• Dredging and Reclamation works for Onne port.
• Construction of 2,000m jetty berth 12 to 19
• Inner channel & turn basin at Onne port
• Water distribution system for berth 9-11 at FOT
• Road development & Tower light system for new roads
DREDGING AND RECLAMATION WORKS FOR ONNE PORT -
CENTRAL SECTION AT FEDERAL OCEAN TERMINAL
The inland section will be in excess of 600 Ha (6 million square metres) and includes
57.85 Ha (1625m x500m x 312m) of removal of unsuitable materials for the
construction of the new channel in the future development area.
CONSTRUCTION OF 2,000 M JETTY BERTHS 12 TO 19 -
FEDERAL OCEAN TERMINAL
The project has been conceived as an extension of Berth 9, 10 & 11 jetty, using similar
designs and construction techniques. 8 Nos. of additional berths of approximately 250
metres each will be located along Bonny River. Berth 12 to Berth 15 will be located
before the inner channel while the remaining Berth 16 to Berth 19 will be located after
the channel (312 m width) along Bonny River.
The jetty will have 12 metre draft Chart Datum (lowest astronomical tide) and the berths
will have the normal capacity of 6T/m2, with 3 Nos. of Heavy Load Platforms (HLP)
having a capacity of 12T/m2 including a 50T/m2 for Super Heavy Load Platform (SLHP)
INNER CHANNEL & TURN BASIN AT
ONNE PORT
The new reclamation for future development of
the central section at FOT, will necessitate the
protection of the sand filled areas for an
approximately length of 3,713 metres for 8
meter draft CD, for the construction of the new
channel (1625m x 500m / 312m) in the future
development area.
ROAD DEVELOPMENT & TOWER
LIGHT SYSTEM FOR NEW ROADS
The basic design with recommended
technical specifications for the development
of roads with a total length of 15,493 meters
divided 2 track roads.
The scope of work comprises of a high mast
lighting system to improve illumination and
enhance security along the access and other
internal roads at the new developed area of
Federal Ocean Terminal (FOT), for easing
and facilitating operations within the area
WATER DISTRIBUTION SYSTEM
FOR BERTH (6,000M3) AT FOT
The proposal is based on the total daily
requirement of 6,000 m3 of industrial water
(i.e. 600m3/H per 10H/day) for vessel water
supply, to be delivered through No. 12
hydrants with flow rate of 50m3/H each.
Onne Oil and Gas Free Zone is becoming a catalyst for investment
creating synergies between different investors: Deep Offshore Services
is the concessionaire investing in the new development better known
technically as Phase 4B, with under listed Projects.
PHASE 4B

More Related Content

What's hot

Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 ExpansionKwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion
Grant Hepburn
 
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
Juan Jorge
 
Slideshare September 2010
Slideshare September 2010Slideshare September 2010
Slideshare September 2010
Joel Johnson
 
List-of-contruction
List-of-contructionList-of-contruction
List-of-contruction
hinh nguyen
 
Aricle in Irish Trucker Magazine
Aricle in Irish Trucker MagazineAricle in Irish Trucker Magazine
Aricle in Irish Trucker Magazine
Tony O Neill
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
Student
 

What's hot (20)

Kwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 ExpansionKwalape Lodge Phase 2 Expansion
Kwalape Lodge Phase 2 Expansion
 
Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
 
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
 
Slideshare September 2010
Slideshare September 2010Slideshare September 2010
Slideshare September 2010
 
List-of-contruction
List-of-contructionList-of-contruction
List-of-contruction
 
Ataturk dam
Ataturk damAtaturk dam
Ataturk dam
 
Ataturk dam report
Ataturk dam report Ataturk dam report
Ataturk dam report
 
Coliseum, Hong Kong
Coliseum, Hong KongColiseum, Hong Kong
Coliseum, Hong Kong
 
Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power Plant
 
MOSE PROJECT
MOSE PROJECT MOSE PROJECT
MOSE PROJECT
 
Presention ppt
Presention pptPresention ppt
Presention ppt
 
Aricle in Irish Trucker Magazine
Aricle in Irish Trucker MagazineAricle in Irish Trucker Magazine
Aricle in Irish Trucker Magazine
 
JV Züblin Jäger - 5th Waterline to Jerusalem - Constructing Israel's longest ...
JV Züblin Jäger - 5th Waterline to Jerusalem - Constructing Israel's longest ...JV Züblin Jäger - 5th Waterline to Jerusalem - Constructing Israel's longest ...
JV Züblin Jäger - 5th Waterline to Jerusalem - Constructing Israel's longest ...
 
Eglinton Crosstown Leaside Open House Presentation
Eglinton Crosstown Leaside Open House PresentationEglinton Crosstown Leaside Open House Presentation
Eglinton Crosstown Leaside Open House Presentation
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
 
IFCDflood
IFCDfloodIFCDflood
IFCDflood
 
Technical Presentation 5th Waterline to Jerusalem
Technical Presentation 5th Waterline to JerusalemTechnical Presentation 5th Waterline to Jerusalem
Technical Presentation 5th Waterline to Jerusalem
 
Kalabagh dam
Kalabagh damKalabagh dam
Kalabagh dam
 
IFCDcompleted
IFCDcompletedIFCDcompleted
IFCDcompleted
 
IFCDongoing
IFCDongoingIFCDongoing
IFCDongoing
 

Viewers also liked

3ceapaffichecommunication2016MR
3ceapaffichecommunication2016MR3ceapaffichecommunication2016MR
3ceapaffichecommunication2016MR
Michel Rochette
 
Confessions of an Adapative Marketer Final PDF
Confessions of an Adapative Marketer Final PDFConfessions of an Adapative Marketer Final PDF
Confessions of an Adapative Marketer Final PDF
cengizc
 
рабочая программа разновозр
рабочая программа разновозррабочая программа разновозр
рабочая программа разновозр
virtualtaganrog
 
150910 praktijkmiddag dienstverlening hoogeveen – gemeente den bosch
150910 praktijkmiddag dienstverlening hoogeveen – gemeente den bosch150910 praktijkmiddag dienstverlening hoogeveen – gemeente den bosch
150910 praktijkmiddag dienstverlening hoogeveen – gemeente den bosch
KING
 
фотозаметка веселые звуки
фотозаметка веселые звуки фотозаметка веселые звуки
фотозаметка веселые звуки
virtualtaganrog
 

Viewers also liked (12)

Kiat sukses menjadi mompreneur goukm.id
Kiat sukses menjadi mompreneur goukm.idKiat sukses menjadi mompreneur goukm.id
Kiat sukses menjadi mompreneur goukm.id
 
3ceapaffichecommunication2016MR
3ceapaffichecommunication2016MR3ceapaffichecommunication2016MR
3ceapaffichecommunication2016MR
 
Confessions of an Adapative Marketer Final PDF
Confessions of an Adapative Marketer Final PDFConfessions of an Adapative Marketer Final PDF
Confessions of an Adapative Marketer Final PDF
 
рабочая программа разновозр
рабочая программа разновозррабочая программа разновозр
рабочая программа разновозр
 
0851.0004.2009 (T.Sel) Sedekah Lewat Transfer, No Rekening Sedekah, Rekening ...
0851.0004.2009 (T.Sel) Sedekah Lewat Transfer, No Rekening Sedekah, Rekening ...0851.0004.2009 (T.Sel) Sedekah Lewat Transfer, No Rekening Sedekah, Rekening ...
0851.0004.2009 (T.Sel) Sedekah Lewat Transfer, No Rekening Sedekah, Rekening ...
 
Myntelligence Vision
Myntelligence VisionMyntelligence Vision
Myntelligence Vision
 
сказка о рыбаке и рыбке. обобщение
сказка о рыбаке и рыбке. обобщениесказка о рыбаке и рыбке. обобщение
сказка о рыбаке и рыбке. обобщение
 
весна
веснавесна
весна
 
150910 praktijkmiddag dienstverlening hoogeveen – gemeente den bosch
150910 praktijkmiddag dienstverlening hoogeveen – gemeente den bosch150910 praktijkmiddag dienstverlening hoogeveen – gemeente den bosch
150910 praktijkmiddag dienstverlening hoogeveen – gemeente den bosch
 
фотозаметка веселые звуки
фотозаметка веселые звуки фотозаметка веселые звуки
фотозаметка веселые звуки
 
Suklaa testi
Suklaa testiSuklaa testi
Suklaa testi
 
PRADO - Erstellung wiederverwendbarer Enterprise-Applikationen
PRADO - Erstellung wiederverwendbarer Enterprise-ApplikationenPRADO - Erstellung wiederverwendbarer Enterprise-Applikationen
PRADO - Erstellung wiederverwendbarer Enterprise-Applikationen
 

Similar to Short summary of PH4b Projects

UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
Charlie Bell
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
Mike Vernon
 
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
Michal Krzeminski
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
Vladimir Popovic
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
Filipe Mello
 

Similar to Short summary of PH4b Projects (20)

UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
Project report
Project reportProject report
Project report
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
Enwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC BreakfastEnwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC Breakfast
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 
Mushrif_Water reservoir_Phase_4_5_and_6
Mushrif_Water reservoir_Phase_4_5_and_6Mushrif_Water reservoir_Phase_4_5_and_6
Mushrif_Water reservoir_Phase_4_5_and_6
 
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in Colombo
 

Short summary of PH4b Projects

  • 1. • Dredging and Reclamation works for Onne port. • Construction of 2,000m jetty berth 12 to 19 • Inner channel & turn basin at Onne port • Water distribution system for berth 9-11 at FOT • Road development & Tower light system for new roads DREDGING AND RECLAMATION WORKS FOR ONNE PORT - CENTRAL SECTION AT FEDERAL OCEAN TERMINAL The inland section will be in excess of 600 Ha (6 million square metres) and includes 57.85 Ha (1625m x500m x 312m) of removal of unsuitable materials for the construction of the new channel in the future development area. CONSTRUCTION OF 2,000 M JETTY BERTHS 12 TO 19 - FEDERAL OCEAN TERMINAL The project has been conceived as an extension of Berth 9, 10 & 11 jetty, using similar designs and construction techniques. 8 Nos. of additional berths of approximately 250 metres each will be located along Bonny River. Berth 12 to Berth 15 will be located before the inner channel while the remaining Berth 16 to Berth 19 will be located after the channel (312 m width) along Bonny River. The jetty will have 12 metre draft Chart Datum (lowest astronomical tide) and the berths will have the normal capacity of 6T/m2, with 3 Nos. of Heavy Load Platforms (HLP) having a capacity of 12T/m2 including a 50T/m2 for Super Heavy Load Platform (SLHP) INNER CHANNEL & TURN BASIN AT ONNE PORT The new reclamation for future development of the central section at FOT, will necessitate the protection of the sand filled areas for an approximately length of 3,713 metres for 8 meter draft CD, for the construction of the new channel (1625m x 500m / 312m) in the future development area. ROAD DEVELOPMENT & TOWER LIGHT SYSTEM FOR NEW ROADS The basic design with recommended technical specifications for the development of roads with a total length of 15,493 meters divided 2 track roads. The scope of work comprises of a high mast lighting system to improve illumination and enhance security along the access and other internal roads at the new developed area of Federal Ocean Terminal (FOT), for easing and facilitating operations within the area WATER DISTRIBUTION SYSTEM FOR BERTH (6,000M3) AT FOT The proposal is based on the total daily requirement of 6,000 m3 of industrial water (i.e. 600m3/H per 10H/day) for vessel water supply, to be delivered through No. 12 hydrants with flow rate of 50m3/H each. Onne Oil and Gas Free Zone is becoming a catalyst for investment creating synergies between different investors: Deep Offshore Services is the concessionaire investing in the new development better known technically as Phase 4B, with under listed Projects. PHASE 4B