1 OFF550 SUBSEA TECHNOLOGY Project Report / ANCHOIS – 1 Field
! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!By!Jose!V.Taboada!//!Stud.nr:!217961!
!
Project Overview
The “Anchois – 1” is part of the Production Tanger-Larache
blocks (47, 48, and 49 in Offshore Morocco), the overall of the
area is around 2744 m2
, being located at 40Km off the Morocco
shoreline to South West (SW). The project operator is lead by
Repsol YPF SA (36%), and operated the consortium with:
Gas Natural Exploration SL→ 24%
Dana Petroleum (D&P) LTD→ 15%
ONHYM→ 25%
The “Anchois – 1” includes encountering reservoir with 90 m of
Gross Gas Column in Two sections (100Bcf = 2.8Bcm
=2.779MMSm3). Potential restriction with “Gas-Bearing Sands”
detected. The “Anchois – 1” reservoir is a discovery from March
2009.
The Field Development contains a Subsea, Offshore Flowline
and Pigging Line infrastructure. The concept selection carry out
is a Subsea System tied back and exported to Onshore Plant
(“Subsea Wells Tie-back to Onshore Plant”) via flow lines and
control umbilical.
The field itself shall be designed with flexibility for new tie-in of
the new discoveries further in the area. Prospection phase has
been development in 2009, and Exploration was during 2011 and
the Drilling phase along 2013.
The water depth is around 387m.The field representation and
existing subsea infrastructure, shown on the Annexes.
Subsea Concept
First at all, to reach up a determination of a Subsea Concept, to
carry out and be implement, shall be base on the ‘‘Objectives of
the Design’’, are listed below:
! Efficient Interface coordination (between Drilling
&Well, Subsurface, Downstream Facilities).
! Cover all design premises for the facilities concept
development process, and successive development
steps.
! Have into account, future operational objectives and
functional requirements for field.
! Establish coalition between services companies and
operator.
In based on previous objectives cited above, the Concept selected
shall be a “Subsea Wells Tie-back to Onshore Plant” through
“Subsea Wells + Multi-Manifold”.(See Annexes representation).
Which one, has been determined through a survey of couple
number of parameters and requirements to satisfy. As main
requirement of the concept, shall allow for tie-in of the future
prospects in the area, for more Subsea Templates, in addition to
possible future Low-pressure production. Which one, we concept
selected allows that. In terms of production rate, using Multi-
Manifold (with Gas Condensate Pumps) will increase
considerable high, due to two pumps in parallel position
integrated.
(QOutLetFlow=QA+ QB → ↑"$ ↑), this particular dimensioning
allows to decrease the pressure rate at the outlet in the Multi-
Manifold (HOutLetFlow=HA- HB → POutLetFlow↓↓). See next
representation below;
.
Figure 1. Pumps production system into the Multi-Manifold.
In contrast, using this type of dimensioning is going to demand
more consuming Energy Supply.
Sand detectors and Gas meters will be installed at the Wellhead
on each well. Such as, Salt detection will be installed as part of
the wet gas meters.
The objective of this subsea solution is to keep up affordable to a
manageable level of activity within a reasonable time frame, and
balancing the full lifecycle with the benefits of production from
the field.
Subsea Features and Key Equipment
The whole Subsea installation begins from Subsea satellite wells,
to ending of the Flow lines and Cables to Onshore plant.
The key pieces equipment, could the two VXTree for each well,
have the next characteristic bellow;
• Simple installation from Vessel, as result a decrease of
Cost Installation.
• Save Energy Supply, only is needed one time to run
each BOP from shore.
As second key part of the installation, could be the Mult-
Manifold (with Gas Condensate Pumps), being classified as key
element for the whole installation, for the next reason below;
• Allows flexibility for new tie-in of the new discoveries
further in the area (new Infield Flow lines into the same
Multi-Manifold).
• Rise up the caudal Flow production, from each column
of Gas, due to two pumps, as having also safety effect
to avoid the formation of ‘Gas Hydrates’, where the
pumps will draw down wellhead pressure and increase
considerably the Flow line Inlet pressure and the caudal
Flow from wells increase as well. (VFlow↑→ Ta↑↑ and
Pressure↓).
1 OFF550 SUBSEA TECHNOLOGY Project Report / ANCHOIS – 1 Field
! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!By!Jose!V.Taboada!//!Stud.nr:!217961!
!
• A considerable reduction of the CAPEX, due to a minor
controls requirements and the installation Cost, in
contrast the Net increases in Oil production (QFlow↑=
$↑↑).
Therefore, using a Multi-Manifold will increase the Control
Capacity, Flexibility, Reservoir Management and Production.
As third key component, shall be cited the Subsea Control
Module, which one shall be capable of management and
controlling each VX-Tree with associated sensors, valves, and
flow control system, in addition to downhole applications.
Other Options and Solutions
We could carry out two main types of subsea solutions;
1. Deepwater Platform to Onshore Plan
(“Offshore stand-alone development”).
2. “Subsea Wells Tie-back to Onshore Plant” through
“Template”.
For the first one, the impact of this conceptual development has
high cost of implementation for Facilities Offshore, which ones
will increase the Cost of Production phase, that means shall raise
considerable the Reduced Costs during cited phase, as result that
Equipment is not designed for the entire project life, having
interchangeable phases.
In the second one, to consider this conceptual idea, could be
carry out and satisfactory to implement for this Well-Stream
Composition in particular. The Template is a large steel structure
which is used as a base of a global integration for wells, subsea
trees and manifolds.
This subsea well configuration has better global integration of
the subsea equipment and productive structures covering, to
prevent damage from fishing activities. But breaks down the
further concept develop in the area (“Flexibility for new tie-in of
the new discoveries”).
Optimal Solution
As was stated above, the solution to execute might be a “Subsea
Wells Tie-back to Onshore Plant” through “Subsea Wells +
Multi-Manifold”.
Knowing that reservoir is close to shore and located between
shallow to transitional waters (D=387m), due to using this
concept selection will contribute to avoid the huge cost of
displacement a Platform dry/wet wells and FSU or even high
Risk levels during the Production(“Offshore stand-alone
development”).
By other hand, according to the estimates reserves provided
(100Bcf = 2.8Bcm =2.779MMSm3
=16.479MM BOE) consider
this Input information given, could be classified as big field, that
means, installing of this concept selection (“Subsea Wells Tie-
back to Onshore Plant”) will contribute for a long period of life
cycle Production, reducing costs during the Production phase.
From OPEX perspective, exist less leak possibilities, less risk of
mal-operations, and simplified operational procedures.
Although, having into account the needs of the Field itself (Big
reservoir + Two columns of gas), the most optimal philosophy
design to carry out (“Subsea Wells + Multi-Manifold”) for this
Well-Stream Composition, looking to keep open new
possibilities for new subsea wells located around further, that
means using Multi-Manifold (with Gas Condensate Pumps) is
going to allow us, more Infield Flowlines into the same Multi-
Manifold, as well was explained previously.
The magnitude of Pipeline Export system (L=40Km) will have a
better contribution during the production phase for this solution,
rather than “Offshore stand-alone development” solution, which
one is suitable for small fields.
In summary, the Facilities (Risers, Export Pipeline rises, Subsea
System, Topside Production Facilities or Mooring lines) will be
avoided to install and mobilize that Equipment.
A balance between Economical, Technical and Strategic issues
had been found for an optimal solution.
Risk and Lessons Learned
Focus on the “Offshore stand-alone development”, in case to
implement this concept development, is going to originate more
Risk Levels during the Production Phase, due to is necessary to
mobilized and implement more Equipment Supply Offshore,
rather than the concept determined above.(“Subsea Wells Tie-
back to Onshore Plant”).
For the Optimal solution, the formation of Span and Buckling
along 40Km of pipeline to shore, are quite likely to happen these
types of Risk, as consequence of the conditions and properties
(Sand = Soft Friction) on Seabed, as well as high dimensioning
requirement for the legs/foundations of the Multi-Manifold. Such
as, a Corrosion distribution along the pipeline, shall be expected
to happen.
As main Risk of Flow Assurance, obviously is the Gas-Bearing
Sand formation that might be gives the chance to originated
Slugg Effect, or even sand screen failure. The mitigation of this
harms, shall be prevent through as first barrier, a Sand Control
System (Active Sand Control is needed!), and with second
barrier on the Terminal Plant (Onshore), through Slugg Catchers.
From the Economical perspective, the installation along pipeline
to shore (40Km) will rise up the CAPEX investment, and also
reduced the controls requirements and given more flexibility.
As Risk induced by the Owner (Repsol YPF) might not be
willing to invest enough money for O&M while Wells were
producing profitably.
Concerning to the Environmental Risk, the Concept selected as
Optimal, will have a major impact on the Sea bottom nature or
even a limitation area for fishing activities.
1 OFF550 SUBSEA TECHNOLOGY Project Report / ANCHOIS – 1 Field
! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!By!Jose!V.Taboada!//!Stud.nr:!217961!
!
References
[1]http://www.onhym.com/Default.aspx?alias=www.onhym.com
/EN
[2]Leslie Adriaansen, Jens Henrik Neuenkirchen, Jim Cattanach,
Sigurd Moe, Carl Eriksen and Huge Clayton. Subsea Control and
Data Acquisition. Professional Engineering Publishing(June -
2002).
[3]API RP 17A, Recommended Pratice 17A, Design and
Operation of Subsea Production Systems.Second Edition(Sept –
1996).
[4]http://www.repsol.com/es_en/corporacion/prensa/notas-de-
prensa/ultimas-
notas/descubrimiento_gas_aguas_marruecos.aspx
[5]http://www.tekna.no/ikbViewer/Content/22993/Nils%252520
Arne%25252 0S%2525C3%2525B8lvik.pdf
[6] http://www.subseaworld.com/fields/dana-petroleum-makes-
gas-discovery- offshore-marocco-02913.html
!
OFF550 SUBSEA TECHNOLOGY ANNEXES Project Report /ANCHOIS – 1 Field
!
1
!
By!Jose!V.!Taboada!//!Stud.nr:!217961!
!
! !
!
!!!!!"!Global!Representation!"!
!
!
!
!
!
!
OFF550 SUBSEA TECHNOLOGY ANNEXES Project Report /ANCHOIS – 1 Field
!
2
!
By!Jose!V.!Taboada!//!Stud.nr:!217961!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!Ref:!ONYM(www.onhym.com).Ac5vity!Report!2009.Office!Na5onal!Des!Hydrocarbures!et!des!mines.!Kingdom!of!Morocco.!2009.!
!
!
!
! ! ! !!
!
!
!!
OFF550%SUBSEA%TECHNOLOGY%%%2%By%Jose%V.Tabaoda_St.nr:%217961%2%%%%%%%%%%%%%%%
Project%Report%/ANCHOIS%–%1%Field%!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !Ref:!ONYM(www.onhym.com).Ac5vity!Report!2009.Office!Na5onal!Des!Hydrocarbures!et!des!mines.!Kingdom!of!Morocco.!2009.!
!
!
!
! ! ! !!
!
!
!!
OFF550%SUBSEA%TECHNOLOGY%%%2%By%Jose%V.Tabaoda_St.nr:%217961%2%%%%%%%%%%%%%%%
Project%Report%/ANCHOIS%–%1%Field%!
!
Annexes!
NGL!
Compressor!
Sta5on!
!!
OFF550%SUBSEA%TECHNOLOGY%%%2%By%Jose%V.Tabaoda_St.nr:%217961%2%%%%%%%%%%%%%%%
Project%Report%/ANCHOIS%–%1%Field%!
!
!!
OFF550%SUBSEA%TECHNOLOGY%%%2%By%Jose%V.Tabaoda_St.nr:%217961%2%%%%%%%%%%%%%%%
Project%Report%/ANCHOIS%–%1%Field%!
!
!!
OFF550%SUBSEA%TECHNOLOGY%%%2%By%Jose%V.Tabaoda_St.nr:%217961%2%%%%%%%%%%%%%%%
Project%Report%/ANCHOIS%–%1%Field%!
!
!!
OFF550%SUBSEA%TECHNOLOGY%%%2%By%Jose%V.Tabaoda_St.nr:%217961%2%%%%%%%%%%%%%%%
Project%Report%/ANCHOIS%–%1%Field%!
!!  Project(Overview(
N  Objec.ve:(To!transport!Rich!Gas!from!Blocks!(47,!48,!
and!49)!to!Onshore!Plant!Facili5es.!
N  Field(Development:(Subsea!+!Offshore!Flowline!+!
Pigging!Line.(“Subsea'to'Shore'–'S2S”)!
N  Concept(Selected:!“Subsea!Wells!TieNback!to!Onshore!
Plant”!through!“Subsea!Wells!+!Mul5NManifold”.!!
N  Drive(Mechanism:!Rich!Gas!+!Condensate!shall!be!
Recovered!by!Deple2on!and!later!by!Gas'
Compression.!
N  Loca.on(:(From!“Anchois!1”!wells!to!the!Onshore!
Facili5es!at!40Km!off!the!Morocco!shoreline!to!South!
West(SW).!
N  Owner:(Repsol!YPF!(36%)!
N  Shareholders(:(Gas!Natural!Explora5on!SL!(24%),!
Dana!Petroleum!(D&P)!LTD!(15%)!and!ONHYM!(25%).!
N  Capacity:!100Bcf!=!2.8Bcm!=2.779MMSm3(High!
Volume!of!Rich!Gas!moved).!
N  Target!Depth!(TD)!Points!for!each!Column!of!Gas,!are!
depth.!!(Greater!Depth!Reservoir!=!High!Pressure)!!
!  Schedule(&(Phases(
N  Prospec.on:(during!2009!(Discovery!in!March!2009).!
N  Explora.on:(during!2011.!
N  Drilling:(during!2013.!
N  Produc.on:(Forward!2014.!
!  Challenges(
N!!!!!!Flow!Assurances.!
N  Well!Stream!Composi5on.!
N  Remote!Control.!
N  Corrosion!Control!&!Corrosion!Monitoring.!
N  GasNBearing!Sand!forma5on.(demanded%acousSc%%%
Sand%Control).!
N  Gas!Hydrates!forma5on.(avoid%through%MEG'flow%
control).!
N  Pipelines!Rou5ng.(Against!Wave!Impact!&!Abrasion!
from!moving!Sand!and!Gravel).!
!  Design(Objec.ves(
N  Be!available!to!produce!as!much!as!possible!from!
Reservoir.[QOutLetFlow!=↑$!↑!]/Max(Produc.vity!/!
N  LowNCost!Pumping!for!both!Gas!Wells!to!recovery!
more!Gas./Minimize(Energy(Consump.on/!
N  The!whole!system!must!be!FailESafe.!
N  Marine!Systems/Subsea!Technology!for!Improved(
Operability(and!CAPEX/OPEX(Op.miza.on.!
N  Reservoir!Proper5es!on!a!wide!range!of!Inlet!
composi5ons.!(Flow(Assurance)!
N  Environmental(Impact!Considera5ons.(HSE)!

More Related Content

What's hot

Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012ggurudev
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasAshwin Gadgil
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production SystemspetroEDGE
 
Trenchless technologies comparing thrust boring with horizontal directional ...
Trenchless technologies  comparing thrust boring with horizontal directional ...Trenchless technologies  comparing thrust boring with horizontal directional ...
Trenchless technologies comparing thrust boring with horizontal directional ...Tobiloba Omitola
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsSarah El Akkad
 
Design & operation of topsides gas field
Design & operation of topsides gas fieldDesign & operation of topsides gas field
Design & operation of topsides gas fieldashutoshgugnani
 
Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-finalJohn Grover
 
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesvinod kumar
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
Application of intelligent well completion in optimizing production
Application of intelligent well completion in optimizing productionApplication of intelligent well completion in optimizing production
Application of intelligent well completion in optimizing productionChirag Vanecha
 
Zion Station RV Segmentation Presentation 37 pgs
Zion Station RV Segmentation Presentation   37 pgsZion Station RV Segmentation Presentation   37 pgs
Zion Station RV Segmentation Presentation 37 pgsGary Krautwurst
 

What's hot (20)

Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
SPE-172315-MS-Turkmenistan
SPE-172315-MS-TurkmenistanSPE-172315-MS-Turkmenistan
SPE-172315-MS-Turkmenistan
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentation
 
Trenchless technologies comparing thrust boring with horizontal directional ...
Trenchless technologies  comparing thrust boring with horizontal directional ...Trenchless technologies  comparing thrust boring with horizontal directional ...
Trenchless technologies comparing thrust boring with horizontal directional ...
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultants
 
Design & operation of topsides gas field
Design & operation of topsides gas fieldDesign & operation of topsides gas field
Design & operation of topsides gas field
 
Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5Statoil innovate subsea_technology_v5
Statoil innovate subsea_technology_v5
 
OGJ Nordstream
OGJ NordstreamOGJ Nordstream
OGJ Nordstream
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12
 
over veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelinesover veiw on desighn of offshore pipelines
over veiw on desighn of offshore pipelines
 
Preview ap
Preview apPreview ap
Preview ap
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Application of intelligent well completion in optimizing production
Application of intelligent well completion in optimizing productionApplication of intelligent well completion in optimizing production
Application of intelligent well completion in optimizing production
 
Zion Station RV Segmentation Presentation 37 pgs
Zion Station RV Segmentation Presentation   37 pgsZion Station RV Segmentation Presentation   37 pgs
Zion Station RV Segmentation Presentation 37 pgs
 
WaterfloodDoc
WaterfloodDocWaterfloodDoc
WaterfloodDoc
 

Viewers also liked

AJ Troup- Broncos digital media strategy
AJ Troup- Broncos digital media strategy AJ Troup- Broncos digital media strategy
AJ Troup- Broncos digital media strategy troupstar19
 
2014 ECAC Football Bowls GuideX
2014 ECAC Football Bowls GuideX2014 ECAC Football Bowls GuideX
2014 ECAC Football Bowls GuideXGuy Fortt
 
OHS DMT hour 6 Dream Vacation
OHS DMT hour 6 Dream VacationOHS DMT hour 6 Dream Vacation
OHS DMT hour 6 Dream Vacationsjs3556
 
על האושר
על האושרעל האושר
על האושרalonhmdt
 
Mindmup_discussio_david_núria
Mindmup_discussio_david_núriaMindmup_discussio_david_núria
Mindmup_discussio_david_núriaDavid Bonet
 
CherryBombClothes
CherryBombClothesCherryBombClothes
CherryBombClothesABrown31
 
Engineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoeEngineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoeAnjhoe Eduria
 
הדברים החשובים בחיים
הדברים החשובים בחייםהדברים החשובים בחיים
הדברים החשובים בחייםalonhmdt
 
CrowdComfort: The Advantages of Mobile Facility Management
CrowdComfort: The Advantages of Mobile Facility ManagementCrowdComfort: The Advantages of Mobile Facility Management
CrowdComfort: The Advantages of Mobile Facility ManagementThomas Beaton
 
Protected areas in Iran-مناطق حفاظت شده در ایران
Protected areas in Iran-مناطق حفاظت شده در ایرانProtected areas in Iran-مناطق حفاظت شده در ایران
Protected areas in Iran-مناطق حفاظت شده در ایرانUniversity of Twente
 
портфоліо презентація куніц о.м.
портфоліо презентація  куніц о.м. портфоліо презентація  куніц о.м.
портфоліо презентація куніц о.м. Елена Кен
 
עבריינות צווארון לבן
עבריינות צווארון לבןעבריינות צווארון לבן
עבריינות צווארון לבןalonhmdt
 

Viewers also liked (20)

AJ Troup- Broncos digital media strategy
AJ Troup- Broncos digital media strategy AJ Troup- Broncos digital media strategy
AJ Troup- Broncos digital media strategy
 
2014 ECAC Football Bowls GuideX
2014 ECAC Football Bowls GuideX2014 ECAC Football Bowls GuideX
2014 ECAC Football Bowls GuideX
 
OHS DMT hour 6 Dream Vacation
OHS DMT hour 6 Dream VacationOHS DMT hour 6 Dream Vacation
OHS DMT hour 6 Dream Vacation
 
על האושר
על האושרעל האושר
על האושר
 
Mindmup_discussio_david_núria
Mindmup_discussio_david_núriaMindmup_discussio_david_núria
Mindmup_discussio_david_núria
 
Sumit Resume(1)
Sumit Resume(1)Sumit Resume(1)
Sumit Resume(1)
 
CherryBombClothes
CherryBombClothesCherryBombClothes
CherryBombClothes
 
Halloween around the world
Halloween around the worldHalloween around the world
Halloween around the world
 
Engineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoeEngineer cum drafter designer eduria anjhoe
Engineer cum drafter designer eduria anjhoe
 
DAMMY'S UPGRADED CV
DAMMY'S UPGRADED CVDAMMY'S UPGRADED CV
DAMMY'S UPGRADED CV
 
הדברים החשובים בחיים
הדברים החשובים בחייםהדברים החשובים בחיים
הדברים החשובים בחיים
 
CrowdComfort: The Advantages of Mobile Facility Management
CrowdComfort: The Advantages of Mobile Facility ManagementCrowdComfort: The Advantages of Mobile Facility Management
CrowdComfort: The Advantages of Mobile Facility Management
 
Undang-Undang
Undang-UndangUndang-Undang
Undang-Undang
 
خشکسالی-Drought
خشکسالی-Droughtخشکسالی-Drought
خشکسالی-Drought
 
Amandemen IV UUD 1945
Amandemen IV UUD 1945Amandemen IV UUD 1945
Amandemen IV UUD 1945
 
Party time job
Party time jobParty time job
Party time job
 
Protected areas in Iran-مناطق حفاظت شده در ایران
Protected areas in Iran-مناطق حفاظت شده در ایرانProtected areas in Iran-مناطق حفاظت شده در ایران
Protected areas in Iran-مناطق حفاظت شده در ایران
 
портфоліо презентація куніц о.м.
портфоліо презентація  куніц о.м. портфоліо презентація  куніц о.м.
портфоліо презентація куніц о.м.
 
עבריינות צווארון לבן
עבריינות צווארון לבןעבריינות צווארון לבן
עבריינות צווארון לבן
 
Penelitian Amnesty
Penelitian AmnestyPenelitian Amnesty
Penelitian Amnesty
 

Similar to Morocco Anchois-1 Field Subsea Tieback

Collaboration delivers first Lower Tertiary smart completion system
Collaboration delivers first Lower Tertiary smart completion systemCollaboration delivers first Lower Tertiary smart completion system
Collaboration delivers first Lower Tertiary smart completion systemBaker Hughes
 
Subsea completion and control system
Subsea completion and control systemSubsea completion and control system
Subsea completion and control systemAmit Nitharwal
 
SPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfSPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfJalal Neshat
 
Improving Efficiency Tight Gas
Improving Efficiency Tight GasImproving Efficiency Tight Gas
Improving Efficiency Tight GasNeil Harvey
 
Sector Summary - Subsea
Sector Summary - SubseaSector Summary - Subsea
Sector Summary - SubseaThomas Burke
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Emeka Ngwobia
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 ManuscriptNghi Nguyen
 
Horizontal vertical christmas tree ppt
Horizontal vertical christmas tree pptHorizontal vertical christmas tree ppt
Horizontal vertical christmas tree pptAmar Gaikwad
 
Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNGRonak Sani
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specificationCARLOS RUIZ CARDENAS
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field developmentHamid S
 
Installation challenges
Installation challengesInstallation challenges
Installation challengesAndrea Intieri
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Developmentfhmutairi
 
Facilities Engineering Coursework
Facilities Engineering CourseworkFacilities Engineering Coursework
Facilities Engineering Courseworklwandfluh
 
Floating LNG/CNG Processing & Storage Offshore Platforms Utilizing a New Tank...
Floating LNG/CNG Processing & Storage Offshore Platforms Utilizing a New Tank...Floating LNG/CNG Processing & Storage Offshore Platforms Utilizing a New Tank...
Floating LNG/CNG Processing & Storage Offshore Platforms Utilizing a New Tank...Altair ProductDesign
 

Similar to Morocco Anchois-1 Field Subsea Tieback (20)

Collaboration delivers first Lower Tertiary smart completion system
Collaboration delivers first Lower Tertiary smart completion systemCollaboration delivers first Lower Tertiary smart completion system
Collaboration delivers first Lower Tertiary smart completion system
 
Subsea completion and control system
Subsea completion and control systemSubsea completion and control system
Subsea completion and control system
 
SPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdfSPE171748 Surface Safety System for ZADCO (4).pdf
SPE171748 Surface Safety System for ZADCO (4).pdf
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
 
Improving Efficiency Tight Gas
Improving Efficiency Tight GasImproving Efficiency Tight Gas
Improving Efficiency Tight Gas
 
IPTC_12_2015
IPTC_12_2015IPTC_12_2015
IPTC_12_2015
 
Sector Summary - Subsea
Sector Summary - SubseaSector Summary - Subsea
Sector Summary - Subsea
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 Manuscript
 
Horizontal vertical christmas tree ppt
Horizontal vertical christmas tree pptHorizontal vertical christmas tree ppt
Horizontal vertical christmas tree ppt
 
SPE WVS-593.
SPE WVS-593. SPE WVS-593.
SPE WVS-593.
 
Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNG
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
Subsea field development
Subsea field developmentSubsea field development
Subsea field development
 
Roy Shilling
Roy ShillingRoy Shilling
Roy Shilling
 
Installation challenges
Installation challengesInstallation challenges
Installation challenges
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Development
 
Facilities Engineering Coursework
Facilities Engineering CourseworkFacilities Engineering Coursework
Facilities Engineering Coursework
 
Floating LNG/CNG Processing & Storage Offshore Platforms Utilizing a New Tank...
Floating LNG/CNG Processing & Storage Offshore Platforms Utilizing a New Tank...Floating LNG/CNG Processing & Storage Offshore Platforms Utilizing a New Tank...
Floating LNG/CNG Processing & Storage Offshore Platforms Utilizing a New Tank...
 

Recently uploaded

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 

Recently uploaded (20)

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 

Morocco Anchois-1 Field Subsea Tieback

  • 1. 1 OFF550 SUBSEA TECHNOLOGY Project Report / ANCHOIS – 1 Field ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!By!Jose!V.Taboada!//!Stud.nr:!217961! ! Project Overview The “Anchois – 1” is part of the Production Tanger-Larache blocks (47, 48, and 49 in Offshore Morocco), the overall of the area is around 2744 m2 , being located at 40Km off the Morocco shoreline to South West (SW). The project operator is lead by Repsol YPF SA (36%), and operated the consortium with: Gas Natural Exploration SL→ 24% Dana Petroleum (D&P) LTD→ 15% ONHYM→ 25% The “Anchois – 1” includes encountering reservoir with 90 m of Gross Gas Column in Two sections (100Bcf = 2.8Bcm =2.779MMSm3). Potential restriction with “Gas-Bearing Sands” detected. The “Anchois – 1” reservoir is a discovery from March 2009. The Field Development contains a Subsea, Offshore Flowline and Pigging Line infrastructure. The concept selection carry out is a Subsea System tied back and exported to Onshore Plant (“Subsea Wells Tie-back to Onshore Plant”) via flow lines and control umbilical. The field itself shall be designed with flexibility for new tie-in of the new discoveries further in the area. Prospection phase has been development in 2009, and Exploration was during 2011 and the Drilling phase along 2013. The water depth is around 387m.The field representation and existing subsea infrastructure, shown on the Annexes. Subsea Concept First at all, to reach up a determination of a Subsea Concept, to carry out and be implement, shall be base on the ‘‘Objectives of the Design’’, are listed below: ! Efficient Interface coordination (between Drilling &Well, Subsurface, Downstream Facilities). ! Cover all design premises for the facilities concept development process, and successive development steps. ! Have into account, future operational objectives and functional requirements for field. ! Establish coalition between services companies and operator. In based on previous objectives cited above, the Concept selected shall be a “Subsea Wells Tie-back to Onshore Plant” through “Subsea Wells + Multi-Manifold”.(See Annexes representation). Which one, has been determined through a survey of couple number of parameters and requirements to satisfy. As main requirement of the concept, shall allow for tie-in of the future prospects in the area, for more Subsea Templates, in addition to possible future Low-pressure production. Which one, we concept selected allows that. In terms of production rate, using Multi- Manifold (with Gas Condensate Pumps) will increase considerable high, due to two pumps in parallel position integrated. (QOutLetFlow=QA+ QB → ↑"$ ↑), this particular dimensioning allows to decrease the pressure rate at the outlet in the Multi- Manifold (HOutLetFlow=HA- HB → POutLetFlow↓↓). See next representation below; . Figure 1. Pumps production system into the Multi-Manifold. In contrast, using this type of dimensioning is going to demand more consuming Energy Supply. Sand detectors and Gas meters will be installed at the Wellhead on each well. Such as, Salt detection will be installed as part of the wet gas meters. The objective of this subsea solution is to keep up affordable to a manageable level of activity within a reasonable time frame, and balancing the full lifecycle with the benefits of production from the field. Subsea Features and Key Equipment The whole Subsea installation begins from Subsea satellite wells, to ending of the Flow lines and Cables to Onshore plant. The key pieces equipment, could the two VXTree for each well, have the next characteristic bellow; • Simple installation from Vessel, as result a decrease of Cost Installation. • Save Energy Supply, only is needed one time to run each BOP from shore. As second key part of the installation, could be the Mult- Manifold (with Gas Condensate Pumps), being classified as key element for the whole installation, for the next reason below; • Allows flexibility for new tie-in of the new discoveries further in the area (new Infield Flow lines into the same Multi-Manifold). • Rise up the caudal Flow production, from each column of Gas, due to two pumps, as having also safety effect to avoid the formation of ‘Gas Hydrates’, where the pumps will draw down wellhead pressure and increase considerably the Flow line Inlet pressure and the caudal Flow from wells increase as well. (VFlow↑→ Ta↑↑ and Pressure↓).
  • 2. 1 OFF550 SUBSEA TECHNOLOGY Project Report / ANCHOIS – 1 Field ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!By!Jose!V.Taboada!//!Stud.nr:!217961! ! • A considerable reduction of the CAPEX, due to a minor controls requirements and the installation Cost, in contrast the Net increases in Oil production (QFlow↑= $↑↑). Therefore, using a Multi-Manifold will increase the Control Capacity, Flexibility, Reservoir Management and Production. As third key component, shall be cited the Subsea Control Module, which one shall be capable of management and controlling each VX-Tree with associated sensors, valves, and flow control system, in addition to downhole applications. Other Options and Solutions We could carry out two main types of subsea solutions; 1. Deepwater Platform to Onshore Plan (“Offshore stand-alone development”). 2. “Subsea Wells Tie-back to Onshore Plant” through “Template”. For the first one, the impact of this conceptual development has high cost of implementation for Facilities Offshore, which ones will increase the Cost of Production phase, that means shall raise considerable the Reduced Costs during cited phase, as result that Equipment is not designed for the entire project life, having interchangeable phases. In the second one, to consider this conceptual idea, could be carry out and satisfactory to implement for this Well-Stream Composition in particular. The Template is a large steel structure which is used as a base of a global integration for wells, subsea trees and manifolds. This subsea well configuration has better global integration of the subsea equipment and productive structures covering, to prevent damage from fishing activities. But breaks down the further concept develop in the area (“Flexibility for new tie-in of the new discoveries”). Optimal Solution As was stated above, the solution to execute might be a “Subsea Wells Tie-back to Onshore Plant” through “Subsea Wells + Multi-Manifold”. Knowing that reservoir is close to shore and located between shallow to transitional waters (D=387m), due to using this concept selection will contribute to avoid the huge cost of displacement a Platform dry/wet wells and FSU or even high Risk levels during the Production(“Offshore stand-alone development”). By other hand, according to the estimates reserves provided (100Bcf = 2.8Bcm =2.779MMSm3 =16.479MM BOE) consider this Input information given, could be classified as big field, that means, installing of this concept selection (“Subsea Wells Tie- back to Onshore Plant”) will contribute for a long period of life cycle Production, reducing costs during the Production phase. From OPEX perspective, exist less leak possibilities, less risk of mal-operations, and simplified operational procedures. Although, having into account the needs of the Field itself (Big reservoir + Two columns of gas), the most optimal philosophy design to carry out (“Subsea Wells + Multi-Manifold”) for this Well-Stream Composition, looking to keep open new possibilities for new subsea wells located around further, that means using Multi-Manifold (with Gas Condensate Pumps) is going to allow us, more Infield Flowlines into the same Multi- Manifold, as well was explained previously. The magnitude of Pipeline Export system (L=40Km) will have a better contribution during the production phase for this solution, rather than “Offshore stand-alone development” solution, which one is suitable for small fields. In summary, the Facilities (Risers, Export Pipeline rises, Subsea System, Topside Production Facilities or Mooring lines) will be avoided to install and mobilize that Equipment. A balance between Economical, Technical and Strategic issues had been found for an optimal solution. Risk and Lessons Learned Focus on the “Offshore stand-alone development”, in case to implement this concept development, is going to originate more Risk Levels during the Production Phase, due to is necessary to mobilized and implement more Equipment Supply Offshore, rather than the concept determined above.(“Subsea Wells Tie- back to Onshore Plant”). For the Optimal solution, the formation of Span and Buckling along 40Km of pipeline to shore, are quite likely to happen these types of Risk, as consequence of the conditions and properties (Sand = Soft Friction) on Seabed, as well as high dimensioning requirement for the legs/foundations of the Multi-Manifold. Such as, a Corrosion distribution along the pipeline, shall be expected to happen. As main Risk of Flow Assurance, obviously is the Gas-Bearing Sand formation that might be gives the chance to originated Slugg Effect, or even sand screen failure. The mitigation of this harms, shall be prevent through as first barrier, a Sand Control System (Active Sand Control is needed!), and with second barrier on the Terminal Plant (Onshore), through Slugg Catchers. From the Economical perspective, the installation along pipeline to shore (40Km) will rise up the CAPEX investment, and also reduced the controls requirements and given more flexibility. As Risk induced by the Owner (Repsol YPF) might not be willing to invest enough money for O&M while Wells were producing profitably. Concerning to the Environmental Risk, the Concept selected as Optimal, will have a major impact on the Sea bottom nature or even a limitation area for fishing activities.
  • 3. 1 OFF550 SUBSEA TECHNOLOGY Project Report / ANCHOIS – 1 Field ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!By!Jose!V.Taboada!//!Stud.nr:!217961! ! References [1]http://www.onhym.com/Default.aspx?alias=www.onhym.com /EN [2]Leslie Adriaansen, Jens Henrik Neuenkirchen, Jim Cattanach, Sigurd Moe, Carl Eriksen and Huge Clayton. Subsea Control and Data Acquisition. Professional Engineering Publishing(June - 2002). [3]API RP 17A, Recommended Pratice 17A, Design and Operation of Subsea Production Systems.Second Edition(Sept – 1996). [4]http://www.repsol.com/es_en/corporacion/prensa/notas-de- prensa/ultimas- notas/descubrimiento_gas_aguas_marruecos.aspx [5]http://www.tekna.no/ikbViewer/Content/22993/Nils%252520 Arne%25252 0S%2525C3%2525B8lvik.pdf [6] http://www.subseaworld.com/fields/dana-petroleum-makes- gas-discovery- offshore-marocco-02913.html !
  • 4. OFF550 SUBSEA TECHNOLOGY ANNEXES Project Report /ANCHOIS – 1 Field ! 1 ! By!Jose!V.!Taboada!//!Stud.nr:!217961! ! ! ! ! !!!!!"!Global!Representation!"! ! ! ! ! ! !
  • 5. OFF550 SUBSEA TECHNOLOGY ANNEXES Project Report /ANCHOIS – 1 Field ! 2 ! By!Jose!V.!Taboada!//!Stud.nr:!217961! ! ! ! ! !
  • 7. ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !Ref:!ONYM(www.onhym.com).Ac5vity!Report!2009.Office!Na5onal!Des!Hydrocarbures!et!des!mines.!Kingdom!of!Morocco.!2009.! ! ! ! ! ! ! !! ! ! !! OFF550%SUBSEA%TECHNOLOGY%%%2%By%Jose%V.Tabaoda_St.nr:%217961%2%%%%%%%%%%%%%%% Project%Report%/ANCHOIS%–%1%Field%! ! Annexes! NGL! Compressor! Sta5on!
  • 11. !! OFF550%SUBSEA%TECHNOLOGY%%%2%By%Jose%V.Tabaoda_St.nr:%217961%2%%%%%%%%%%%%%%% Project%Report%/ANCHOIS%–%1%Field%! !!  Project(Overview( N  Objec.ve:(To!transport!Rich!Gas!from!Blocks!(47,!48,! and!49)!to!Onshore!Plant!Facili5es.! N  Field(Development:(Subsea!+!Offshore!Flowline!+! Pigging!Line.(“Subsea'to'Shore'–'S2S”)! N  Concept(Selected:!“Subsea!Wells!TieNback!to!Onshore! Plant”!through!“Subsea!Wells!+!Mul5NManifold”.!! N  Drive(Mechanism:!Rich!Gas!+!Condensate!shall!be! Recovered!by!Deple2on!and!later!by!Gas' Compression.! N  Loca.on(:(From!“Anchois!1”!wells!to!the!Onshore! Facili5es!at!40Km!off!the!Morocco!shoreline!to!South! West(SW).! N  Owner:(Repsol!YPF!(36%)! N  Shareholders(:(Gas!Natural!Explora5on!SL!(24%),! Dana!Petroleum!(D&P)!LTD!(15%)!and!ONHYM!(25%).! N  Capacity:!100Bcf!=!2.8Bcm!=2.779MMSm3(High! Volume!of!Rich!Gas!moved).! N  Target!Depth!(TD)!Points!for!each!Column!of!Gas,!are! depth.!!(Greater!Depth!Reservoir!=!High!Pressure)!! !  Schedule(&(Phases( N  Prospec.on:(during!2009!(Discovery!in!March!2009).! N  Explora.on:(during!2011.! N  Drilling:(during!2013.! N  Produc.on:(Forward!2014.! !  Challenges( N!!!!!!Flow!Assurances.! N  Well!Stream!Composi5on.! N  Remote!Control.! N  Corrosion!Control!&!Corrosion!Monitoring.! N  GasNBearing!Sand!forma5on.(demanded%acousSc%%% Sand%Control).! N  Gas!Hydrates!forma5on.(avoid%through%MEG'flow% control).! N  Pipelines!Rou5ng.(Against!Wave!Impact!&!Abrasion! from!moving!Sand!and!Gravel).! !  Design(Objec.ves( N  Be!available!to!produce!as!much!as!possible!from! Reservoir.[QOutLetFlow!=↑$!↑!]/Max(Produc.vity!/! N  LowNCost!Pumping!for!both!Gas!Wells!to!recovery! more!Gas./Minimize(Energy(Consump.on/! N  The!whole!system!must!be!FailESafe.! N  Marine!Systems/Subsea!Technology!for!Improved( Operability(and!CAPEX/OPEX(Op.miza.on.! N  Reservoir!Proper5es!on!a!wide!range!of!Inlet! composi5ons.!(Flow(Assurance)! N  Environmental(Impact!Considera5ons.(HSE)!