SlideShare a Scribd company logo
1 of 64
CONSTRUCTION OF SEISMIC CONCRETE BORE
PILES
AT MAKHINJAURI WATER SUPPLY RESERVOIR
A PART OF REHABILITATION OF MUNICIPAL WATER SUPPLY &
WASTEWATER INFRASTRUCTURE IN BATUMI, ADJARA, REPUBLIC OF
GEORGIA
PHASE III (LOT 1, 3, 5)
(OCT. 2015 - NOV. 2018)
Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct.
2015 / Nov.2018)
1
PROJECT OVERVIEW:
BAT III
LOT 1, 3, 5
• WS COMPONENTS:
• WS NETWORK P2E
• WS NETWORK ZONE 1
• WS MEJINISTSKALI WELLFIELD &
TRANSMISSION MAIN
• WS RESERVOIR MAKHINJAURI
• WW COMPONENTS:
• WW NETWORK BNZ
• WW NETWORK BARTSKANA
• WW NETWORK UPPER GORODOK
• WW NETWORK GONIO
• WW PS D1 & PRESSURE MAIN D1
• WW PS D2 & PRESSURE MAIN D2
• KFW, EC, LOCAL BUDGET FINANCED, BASED ON
FIDIC CONDITIONS OF CONTRACT (FIDIC RED
BOOK, ED.1999). TOTAL WORTH OF PROJECT ~
EUR € 15M
Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater
Infrastructure in Batumi (Oct. 2015 / Nov.2018)
2
REHABILITATI
ON OF
MUNICIPAL
WATER
SUPPLY &
WASTEWATER
INFRASTRUCT
URE IN
BATUMI,
REPUBLIC OF
GEORGIA
PHASE III (LOT
1, 3, 5)
(OCT. 2015 -
NOV. 2018)
PROJECT OVERVIEW:
• WATER-SUPPLY COMPONENT: 78KM OF WELLFIELD PIPING, TRANSMISSION
MAINS, NETWORKS DN90 TO DN800 (STEEL, HDPE), 1,900NR HOUSE
CONNECTIONS, RC RESERVOIR (Q=1,800M3, OUTFLOW 126L/S,
10,900M3/DAY) WITH ASSOCIATED OPERATION BUILDING FOR NAOCL BASED
TREATMENT / DISINFECTION WITH DESIGNED 1MG/L DOSING
CONCENTRATION AND MIN. PRODUCTION OF 6,75L/H, STAND-BY DIESEL-
ELECTRIC GENERATOR (380V, 9.2KW) AND ASSOCIATED VALVE CHAMBER &
INLET / OUTLET PIPES AND VALVES. CITY NETWORK IN 61,500M OF PIPELINES,
1,470NR HOUSE CONNECTIONS (HDPE 100, PN10, DN32-400MM; STEEL PE
COATED / EPOXY LINED PIPELINES DN500MM), ~900M OF TRANSMISSION
MAINS (STEEL PE/EPOXY, DN600, 800MM), RECONSTRUCTION OF 3NR
WELLFIELD BORE-HOLES WITH ASSOCIATED WELL-PUMPS (Q=126M3/H @
50.4M, 30KW, 400V), ASSOCIATED PIPING WORKS (STEEL EPOXY/EPOXY,
PE/EPOXY, DN150MM), UL.SONIC FLOW METERS, AIR & GATE VALVES.
BORDERING OF DISTRICT METERED AREA (DMA) WITH 4NR EL.MAG. FLOW
METERS.
• WASTEWATER COMPONENT: IN TOTAL 19,6KM OF SEWERAGE PIPELINES,
450NR INSPECTION MANHOLES, 882NR HOUSE CONNECTION MANHOLES.
16,850M OF GRAVITY SEWER COLLECTORS (PP SN10 DN200-300MM, GRP
PN10, SN10000 DN500, 800MM), 2,800M OF PRESSURE MAINS (STEEL PE
COATED / CEM.MORTAR LINED, DN300, 400MM) WITH ASSOCIATED
COMBINED TYPE AIR VALVES, VALVES & WASHOUTS, 2NR RC PUMPING
STATIONS (Q1 = 3X360M3/H @ 12.58M, 50HZ, 400V; Q2 = 3X252M3/H @
9.83M, 50HZ, 400V), WITH INTEGRATED BAR SCREENS, EL.MAG. FLOW METERS,
UL.SONIC WATER LEVEL SENSORS, SLUICE GATE VALVES, PROVISION OF
ASSOCIATED TRANSFORMERS 160KWA, 0.4/10KW, EMERGENCY ELECTRO-
GENERATORS 80&100KVA, AUTOMATIC CONTROL SYSTEMS.Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
3
REHABILITATION OF MUNICIPAL WATER SUPPLY &
WASTEWATER INFRASTRUCTURE IN BATUMI,
REPUBLIC OF GEORGIA
PHASE III (LOT 1, 3, 5)
• UNDER “BAT III” PROJECT’S WATER SUPPLY COMPONENT, NEW RC RESERVOIR
(Q=1,800M3, 126L/S, 10,900M3/DAY), AT “MAKHINJAURI” AREA LOCATION WAS
FORESEEN
• ASSOCIATED OPERATION BUILDING FOR NAOCL BASED TREATMENT /
DISINFECTION
• CONCRETE CHANNEL/TUNNEL FOR ACCOMMODATION OF INLET, OUTLET,
WASHOUT & OVERFLOW PIPELINES
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
4
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
5
SECTIONS I-I, II-II
• MAKHINJAURI WATER SUPPLYING RC
RESERVOIR (Q=1,800M3), HAS BEEN SET
ON THE STEEP HILL-SIDE WITH 2-
DIRECTIONAL SLOPE GRADIENT OF 18-
20%, ON ELEVATION OF 58M ABOVE
SEA LEVEL.
• GEOTECHNICAL REPORT INDICATE
THAT NO LAND-SLIDING HAZARD EXISTS
• SEISMIC HAZARD – 7 POINTS,
FOUNDATION SOIL – II CATEGORY
• POSITION OF THE RESERVOIR &
SEISMICITY OF MICRO-LOCATION HAVE
SPECIFIED THE REQUIREMENT FOR BORE
PILES IN ACCORDANCE WITH GEORGIAN
NORMS & REGULATIONS (PN 01.01-09
“SEISMICITY OF CONSTRUCTION”
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
6
SECTIONS
III-III, IV-IV
• DESIGN CONSIDERED
TOTAL NUMBER OF 112NR
PILES:
• 60NR BELLOW RESERVOIR
• 8NR BELLOW VALVE
CHAMBER;
• 12NR BELOW THE
OPERATION BUILDING
• 32NR BELOW THE
CONCRETE PIPE-TUNNEL
• PILES’ DIMENSION: 10,5M X
0.60M
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
7
BORE HOLE DRILLING SEQUENCE METHOD
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
8
1 - BORE HOLES SETTING-OUT
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
9
SETTING-OUT MARKERS ON RESERVOIR’S PLATEAU AREA
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
10
2 - BORE
HOLES
DRILLING
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
11
• MAICAT180 – DRILLING
RIG WITH CATERPILLAR
325C BASE
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
12
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
13
3 -
ENCASEMENT
PIPE
INSERTION
• TEMPORARY, PARTIAL
ENCASEMENT STEEL PIPES
(L=3,0M), PREVENTING
BORE HOLE TOP FROM
COLLAPSING
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
14
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
15
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
16
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
17
4 - DRILLING
COMPLETION
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
18
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
19
5 -
VERIFICATION
OF BORE HOLE
• VERIFICATION OF FINAL
DRILLING DEPTH,
VERTICALITY OF THE BORE
HOLE
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
20
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
21
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
22
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
23
6 - INSERTION
OF
REINFORCEME
NT
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
24
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 /
Nov.2018)
25
• HYDRAULIC CRAWLER
CRANE – HITACHI KH150
BORE PILE’S
REINFORCEMEN
T “HELICAL”
CAGES
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
26
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
27
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
28
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
29
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
30
7 - RE-BAR
CAGE
POSITIONING
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
31
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
32
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
33
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
34
8 - TREMIE
PIPE
INSTALLATIO
N
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
35
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
36
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
37
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
38
9 -
CONCRETE
INSPECTION
• DUE TO PRESENCE OF THE
UNDERGROUND WATER ON
7-9M’ DEPTH, ORIGINAL
CEMENT CONTENT
(C20/25), WAS INCREASED
FOR 10% IN ACCORDANCE
WITH EN1536 / 6.3.1.5.
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
39
CONCRETE PRE-INSTALLATION INSPECTION – “SLUMP-TEST”,
CONCRETE TEMPERATURE (<32C).
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
40
BORE PILE’S
INSPECTION
CHECKLIST
• 1 – SETTING OUT INSPECTION;
• 2 - VERTICALITY CONTROL;
• 3 – PILE’S DIMENSIONS;
• 4 – EXCAVATED SOIL
VERIFICATION;
• 5 - FINAL DRILLING DEPTH
VERIFICATION;
• 6 – REINFORCEMENT
INSPECTION;
• 7 – CONCRETE INSPECTION;
• * - APPROVAL FOR CONCRETE
INSTALLATIONMakhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct.
2015 / Nov.2018)
41
SAMPLING OF CONCRETE - CONCRETE STANDARD TESTING
MOLDS 6PCS(15X15X15CM), FOR 7 & 28-DAY COMPRESSIVE
STRENGTH TESTING
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
42
10 -
CONCRETE
INSTALLATIO
N
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
43
PILE CONCRETE INJECTING OVER “TREMIE-PIPE”
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
44
PILE’S ENCASEMENT PIPES FILLED WITH CONCRETE PRIOR OF
EXTRACTION
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
45
11 - EXTRACTION OF CASING PIPES
REQUIRED 10CM TOP PROVIDED BY ADDITIONAL RING
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
46
RESERVOIR PLATEAU AREA
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
47
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
48
12 - FINAL PILES
PILES/COLUMNS COMBINATION BELOW THE OPERATION
BUILDING
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
49
OPERATION BUILDING PILES
Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater
Infrastructure in Batumi (Oct. 2015 / Nov.2018)
50
RESERVOIR PAN’S PILES
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
51
CONCRETE TUNNEL’S PILES (TUNNEL ACCOMMODATING INLET,
OUTLET, WASHOUT & OVERFLOW PIPELINES)
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
52
13 - SOIL
COMPACTION
TEST
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
53
SOIL COMPACTION TESTING
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
54
14 -
BLINDING
CONCRETE
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
55
RESERVOIR PLATEAU AREA BLINDING CONCRETE
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
56
RESERVOIR PLATEAU AREA
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
57
14 - BASE SLAB
DESIGN REFERS TO WELDING
CONNECTION BETWEEN PILE’S
VERTICAL BARS AND “L” BARS FOR
CONNECTION WITH BASE SLABS
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
58
PIPELINES CONCRETE TUNNEL – CONNECTION BTW PILES & BASE
SLAB
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
59
PIPELINES CONCRETE TUNNEL – CONNECTION BTW PILES & BASE
SLAB
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
60
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
61
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
62
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
63
Makhinjauri Reservoir Seismic Bore Piling /
Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018)
64

More Related Content

What's hot

Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Michael Hewitt, GISP
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesEkonnect
 
Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Jose Miguel Ruiz
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Michael Hewitt, GISP
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Fairfax County
 
Cold water distribution
Cold water distributionCold water distribution
Cold water distributionashikin
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Ekonnect
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveFairfax County
 
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationLittle Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationFairfax County
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Fairfax County
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Fairfax County
 
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Michael Hewitt, GISP
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Fairfax County
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Fairfax County
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Fairfax County
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveFairfax County
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingFairfax County
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairFairfax County
 

What's hot (20)

Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
 
Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
Cold water distribution
Cold water distributionCold water distribution
Cold water distribution
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
 
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationLittle Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station Rehabilitation
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation
 
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
 
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 

Similar to Seismic concrete Bore Piles at Makhinjauri water supply reservoir

Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdfAKASHICWORLD
 
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxE1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxRuiMendes93783
 
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxE1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxRuiMendes93783
 
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxE1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxRuiMendes93783
 
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...IRJET Journal
 
Tuul-Songino Project Overview 22.05.2015
Tuul-Songino Project Overview  22.05.2015Tuul-Songino Project Overview  22.05.2015
Tuul-Songino Project Overview 22.05.2015Ivaylo Velikov
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitaeSunil Singh
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBSangeeta (San) Banerjee
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreADDA
 
Kathmandu's water supply operators_Mr. Dibesh Shrestha
Kathmandu's water supply operators_Mr. Dibesh ShresthaKathmandu's water supply operators_Mr. Dibesh Shrestha
Kathmandu's water supply operators_Mr. Dibesh ShresthaSaciWATERs
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresPrasad Thanthratey
 
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...Will Jacobson
 
IRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET Journal
 
Water Supply & Sanitation
Water Supply & SanitationWater Supply & Sanitation
Water Supply & Sanitationrk_misra
 
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”IRJET Journal
 

Similar to Seismic concrete Bore Piles at Makhinjauri water supply reservoir (20)

Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
Planning of irrigation system
Planning of irrigation systemPlanning of irrigation system
Planning of irrigation system
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
ANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptxANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptx
 
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxE1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
 
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxE1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
 
Water supply
Water supplyWater supply
Water supply
 
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptxE1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Maliana_v1a.pptx
 
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
IRJET- Planning and Design of Small Hydro Power Station on D/S of Low Head We...
 
Tuul-Songino Project Overview 22.05.2015
Tuul-Songino Project Overview  22.05.2015Tuul-Songino Project Overview  22.05.2015
Tuul-Songino Project Overview 22.05.2015
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSB
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
 
Kathmandu's water supply operators_Mr. Dibesh Shrestha
Kathmandu's water supply operators_Mr. Dibesh ShresthaKathmandu's water supply operators_Mr. Dibesh Shrestha
Kathmandu's water supply operators_Mr. Dibesh Shrestha
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
 
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
 
IRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of Gutters
 
Water Supply & Sanitation
Water Supply & SanitationWater Supply & Sanitation
Water Supply & Sanitation
 
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
 

More from Vladimir Popovic

Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Vladimir Popovic
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelinesVladimir Popovic
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction ScheduleVladimir Popovic
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesVladimir Popovic
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesVladimir Popovic
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESVladimir Popovic
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopVladimir Popovic
 
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Vladimir Popovic
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionVladimir Popovic
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsVladimir Popovic
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectVladimir Popovic
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Vladimir Popovic
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Vladimir Popovic
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresVladimir Popovic
 
Derventa City Water Supply Project
Derventa City Water Supply ProjectDerventa City Water Supply Project
Derventa City Water Supply ProjectVladimir Popovic
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)Vladimir Popovic
 

More from Vladimir Popovic (20)

Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelines
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction Schedule
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing Examples
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod Holes
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-Stop
 
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elements
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply Project
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor Structures
 
Derventa City Water Supply Project
Derventa City Water Supply ProjectDerventa City Water Supply Project
Derventa City Water Supply Project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Vani Water Supply Project
Vani Water Supply ProjectVani Water Supply Project
Vani Water Supply Project
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 

Seismic concrete Bore Piles at Makhinjauri water supply reservoir

  • 1. CONSTRUCTION OF SEISMIC CONCRETE BORE PILES AT MAKHINJAURI WATER SUPPLY RESERVOIR A PART OF REHABILITATION OF MUNICIPAL WATER SUPPLY & WASTEWATER INFRASTRUCTURE IN BATUMI, ADJARA, REPUBLIC OF GEORGIA PHASE III (LOT 1, 3, 5) (OCT. 2015 - NOV. 2018) Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 1
  • 2. PROJECT OVERVIEW: BAT III LOT 1, 3, 5 • WS COMPONENTS: • WS NETWORK P2E • WS NETWORK ZONE 1 • WS MEJINISTSKALI WELLFIELD & TRANSMISSION MAIN • WS RESERVOIR MAKHINJAURI • WW COMPONENTS: • WW NETWORK BNZ • WW NETWORK BARTSKANA • WW NETWORK UPPER GORODOK • WW NETWORK GONIO • WW PS D1 & PRESSURE MAIN D1 • WW PS D2 & PRESSURE MAIN D2 • KFW, EC, LOCAL BUDGET FINANCED, BASED ON FIDIC CONDITIONS OF CONTRACT (FIDIC RED BOOK, ED.1999). TOTAL WORTH OF PROJECT ~ EUR € 15M Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 2
  • 3. REHABILITATI ON OF MUNICIPAL WATER SUPPLY & WASTEWATER INFRASTRUCT URE IN BATUMI, REPUBLIC OF GEORGIA PHASE III (LOT 1, 3, 5) (OCT. 2015 - NOV. 2018) PROJECT OVERVIEW: • WATER-SUPPLY COMPONENT: 78KM OF WELLFIELD PIPING, TRANSMISSION MAINS, NETWORKS DN90 TO DN800 (STEEL, HDPE), 1,900NR HOUSE CONNECTIONS, RC RESERVOIR (Q=1,800M3, OUTFLOW 126L/S, 10,900M3/DAY) WITH ASSOCIATED OPERATION BUILDING FOR NAOCL BASED TREATMENT / DISINFECTION WITH DESIGNED 1MG/L DOSING CONCENTRATION AND MIN. PRODUCTION OF 6,75L/H, STAND-BY DIESEL- ELECTRIC GENERATOR (380V, 9.2KW) AND ASSOCIATED VALVE CHAMBER & INLET / OUTLET PIPES AND VALVES. CITY NETWORK IN 61,500M OF PIPELINES, 1,470NR HOUSE CONNECTIONS (HDPE 100, PN10, DN32-400MM; STEEL PE COATED / EPOXY LINED PIPELINES DN500MM), ~900M OF TRANSMISSION MAINS (STEEL PE/EPOXY, DN600, 800MM), RECONSTRUCTION OF 3NR WELLFIELD BORE-HOLES WITH ASSOCIATED WELL-PUMPS (Q=126M3/H @ 50.4M, 30KW, 400V), ASSOCIATED PIPING WORKS (STEEL EPOXY/EPOXY, PE/EPOXY, DN150MM), UL.SONIC FLOW METERS, AIR & GATE VALVES. BORDERING OF DISTRICT METERED AREA (DMA) WITH 4NR EL.MAG. FLOW METERS. • WASTEWATER COMPONENT: IN TOTAL 19,6KM OF SEWERAGE PIPELINES, 450NR INSPECTION MANHOLES, 882NR HOUSE CONNECTION MANHOLES. 16,850M OF GRAVITY SEWER COLLECTORS (PP SN10 DN200-300MM, GRP PN10, SN10000 DN500, 800MM), 2,800M OF PRESSURE MAINS (STEEL PE COATED / CEM.MORTAR LINED, DN300, 400MM) WITH ASSOCIATED COMBINED TYPE AIR VALVES, VALVES & WASHOUTS, 2NR RC PUMPING STATIONS (Q1 = 3X360M3/H @ 12.58M, 50HZ, 400V; Q2 = 3X252M3/H @ 9.83M, 50HZ, 400V), WITH INTEGRATED BAR SCREENS, EL.MAG. FLOW METERS, UL.SONIC WATER LEVEL SENSORS, SLUICE GATE VALVES, PROVISION OF ASSOCIATED TRANSFORMERS 160KWA, 0.4/10KW, EMERGENCY ELECTRO- GENERATORS 80&100KVA, AUTOMATIC CONTROL SYSTEMS.Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 3
  • 4. REHABILITATION OF MUNICIPAL WATER SUPPLY & WASTEWATER INFRASTRUCTURE IN BATUMI, REPUBLIC OF GEORGIA PHASE III (LOT 1, 3, 5) • UNDER “BAT III” PROJECT’S WATER SUPPLY COMPONENT, NEW RC RESERVOIR (Q=1,800M3, 126L/S, 10,900M3/DAY), AT “MAKHINJAURI” AREA LOCATION WAS FORESEEN • ASSOCIATED OPERATION BUILDING FOR NAOCL BASED TREATMENT / DISINFECTION • CONCRETE CHANNEL/TUNNEL FOR ACCOMMODATION OF INLET, OUTLET, WASHOUT & OVERFLOW PIPELINES Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 4
  • 5. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 5
  • 6. SECTIONS I-I, II-II • MAKHINJAURI WATER SUPPLYING RC RESERVOIR (Q=1,800M3), HAS BEEN SET ON THE STEEP HILL-SIDE WITH 2- DIRECTIONAL SLOPE GRADIENT OF 18- 20%, ON ELEVATION OF 58M ABOVE SEA LEVEL. • GEOTECHNICAL REPORT INDICATE THAT NO LAND-SLIDING HAZARD EXISTS • SEISMIC HAZARD – 7 POINTS, FOUNDATION SOIL – II CATEGORY • POSITION OF THE RESERVOIR & SEISMICITY OF MICRO-LOCATION HAVE SPECIFIED THE REQUIREMENT FOR BORE PILES IN ACCORDANCE WITH GEORGIAN NORMS & REGULATIONS (PN 01.01-09 “SEISMICITY OF CONSTRUCTION” Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 6
  • 7. SECTIONS III-III, IV-IV • DESIGN CONSIDERED TOTAL NUMBER OF 112NR PILES: • 60NR BELLOW RESERVOIR • 8NR BELLOW VALVE CHAMBER; • 12NR BELOW THE OPERATION BUILDING • 32NR BELOW THE CONCRETE PIPE-TUNNEL • PILES’ DIMENSION: 10,5M X 0.60M Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 7
  • 8. BORE HOLE DRILLING SEQUENCE METHOD Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 8
  • 9. 1 - BORE HOLES SETTING-OUT Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 9
  • 10. SETTING-OUT MARKERS ON RESERVOIR’S PLATEAU AREA Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 10
  • 11. 2 - BORE HOLES DRILLING Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 11 • MAICAT180 – DRILLING RIG WITH CATERPILLAR 325C BASE
  • 12. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 12
  • 13. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 13
  • 14. 3 - ENCASEMENT PIPE INSERTION • TEMPORARY, PARTIAL ENCASEMENT STEEL PIPES (L=3,0M), PREVENTING BORE HOLE TOP FROM COLLAPSING Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 14
  • 15. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 15
  • 16. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 16
  • 17. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 17
  • 18. 4 - DRILLING COMPLETION Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 18
  • 19. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 19
  • 20. 5 - VERIFICATION OF BORE HOLE • VERIFICATION OF FINAL DRILLING DEPTH, VERTICALITY OF THE BORE HOLE Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 20
  • 21. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 21
  • 22. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 22
  • 23. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 23
  • 24. 6 - INSERTION OF REINFORCEME NT Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 24
  • 25. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 25 • HYDRAULIC CRAWLER CRANE – HITACHI KH150
  • 26. BORE PILE’S REINFORCEMEN T “HELICAL” CAGES Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 26
  • 27. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 27
  • 28. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 28
  • 29. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 29
  • 30. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 30
  • 31. 7 - RE-BAR CAGE POSITIONING Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 31
  • 32. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 32
  • 33. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 33
  • 34. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 34
  • 35. 8 - TREMIE PIPE INSTALLATIO N Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 35
  • 36. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 36
  • 37. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 37
  • 38. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 38
  • 39. 9 - CONCRETE INSPECTION • DUE TO PRESENCE OF THE UNDERGROUND WATER ON 7-9M’ DEPTH, ORIGINAL CEMENT CONTENT (C20/25), WAS INCREASED FOR 10% IN ACCORDANCE WITH EN1536 / 6.3.1.5. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 39
  • 40. CONCRETE PRE-INSTALLATION INSPECTION – “SLUMP-TEST”, CONCRETE TEMPERATURE (<32C). Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 40
  • 41. BORE PILE’S INSPECTION CHECKLIST • 1 – SETTING OUT INSPECTION; • 2 - VERTICALITY CONTROL; • 3 – PILE’S DIMENSIONS; • 4 – EXCAVATED SOIL VERIFICATION; • 5 - FINAL DRILLING DEPTH VERIFICATION; • 6 – REINFORCEMENT INSPECTION; • 7 – CONCRETE INSPECTION; • * - APPROVAL FOR CONCRETE INSTALLATIONMakhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 41
  • 42. SAMPLING OF CONCRETE - CONCRETE STANDARD TESTING MOLDS 6PCS(15X15X15CM), FOR 7 & 28-DAY COMPRESSIVE STRENGTH TESTING Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 42
  • 43. 10 - CONCRETE INSTALLATIO N Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 43
  • 44. PILE CONCRETE INJECTING OVER “TREMIE-PIPE” Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 44
  • 45. PILE’S ENCASEMENT PIPES FILLED WITH CONCRETE PRIOR OF EXTRACTION Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 45
  • 46. 11 - EXTRACTION OF CASING PIPES REQUIRED 10CM TOP PROVIDED BY ADDITIONAL RING Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 46
  • 47. RESERVOIR PLATEAU AREA Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 47
  • 48. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 48
  • 49. 12 - FINAL PILES PILES/COLUMNS COMBINATION BELOW THE OPERATION BUILDING Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 49
  • 50. OPERATION BUILDING PILES Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 50
  • 51. RESERVOIR PAN’S PILES Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 51
  • 52. CONCRETE TUNNEL’S PILES (TUNNEL ACCOMMODATING INLET, OUTLET, WASHOUT & OVERFLOW PIPELINES) Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 52
  • 53. 13 - SOIL COMPACTION TEST Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 53
  • 54. SOIL COMPACTION TESTING Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 54
  • 55. 14 - BLINDING CONCRETE Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 55
  • 56. RESERVOIR PLATEAU AREA BLINDING CONCRETE Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 56
  • 57. RESERVOIR PLATEAU AREA Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 57
  • 58. 14 - BASE SLAB DESIGN REFERS TO WELDING CONNECTION BETWEEN PILE’S VERTICAL BARS AND “L” BARS FOR CONNECTION WITH BASE SLABS Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 58
  • 59. PIPELINES CONCRETE TUNNEL – CONNECTION BTW PILES & BASE SLAB Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 59
  • 60. PIPELINES CONCRETE TUNNEL – CONNECTION BTW PILES & BASE SLAB Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 60
  • 61. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 61
  • 62. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 62
  • 63. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 63
  • 64. Makhinjauri Reservoir Seismic Bore Piling / Rehabilitation of Municipal Water Supply & Wastewater Infrastructure in Batumi (Oct. 2015 / Nov.2018) 64