repairs works per year. To ensure the water supply of the city of
Kostajnica it is necessary to replace approx. 6,500 m of the transmission main.
 Many pipe bursts in the drinking water network occur every year in the city centre of Kostajnica. These parts of the city network
consist of approx. 30 years old CI pipes. So it is necessary to replace these parts of the city network. Approx. 2400 m (OD90,
180mm) pipes and furthermore 200 house connections in these parts must be replaced
 Project Budget for WS scope – 1.000.000,00EUR
 Waste Water Scope:
 The existing sewer system has the following defects: Inflow and Infiltration of the sewer system; Cycle flow; Pipe clogging;
Pollution of the Tavija River
 Construction of a new collector from west to east main collector with HDPE pipe material and a diameter ranging from OD 400
to OD 800 shall be laid in the northern part of the city, stretching approximately 4,850m from west to east.
 In the south of Kostajnica, on the right bank of the Tavija River, a new combined sewer system consisting of a main collector
and a secondary network will be constructed. The wastewater produced by the new settlements in the south of Kostajnica will
be collected by the secondary network, which has a diameter of OD 300. The secondary network will be connected to the main
collector, which will be laid along the Tavija river from south to north and has a diameter ranging from OD 400 to OD 600.
 Project Budget for WW scope – 1.000.000,00EUR
Water Supply Project
Transmission Main
Replacement of existing gravity feed
Cast Iron Transmission Main from
Source “Mraovo Polje” to the City
limits has been replaced in length of
7.331m (HDPE100, PN16,
d315x28.6mm) Pipeline under a
Project with replacement of existing
Air Valves and Mud Valves in existing
shafts along the pipe route.
PIPELIFE PE100, SDR11, PN16, D315X28.6MM VALVES, HYDRANTS, FITTINGS
WSTransmission main
– Pipe-laying
PIPE WELDING SURVEY VERIFICATION
6NR RIVER-CROSSINGS IN TOTAL
RIVER CROSSING BY PREFABRICATED CONCRETE SLABS
PIPE THERMAL INSULATION AND SEALING FOR RIVER
CROSSING
PREFABRICATED BASE SLAB WITH HORIZONTAL WATER
STOP
PREFABRICATED ROOF SLAB
SLUMP TEST AIR CONTENT TEST
CONCRETE TEMPERATURE
CONCRETE MOLDS FOR COMPRESSIVE STRENGTH AND
WATER-TIGHTNESS TESTING
PRESSURE TESTING AS PER EN805 EXISTING SHAFT ON TRANSMISSION MAIN
MUD / DRAIN VALVE – IN TOTAL 10NR NEW DRAIN VALVES
INSTALLED
AIR VALVE – IN TOTAL 9NR OF AIR VALVES INSTALLED
Water Supply – City
Network
Project considered replacement of
existing WS Cast Iron Pipes with
PE100, PN16 Pipelines (OD63-180) in
total length of 3.098m with associated
320nr House Connections. Connection
onto existing network to be
performed within existing node point
chamber with replacement of 14nr
existing valves, installation of 14nr
fire-hydrants.
SERVICE LINES PIPELIFE PE100, PN16 VALVES, FITTINGS
PIPE SADDLES, SERVICE VALVES, HOUSE CONNECTIONS
FITTINGS
PIPE MATERIAL PE100, PN16
EXISTING CULVERT CROSSING PE PIPE WELDING
CONNECTION TO EXISTING CHAMBER SMALL DIAMETERS PE PIPE WELDING
ABOVE GROUND HYDRANTS UNDERGROUND HYDRANTS
ABOVE GROUND HYDRANTS COMMISSIONING
UNDERGROUND HYDRANT COMMISSIONING
HOUSE CONNECTION WITH SERVICE VALVE AND PIPE
SADDLE
HOUSE CONNECTION WITH SERVICE VALVE AND PIPE
SADDLE
SERVICE VALVE SPINDLE PE PIPE SADDLE
HOUSE CONNECTION / EXISTING WATER METER SHAFT
CONNECTION TO THE EXISTING NETWORK / REPLACEMENT
OF VALVES IN EXISTING CHAMBERS
CONNECTION TO THE EXISTING NETWORK / REPLACEMENT
OF VALVES IN EXISTING CHAMBERS
CONNECTION TO THE EXISTING NETWORK / REPLACEMENT
OF VALVES IN EXISTING CHAMBERS
OUT OF REMAINING BUDGET FOR WS PROJECT WORKS,
WATER UTILITY KOSTAJNICA HAS BEEN PROVIDED WITH:
TERRAIN VEHICLE 4X4: LADA NIVA 2131, 1,7I;
FLAT BED VEHICLE: IVECO DAILY, 35S11D, 3,5T;
BACKHOE LOADER: JCB 3CX SITE MASTER 4T
WasteWater Project
East –West Collector
Originally waste water system (combined
type) has suffered from Inflow and
Infiltration of the sewer system due to the
poor construction quality of the concrete
pipe joints. Due to poor and wrong
construction, in some sewage pipes the
wastewater flows in both directions and
causes cycle flow. Due to heavy
overloading, the collector located in
Svetosavska Main Street was often
clogged.
Under this Project relieve of the existing
system was planned, decrease of pollution
by replacement of existing collectors and
house connections, waste water transport
and discharging at 4nr locations with
combined system Collectors - Corrugated
HDPE100, SN8:
-ID300 mm – 8m
-ID400mm – 94m;
-ID500mm – 1.075m;
-ID600mm – 61m;
-ID800mm – 1.640m;
-ID1000mm – 115m
-In total – 2.993m of collectors installed
with 28nr of House Connections (PVC ID
100mm) and 5nr Road Gullies
CORRUGATED HDPE 100, SN8 PIPES ID300-1000MM
CORRUGATED HDPE 100, SN8 PIPES ID300-1000MM
CORRUGATED HDPE 100, SN8 PIPES ID300-1000MM PVC ID100MM PIPES – HOUSE CONNECTIONS
PREFABRICATED CONCRETE SHAFTS PREFABRICATED CONCRETE SHAFTS
GEO-TEXTILE WRAPPING
PIPE LASER USE FOR PRECISE PIPE-LAYING SURVEYING & CONTROL
PREFABRICATED MANHOLES
COLLECTING SHAFTS WITH HOUSE CONNECTIONS
IN-SITY BUILT COLLECTOR-CONNECTION MANHOLES
IN TOTAL 49NR OF MANHOLES INSTALLED ON E-W
COLLECTOR
IN TOTAL 3NR STORM OVERFLOWS INSTALLED ON E-W
COLLECTOR
IN TOTAL 4NR OUTLET STRUCTURES BUILT ON E-W
COLLECTOR DISCHARGE LOCATIONS
WW North – South
Collector
Originally no sewage system existed
where inhabitants private connections
discharged waste water directly into
the Tavia River causing the pollution.
New project considered construction
of North-South Collector, collection of
all belonging house connections,
transport and discharging at
downstream location. Future projects
will consider continuation of collector
until the Waste Water Treatment
Plant.
Under this Project North South
Collector was installed (Corrugated
HDPE100, SN8):
-ID300mm – 400m;
-ID400mm – 195m;
-ID500mm – 336m;
-ID800mm – 163m
-In total 1.094m installed with 38nr
House Connections PVC ID100mm
PVC PIPES LEFT FOR CONNECTION WITH HOUSE SHAFT
RIVER “TAVIA” INCASING DURING COLLECTOR RIVER-
CROSSING WORKS
IN TOTAL 32NR MANHOLES INSTALLED ON N-S COLLECTOR
CASCADE CHAMBER HOUSE SHAFT
COLLECTION SHAFT (IN TOTAL 38NR HOUSE CONNECTIONS
INSTALLED ON N-S COLLECTOR)
1NR OUTLET STRUCTURE INSTALLED ON NORTH – SOUTH
COLLECTOR. FUTURE PROJECTS WILL CONTINUE
COLLECTOR TO WASTE WATER TREATMENT PLANT
TIGHTNESS TESTING PERFORMED IN ACCORDANCE WITH
EN1610 STANDARD
IN ACCORDANCE WITH ATV M14 PART 2
WW COLLECTOR’S CCTV RECORDED LONGITUDINAL
PROFILE
SURFACE REINSTATEMENT / COMPACTION
Kostajnica, ws, ww project

More Related Content

What's hot (8)

High rise plumbing design by aspe
High rise plumbing design by aspeHigh rise plumbing design by aspe
High rise plumbing design by aspe
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)
 
Jan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long versionJan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long version
 
Town Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology ChoicesTown Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology Choices
 
Tempe Town Lake dam replacement technology - short version
Tempe Town Lake dam replacement technology  - short versionTempe Town Lake dam replacement technology  - short version
Tempe Town Lake dam replacement technology - short version
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in Architecture
 
Plumbing training
Plumbing training Plumbing training
Plumbing training
 
ACH 121 Lecture 10 (Utilities)
ACH 121 Lecture 10 (Utilities)ACH 121 Lecture 10 (Utilities)
ACH 121 Lecture 10 (Utilities)
 

Similar to Kostajnica, ws, ww project

Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgiaVladimir Popovic
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewVladimir Popovic
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosniaVladimir Popovic
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaVladimir Popovic
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 
Derventa, Water Supply Project
Derventa, Water Supply ProjectDerventa, Water Supply Project
Derventa, Water Supply ProjectVladimir Popovic
 
AD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxAD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxNehaRanade2
 
S06.s1 material de clase
S06.s1 material de claseS06.s1 material de clase
S06.s1 material de clasePatyAranibar
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxAgohaChinonso
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasUbaldoJGarca
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010AlfredBirnhuber
 
EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013AlfredBirnhuber
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsAreej Al-Azzawi
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdfAKASHICWORLD
 
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story Vj NiroSh
 

Similar to Kostajnica, ws, ww project (20)

Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosnia
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Derventa, Water Supply Project
Derventa, Water Supply ProjectDerventa, Water Supply Project
Derventa, Water Supply Project
 
AD WATER SUPPLY.pptx
AD WATER SUPPLY.pptxAD WATER SUPPLY.pptx
AD WATER SUPPLY.pptx
 
S06.s1 material de clase
S06.s1 material de claseS06.s1 material de clase
S06.s1 material de clase
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptx
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos Cloacas
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010
 
Sewerage design
Sewerage designSewerage design
Sewerage design
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Sanitary and water supply
Sanitary and water supplySanitary and water supply
Sanitary and water supply
 
EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutions
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
Planning and design of building services in multi Story
Planning and design of building services in multi Story Planning and design of building services in multi Story
Planning and design of building services in multi Story
 
Vani Water Supply Project
Vani Water Supply ProjectVani Water Supply Project
Vani Water Supply Project
 

More from Vladimir Popovic

Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaVladimir Popovic
 
Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Vladimir Popovic
 
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionLanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionVladimir Popovic
 
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationLanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationVladimir Popovic
 
Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Vladimir Popovic
 
Ghadames project, minor structures
Ghadames project, minor structuresGhadames project, minor structures
Ghadames project, minor structuresVladimir Popovic
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipelineVladimir Popovic
 
Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Vladimir Popovic
 
Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Vladimir Popovic
 
Al Jewaibyah Regulating Tank 70,000m3
Al Jewaibyah Regulating Tank  70,000m3Al Jewaibyah Regulating Tank  70,000m3
Al Jewaibyah Regulating Tank 70,000m3Vladimir Popovic
 

More from Vladimir Popovic (10)

Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgia
 
Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3
 
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionLanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
 
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationLanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
 
Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3
 
Ghadames project, minor structures
Ghadames project, minor structuresGhadames project, minor structures
Ghadames project, minor structures
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipeline
 
Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3
 
Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3
 
Al Jewaibyah Regulating Tank 70,000m3
Al Jewaibyah Regulating Tank  70,000m3Al Jewaibyah Regulating Tank  70,000m3
Al Jewaibyah Regulating Tank 70,000m3
 

Recently uploaded

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsmeharikiros2
 

Recently uploaded (20)

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 

Kostajnica, ws, ww project

  • 1.
  • 2.  Rehabilitation of the UrbanWater Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)  Water Supply Scope:  Existing gravity feed Transmission main between Source Mraovo Polje and the City is approx. 25 years old and in a poor condition resulting in approx. 5 numbers of significant repairs works per year. To ensure the water supply of the city of Kostajnica it is necessary to replace approx. 6,500 m of the transmission main.  Many pipe bursts in the drinking water network occur every year in the city centre of Kostajnica. These parts of the city network consist of approx. 30 years old CI pipes. So it is necessary to replace these parts of the city network. Approx. 2400 m (OD90, 180mm) pipes and furthermore 200 house connections in these parts must be replaced  Project Budget for WS scope – 1.000.000,00EUR  Waste Water Scope:  The existing sewer system has the following defects: Inflow and Infiltration of the sewer system; Cycle flow; Pipe clogging; Pollution of the Tavija River  Construction of a new collector from west to east main collector with HDPE pipe material and a diameter ranging from OD 400 to OD 800 shall be laid in the northern part of the city, stretching approximately 4,850m from west to east.  In the south of Kostajnica, on the right bank of the Tavija River, a new combined sewer system consisting of a main collector and a secondary network will be constructed. The wastewater produced by the new settlements in the south of Kostajnica will be collected by the secondary network, which has a diameter of OD 300. The secondary network will be connected to the main collector, which will be laid along the Tavija river from south to north and has a diameter ranging from OD 400 to OD 600.  Project Budget for WW scope – 1.000.000,00EUR
  • 3. Water Supply Project Transmission Main Replacement of existing gravity feed Cast Iron Transmission Main from Source “Mraovo Polje” to the City limits has been replaced in length of 7.331m (HDPE100, PN16, d315x28.6mm) Pipeline under a Project with replacement of existing Air Valves and Mud Valves in existing shafts along the pipe route.
  • 4.
  • 5. PIPELIFE PE100, SDR11, PN16, D315X28.6MM VALVES, HYDRANTS, FITTINGS
  • 7.
  • 8. PIPE WELDING SURVEY VERIFICATION
  • 10. RIVER CROSSING BY PREFABRICATED CONCRETE SLABS PIPE THERMAL INSULATION AND SEALING FOR RIVER CROSSING
  • 11. PREFABRICATED BASE SLAB WITH HORIZONTAL WATER STOP PREFABRICATED ROOF SLAB
  • 12.
  • 13.
  • 14. SLUMP TEST AIR CONTENT TEST
  • 15. CONCRETE TEMPERATURE CONCRETE MOLDS FOR COMPRESSIVE STRENGTH AND WATER-TIGHTNESS TESTING
  • 16. PRESSURE TESTING AS PER EN805 EXISTING SHAFT ON TRANSMISSION MAIN
  • 17. MUD / DRAIN VALVE – IN TOTAL 10NR NEW DRAIN VALVES INSTALLED AIR VALVE – IN TOTAL 9NR OF AIR VALVES INSTALLED
  • 18. Water Supply – City Network Project considered replacement of existing WS Cast Iron Pipes with PE100, PN16 Pipelines (OD63-180) in total length of 3.098m with associated 320nr House Connections. Connection onto existing network to be performed within existing node point chamber with replacement of 14nr existing valves, installation of 14nr fire-hydrants.
  • 19. SERVICE LINES PIPELIFE PE100, PN16 VALVES, FITTINGS
  • 20. PIPE SADDLES, SERVICE VALVES, HOUSE CONNECTIONS FITTINGS PIPE MATERIAL PE100, PN16
  • 21. EXISTING CULVERT CROSSING PE PIPE WELDING
  • 22. CONNECTION TO EXISTING CHAMBER SMALL DIAMETERS PE PIPE WELDING
  • 23. ABOVE GROUND HYDRANTS UNDERGROUND HYDRANTS
  • 24. ABOVE GROUND HYDRANTS COMMISSIONING
  • 26. HOUSE CONNECTION WITH SERVICE VALVE AND PIPE SADDLE HOUSE CONNECTION WITH SERVICE VALVE AND PIPE SADDLE
  • 27. SERVICE VALVE SPINDLE PE PIPE SADDLE
  • 28. HOUSE CONNECTION / EXISTING WATER METER SHAFT CONNECTION TO THE EXISTING NETWORK / REPLACEMENT OF VALVES IN EXISTING CHAMBERS
  • 29. CONNECTION TO THE EXISTING NETWORK / REPLACEMENT OF VALVES IN EXISTING CHAMBERS CONNECTION TO THE EXISTING NETWORK / REPLACEMENT OF VALVES IN EXISTING CHAMBERS
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. OUT OF REMAINING BUDGET FOR WS PROJECT WORKS, WATER UTILITY KOSTAJNICA HAS BEEN PROVIDED WITH: TERRAIN VEHICLE 4X4: LADA NIVA 2131, 1,7I; FLAT BED VEHICLE: IVECO DAILY, 35S11D, 3,5T; BACKHOE LOADER: JCB 3CX SITE MASTER 4T
  • 35. WasteWater Project East –West Collector Originally waste water system (combined type) has suffered from Inflow and Infiltration of the sewer system due to the poor construction quality of the concrete pipe joints. Due to poor and wrong construction, in some sewage pipes the wastewater flows in both directions and causes cycle flow. Due to heavy overloading, the collector located in Svetosavska Main Street was often clogged. Under this Project relieve of the existing system was planned, decrease of pollution by replacement of existing collectors and house connections, waste water transport and discharging at 4nr locations with combined system Collectors - Corrugated HDPE100, SN8: -ID300 mm – 8m -ID400mm – 94m; -ID500mm – 1.075m; -ID600mm – 61m; -ID800mm – 1.640m; -ID1000mm – 115m -In total – 2.993m of collectors installed with 28nr of House Connections (PVC ID 100mm) and 5nr Road Gullies
  • 36. CORRUGATED HDPE 100, SN8 PIPES ID300-1000MM CORRUGATED HDPE 100, SN8 PIPES ID300-1000MM
  • 37. CORRUGATED HDPE 100, SN8 PIPES ID300-1000MM PVC ID100MM PIPES – HOUSE CONNECTIONS
  • 38. PREFABRICATED CONCRETE SHAFTS PREFABRICATED CONCRETE SHAFTS
  • 39.
  • 41.
  • 42. PIPE LASER USE FOR PRECISE PIPE-LAYING SURVEYING & CONTROL
  • 43.
  • 45.
  • 46.
  • 47. COLLECTING SHAFTS WITH HOUSE CONNECTIONS
  • 49. IN TOTAL 49NR OF MANHOLES INSTALLED ON E-W COLLECTOR
  • 50.
  • 51.
  • 52. IN TOTAL 3NR STORM OVERFLOWS INSTALLED ON E-W COLLECTOR
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59. IN TOTAL 4NR OUTLET STRUCTURES BUILT ON E-W COLLECTOR DISCHARGE LOCATIONS
  • 60.
  • 61.
  • 62.
  • 63.
  • 64. WW North – South Collector Originally no sewage system existed where inhabitants private connections discharged waste water directly into the Tavia River causing the pollution. New project considered construction of North-South Collector, collection of all belonging house connections, transport and discharging at downstream location. Future projects will consider continuation of collector until the Waste Water Treatment Plant. Under this Project North South Collector was installed (Corrugated HDPE100, SN8): -ID300mm – 400m; -ID400mm – 195m; -ID500mm – 336m; -ID800mm – 163m -In total 1.094m installed with 38nr House Connections PVC ID100mm
  • 65.
  • 66.
  • 67. PVC PIPES LEFT FOR CONNECTION WITH HOUSE SHAFT
  • 68. RIVER “TAVIA” INCASING DURING COLLECTOR RIVER- CROSSING WORKS
  • 69. IN TOTAL 32NR MANHOLES INSTALLED ON N-S COLLECTOR
  • 70.
  • 71.
  • 72.
  • 74.
  • 75. COLLECTION SHAFT (IN TOTAL 38NR HOUSE CONNECTIONS INSTALLED ON N-S COLLECTOR)
  • 76.
  • 77. 1NR OUTLET STRUCTURE INSTALLED ON NORTH – SOUTH COLLECTOR. FUTURE PROJECTS WILL CONTINUE COLLECTOR TO WASTE WATER TREATMENT PLANT
  • 78. TIGHTNESS TESTING PERFORMED IN ACCORDANCE WITH EN1610 STANDARD
  • 79. IN ACCORDANCE WITH ATV M14 PART 2
  • 80.
  • 81. WW COLLECTOR’S CCTV RECORDED LONGITUDINAL PROFILE SURFACE REINSTATEMENT / COMPACTION