PROJECT ON
Design and Analysis of Flexible Pavement
Schoolof ManagementSciences
(SMSInstituteof Technology)
Lucknow
Prepared by:-
Anshuman Ojha – 1742300006
Deepanshu Pandey – 1742300007
Devesh Kumar Chaurasia – 1742300008
Himanshu Gautam – 1742300009
TABLE OF CONTENT
PROJECT LOCATION
INTRODUCTION
TYPES OF PAVEMENT
LEVELLING
SOIL TESTS
LAYERS OF PAVEMENT
DESIGN AND ANALSIS OF FLEXIBLE
PAVEMENT
COST & ESTIMATION
PLANT OVERVIEW
PROJECT LOCATION
ROAD
DIMENSIONS
Total Length of Road =
750meter
Road width= 3.7meter
INTRODUCTION
What is a ROAD ?
A road is a thoroughfare, route,or
way on land between two places
that has been paved or otherwise
improved to allow travel by foot or
some form of conveyance,
including a motor vehicle, cart,
bicycle, or horse etc.
PAVEMENT
A structure consisting of
superimposed layers of processed
materials above the natural soil
subgrade, whose primary function is
to distribute the applied vehicleloads
to the sub-grade.
TYPES OF PAVEMENT
There are two types of pavementas
follows:
1.Flexible Pavements: Flexible
pavement can be defined as the
one consisting of a mixture of
asphaltic or bituminousmaterial
and aggregates.
2.Rigid Pavements: A rigid
pavement is constructed from
cement concrete or reinforced
concrete slabs.
DIFFERENCE BETWEEN
FLEXIBLE AND RIGID
PAVEMENT
Properties Flexible Rigid
Design
Principle
Empirical method
Based on load distribution
characteristics.
Designed and
analyzed by using the
elastic
theory
Material Granular material Made of Cement
Concrete reinforced
or pre stressed
concrete
Excessive
Loading
Local depression Causes Cracks
Design
Practice
Constructed in number of
layers
Laid in slabs with
steel reinforcement
Opening to
Traffic
Road can be used for
traffic
within 24 hours
Road cannot be used
until 14 days of curing
Stress Transmits vertical and
compressive stresses to
Tensile Stress and
Temperature
LEVELLING
AUTO LEVEL: An auto level is similar to the dumpy
level, with its telescope fixed to the tribrach.
For more precise leveling of the instrument a
spirit level is attached to the telescope. It is used to
measure the reduced level of any plane. Using the
formula :
Height of the Instrument = Back sight+ Reduced Level
i.e. HI = BS + RL
Here, considering BM= 100
PROPOSED
METHODOLOGY
To meetthe abovementioned objectivesof the presentstudy,
following stepsare adopted:
1.WehaveusedCalifornia BearingRatioMethod for designing the
Flexible Pavement.With the helpof this method wehave found the
thicknessof pavement.
2.TheCodesfor designingof flexible pavementusedareIRC
37:2001– (Guidelinesfor the Designof Flexible),IS: 20:2007.
3.Theinstruments usedareAuto level, PrismaticCompassfor survey
work.
4.TheHeight of InstrumentMethod isusedfor levelingpurpose
of the ground surface.
5.Mid SectionalArea Method isusedfor Estimatingthe
earthwork
TESTS
There are several types of tests which are as
follows:
1. CBR Test
2. Sieve Analysis
3. Dry Density Test
4. Bitumen Test
DEFINITION OF C.B.R. :-
It is the ratio of force per unit area required to penetratea soil
mass with standard circular piston at the rate of 1.25
mm/min. to that required for the corresponding penetration
of a standard material.
C.B.R. =Test load/Standard load X 100
The same samples were further tested for CBR using Static
Compaction with 56blows by standard rammer of 2.6 kg.
1. CBR TEST
APPARATUS
R
E
A
D
I
N
G
S
G
R
A
P
H
CALCULATION
2. Sieve
Analysis
S . no Sieve
no
mm)
Wt.
Ret.
(kg)
%Wt.
Ret.
Cum %
Wt
retain
%
Passin
g
JHF
(BC)
1 19.5 0 0 0 100 100
2 13.2 .350 3.681 3.681 96.319 99.60
3 9.5 2.056 21.628 25.309 74.691 87.98
4 4.75 3.954 41.594 66.903 33.097 58.80
5 2.36 1.496 15.737 82.64 17.36 44.28
6 1.18 1.65 17.357 99.997 .003 34.48
7 Total 9.506
3. Maximum Dry Density Test
Test pits were excavated
Maximum dry density (MDD) corresponding optimum
moisture content (OMC) were determined using standard
compaction method and modified method in accordance
with IS:10074:1987, BIS 270 (Part-VIII)
4. Bitumen Test
PROPERTIES OF BITUMEN
Bitumen is a sticky, black, and highly viscous liquid
or semi-solid form of petroleum.
It may be found in natural deposits or may be a
refined product, and is classed as a pitch. Before the
20th century, the term asphalt was also used
It consists chiefly high molecular weight
hydrocarbons derived from distillation of petroleum
or natural asphalt.
Bitumen is often confused with Tar.
Tars are resides from the destructive distillation of
organic substances such as coal, wood, or
TYPYCAL LAYERS OF
FLEXIBLE
PAVEMENT
Seal Coat: The seal coat has to be provided which is
a thin surface treatment used to water-proof the
surface and to provide skid resistance.
Tack Coat: It coat is very light application of asphalt,
usually asphalt emulsion diluted with water. It must be
thin, uniformly cover the entire surface, and set very
fast.
Prime Coat: Prime coat provides bonding between
two layers which penetrates into the layer below,
plugs the voids, and forms a water tight surface.
That’s why both prime coat and tack coat has to be
provided. They both have different functions.
Surface course
Surface course is the layer directly in contact with
traffic loads and generally contains superiorquality
materials. They are usually constructed with dense
graded asphalt concrete(AC).
Binder course
This layer provides the bulk of the asphalt concrete
structure. It's chief purpose is to distribute load tothe
base course The binder course generally consists of
aggregates having less asphalt and doesn't require
quality as high as the surface course, so replacing a
part of the surface course by the binder course results
in more economical design.
Base course
The base course is the layer of material immediately
beneath the surface of binder course and it provides
additional load distribution and contributes to the sub-
surface drainage It may be composed of crushed stone,
crushed slag, and other untreated or stabilized materials.
Sub-Base course
The sub-base course is the layer of material beneath the
base course and the primary functions are to provide
structural support, improve drainage. A sub-base course is
not always needed or used.
Sub-grade
The top soil or sub-grade is a layer of natural soilprepared
to receive the stresses from the layers above. It is essential
that at no time soil sub-grade is overstressed. It should be
compacted to the desirable density, near the optimum
moisture content.
Design of a Flexible
Pavement:
A Flexible Pavement of 750meters patch is being
designed in accordance with the charts in IRC37-2012.
With reference to the Geotechnical tests and traffic
survey performed, the important parameters andtheir
values are determined, & on that basis, the design of
the pavement isdone.
Though, the available width is taken as 4.5 meters, in
which the carriageway width is taken as 3.7 metersand
shoulders on the either side of the road as 1.00meters,
and also the provision of the side drains is made as
well.
Computation of Design
Traffic
The design traffic is considered in terms of the cumulative
number of standard axles(in the lane carrying maximumtraffic)
to be carried during the design life of the road. This can be
computed using the following equation:-
N = 365 x [ (1+r)n – 1]x Ax D x F/r
Where,
N = Cumulative number of Standard axles to be catered in the
design in terms of use.
A =Initial traffic in the year of completion of construction in
day.
terms of the number of commercial vehiclesper
D =Lane distribution factor
R=Annual growth rate of commercial vehicles
F=Vehicle damage factor
N =Design life in years
Design
Data
1.)According to the test results, the C.B.R. value of the
sub-grade soil is found to be =2.93 %
2.) Traffic Vehicle per Day is assumed to be 100CVPD.
3.) Traffic growth rate, to be taken as2%.
4.) Vehicle Damage Factor, for plain terrain = 3.5
5.) Design Life =10 Years.
6.) Distribution Factor = 0.75
7.) Single Lane Road.
So the Flexible Pavement thickness according to
IRC 37-2012 for 1.05 msa is 635mm.
ESTIMATION AND
COSTING
S.N
o
Particulars Length
(m)
Broa
d
(m)
Depth
(m)
Quantity
(cum)
Rate
(Rs)
Amount
1 Subgrade Lime
Stabilization for
Improving
subgrade
750 4.5 0.335 1130.625 157 177,508.125
2 Granular Sub
Base with Coarse
Graded Material
750 4.5 0.225 759.375 719 545,990.625
3 Base coarse
Bituminous
Macadam
750 3.7 0.050 138.75 799 110,861.25
4 Surface coarse
Bituminous
Macadam
750 3.7 0.025 69.375 6808 472,305
5 Total Cost 13,06,665
PLANT
OVERVIEW
 For the construction of bitumen concrete pavement there is
requirement of mix plant which ready the material for
laying the pavement.
Types of Plant :
1.Batch Mix Plant
2.Drum Mix Plant
We’ll use DRUM MIX PLANT for mixing the materials.
DRUM MIX
PLANT
 The name of the plant is DRUM MIX 5O.
 In this there is a cylindrical drum in which mixing is done.
PLANT
 Water Pump
 Gathering Conveyer
 Slinger Conveyer
 Drum
 Load out Conveyer
Exhauster
Feeder
Bitumen Tank
Temperature Gun
MACHINES USED FOR THE
ROAD CONSTRUCTION
BACK HOE LOADER
V
I
B
R
A
T
O
R
Y
R
O
L
L
E
R
BITUMENS
P
R
A
Y
E
R
Design and analysis of flexible pavemeT

More Related Content

What's hot

Pavement
PavementPavement
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
Kavin Raval
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
Anitha Jacob
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
GARRE RAVI KUMAR
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
Fresher Thinking
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
srinivas2036
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
Md Tanvir Alam
 
Failures in flexible pavement
Failures in flexible pavementFailures in flexible pavement
Failures in flexible pavement
Randhir Kumar
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
Rohit Ranjan
 
Highway failure & their maintenance seminar report
Highway failure & their maintenance seminar reportHighway failure & their maintenance seminar report
Highway failure & their maintenance seminar report
Being Deepak
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
RAMPRASAD KUMAWAT
 
Construction of flexible pavement in brief.
Construction of flexible pavement in brief.Construction of flexible pavement in brief.
Construction of flexible pavement in brief.
AJINKYA THAKRE
 
Study of design of the flexible pavements ppt
Study of design of the flexible pavements pptStudy of design of the flexible pavements ppt
Study of design of the flexible pavements ppt
Shaik Asif Ahmed
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
harshit315
 
rigid and flexiable pavement design ppt
rigid and flexiable pavement design pptrigid and flexiable pavement design ppt
rigid and flexiable pavement design ppt
rakeshchoudhary129
 
Road construction
Road constructionRoad construction
Road construction
Mohideen Al-haseb
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
Bhavya Jaiswal
 
Types of road material and its tests
Types of road material and its testsTypes of road material and its tests
Types of road material and its tests
Govt, Polytechnic Tekari, Gaya
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. I
Gauri kadam
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
Arbaz Kazi
 

What's hot (20)

Pavement
PavementPavement
Pavement
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
 
Failures in flexible pavement
Failures in flexible pavementFailures in flexible pavement
Failures in flexible pavement
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Highway failure & their maintenance seminar report
Highway failure & their maintenance seminar reportHighway failure & their maintenance seminar report
Highway failure & their maintenance seminar report
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Construction of flexible pavement in brief.
Construction of flexible pavement in brief.Construction of flexible pavement in brief.
Construction of flexible pavement in brief.
 
Study of design of the flexible pavements ppt
Study of design of the flexible pavements pptStudy of design of the flexible pavements ppt
Study of design of the flexible pavements ppt
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
 
rigid and flexiable pavement design ppt
rigid and flexiable pavement design pptrigid and flexiable pavement design ppt
rigid and flexiable pavement design ppt
 
Road construction
Road constructionRoad construction
Road construction
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Types of road material and its tests
Types of road material and its testsTypes of road material and its tests
Types of road material and its tests
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. I
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 

Similar to Design and analysis of flexible pavemeT

Project presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash GargProject presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash Garg
harshit315
 
V35119123
V35119123V35119123
V35119123
IJERA Editor
 
337276998-project-report-on-pavement-design.pptx
337276998-project-report-on-pavement-design.pptx337276998-project-report-on-pavement-design.pptx
337276998-project-report-on-pavement-design.pptx
sakibhussain036
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
alamrintu
 
Pavement and Types of pavement
Pavement and Types of pavementPavement and Types of pavement
Pavement and Types of pavement
SaleemAbbasLound
 
highway materials and desihn.pptx
highway materials and desihn.pptxhighway materials and desihn.pptx
highway materials and desihn.pptx
SekharJ4
 
Pavement_design.pptx
Pavement_design.pptxPavement_design.pptx
Pavement_design.pptx
ShabbirAli81
 
Unit 4
Unit 4Unit 4
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
shashanksingh593
 
DESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENTDESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENT
atchitect and design
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
Lai Yen
 
Village networking ppt
Village networking pptVillage networking ppt
Village networking ppt
Patel Tapan
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
Arun Karthik
 
Design of highway (Flexible pavement)
Design of highway (Flexible pavement)Design of highway (Flexible pavement)
Design of highway (Flexible pavement)
Raz Gupta
 
Study on comparative flexible pavement thickness analysis using various desig...
Study on comparative flexible pavement thickness analysis using various desig...Study on comparative flexible pavement thickness analysis using various desig...
Study on comparative flexible pavement thickness analysis using various desig...
eSAT Publishing House
 
Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...
PrashannaKumar2
 
M1303078488
M1303078488M1303078488
M1303078488
IOSR Journals
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
'Sayed Asadullah
 
ppt on construction and design of flexible pavement
ppt on construction and design of flexible pavementppt on construction and design of flexible pavement
ppt on construction and design of flexible pavement
SUSMITAMAITY4
 
Lecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdfLecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdf
OmarAbdi39
 

Similar to Design and analysis of flexible pavemeT (20)

Project presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash GargProject presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash Garg
 
V35119123
V35119123V35119123
V35119123
 
337276998-project-report-on-pavement-design.pptx
337276998-project-report-on-pavement-design.pptx337276998-project-report-on-pavement-design.pptx
337276998-project-report-on-pavement-design.pptx
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
Pavement and Types of pavement
Pavement and Types of pavementPavement and Types of pavement
Pavement and Types of pavement
 
highway materials and desihn.pptx
highway materials and desihn.pptxhighway materials and desihn.pptx
highway materials and desihn.pptx
 
Pavement_design.pptx
Pavement_design.pptxPavement_design.pptx
Pavement_design.pptx
 
Unit 4
Unit 4Unit 4
Unit 4
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
 
DESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENTDESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENT
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Village networking ppt
Village networking pptVillage networking ppt
Village networking ppt
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
 
Design of highway (Flexible pavement)
Design of highway (Flexible pavement)Design of highway (Flexible pavement)
Design of highway (Flexible pavement)
 
Study on comparative flexible pavement thickness analysis using various desig...
Study on comparative flexible pavement thickness analysis using various desig...Study on comparative flexible pavement thickness analysis using various desig...
Study on comparative flexible pavement thickness analysis using various desig...
 
Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...
 
M1303078488
M1303078488M1303078488
M1303078488
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
 
ppt on construction and design of flexible pavement
ppt on construction and design of flexible pavementppt on construction and design of flexible pavement
ppt on construction and design of flexible pavement
 
Lecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdfLecture one_introffffffffffffduction.pdf
Lecture one_introffffffffffffduction.pdf
 

Recently uploaded

一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
pxyhy
 
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
yuhofha
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
Bruce Bennett
 
一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理
yuhofha
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
Ghh
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
yuhofha
 
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdfRECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
AlessandroMartins454470
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
kakomaeric00
 
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
dsnow9802
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
2zjra9bn
 
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
pxyhy
 
Introducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptxIntroducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptx
FauzanHarits1
 
5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf
Alliance Jobs
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
Thomas GIRARD BDes
 
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
MuhammadWaqasBaloch1
 
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
atwvhyhm
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
Ghh
 
Job Finding Apps Everything You Need to Know in 2024
Job Finding Apps Everything You Need to Know in 2024Job Finding Apps Everything You Need to Know in 2024
Job Finding Apps Everything You Need to Know in 2024
SnapJob
 
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
taqyea
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
Aditya Raghav
 

Recently uploaded (20)

一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
一比一原版(UBC毕业证)不列颠哥伦比亚大学毕业证如何办理
 
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
一比一原版(TMU毕业证)多伦多都会大学毕业证如何办理
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
 
一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理一比一原版(YU毕业证)约克大学毕业证如何办理
一比一原版(YU毕业证)约克大学毕业证如何办理
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdfRECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
 
Leadership Ambassador club Adventist module
Leadership Ambassador club Adventist moduleLeadership Ambassador club Adventist module
Leadership Ambassador club Adventist module
 
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
 
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
一比一原版(SFU毕业证)西蒙弗雷泽大学毕业证如何办理
 
Introducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptxIntroducing Gopay Mobile App For Environment.pptx
Introducing Gopay Mobile App For Environment.pptx
 
5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf5 Common Mistakes to Avoid During the Job Application Process.pdf
5 Common Mistakes to Avoid During the Job Application Process.pdf
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
 
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
Status of Women in Pakistan.pptxStatus of Women in Pakistan.pptx
 
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
原版制作(RMIT毕业证书)墨尔本皇家理工大学毕业证在读证明一模一样
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
 
Job Finding Apps Everything You Need to Know in 2024
Job Finding Apps Everything You Need to Know in 2024Job Finding Apps Everything You Need to Know in 2024
Job Finding Apps Everything You Need to Know in 2024
 
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
 
thyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatialthyroid case presentation.pptx Kamala's Lakshaman palatial
thyroid case presentation.pptx Kamala's Lakshaman palatial
 

Design and analysis of flexible pavemeT

  • 1. PROJECT ON Design and Analysis of Flexible Pavement Schoolof ManagementSciences (SMSInstituteof Technology) Lucknow Prepared by:- Anshuman Ojha – 1742300006 Deepanshu Pandey – 1742300007 Devesh Kumar Chaurasia – 1742300008 Himanshu Gautam – 1742300009
  • 2. TABLE OF CONTENT PROJECT LOCATION INTRODUCTION TYPES OF PAVEMENT LEVELLING SOIL TESTS LAYERS OF PAVEMENT DESIGN AND ANALSIS OF FLEXIBLE PAVEMENT COST & ESTIMATION PLANT OVERVIEW
  • 4. ROAD DIMENSIONS Total Length of Road = 750meter Road width= 3.7meter
  • 5. INTRODUCTION What is a ROAD ? A road is a thoroughfare, route,or way on land between two places that has been paved or otherwise improved to allow travel by foot or some form of conveyance, including a motor vehicle, cart, bicycle, or horse etc. PAVEMENT A structure consisting of superimposed layers of processed materials above the natural soil subgrade, whose primary function is to distribute the applied vehicleloads to the sub-grade.
  • 6. TYPES OF PAVEMENT There are two types of pavementas follows: 1.Flexible Pavements: Flexible pavement can be defined as the one consisting of a mixture of asphaltic or bituminousmaterial and aggregates. 2.Rigid Pavements: A rigid pavement is constructed from cement concrete or reinforced concrete slabs.
  • 8. Properties Flexible Rigid Design Principle Empirical method Based on load distribution characteristics. Designed and analyzed by using the elastic theory Material Granular material Made of Cement Concrete reinforced or pre stressed concrete Excessive Loading Local depression Causes Cracks Design Practice Constructed in number of layers Laid in slabs with steel reinforcement Opening to Traffic Road can be used for traffic within 24 hours Road cannot be used until 14 days of curing Stress Transmits vertical and compressive stresses to Tensile Stress and Temperature
  • 9. LEVELLING AUTO LEVEL: An auto level is similar to the dumpy level, with its telescope fixed to the tribrach. For more precise leveling of the instrument a spirit level is attached to the telescope. It is used to measure the reduced level of any plane. Using the formula : Height of the Instrument = Back sight+ Reduced Level i.e. HI = BS + RL Here, considering BM= 100
  • 10.
  • 11.
  • 12. PROPOSED METHODOLOGY To meetthe abovementioned objectivesof the presentstudy, following stepsare adopted: 1.WehaveusedCalifornia BearingRatioMethod for designing the Flexible Pavement.With the helpof this method wehave found the thicknessof pavement. 2.TheCodesfor designingof flexible pavementusedareIRC 37:2001– (Guidelinesfor the Designof Flexible),IS: 20:2007. 3.Theinstruments usedareAuto level, PrismaticCompassfor survey work. 4.TheHeight of InstrumentMethod isusedfor levelingpurpose of the ground surface. 5.Mid SectionalArea Method isusedfor Estimatingthe earthwork
  • 13. TESTS There are several types of tests which are as follows: 1. CBR Test 2. Sieve Analysis 3. Dry Density Test 4. Bitumen Test
  • 14. DEFINITION OF C.B.R. :- It is the ratio of force per unit area required to penetratea soil mass with standard circular piston at the rate of 1.25 mm/min. to that required for the corresponding penetration of a standard material. C.B.R. =Test load/Standard load X 100 The same samples were further tested for CBR using Static Compaction with 56blows by standard rammer of 2.6 kg. 1. CBR TEST
  • 18. 2. Sieve Analysis S . no Sieve no mm) Wt. Ret. (kg) %Wt. Ret. Cum % Wt retain % Passin g JHF (BC) 1 19.5 0 0 0 100 100 2 13.2 .350 3.681 3.681 96.319 99.60 3 9.5 2.056 21.628 25.309 74.691 87.98 4 4.75 3.954 41.594 66.903 33.097 58.80 5 2.36 1.496 15.737 82.64 17.36 44.28 6 1.18 1.65 17.357 99.997 .003 34.48 7 Total 9.506
  • 19. 3. Maximum Dry Density Test Test pits were excavated Maximum dry density (MDD) corresponding optimum moisture content (OMC) were determined using standard compaction method and modified method in accordance with IS:10074:1987, BIS 270 (Part-VIII)
  • 20.
  • 22. PROPERTIES OF BITUMEN Bitumen is a sticky, black, and highly viscous liquid or semi-solid form of petroleum. It may be found in natural deposits or may be a refined product, and is classed as a pitch. Before the 20th century, the term asphalt was also used It consists chiefly high molecular weight hydrocarbons derived from distillation of petroleum or natural asphalt. Bitumen is often confused with Tar. Tars are resides from the destructive distillation of organic substances such as coal, wood, or
  • 24. Seal Coat: The seal coat has to be provided which is a thin surface treatment used to water-proof the surface and to provide skid resistance. Tack Coat: It coat is very light application of asphalt, usually asphalt emulsion diluted with water. It must be thin, uniformly cover the entire surface, and set very fast. Prime Coat: Prime coat provides bonding between two layers which penetrates into the layer below, plugs the voids, and forms a water tight surface. That’s why both prime coat and tack coat has to be provided. They both have different functions.
  • 25. Surface course Surface course is the layer directly in contact with traffic loads and generally contains superiorquality materials. They are usually constructed with dense graded asphalt concrete(AC). Binder course This layer provides the bulk of the asphalt concrete structure. It's chief purpose is to distribute load tothe base course The binder course generally consists of aggregates having less asphalt and doesn't require quality as high as the surface course, so replacing a part of the surface course by the binder course results in more economical design.
  • 26. Base course The base course is the layer of material immediately beneath the surface of binder course and it provides additional load distribution and contributes to the sub- surface drainage It may be composed of crushed stone, crushed slag, and other untreated or stabilized materials. Sub-Base course The sub-base course is the layer of material beneath the base course and the primary functions are to provide structural support, improve drainage. A sub-base course is not always needed or used. Sub-grade The top soil or sub-grade is a layer of natural soilprepared to receive the stresses from the layers above. It is essential that at no time soil sub-grade is overstressed. It should be compacted to the desirable density, near the optimum moisture content.
  • 27. Design of a Flexible Pavement: A Flexible Pavement of 750meters patch is being designed in accordance with the charts in IRC37-2012. With reference to the Geotechnical tests and traffic survey performed, the important parameters andtheir values are determined, & on that basis, the design of the pavement isdone. Though, the available width is taken as 4.5 meters, in which the carriageway width is taken as 3.7 metersand shoulders on the either side of the road as 1.00meters, and also the provision of the side drains is made as well.
  • 28. Computation of Design Traffic The design traffic is considered in terms of the cumulative number of standard axles(in the lane carrying maximumtraffic) to be carried during the design life of the road. This can be computed using the following equation:- N = 365 x [ (1+r)n – 1]x Ax D x F/r Where, N = Cumulative number of Standard axles to be catered in the design in terms of use. A =Initial traffic in the year of completion of construction in day. terms of the number of commercial vehiclesper D =Lane distribution factor R=Annual growth rate of commercial vehicles F=Vehicle damage factor N =Design life in years
  • 29.
  • 30. Design Data 1.)According to the test results, the C.B.R. value of the sub-grade soil is found to be =2.93 % 2.) Traffic Vehicle per Day is assumed to be 100CVPD. 3.) Traffic growth rate, to be taken as2%. 4.) Vehicle Damage Factor, for plain terrain = 3.5 5.) Design Life =10 Years. 6.) Distribution Factor = 0.75 7.) Single Lane Road.
  • 31. So the Flexible Pavement thickness according to IRC 37-2012 for 1.05 msa is 635mm.
  • 32. ESTIMATION AND COSTING S.N o Particulars Length (m) Broa d (m) Depth (m) Quantity (cum) Rate (Rs) Amount 1 Subgrade Lime Stabilization for Improving subgrade 750 4.5 0.335 1130.625 157 177,508.125 2 Granular Sub Base with Coarse Graded Material 750 4.5 0.225 759.375 719 545,990.625 3 Base coarse Bituminous Macadam 750 3.7 0.050 138.75 799 110,861.25 4 Surface coarse Bituminous Macadam 750 3.7 0.025 69.375 6808 472,305 5 Total Cost 13,06,665
  • 33. PLANT OVERVIEW  For the construction of bitumen concrete pavement there is requirement of mix plant which ready the material for laying the pavement. Types of Plant : 1.Batch Mix Plant 2.Drum Mix Plant We’ll use DRUM MIX PLANT for mixing the materials.
  • 34. DRUM MIX PLANT  The name of the plant is DRUM MIX 5O.  In this there is a cylindrical drum in which mixing is done.
  • 35.
  • 36. PLANT  Water Pump  Gathering Conveyer  Slinger Conveyer  Drum  Load out Conveyer Exhauster Feeder Bitumen Tank Temperature Gun
  • 37. MACHINES USED FOR THE ROAD CONSTRUCTION BACK HOE LOADER