 Rehabilitation of the UrbanWater Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)
 The existing sewer system has the following defects:
 · Low connection rate. In the city centre of Kakanj, the existing sewer system serves only 35 % of the inhabitants,
who are connected to the public water supply system of. The other inhabitants discharge the wastewater without
authorization on to the land, which has caused severe environmental and public health problems.
 · In the settlement, where a separate sewer system is existent, some house connections have been connected to the
storm water pipes instead of to the wastewater pipes. This will cause the pollution of the water body if the
wastewater shall be treated in aWWTP in the future.
 · An important drinking water source “Pitka Voda”, which is situated near the city centre and is recharged with water
from the Zgosca river by bank filtration. The nearby discharge of the untreated wastewater into the Zgosca river will
cause severe damage to the drinking water supply.
 Some sewers don not discharge the collected waster water into a receiving water body, e.g. the Zgošća river or
Bosna river, but without authorization on to the land, which has caused severe environmental and public health
problems.
 · The sewerage collectors in the settlements of Mile and New Bare discharge the wastewater into the nearby creeks,
which flows through a valley before it reaches the Bosna river. This caused, the valley is very often flooded by
wastewater.
 Lot 1: Construction of a separate sewer system in Zone 1 - DN250-400, L=4,623m
 Lot 2: Construction of a separate sewer system in Zone 2 - DN250, L=1,546m
 Lot 3: Construction of a separate sewer system in Zone 3 – DN250, L=1,098m
 Lot 4: Rehabilitation of the existing sewer system in Zone 4 - DN1000, L=30m
 Lot 5: Rehabilitation of the existing sewer system in Zone 5 – DN400, L=437m
 Lot 6: Rehabilitation of the existing sewer system in Zone 6 – DN350-400, L=1,150m
 Designed length in total – 8,854m
 Storm Water Overflows - the construction of three storm water overflow structures shall be also included in the
scope of works. Two storm water overflow structures shall be integrated into the existing sewer mains. One storm
water overflow structure shall be constructed at the connection of the existing and the new sewer mains.
 Inspection / Maintenance Shafts - the construction and integration of approximately 298 maintenance shafts (incl. 18
backdrop shafts) into the existing sewer mains shall be included in the scope of works.
 Bridge Foundation Crossing: the bridge crossing is located at the end of Zone 1. The main collector will run through
the foundation of the city bridge.
 House Connections – The Contractor is to provide material and construct approx.294pcs, while as a part of Water
Utility’s “contribution”, Water Utility is to construct approx.293pcs of House Connections from material provided by
the Contract
 Water Utility Kakanj is to be provided with the following mechanization: Hydraulic Excavator, Backhoe Loader &
Pick-up vehicle
 Project Budget – 2,000,000.00EUR
PROJECT SIGN BOARD
PIPE MATERIAL:
CORRUGATED HDPE SN8 PIPES (DN250-1200)
PVC SN4 (DN160-200)
SHAFT COVERS, VARIOUS MATERIAL PREFABRICATED MAINTENANCE SHAFTS
PREFABRICATED MAINTENANCE SHAFTS PREFABRICATED COLLECTION SHAFTS
WU PROVIDED UNDER CONTRACT WITH:
HYDRAULIC EXCAVATOR NEW HOLLAND
BACKHOE LOADER NEW HOLLAND &
PICK-UP VEHICLE TOYOTA HILUX 4X4
GEO-TEXTILE PIPE WRAPPING
Bridge Foundation /
Pipe Jacking
PIPE-SADDLE CONNECTION OF HOUSE CONNECTION
PREFABRICATED COLLECTION SHAFT IN-SITY DRILLING FOR
HOUSE CONNECTION
COLLECTION SHAFT
CASCADE SHAFT
CONCRETE CULVERT INSPECTION SHAFT
STROM WATER OVERFLOW (SWO1) WITH OUTLET
STRUCTURE
STORM WATER OVERFLOW WITH OUTLET STRUCTURE
STORM WATER OVERFLOW (SWO3)
STORM WATER OVERFLOW (SWO3)
OUTLET STRUCTURE WITH FLAP VALVE
LAID ALONG THE MAGISTERIAL ROAD RIVER BOSNA OUTLET STRUCTURE
RIVER BOSNA OUTLET STRUCTURE RIVER BOSNA OUTLET STRUCTURE
DOWNSTREAM PIPE CLOGGED BY BALLON UPSTREAM SHAFT FILLED WITH WATER
COLLECTOR FLUSHING CCTV INSPECTION
Zone 1 –Take Over
Inspection
In total installed:
HDPE (SN8) DN250 – 3,801m;
HDPE (SN8) DN300 – 580m;
HDPE (SN8) DN350 – 21m;
HDPE (SN8) DN400 – 16m;
Total Collector length 4,418m;
Total House Connections – 277nr
Zone 2 –TakeOver
Inspection
In total installed:
HDPE (SN8) DN250 – 1,781m;
Total House Connections – 87nr
CASCADE SHAFT
Zone 3 -Take Over
Inspection
In total installed:
HDPE (SN8) DN250 – 95.35m
Total House Connections – 2nr
Zone 4 -TakeOver
Inspection
In total installed:
HDPE (SN8) DN500 – 80m
HDPE (SN8) DN1000 – 20m
Total Collector length 100m;
Zone 5 –Take Over
Inspection
In total installed:
HDPE (SN8) DN250 – 590m
HDPE (SN8) DN400 – 424m
Total Collector length 1014m;
Total House Connections – 51nr
Zone 6 –Take Over
Inspection
In total installed:
HDPE (SN8) DN250 – 340m
HDPE (SN8) DN350 – 200m
HDPE (SN8) DN400 – 935m
Total Collector length 1,475m;
Total House Connections – 73nr
CONNECTION TO EXISTING SYSTEM
MainCity Collector
DN1200Take Over
Inspection
In total installed:
HDPE (SN8), DN1200 – 382m
Remaining Budget
Considering the remaining Budget,
the following material has been
provided for WU “Vodokom” Kakanj :
HDPE (SN8) Pipes:
DN250 Pipes – 1,000m;
DN400 Pipes – 250m;
PVC (SN4) Pipes
DN160 – 1,500m;
DN200 – 1,500m;
Pipe saddles DN250/160 – 100pcs;
Flat Bed Vehicle IVECO
In total 265nr maintenance shafts
have been installed under the Project,
139nr of House Connection Collection
Shafts.
Total number of installed House
Connections (households connected)
to new WW System – 496nr.

More Related Content

What's hot

Presentation CS_update
Presentation CS_updatePresentation CS_update
Presentation CS_updateBoris Markov
 
EQUITABLE Water Supply PROJECT for Pune City
EQUITABLE Water  Supply PROJECT for Pune CityEQUITABLE Water  Supply PROJECT for Pune City
EQUITABLE Water Supply PROJECT for Pune Citypmcpune
 
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Vladimir Popovic
 
Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust” Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust” Fairfax County
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingVladimir Popovic
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b ProjectsAnandhan Annasamy
 
3rww comprehensive report site photos version 2
3rww comprehensive report site photos version 23rww comprehensive report site photos version 2
3rww comprehensive report site photos version 2Gbemisola Arike Agbaje
 
Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Fairfax County
 
Glacial Lake Outburst Floods in the Karakoram Mountains, P.R. China
Glacial Lake Outburst Floods in the Karakoram Mountains, P.R. ChinaGlacial Lake Outburst Floods in the Karakoram Mountains, P.R. China
Glacial Lake Outburst Floods in the Karakoram Mountains, P.R. ChinaInfoAndina CONDESAN
 
Solids Processing Rehabilitation Phase II
Solids Processing Rehabilitation Phase IISolids Processing Rehabilitation Phase II
Solids Processing Rehabilitation Phase IIFairfax County
 

What's hot (12)

Presentation CS_update
Presentation CS_updatePresentation CS_update
Presentation CS_update
 
EQUITABLE Water Supply PROJECT for Pune City
EQUITABLE Water  Supply PROJECT for Pune CityEQUITABLE Water  Supply PROJECT for Pune City
EQUITABLE Water Supply PROJECT for Pune City
 
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
 
Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust” Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust”
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b Projects
 
3rww comprehensive report site photos version 2
3rww comprehensive report site photos version 23rww comprehensive report site photos version 2
3rww comprehensive report site photos version 2
 
Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015
 
Low-Carbon Urban Infrastrucure Projects 2
Low-Carbon Urban Infrastrucure Projects 2Low-Carbon Urban Infrastrucure Projects 2
Low-Carbon Urban Infrastrucure Projects 2
 
2. glof
2. glof2. glof
2. glof
 
Glacial Lake Outburst Floods in the Karakoram Mountains, P.R. China
Glacial Lake Outburst Floods in the Karakoram Mountains, P.R. ChinaGlacial Lake Outburst Floods in the Karakoram Mountains, P.R. China
Glacial Lake Outburst Floods in the Karakoram Mountains, P.R. China
 
Solids Processing Rehabilitation Phase II
Solids Processing Rehabilitation Phase IISolids Processing Rehabilitation Phase II
Solids Processing Rehabilitation Phase II
 

Similar to Kakanj wastewater project

Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosniaVladimir Popovic
 
Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww projectVladimir Popovic
 
Derventa, Water Supply Project
Derventa, Water Supply ProjectDerventa, Water Supply Project
Derventa, Water Supply ProjectVladimir Popovic
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaVladimir Popovic
 
Ee ii ce(pc)505- module 1_2_3
Ee ii ce(pc)505- module 1_2_3Ee ii ce(pc)505- module 1_2_3
Ee ii ce(pc)505- module 1_2_3SamirDas66
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 
New Persentation
New PersentationNew Persentation
New PersentationTarek Fagal
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdfAKASHICWORLD
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 John M Riggs
 
Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26Uyanga Nyamkhuu
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGDEEPAK MALLICK
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guanshacjhow
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02Bolin Loong
 

Similar to Kakanj wastewater project (20)

Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosnia
 
Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww project
 
Derventa, Water Supply Project
Derventa, Water Supply ProjectDerventa, Water Supply Project
Derventa, Water Supply Project
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
Ee ii ce(pc)505- module 1_2_3
Ee ii ce(pc)505- module 1_2_3Ee ii ce(pc)505- module 1_2_3
Ee ii ce(pc)505- module 1_2_3
 
HATS 2A
HATS 2AHATS 2A
HATS 2A
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
New Persentation
New PersentationNew Persentation
New Persentation
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 
Hydraulic Systems
Hydraulic SystemsHydraulic Systems
Hydraulic Systems
 
Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26Intro infrastructure project 2015.02.26
Intro infrastructure project 2015.02.26
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guan
 
School Services
School ServicesSchool Services
School Services
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
Building Services Project 02
Building Services Project 02Building Services Project 02
Building Services Project 02
 

More from Vladimir Popovic

Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgiaVladimir Popovic
 
Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaVladimir Popovic
 
Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Vladimir Popovic
 
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionLanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionVladimir Popovic
 
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationLanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationVladimir Popovic
 
Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Vladimir Popovic
 
Ghadames project, minor structures
Ghadames project, minor structuresGhadames project, minor structures
Ghadames project, minor structuresVladimir Popovic
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipelineVladimir Popovic
 
Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Vladimir Popovic
 
Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Vladimir Popovic
 
Al Jewaibyah Regulating Tank 70,000m3
Al Jewaibyah Regulating Tank  70,000m3Al Jewaibyah Regulating Tank  70,000m3
Al Jewaibyah Regulating Tank 70,000m3Vladimir Popovic
 

More from Vladimir Popovic (11)

Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgia
 
Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3
 
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionLanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
 
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationLanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
 
Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3
 
Ghadames project, minor structures
Ghadames project, minor structuresGhadames project, minor structures
Ghadames project, minor structures
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipeline
 
Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3
 
Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3
 
Al Jewaibyah Regulating Tank 70,000m3
Al Jewaibyah Regulating Tank  70,000m3Al Jewaibyah Regulating Tank  70,000m3
Al Jewaibyah Regulating Tank 70,000m3
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Recently uploaded (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

Kakanj wastewater project

  • 1.
  • 2.  Rehabilitation of the UrbanWater Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)  The existing sewer system has the following defects:  · Low connection rate. In the city centre of Kakanj, the existing sewer system serves only 35 % of the inhabitants, who are connected to the public water supply system of. The other inhabitants discharge the wastewater without authorization on to the land, which has caused severe environmental and public health problems.  · In the settlement, where a separate sewer system is existent, some house connections have been connected to the storm water pipes instead of to the wastewater pipes. This will cause the pollution of the water body if the wastewater shall be treated in aWWTP in the future.  · An important drinking water source “Pitka Voda”, which is situated near the city centre and is recharged with water from the Zgosca river by bank filtration. The nearby discharge of the untreated wastewater into the Zgosca river will cause severe damage to the drinking water supply.  Some sewers don not discharge the collected waster water into a receiving water body, e.g. the Zgošća river or Bosna river, but without authorization on to the land, which has caused severe environmental and public health problems.  · The sewerage collectors in the settlements of Mile and New Bare discharge the wastewater into the nearby creeks, which flows through a valley before it reaches the Bosna river. This caused, the valley is very often flooded by wastewater.
  • 3.  Lot 1: Construction of a separate sewer system in Zone 1 - DN250-400, L=4,623m  Lot 2: Construction of a separate sewer system in Zone 2 - DN250, L=1,546m  Lot 3: Construction of a separate sewer system in Zone 3 – DN250, L=1,098m  Lot 4: Rehabilitation of the existing sewer system in Zone 4 - DN1000, L=30m  Lot 5: Rehabilitation of the existing sewer system in Zone 5 – DN400, L=437m  Lot 6: Rehabilitation of the existing sewer system in Zone 6 – DN350-400, L=1,150m  Designed length in total – 8,854m  Storm Water Overflows - the construction of three storm water overflow structures shall be also included in the scope of works. Two storm water overflow structures shall be integrated into the existing sewer mains. One storm water overflow structure shall be constructed at the connection of the existing and the new sewer mains.  Inspection / Maintenance Shafts - the construction and integration of approximately 298 maintenance shafts (incl. 18 backdrop shafts) into the existing sewer mains shall be included in the scope of works.  Bridge Foundation Crossing: the bridge crossing is located at the end of Zone 1. The main collector will run through the foundation of the city bridge.  House Connections – The Contractor is to provide material and construct approx.294pcs, while as a part of Water Utility’s “contribution”, Water Utility is to construct approx.293pcs of House Connections from material provided by the Contract  Water Utility Kakanj is to be provided with the following mechanization: Hydraulic Excavator, Backhoe Loader & Pick-up vehicle  Project Budget – 2,000,000.00EUR
  • 4.
  • 5. PROJECT SIGN BOARD PIPE MATERIAL: CORRUGATED HDPE SN8 PIPES (DN250-1200) PVC SN4 (DN160-200)
  • 6. SHAFT COVERS, VARIOUS MATERIAL PREFABRICATED MAINTENANCE SHAFTS
  • 7. PREFABRICATED MAINTENANCE SHAFTS PREFABRICATED COLLECTION SHAFTS
  • 8. WU PROVIDED UNDER CONTRACT WITH: HYDRAULIC EXCAVATOR NEW HOLLAND BACKHOE LOADER NEW HOLLAND & PICK-UP VEHICLE TOYOTA HILUX 4X4
  • 9.
  • 11.
  • 12.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. PIPE-SADDLE CONNECTION OF HOUSE CONNECTION
  • 19.
  • 20. PREFABRICATED COLLECTION SHAFT IN-SITY DRILLING FOR HOUSE CONNECTION
  • 24. STROM WATER OVERFLOW (SWO1) WITH OUTLET STRUCTURE
  • 25. STORM WATER OVERFLOW WITH OUTLET STRUCTURE
  • 28. OUTLET STRUCTURE WITH FLAP VALVE
  • 29.
  • 30.
  • 31.
  • 32.
  • 33. LAID ALONG THE MAGISTERIAL ROAD RIVER BOSNA OUTLET STRUCTURE
  • 34. RIVER BOSNA OUTLET STRUCTURE RIVER BOSNA OUTLET STRUCTURE
  • 35. DOWNSTREAM PIPE CLOGGED BY BALLON UPSTREAM SHAFT FILLED WITH WATER
  • 37.
  • 38.
  • 39. Zone 1 –Take Over Inspection In total installed: HDPE (SN8) DN250 – 3,801m; HDPE (SN8) DN300 – 580m; HDPE (SN8) DN350 – 21m; HDPE (SN8) DN400 – 16m; Total Collector length 4,418m; Total House Connections – 277nr
  • 40.
  • 41.
  • 42. Zone 2 –TakeOver Inspection In total installed: HDPE (SN8) DN250 – 1,781m; Total House Connections – 87nr
  • 43.
  • 45. Zone 3 -Take Over Inspection In total installed: HDPE (SN8) DN250 – 95.35m Total House Connections – 2nr
  • 46. Zone 4 -TakeOver Inspection In total installed: HDPE (SN8) DN500 – 80m HDPE (SN8) DN1000 – 20m Total Collector length 100m;
  • 47. Zone 5 –Take Over Inspection In total installed: HDPE (SN8) DN250 – 590m HDPE (SN8) DN400 – 424m Total Collector length 1014m; Total House Connections – 51nr
  • 48. Zone 6 –Take Over Inspection In total installed: HDPE (SN8) DN250 – 340m HDPE (SN8) DN350 – 200m HDPE (SN8) DN400 – 935m Total Collector length 1,475m; Total House Connections – 73nr
  • 49.
  • 51. MainCity Collector DN1200Take Over Inspection In total installed: HDPE (SN8), DN1200 – 382m
  • 52. Remaining Budget Considering the remaining Budget, the following material has been provided for WU “Vodokom” Kakanj : HDPE (SN8) Pipes: DN250 Pipes – 1,000m; DN400 Pipes – 250m; PVC (SN4) Pipes DN160 – 1,500m; DN200 – 1,500m; Pipe saddles DN250/160 – 100pcs; Flat Bed Vehicle IVECO In total 265nr maintenance shafts have been installed under the Project, 139nr of House Connection Collection Shafts. Total number of installed House Connections (households connected) to new WW System – 496nr.