Supervision ofWater Supply Systems RehabilitationWorks in 17 (21)Towns of Georgia under WIMP
(Rehabilitation of OzurgetiWater Supply System - EIB/WIMP/W/ICB/12-L1)
 Due to deteriorated conditions of existing City Network and Transmission Main Pipelines, part of City
Network is to be rehabilitated. 3nr of Pump Stations were to be fully rehabilitated and system
modernzied.
 Project included: rehabilitation of 3nr pump stations with installation , including complete civil
rehabilitation works, provision of new pumps (8nr in total ranging from 360m3/h @ H=65.2m ,to
160m3/h @ H=80.4m), associated Steel Pipes, Valves & Fittings, new Pump Motor Control panels,
Building Services, new High Voltage & Low Voltage Switchgear, SCADA System (automatic Pump
Control, Flow Measurement, Chlorine Residual Monitoring) and installation of Chlorine Gas Dosing
Systems.
 Extension of Distribution Network, installation of Distribution Network 5,700m of PE100 Pipe (OD250,
OD200, OD160, OD110, OD90 & OD63), 385m of Steel d219/5mm Pipe, associated 264nr House
Connections & associated 2,000m of PE100 Pipe (OD20) and “sectoring” of Network with 19nrValves.
ORIGINAL FACADE NEW FACADE
ORIGINAL STATUS NEW “GRUNDFOS” PUMPS: 3X350/165M3/H, H=65M
ORIGINAL PUMP’S CONTROL CABINET NEW PUMP’S CONTROL CABINET
AUTOMATIC PUMP’S CONTROL
ORIGINAL STATUS OF EXISTING PUMPS
REHABILITATION AND INSTALLATION OF EXISTING PUMPS:
1X630M3/H, H=90M;
1X530M3/H, H=50M
ORIGINAL CEILING STATUS
DISMANTLING OF EXISTING & CONSTRUCTION OF NEW
ROOF, CRANE MONORAIL (2T)
ORIGINAL ROOF SLAB / CEILING STATUS
REHABILITATION OF EXISTING ROOF SLAB, NEW PVC
CEILING , CRANE MONORAIL (2T)
NEW ROOF CONSTRUCTION PVC CEILING, CRANE MONORAIL (2T)
ORIGINAL COLLECTIVE WELL NEW STATUS OF COLLECTIVE WELL
ORIGINAL COLLECTIVE WELL STATUS COLLECTIVE WELL DURING CONSTRUCTION
ORIGINAL COLLECTION WELL SUCTION PIPE NEW SUCTION PIPES
ORIGINAL TRANSFORMER BUILDING REHABILITATED TRANSFORMER BUILDING
NEW CONTAINER TYPE TRANSFORMER (630KVA)
NEW DOUBLE-BUNKER TYPE CHLORINATOR BUILDING
DOUBLE BUNKERS FOR CHLORINE GAS CYLINDERS
SPRINKLER SYSTEM FOR FLOODING THE CHLORINE GAS
CYLINDER
CHLORINE GENERATION EQUIPMENT, WATER
PURIFICATION BY CHLORINE GAS
ORIGINAL FAÇADE STATUS NEW FACADE
ORIGINAL PUMP
NEW PUMPS:
3X160M3/H, H=65M
ORIGINAL PUMP NEW PUMPS DURING INSTALLATION
ORIGINAL ROOF SLAB, CRANE
REHABILITATION WORKS, PVC CEILING, CRANE MONORAIL
(2T)
ORIGINAL COLLECTIVE WELL REHABILITATED WELL
SUCTION PIPES DURING INSTALLATION
ORIGINAL FAÇADE, PUMP’S CRANE MONORAIL NEW FAÇADE, MONORAIL CRANE (2T)
ORIGINAL PUMP’S CONTROL CABINET NEW PUMP’S CONTROL CABINET
ORIGINAL CHLORINE GAS CHLORINATING EQUIPMENT NEW CHLORINE GENERATION EQUIPMENT
NEW TRANSFORMER 400KVA
EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR
EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER
IN CASE OF EMERGENCY
MONORAIL CRANES SYSTEM (2T) FOR DELIVERY,
REPLACEMENT AND EVACUATION OF CHLORINE GAS
CYLINDERS
ORIGINAL FAÇADE STATUS NEW FAÇADE BEFORE PAINTING
PS#3 SIDE VIEW WITH NEW PUMP’S CRANE MONORAIL
EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR
EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER
IN CASE OF EMERGENCY
PS#3 BACKSIDE ORIGINAL STATUS
ORIGINAL PUMP NEW PUMPS: 2X160/180M3/H, H=80M
PRIMER PUMP AUTOMATIC CONTROL OF THE PUMPS
ORIGINAL CONTROL CABINET NEW CONTROL CABINET
ORIGINAL TRANSFORMER BUILDING REHABILITATED STATUS
ORIGINAL TRANSFORMER NEW TRANSFORMER 250KVA
ORIGINAL STATUS NEW STATUS
ORIGINAL STATUS OF COLLECTIVE WELL REHABILITATED COLLECTIVE WELL
EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR
EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER
IN CASE OF EMERGENCY
CHLORINE GAS CHLORINE GENERATION EQUIPMENT
TRANSMISSION/DISTRIBUTION MAIN
(KITE MEGRILADZE STREET)
IN TOTAL 1,726M OF PE100, PN12,5 DN200MM
TRANSMISSION MAIN PIPE INSTALLED CONNECTING PS#3
TO THE CITY NETWORK
PIPE MATERIAL, VALVES, HYDRANTS AND FITTINGS
EXISTING STEEL PIPELINE AND NEW PE PIPELINE, OLD PIPE
WAS DISCONNECTED DURING CONSTRUCTION WORKS
TRANSMISSION MAIN PE DN200 CONNECTION TO PS#3
13NR BRANCHES INSTALLED (PE DN63-160MM) IN TOTAL
LENGTH OF 3,060M) WITH 217NR HOUSE CONNECTIONS
PRESSURE TESTING AS PER
“SNIP” CONSTRUCTION NORMS AND REGULATIONS 3.05.04-
85*
PE PIPE JOINTS WELDING
PREFABRICATED CONCRETE MANHOLES WITH BITUMEN
CORROSION PROTECTIVE LAYERS
LARGE CONSUMER’S SERVICE LINES
LARGE CONSUMER’S SERVICE LINE MANHOLES
PIPE SADDLES FOR HOUSE CONNECTIONS SERVICE LINES CONNECTION WITH EXISTING HOUSE CONNECTION
13NR BRANCHES INSTALLED (PE DN63-160MM) IN TOTAL
LENGTH OF 3,060M)
GATE VALVES
STEEL D219X5MM PIPE IN 385M LENGTH TRENCH EXCAVATION
EXISTING PIPELINE PARALLEL TO NEW STEEL PIPELINE
ABANDONED DURING CONSTRUCTION
NODE POINTS FOR CONNECTION WITH EXISTING PIPELINES
PE DN40-250MM IN 900M LENGTH
47NR HOUSE CONNECTIONS IN 260M LENGTH WATER METER PE BOX
19NR SECTOR VALVES;
4NR RESIDUAL CHLORINE ANALYSERS;
2NR PRESSURE REDUCING VALVES
PRESSURE REDUCING VALVE SHAFT ON TRANSMISSION
MAIN
PREFABRICATED CONCRETE MANHOLES FOR
INSTALLATION OF NEW SECTOR VALVES ON EXISTING
NETWORK
SECTOR VALVES
FLOW CONTROL – PRESSURE REDUCING VALVE ON
TRANSMISSION MAIN

More Related Content

What's hot

Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingVladimir Popovic
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Michael Hewitt, GISP
 
Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelinesGasforlife Polysource
 
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Michael Hewitt, GISP
 
Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011Shammy Puri
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply schemeAby Mundackal
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...Michael Hewitt, GISP
 
Integrating GIS data with pipeline design (Part 1)
Integrating GIS data with pipeline design (Part 1)Integrating GIS data with pipeline design (Part 1)
Integrating GIS data with pipeline design (Part 1)Usman Imtiaz, (EIT, PMP)
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsSarah El Akkad
 
2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LININGTimothy Antos
 
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Michael Hewitt, GISP
 
Pipeline design for water supply
Pipeline design for water supplyPipeline design for water supply
Pipeline design for water supplyTej Binod Pandey
 
Met council Environmental Services - overview of wastewater treatment
Met council Environmental Services - overview of wastewater treatment Met council Environmental Services - overview of wastewater treatment
Met council Environmental Services - overview of wastewater treatment Amanda Bilek
 

What's hot (16)

Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
 
Pipeline Design Project
Pipeline Design ProjectPipeline Design Project
Pipeline Design Project
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
 
Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelines
 
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
Terry Schmidt, Skelly & Loy, “Big Run Restoration: A Success Story”
 
Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011Dubaidib Wellfield Sdc Presentation July2011
Dubaidib Wellfield Sdc Presentation July2011
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
 
Integrating GIS data with pipeline design (Part 1)
Integrating GIS data with pipeline design (Part 1)Integrating GIS data with pipeline design (Part 1)
Integrating GIS data with pipeline design (Part 1)
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultants
 
Plumbing training
Plumbing training Plumbing training
Plumbing training
 
2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING2015 OAWWA 30-INCH SLIP-LINING
2015 OAWWA 30-INCH SLIP-LINING
 
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
 
Pipeline design for water supply
Pipeline design for water supplyPipeline design for water supply
Pipeline design for water supply
 
Met council Environmental Services - overview of wastewater treatment
Met council Environmental Services - overview of wastewater treatment Met council Environmental Services - overview of wastewater treatment
Met council Environmental Services - overview of wastewater treatment
 

Similar to Ozurgeti City / Water Supply Project

Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaVladimir Popovic
 
Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww projectVladimir Popovic
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosniaVladimir Popovic
 
Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaVladimir Popovic
 
ASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANTASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANTneerajshopping
 
Derventa, Water Supply Project
Derventa, Water Supply ProjectDerventa, Water Supply Project
Derventa, Water Supply ProjectVladimir Popovic
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016Charlie Bell
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipelineVladimir Popovic
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water ProjectVladimir Popovic
 
Pilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesPilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesLaura Anderson
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Abhijeet Thakur
 

Similar to Ozurgeti City / Water Supply Project (20)

Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww project
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosnia
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12
 
Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgia
 
ASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANTASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANT
 
John Hart TAC Paper
John Hart TAC PaperJohn Hart TAC Paper
John Hart TAC Paper
 
Derventa, Water Supply Project
Derventa, Water Supply ProjectDerventa, Water Supply Project
Derventa, Water Supply Project
 
hendrik cv 3
hendrik cv 3hendrik cv 3
hendrik cv 3
 
Vani Water Supply Project
Vani Water Supply ProjectVani Water Supply Project
Vani Water Supply Project
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
 
Projects alrawan
Projects alrawanProjects alrawan
Projects alrawan
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipeline
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Pilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesPilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project Challenges
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 

More from Vladimir Popovic

Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Vladimir Popovic
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelinesVladimir Popovic
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction ScheduleVladimir Popovic
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesVladimir Popovic
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesVladimir Popovic
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESVladimir Popovic
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopVladimir Popovic
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionVladimir Popovic
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsVladimir Popovic
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Vladimir Popovic
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Vladimir Popovic
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresVladimir Popovic
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)Vladimir Popovic
 

More from Vladimir Popovic (15)

Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
 
Tightness testing of gravity pipelines
Tightness testing of gravity pipelinesTightness testing of gravity pipelines
Tightness testing of gravity pipelines
 
3-Days Construction Schedule
3-Days Construction Schedule3-Days Construction Schedule
3-Days Construction Schedule
 
Water Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing ExamplesWater Supply Pipelines Channel Crossing Examples
Water Supply Pipelines Channel Crossing Examples
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
 
Sealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod HolesSealing of Wall Shutter Tie-Rod Holes
Sealing of Wall Shutter Tie-Rod Holes
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
 
Construction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-StopConstruction Joints Sealing - Dual Seal Swellable Water-Stop
Construction Joints Sealing - Dual Seal Swellable Water-Stop
 
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 ConstructionMan Made River Project – Libya - Gharyan Tank 300.000m3 Construction
Man Made River Project – Libya - Gharyan Tank 300.000m3 Construction
 
Standard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elementsStandard Waste Water Manholes of precast concrete elements
Standard Waste Water Manholes of precast concrete elements
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)
 
Man Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor StructuresMan Made River Project IV Phase / Ghadames Project - Minor Structures
Man Made River Project IV Phase / Ghadames Project - Minor Structures
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)
 

Recently uploaded

ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Ozurgeti City / Water Supply Project