3. Supervision ofWater Supply Systems RehabilitationWorks in 17 (21)Towns of Georgia under WIMP
(Rehabilitation of OzurgetiWater Supply System - EIB/WIMP/W/ICB/12-L1)
Due to deteriorated conditions of existing City Network and Transmission Main Pipelines, part of City
Network is to be rehabilitated. 3nr of Pump Stations were to be fully rehabilitated and system
modernzied.
Project included: rehabilitation of 3nr pump stations with installation , including complete civil
rehabilitation works, provision of new pumps (8nr in total ranging from 360m3/h @ H=65.2m ,to
160m3/h @ H=80.4m), associated Steel Pipes, Valves & Fittings, new Pump Motor Control panels,
Building Services, new High Voltage & Low Voltage Switchgear, SCADA System (automatic Pump
Control, Flow Measurement, Chlorine Residual Monitoring) and installation of Chlorine Gas Dosing
Systems.
Extension of Distribution Network, installation of Distribution Network 5,700m of PE100 Pipe (OD250,
OD200, OD160, OD110, OD90 & OD63), 385m of Steel d219/5mm Pipe, associated 264nr House
Connections & associated 2,000m of PE100 Pipe (OD20) and “sectoring” of Network with 19nrValves.
35. EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR
EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER
IN CASE OF EMERGENCY
MONORAIL CRANES SYSTEM (2T) FOR DELIVERY,
REPLACEMENT AND EVACUATION OF CHLORINE GAS
CYLINDERS
37. PS#3 SIDE VIEW WITH NEW PUMP’S CRANE MONORAIL
EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR
EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER
IN CASE OF EMERGENCY
48. EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR
EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER
IN CASE OF EMERGENCY
CHLORINE GAS CHLORINE GENERATION EQUIPMENT
51. EXISTING STEEL PIPELINE AND NEW PE PIPELINE, OLD PIPE
WAS DISCONNECTED DURING CONSTRUCTION WORKS
TRANSMISSION MAIN PE DN200 CONNECTION TO PS#3
52. 13NR BRANCHES INSTALLED (PE DN63-160MM) IN TOTAL
LENGTH OF 3,060M) WITH 217NR HOUSE CONNECTIONS
PRESSURE TESTING AS PER
“SNIP” CONSTRUCTION NORMS AND REGULATIONS 3.05.04-
85*
53. PE PIPE JOINTS WELDING
PREFABRICATED CONCRETE MANHOLES WITH BITUMEN
CORROSION PROTECTIVE LAYERS