OPERATIONS MANAGEMENT
By-:
Er. Vaibhav Agarwal
Asst. Prof.
SOM, BBDU
Lucknow
WORK STUDY-METHOD STUDY
• Industry is trying hard to discover new work methods and techniques which could help produce
goods of required quality at reasonable costs.
• Work simplification, job design, value analysis, etc. are some methods discovered for the purpose.
• These methods are called as ‘METHIDS ENGINEERING’, ‘INDUSTRIAL ENGINEERING’,
‘WORK DESIGN’, ‘WORK STUDY’, ‘METHOD ANALYSIS’, ‘OPERATION ANALYSIS’.
• Work study method was designed to improve the performance of a given work.
• Employees need to work harder, more productive, lower production costs needed.
• High product quality is needed and improving the manufacturing methods.
• So work study an method study are areas under special attention of operations managers.
WORK STUDY-METHOD STUDY
• Work study method was developed to improve the performance of a given work.
• Work study is defined as the body of knowledge concerned with the analysis of the work
methods and the equipments used in performing a job, the design of an optimum work method
and standardization of proposed work methods.
• Work study is a management tool to achieve higher productivity in any organisation whether
manufacturing tangible products or offering services to its customers.
• Work study is a systematic, objective and critical examination of the factors affecting
productivity for the purpose of improvement.
• It ensures best possible use of human and material resources in carrying out a specific activity.
• To analyze the present method of doing a job, systematically in order to develop a new
and better method.
• To measure the work content of a job by measuring the time required to do the job for a
qualified worker and hence to establish a standard time.
• To increase the productivity by ensuring the best possible use of human, machine and
material resources and to achieve best quality product/service at minimum possible cost.
• To improve operational efficiency.
WORK STUDY OBJECTIVES
• Increased productivity and operational efficiency.
• Reduced manufacturing costs.
• Improved work place layout.
• Better manpower planning and capacity planning.
• Fair wages to employees.
• Better working conditions to employees.
• Improved work flow.
• Reduced material handling costs.
• Provides a standard of performance to measure labor efficiency.
• Better industrial relations and employee morale.
• Basis for sound incentive scheme.
• Provides better job satisfaction to employees.
BENEFITS OF WORK STUDY
• There are 8 steps for conducting the work study.
• SELECT the job or the process or the operation to be studied.
• RECORD all relevant facts about the job or operation using suitable charting techniques such as operation
process chart, flow process chart, flow diagrams, SIMO (simultaneous motion chart) chart and man-
machine chart.
• EXAMINE critically all the recorded facts, questioning the purpose, place, sequence, person and the
means of doing the job/process/operation.
• DEVELOP the new method for the job/process/operation.
• MEASURE the work content and establish the standard time using an appropriate work measurement
technique.
• DEFINE the new method for the job/process/operations.
• INSTALL the new method as standard practice.
• MAINTAIN the new method fro the job/process/operation.
BASIC WORK STUDY PROCEDURE
• Work Methods analysis or method study is a scientific technique of observing, recording and
critically examining the present method of performing a task or an operation.
• It aims at improving the present method and developing a new and cheaper method.
• It is also called as method improvement or work improvement.
• It includes the study of work processes, working conditions and equipments and tools to carry out
the job.
• It is a systematic recording and critical examination of existing and proposed way of doing work.
METHOD STUDY OR METHOD ANALYSIS
• To study the existing proposed method of doing any job, operation and activity.
• To develop an improved productivity and to reduce operating costs.
• To reduce excessive material handling or movement and so reduces the fatigue caused to the
workmen.
• To improvise utilization of the resources.
• To eliminate wasteful and inefficient motions.
• To standardize work methods or processes, working conditions, machinery, equipments and
tools.
OBJECTIVES OF METHOD STUDY
• Work simplification.
• Improved working method
• Better product quality
• Improved workplace layout
• Improved equipment design
• Better working conditions.
• Better material handling and lesser material costs
• Improved work flow
• Less fatigue to operator
• Optimum utilization of all resources.
• Higher safety to workmen
• Shorter production cycle time.
• Higher job satisfaction for workmen.
• Reduced material consumption and wastages.
• Reduced manufacturing cost and higher productivity.
ADVANTAGES OF METHOD STUDY
• The various steps in method study are;
1. SELECT the work or job to be studied and define the objectives to be achieved by the method study. The
job should have scope of work improvement through reduction of excessive material handling and fatigue to
workmen, scope for improving the working conditions and utilization of resources.
2. RECORD: All the relevant facts related to existing methods using the recording techniques such as-
• Process Charts:
1. Outline process charts
2. Operation process charts
3. Flow process chart-material type
4. Man-machine chart
5. Two-handed process chart
6. Multiple activity chart
7. Simultaneous Motion Charts (SIMO) Charts
8. Motion Charts
9. Film Analysis Charts
• Diagrams such as;
1. Flow diagrams
2. String Diagrams
3. Cycle Graphs
4. Chronocycligraphs
METHOD STUDY PROCEDURE
3. EXAMINE the recorded facts critically challenging everything being done and seeking alternatives,
questioning the purpose, the means, sequence, place, and the person.
4. DEVELOP: The improved method by generating several alternatives and selecting the best method. The
factors to be considered while evaluating alternatives and selecting the best methods are:
1. Cost of implementation.
2. Expected savings in time and cost.
3. Feasibility.
4. Producibility.
5. Acceptance to design, production planning and control, quality control production and sales
departments.
6. Reaction of employees to the new methods.
7. Short term or long term implication of the alternative.
5. INSTALL the new improved method in 3 phases- planning, arranging and implementing phases. The
implementation phase involves the introduction of the developed methods as standard practice to achieve
the desired results.
6. MAINTAIN the new method by ensuring that the installed method is functioning well. This is done by
periodic checks and verifications at regular intervals. Proper control procedures are used to ensure that the
new method is practiced to achieve the benefits of methods study and also to achieve higher productivity.
METHOD STUDY PROCEDURE
1. Method Study and Work Measurement are 2 techniques of work study.
2. Work Measurement establishes the work content of a job.
3. Work content of a job can be accurately established only after the method of doing a job is standardized.
4. Method study and Work Measurement are important elements in achieving higher labor productivity.
5. Work Measurement is defined as, ‘ Application of techniques designed to establish the work content of a
specified task by determining the time required for carrying out the task at a defined standard of
performance by a qualified worker’.
6. International Labour Organisation defined ‘QUALIFIED WORKER’ as, ‘one who is accepted as having the
necessary physical attributes, possessing the required intelligence and education and having acquired the
necessary skill and knowledge to carry out the work in hand to satisfactory standards of safety, quantity and
quality’.
WORK MEASUREMENT
1. Simply, Work Measurement is technique applied to determine the amount of time necessary for a qualified
worker to perform a particular task.
2. “Time Standard”, “Work Standard”, “Labour Standard”, “Production Standard”, “Standard Time” words are
used to express the time needed by a job to be completed.
3. “Standard Time” is the time required by the qualified worker, working at normal rate of speed, will require to
perform the specified task.(units od output per hour).
4. Work Measurement identifies the human effectiveness.
5. It compares one method to another for developing labour standards.
WORK MEASUREMENT
1. Improved planning and control of activities or operations.
2. More efficient manning of the plant.
3. Reliable indices for labour performance.
4. Reliable basis for labour cost control.
5. Basis for sound incentive schemes.
OBJECTIVES OF WORK MEASUREMENT
1. To compare alternate methods developed in method study on the basis of work content in each
method.
2. To prepare a realistic work schedules by accurate assessment of human work.
3. Setting standards of performances for labour utilization by establishing labour standards for an
element of work, operation under normal condition.
4. To compare actual time taken by the worker with the allowed time fro proper control of labour.
5. To assist on labour cost estimation.
6. To provide information related to estimation of tenders, fixation of selling price and assessment of
delivery schedule.
BENEFITS OF WORK MEASUREMENT
1. Direct time study
2. Synthetic Method.
3. Analytical Estimating
4. Pre-determined Motion Time System (PMTS).
5. Work Sampling or Activity Sampling or Ration Delay Method.
TECHNIQUES OF WORK MEASUREMENT
The various Steps are:
1. Break the jobs into elements
2. Record the observed time for each element by means of either time study, synthesis or analytical estimating.
3. Establish elemental time values by extending observed time into normal time for each element by applying a
rating factor.
4. Assess relaxation allowances for personal needs and physical and mental fatigue involved in carrying out each
element.
5. Add the relaxation allowance time to the normal time for each element to arrive at the work content.
6. Determine the frequency of occurrences of each elements in the job. (multiply work content with its
frequency) and up to the times to arrive at the work content of job.
7. Add contingency allowance if any to arrive at the standard time to do the job.
STEPS IN WORK MEASUREMENT
STEPS IN WORK MEASUREMENT
OBSERVED TIME
NORMAL TIME
WORK CONTENT
STANDARD TIME
APPLY RATING FACTOR
ADD RELAXATION
ALLOWANCES
ADD CONTINGENCY
AND OTHER
ALLOWANCE IF
REQUIRED
• The classical stop watch study is widely used for the time study method.
• A time study involves the timing of a sample of a worker’s performance and using it to set a standard.
• These 8 steps are followed:
1. Define the task to be studied (after method study)
2. Divide the task into precise elements (a few second parts each)
3. Decide how many to measure a task (the number of job cycles or samples needed)
4. Time and record the elemental times and ratings of the performance.
5. Compute the average observed (actual) time.
6. Determine the performance rating (work pace) and then compute the normal time for each element.
7. Add the normal times for each element to develop a total normal time for the task.
8. Compute the standard time. This adjustment to the total normal time provides for the allowances such as
personal needs, unavoidable work delays, and worker fatigue:
TIME STUDIES METHODS AND CALCULATIONS
• Average observed time =
𝑆𝑢𝑚 𝑜𝑓 𝑡ℎ𝑒 𝑡𝑖𝑚𝑒 𝑟𝑒𝑐𝑜𝑟𝑑𝑒𝑑 𝑡𝑜 𝑝𝑒𝑟𝑓𝑜𝑟𝑚 𝑒𝑎𝑐ℎ 𝑒𝑙𝑒𝑚𝑒𝑛𝑡
𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑜𝑏𝑠𝑒𝑟𝑣𝑎𝑡𝑖𝑜𝑛𝑠
• Normal Time = (Average observed time) x (Performance Rating Factor)
• Standard Time =
𝑇𝑜𝑡𝑎𝑙 𝑁𝑜𝑟𝑚𝑎𝑙 𝑇𝑖𝑚𝑒
1−𝐴𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 𝐹𝑎𝑐𝑡𝑜𝑟
TIME STUDY CALCULATIONS
Q1. Red Lobster restaurant yielded an average observed time of 4.0 minutes. The analyst rated the observed worker at
85%. This means the worker performed at 85% of the normal when the study was made. The firm uses a 13% allowance
factor. Red Lobster wants to compute the normal time and standard time for this operation.
Solution:
Q2. Management Science Associates promotes its management development seminars by mailing thousands of
individually composed and typed letters to various firms. A time study has been conducted on the task of preparing letters
for mailing. Management Science Associates wants to develop a time standard for this task. The firm’s personal, delay, and
fatigue allowance factor is 15%.
OBSERVATIONS (MINUTES)
Job Element 1 2 3 4 5 Performance Rating
Compose And Type Letters 8 10 9 21* 11 120%
Type Envelope And Address 2 6 2 1 3 105%
Stuff, Stamp, Seal And Sort Envelope 2 1 5* 2 1 110%
• Required Sample Size for time studies = n =
𝑧𝑠
ℎ 𝑥
2
h = accuracy level desired in percent of the job element, expressed as decimal (5%)
z = number of standard deviations required for desired level of confidence
s = standard deviation of the initial sample
𝑥 = mean of initial sample
n = required no. of sample.
Q1. Thomas Co. has asked you to check the labour standard prepared by a
recently terminated analyst. Find the correct sample size. Accuracy should be
within 5% limit and confidence level at 95%. The standard deviation of the
sample is 1.0 and mean is 3.0.
TIME STUDY CALCULATIONS
THANK YOU
References:
1. Kumar, S. Anil; Suresh, N., ‘Operations Management’, New Age International Publishers, 2e.
2. Heizer, Jay; Render, Barry; Rajashekhar, Jagadeesh, ‘Operations Management’, Pearson, 9e.
3. Chary, S N, ‘Production & Operations Management’, McGraw-Hill Companies, 4e.
4. Ashwathappa, K.; Bhat, K. Shridhara, ‘Productions and Operations Management’, Himalaya
Publishing House, 2e.

More Related Content

What's hot

Method study
Method studyMethod study
Method study
sparsh maheshwari
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
sudhir pawar
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
vish0110
 
Work Measurement
Work MeasurementWork Measurement
Work measurement
Work measurementWork measurement
Work measurement
Ratnadeepsinh Jadeja
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
Joseph Konnully
 
Work study and method study
Work study and method studyWork study and method study
Work study and method study
Nitin Gulgulia
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
KunalJagtap5
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide share
K. M. Hasan Ripon
 
Work measurement
Work measurementWork measurement
Work measurement
Huy Tạ Ngọc
 
Work study
Work studyWork study
Work study
Dharam Ranka.Rvd
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
Rohit Goutam
 
types of production system
types of production systemtypes of production system
types of production systemram4181
 
Work Study
Work Study Work Study
Work Study
PraveenManickam2
 
UNIT 2 - WORK STUDY
UNIT 2 -  WORK STUDYUNIT 2 -  WORK STUDY
Line balancing
Line balancingLine balancing
Line balancing
Hiwa Gaffari
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)Abhishek Kumar
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Simran Kaur
 

What's hot (20)

Method study
Method studyMethod study
Method study
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 
Work study and method study
Work study and method studyWork study and method study
Work study and method study
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Productivity improvement slide share
Productivity improvement slide shareProductivity improvement slide share
Productivity improvement slide share
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work study
Work studyWork study
Work study
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
types of production system
types of production systemtypes of production system
types of production system
 
Work Study
Work Study Work Study
Work Study
 
UNIT 2 - WORK STUDY
UNIT 2 -  WORK STUDYUNIT 2 -  WORK STUDY
UNIT 2 - WORK STUDY
 
Ppc
PpcPpc
Ppc
 
Line balancing
Line balancingLine balancing
Line balancing
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 

Similar to Work study method study-work measurement

Jivan work study
Jivan work studyJivan work study
Jivan work study
Jivan Jadhav
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9Shweta Varshney
 
Work Study
Work StudyWork Study
Work Study
varsharocks
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
varsharocks
 
Work Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptxWork Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptx
SHREYASHSHAHMSGSGKM0
 
L 05- industrial management
L 05- industrial managementL 05- industrial management
L 05- industrial managementTanya Mathur
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
learnito
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
homeworkping3
 
Sanket work study-1
Sanket work study-1Sanket work study-1
Sanket work study-1
Sanket Rahane
 
Work study new
Work study newWork study new
Work study new
Chakravarti Chakri
 
Management tools
Management toolsManagement tools
Management tools
Paritosh Kasaudhan
 
Work Study
Work StudyWork Study
Work Study
Mandeep Raj
 
Operations ManagementServices
Operations ManagementServicesOperations ManagementServices
Operations ManagementServices
ahmad bassiouny
 
History of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job designHistory of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job design
Rajeswari Balakrishnan
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systemsaizellbernal
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
Joseph Konnully
 

Similar to Work study method study-work measurement (20)

Jivan work study
Jivan work studyJivan work study
Jivan work study
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Work Study
Work StudyWork Study
Work Study
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Work Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptxWork Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptx
 
L 05- industrial management
L 05- industrial managementL 05- industrial management
L 05- industrial management
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
 
Sanket work study-1
Sanket work study-1Sanket work study-1
Sanket work study-1
 
Work study new
Work study newWork study new
Work study new
 
Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
 
Management tools
Management toolsManagement tools
Management tools
 
Work Study
Work StudyWork Study
Work Study
 
Operations ManagementServices
Operations ManagementServicesOperations ManagementServices
Operations ManagementServices
 
Work study
Work studyWork study
Work study
 
Garments
Garments Garments
Garments
 
P roduction ppt
P roduction pptP roduction ppt
P roduction ppt
 
History of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job designHistory of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job design
 
Design of Work Systems
Design of Work SystemsDesign of Work Systems
Design of Work Systems
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
 

More from Er. Vaibhav Agarwal

Forecasting Methods
Forecasting MethodsForecasting Methods
Forecasting Methods
Er. Vaibhav Agarwal
 
Box jenkins method of forecasting
Box jenkins method of forecastingBox jenkins method of forecasting
Box jenkins method of forecasting
Er. Vaibhav Agarwal
 
ISO Standards
ISO StandardsISO Standards
ISO Standards
Er. Vaibhav Agarwal
 
Operations Management Introduction
Operations Management IntroductionOperations Management Introduction
Operations Management Introduction
Er. Vaibhav Agarwal
 
Inventory management
Inventory managementInventory management
Inventory management
Er. Vaibhav Agarwal
 
Waiting line mgmt
Waiting line mgmtWaiting line mgmt
Waiting line mgmt
Er. Vaibhav Agarwal
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
Er. Vaibhav Agarwal
 
Knowledge management
Knowledge managementKnowledge management
Knowledge management
Er. Vaibhav Agarwal
 
Customer relationship Management
Customer relationship ManagementCustomer relationship Management
Customer relationship Management
Er. Vaibhav Agarwal
 
ManagemSystement Information
ManagemSystement Information ManagemSystement Information
ManagemSystement Information
Er. Vaibhav Agarwal
 
International Bank of Reconstruction and Development
International Bank of Reconstruction and DevelopmentInternational Bank of Reconstruction and Development
International Bank of Reconstruction and Development
Er. Vaibhav Agarwal
 
Franchising in retail
Franchising in retailFranchising in retail
Franchising in retail
Er. Vaibhav Agarwal
 
Quality Management
Quality Management Quality Management
Quality Management
Er. Vaibhav Agarwal
 
Introduction to Retail Management
Introduction to Retail ManagementIntroduction to Retail Management
Introduction to Retail Management
Er. Vaibhav Agarwal
 
IFCI, Industrial Finance Corporation of INDIA
IFCI, Industrial Finance Corporation of INDIAIFCI, Industrial Finance Corporation of INDIA
IFCI, Industrial Finance Corporation of INDIA
Er. Vaibhav Agarwal
 
ICICI
ICICIICICI
IBRD: International Bank for Reconstruction and Development
IBRD: International Bank for Reconstruction and DevelopmentIBRD: International Bank for Reconstruction and Development
IBRD: International Bank for Reconstruction and Development
Er. Vaibhav Agarwal
 

More from Er. Vaibhav Agarwal (17)

Forecasting Methods
Forecasting MethodsForecasting Methods
Forecasting Methods
 
Box jenkins method of forecasting
Box jenkins method of forecastingBox jenkins method of forecasting
Box jenkins method of forecasting
 
ISO Standards
ISO StandardsISO Standards
ISO Standards
 
Operations Management Introduction
Operations Management IntroductionOperations Management Introduction
Operations Management Introduction
 
Inventory management
Inventory managementInventory management
Inventory management
 
Waiting line mgmt
Waiting line mgmtWaiting line mgmt
Waiting line mgmt
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Knowledge management
Knowledge managementKnowledge management
Knowledge management
 
Customer relationship Management
Customer relationship ManagementCustomer relationship Management
Customer relationship Management
 
ManagemSystement Information
ManagemSystement Information ManagemSystement Information
ManagemSystement Information
 
International Bank of Reconstruction and Development
International Bank of Reconstruction and DevelopmentInternational Bank of Reconstruction and Development
International Bank of Reconstruction and Development
 
Franchising in retail
Franchising in retailFranchising in retail
Franchising in retail
 
Quality Management
Quality Management Quality Management
Quality Management
 
Introduction to Retail Management
Introduction to Retail ManagementIntroduction to Retail Management
Introduction to Retail Management
 
IFCI, Industrial Finance Corporation of INDIA
IFCI, Industrial Finance Corporation of INDIAIFCI, Industrial Finance Corporation of INDIA
IFCI, Industrial Finance Corporation of INDIA
 
ICICI
ICICIICICI
ICICI
 
IBRD: International Bank for Reconstruction and Development
IBRD: International Bank for Reconstruction and DevelopmentIBRD: International Bank for Reconstruction and Development
IBRD: International Bank for Reconstruction and Development
 

Recently uploaded

The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 

Recently uploaded (20)

The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 

Work study method study-work measurement

  • 1. OPERATIONS MANAGEMENT By-: Er. Vaibhav Agarwal Asst. Prof. SOM, BBDU Lucknow
  • 2. WORK STUDY-METHOD STUDY • Industry is trying hard to discover new work methods and techniques which could help produce goods of required quality at reasonable costs. • Work simplification, job design, value analysis, etc. are some methods discovered for the purpose. • These methods are called as ‘METHIDS ENGINEERING’, ‘INDUSTRIAL ENGINEERING’, ‘WORK DESIGN’, ‘WORK STUDY’, ‘METHOD ANALYSIS’, ‘OPERATION ANALYSIS’. • Work study method was designed to improve the performance of a given work. • Employees need to work harder, more productive, lower production costs needed. • High product quality is needed and improving the manufacturing methods. • So work study an method study are areas under special attention of operations managers.
  • 3. WORK STUDY-METHOD STUDY • Work study method was developed to improve the performance of a given work. • Work study is defined as the body of knowledge concerned with the analysis of the work methods and the equipments used in performing a job, the design of an optimum work method and standardization of proposed work methods. • Work study is a management tool to achieve higher productivity in any organisation whether manufacturing tangible products or offering services to its customers. • Work study is a systematic, objective and critical examination of the factors affecting productivity for the purpose of improvement. • It ensures best possible use of human and material resources in carrying out a specific activity.
  • 4. • To analyze the present method of doing a job, systematically in order to develop a new and better method. • To measure the work content of a job by measuring the time required to do the job for a qualified worker and hence to establish a standard time. • To increase the productivity by ensuring the best possible use of human, machine and material resources and to achieve best quality product/service at minimum possible cost. • To improve operational efficiency. WORK STUDY OBJECTIVES
  • 5. • Increased productivity and operational efficiency. • Reduced manufacturing costs. • Improved work place layout. • Better manpower planning and capacity planning. • Fair wages to employees. • Better working conditions to employees. • Improved work flow. • Reduced material handling costs. • Provides a standard of performance to measure labor efficiency. • Better industrial relations and employee morale. • Basis for sound incentive scheme. • Provides better job satisfaction to employees. BENEFITS OF WORK STUDY
  • 6. • There are 8 steps for conducting the work study. • SELECT the job or the process or the operation to be studied. • RECORD all relevant facts about the job or operation using suitable charting techniques such as operation process chart, flow process chart, flow diagrams, SIMO (simultaneous motion chart) chart and man- machine chart. • EXAMINE critically all the recorded facts, questioning the purpose, place, sequence, person and the means of doing the job/process/operation. • DEVELOP the new method for the job/process/operation. • MEASURE the work content and establish the standard time using an appropriate work measurement technique. • DEFINE the new method for the job/process/operations. • INSTALL the new method as standard practice. • MAINTAIN the new method fro the job/process/operation. BASIC WORK STUDY PROCEDURE
  • 7. • Work Methods analysis or method study is a scientific technique of observing, recording and critically examining the present method of performing a task or an operation. • It aims at improving the present method and developing a new and cheaper method. • It is also called as method improvement or work improvement. • It includes the study of work processes, working conditions and equipments and tools to carry out the job. • It is a systematic recording and critical examination of existing and proposed way of doing work. METHOD STUDY OR METHOD ANALYSIS
  • 8. • To study the existing proposed method of doing any job, operation and activity. • To develop an improved productivity and to reduce operating costs. • To reduce excessive material handling or movement and so reduces the fatigue caused to the workmen. • To improvise utilization of the resources. • To eliminate wasteful and inefficient motions. • To standardize work methods or processes, working conditions, machinery, equipments and tools. OBJECTIVES OF METHOD STUDY
  • 9. • Work simplification. • Improved working method • Better product quality • Improved workplace layout • Improved equipment design • Better working conditions. • Better material handling and lesser material costs • Improved work flow • Less fatigue to operator • Optimum utilization of all resources. • Higher safety to workmen • Shorter production cycle time. • Higher job satisfaction for workmen. • Reduced material consumption and wastages. • Reduced manufacturing cost and higher productivity. ADVANTAGES OF METHOD STUDY
  • 10. • The various steps in method study are; 1. SELECT the work or job to be studied and define the objectives to be achieved by the method study. The job should have scope of work improvement through reduction of excessive material handling and fatigue to workmen, scope for improving the working conditions and utilization of resources. 2. RECORD: All the relevant facts related to existing methods using the recording techniques such as- • Process Charts: 1. Outline process charts 2. Operation process charts 3. Flow process chart-material type 4. Man-machine chart 5. Two-handed process chart 6. Multiple activity chart 7. Simultaneous Motion Charts (SIMO) Charts 8. Motion Charts 9. Film Analysis Charts • Diagrams such as; 1. Flow diagrams 2. String Diagrams 3. Cycle Graphs 4. Chronocycligraphs METHOD STUDY PROCEDURE
  • 11. 3. EXAMINE the recorded facts critically challenging everything being done and seeking alternatives, questioning the purpose, the means, sequence, place, and the person. 4. DEVELOP: The improved method by generating several alternatives and selecting the best method. The factors to be considered while evaluating alternatives and selecting the best methods are: 1. Cost of implementation. 2. Expected savings in time and cost. 3. Feasibility. 4. Producibility. 5. Acceptance to design, production planning and control, quality control production and sales departments. 6. Reaction of employees to the new methods. 7. Short term or long term implication of the alternative. 5. INSTALL the new improved method in 3 phases- planning, arranging and implementing phases. The implementation phase involves the introduction of the developed methods as standard practice to achieve the desired results. 6. MAINTAIN the new method by ensuring that the installed method is functioning well. This is done by periodic checks and verifications at regular intervals. Proper control procedures are used to ensure that the new method is practiced to achieve the benefits of methods study and also to achieve higher productivity. METHOD STUDY PROCEDURE
  • 12. 1. Method Study and Work Measurement are 2 techniques of work study. 2. Work Measurement establishes the work content of a job. 3. Work content of a job can be accurately established only after the method of doing a job is standardized. 4. Method study and Work Measurement are important elements in achieving higher labor productivity. 5. Work Measurement is defined as, ‘ Application of techniques designed to establish the work content of a specified task by determining the time required for carrying out the task at a defined standard of performance by a qualified worker’. 6. International Labour Organisation defined ‘QUALIFIED WORKER’ as, ‘one who is accepted as having the necessary physical attributes, possessing the required intelligence and education and having acquired the necessary skill and knowledge to carry out the work in hand to satisfactory standards of safety, quantity and quality’. WORK MEASUREMENT
  • 13. 1. Simply, Work Measurement is technique applied to determine the amount of time necessary for a qualified worker to perform a particular task. 2. “Time Standard”, “Work Standard”, “Labour Standard”, “Production Standard”, “Standard Time” words are used to express the time needed by a job to be completed. 3. “Standard Time” is the time required by the qualified worker, working at normal rate of speed, will require to perform the specified task.(units od output per hour). 4. Work Measurement identifies the human effectiveness. 5. It compares one method to another for developing labour standards. WORK MEASUREMENT
  • 14. 1. Improved planning and control of activities or operations. 2. More efficient manning of the plant. 3. Reliable indices for labour performance. 4. Reliable basis for labour cost control. 5. Basis for sound incentive schemes. OBJECTIVES OF WORK MEASUREMENT
  • 15. 1. To compare alternate methods developed in method study on the basis of work content in each method. 2. To prepare a realistic work schedules by accurate assessment of human work. 3. Setting standards of performances for labour utilization by establishing labour standards for an element of work, operation under normal condition. 4. To compare actual time taken by the worker with the allowed time fro proper control of labour. 5. To assist on labour cost estimation. 6. To provide information related to estimation of tenders, fixation of selling price and assessment of delivery schedule. BENEFITS OF WORK MEASUREMENT
  • 16. 1. Direct time study 2. Synthetic Method. 3. Analytical Estimating 4. Pre-determined Motion Time System (PMTS). 5. Work Sampling or Activity Sampling or Ration Delay Method. TECHNIQUES OF WORK MEASUREMENT
  • 17. The various Steps are: 1. Break the jobs into elements 2. Record the observed time for each element by means of either time study, synthesis or analytical estimating. 3. Establish elemental time values by extending observed time into normal time for each element by applying a rating factor. 4. Assess relaxation allowances for personal needs and physical and mental fatigue involved in carrying out each element. 5. Add the relaxation allowance time to the normal time for each element to arrive at the work content. 6. Determine the frequency of occurrences of each elements in the job. (multiply work content with its frequency) and up to the times to arrive at the work content of job. 7. Add contingency allowance if any to arrive at the standard time to do the job. STEPS IN WORK MEASUREMENT
  • 18. STEPS IN WORK MEASUREMENT OBSERVED TIME NORMAL TIME WORK CONTENT STANDARD TIME APPLY RATING FACTOR ADD RELAXATION ALLOWANCES ADD CONTINGENCY AND OTHER ALLOWANCE IF REQUIRED
  • 19. • The classical stop watch study is widely used for the time study method. • A time study involves the timing of a sample of a worker’s performance and using it to set a standard. • These 8 steps are followed: 1. Define the task to be studied (after method study) 2. Divide the task into precise elements (a few second parts each) 3. Decide how many to measure a task (the number of job cycles or samples needed) 4. Time and record the elemental times and ratings of the performance. 5. Compute the average observed (actual) time. 6. Determine the performance rating (work pace) and then compute the normal time for each element. 7. Add the normal times for each element to develop a total normal time for the task. 8. Compute the standard time. This adjustment to the total normal time provides for the allowances such as personal needs, unavoidable work delays, and worker fatigue: TIME STUDIES METHODS AND CALCULATIONS
  • 20. • Average observed time = 𝑆𝑢𝑚 𝑜𝑓 𝑡ℎ𝑒 𝑡𝑖𝑚𝑒 𝑟𝑒𝑐𝑜𝑟𝑑𝑒𝑑 𝑡𝑜 𝑝𝑒𝑟𝑓𝑜𝑟𝑚 𝑒𝑎𝑐ℎ 𝑒𝑙𝑒𝑚𝑒𝑛𝑡 𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑜𝑏𝑠𝑒𝑟𝑣𝑎𝑡𝑖𝑜𝑛𝑠 • Normal Time = (Average observed time) x (Performance Rating Factor) • Standard Time = 𝑇𝑜𝑡𝑎𝑙 𝑁𝑜𝑟𝑚𝑎𝑙 𝑇𝑖𝑚𝑒 1−𝐴𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 𝐹𝑎𝑐𝑡𝑜𝑟 TIME STUDY CALCULATIONS
  • 21. Q1. Red Lobster restaurant yielded an average observed time of 4.0 minutes. The analyst rated the observed worker at 85%. This means the worker performed at 85% of the normal when the study was made. The firm uses a 13% allowance factor. Red Lobster wants to compute the normal time and standard time for this operation. Solution: Q2. Management Science Associates promotes its management development seminars by mailing thousands of individually composed and typed letters to various firms. A time study has been conducted on the task of preparing letters for mailing. Management Science Associates wants to develop a time standard for this task. The firm’s personal, delay, and fatigue allowance factor is 15%. OBSERVATIONS (MINUTES) Job Element 1 2 3 4 5 Performance Rating Compose And Type Letters 8 10 9 21* 11 120% Type Envelope And Address 2 6 2 1 3 105% Stuff, Stamp, Seal And Sort Envelope 2 1 5* 2 1 110%
  • 22. • Required Sample Size for time studies = n = 𝑧𝑠 ℎ 𝑥 2 h = accuracy level desired in percent of the job element, expressed as decimal (5%) z = number of standard deviations required for desired level of confidence s = standard deviation of the initial sample 𝑥 = mean of initial sample n = required no. of sample. Q1. Thomas Co. has asked you to check the labour standard prepared by a recently terminated analyst. Find the correct sample size. Accuracy should be within 5% limit and confidence level at 95%. The standard deviation of the sample is 1.0 and mean is 3.0. TIME STUDY CALCULATIONS
  • 23. THANK YOU References: 1. Kumar, S. Anil; Suresh, N., ‘Operations Management’, New Age International Publishers, 2e. 2. Heizer, Jay; Render, Barry; Rajashekhar, Jagadeesh, ‘Operations Management’, Pearson, 9e. 3. Chary, S N, ‘Production & Operations Management’, McGraw-Hill Companies, 4e. 4. Ashwathappa, K.; Bhat, K. Shridhara, ‘Productions and Operations Management’, Himalaya Publishing House, 2e.