This document discusses the widening and drainage improvements for a 13.5 km road project. It provides details on the types of pavement and widening processes. The widening will increase the road width by 2.5m on both sides for better traffic flow. The steps discussed are clearance, excavation, preparing the sub-base and sub-grade, applying binder and stone chipping, and rolling. Different types of rollers are used in the rolling process. Reconnaissance surveys are conducted to gather data on the terrain and existing structures to inform the design. Drainage systems help remove water from the road surface and channels. Common drainage system elements are described along with problems that can occur if drainage is inadequate.