This document discusses types of grading and reporting in education. It defines grading as applying standardized measurements to student achievement using methods like percentages, letters, or descriptors. The main types of grading discussed are percentage grading, letter grading, standards-based grading, narrative grading, norm-referenced grading, mastery grading, and pass/fail grading. Reporting is defined as communicating student achievement and progress over time. The types of reporting covered are informational reporting, analytical reporting, routine reporting, special reports, formal reporting, informal reporting, and parent-teacher conference reporting.